Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Considerations For Waste-to-Base Future Research Paths

Developing innovative technologies to reprocess low value waste into high value base products will enable a new “Waste-to-Base” (WtB) capability leading to innovative approaches to space mission design. Systems engineers and mission architects will work together under a new paradigm in logistics planning. Equipment, components, packaging, storage, and structures will be understood not only by functional requirements, but also in terms of useful lifetimes and materials of construction. The advent of a new technical discipline - reprocess engineering - will grow from the intersection between chemical, mechanical, and systems engineering, mission design, and logistics planning. A crowdsourcing approach was employed to gather low Technology Readiness Level (TRL) concepts into workable solutions for issues in trash management, CO 2 processing, foam reprocessing, and fecal processing. The results of the crowdsourcing activities are summarized along with a discussion for future technology development work.

Logistics reduction↗

Considerations For Waste-to-Base Future Research Paths

Developing innovative technologies to reprocess low value waste into high value base products will enable a new “Waste-to-Base” (WtB) capability leading to innovative approaches to space mission design. Systems engineers and mission architects will work together under a new paradigm in logistics planning. Equipment, components, packaging, storage, and structures will be understood not only by functional requirements, but also in terms of useful lifetimes and materials of construction. The advent of a new technical discipline - reprocess engineering - will grow from the intersection between chemical, mechanical, and systems engineering, mission design, and logistics planning. A crowdsourcing approach was employed to gather low Technology Readiness Level (TRL) concepts into workable solutions for issues in trash management, CO2 processing, foam reprocessing, and fecal processing. The results of the crowdsourcing activities are summarized along with a discussion for future technology development work.

Logistics reduction↗

Technical Findings, Lessons Learned, and Recommendations Resulting from the Helios Prototype Vehicle Mishap

The Helios Prototype was originally planned to be two separate vehicles, but because of resource limitations only one vehicle was developed to demonstrate two missions. The vehicle consisted of two configurations, one for each mission. One configuration, designated HP01, was designed to operate at extremely high altitudes using batteries and high-efficiency solar cells spread across the upper surface of its 247-foot wingspan. On August 13, 2001, the HP01 configuration reached an altitude of 96,863 feet, a world record for sustained horizontal flight by a winged aircraft. The other configuration, designated HP03, was designed for long-duration flight. The plan was to use the solar cells to power the vehicle's electric motors and subsystems during the day and to use a modified commercial hydrogen-air fuel cell system for use during the night. The aircraft design used wing dihedral, engine power, elevator control surfaces, and a stability augmentation and control system to provide aerodynamic stability and control. At about 30 minutes into the second flight of HP03, the aircraft encountered a disturbance in the way of turbulence and morphed into an unexpected, persistent, high dihedral configuration. As a result of the persistent high dihedral, the aircraft became unstable in a very divergent pitch mode in which the airspeed excursions from the nominal flight speed about doubled every cycle of the oscillation. The aircraft s design airspeed was subsequently exceeded and the resulting high dynamic pressures caused the wing leading edge secondary structure on the outer wing panels to fail and the solar cells and skin on the upper surface of the wing to rip away. As a result, the vehicle lost its ability to maintain lift, fell into the Pacific Ocean within the confines of the U.S. Navy's Pacific Missile Range Facility, and was destroyed. This paper describes the mishap and its causes, and presents the technical recommendations and lessons learned for improving the design, analysis, and testing methods and techniques required for this class of vehicle.

Noll, Thomas E.↗

Joint US/Soviet docking mission.

The purpose and objectives of the joint Apollo/Soyuz experimental test flight, the technical requirements and anticipated solutions necessary to meet the objectives, the mission plan, the flight vehicles, the schedule, and the expected results of successfully completing such a project are discussed. The androgynous feature of the docking system is provided by a symmetrical distribution of all elements which are directly connected during docking, relative to the axis of reverse symmetry. Both the American and Russian systems are designed to serve as either the active or passive system for docking and undocking.

Scott, D. R.↗

Advanced space program studies: Overall executive summary

Studies were conducted to provide NASA with advanced planning analyses which relate integrated space program goals and options to credible technical capabilities, applications potential, and funding resources. The studies concentrated on the following subjects: (1) upper stage options for the space transportation system based on payload considerations, (2) space servicing and standardization of payloads, (3) payload operations, and (4) space transportation system economic analyses related to user charges and new space applications. A systems cost/performance model was developed to synthesize automated, unmanned spacecraft configurations based on the system requirements and a list of equipments at the assembly level.

Sitney, L. R.↗

Feasibility study of an Integrated Program for Aerospace vehicle Design (IPAD). Volume 6: IPAD system development and operation

The strategy of the IPAD implementation plan presented, proposes a three phase development of the IPAD system and technical modules, and the transfer of this capability from the development environment to the aerospace vehicle design environment. The system and technical module capabilities for each phase of development are described. The system and technical module programming languages are recommended as well as the initial host computer system hardware and operating system. The cost of developing the IPAD technology is estimated. A schedule displaying the flowtime required for each development task is given. A PERT chart gives the developmental relationships of each of the tasks and an estimate of the operational cost of the IPAD system is offered.

Redhed, D. D.↗

Second Eastern Regional Remote Sensing Applications Conference

Participants from state and local governments share experiences in remote sensing applications with one another and with users in the Federal government, universities, and the private sector during technical sessions and forums covering agriculture and forestry; land cover analysis and planning; surface mining and energy; data processing; water quality and the coastal zone; geographic information systems; and user development programs.

Imhoff, M. L.↗

Teleoperator human factors study

The progress made on the Teleoperator Human Factors Study program during the period of September 7, 1985 to October 6, 1985 is discussed. Technical and programmatic problems that were encountered are discussed along with activity planned for the following month. The main portion of the report has been separated into four sections: Work Performed, Future Work, Problems Encountered, and Cost Information.

Bradford, K. Z.↗

Space platform expendables resupply concept definition study. Volume 3: Work breakdown structure and work breakdown structure dictionary

The work breakdown structure (WBS) for the Space Platform Expendables Resupply Concept Definition Study is described. The WBS consists of a list of WBS elements, a dictionary of element definitions, and an element logic diagram. The list and logic diagram identify the interrelationships of the elements. The dictionary defines the types of work that may be represented by or be classified under each specific element. The Space Platform Expendable Resupply WBS was selected mainly to support the program planning, scheduling, and costing performed in the programmatics task (task 3). The WBS is neither a statement-of-work nor a work authorization document. Rather, it is a framework around which to define requirements, plan effort, assign responsibilities, allocate and control resources, and report progress, expenditures, technical performance, and schedule performance. The WBS element definitions are independent of make-or-buy decisions, organizational structure, and activity locations unless exceptions are specifically stated.

Source record↗

X-ray satellite

As far as technical performance is concerned, the project is still within the previously arranged plan and as far as the launching possibilities are conserned, there is a change from the previous situation. A launch date in 1989 can only be realized with a Delta II, since there is no data available at present for the Atlas/Centaur as to whether and when production will resume.

Source record↗

An application of artificial intelligence to automatic telescopes

Automatic Photoelectric Telescopes (APT's) allow an astronomer to be removed form the telescope site in both time and space. APT's 'execute' an observation program (a set of observation requests) expressed in an ASCII-based language (ATIS) and collect observation results expressed in this same language. The observation program is currently constructed by a Principal Astronomer from the requests of multiple users; the execution is currently controlled by a simple heuristic dispatch scheduler. Research aimed at improving the use of APT's is being carried out by the Entropy Reduction Engine (ERE) project at NASA Ames. The overall goal of the ERE project is the study and construction of systems that integrate planning, scheduling, and control. This paper discusses the application of some ERE technical results to the improvement of both the scheduling and the operation of APT's.

Swanson, Keith↗

Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team

Personnel representing several NASA field centers have formulated a "Reference Mission" addressing human exploration of Mars. This report summarizes their work and describes a plan for the first human missions to Mars, using approaches that are technically feasible, have reasonable risks, and have relatively low costs. The architecture for the Mars Reference Mission builds on previous work of the Synthesis Group (1991) and Zubrin's (1991) concepts for the use of propellants derived from the Martian Atmosphere. In defining the Reference Mission, choices have been made. In this report, the rationale for each choice is documented; however, unanticipated technology advances or political decisions might change the choices in the future.

Stephen J Hoffman↗

Formal Methods Specification and Analysis Guidebook for the Verification of Software and Computer Systems: A Practitioner's Companion - Volume 2

This guidebook, the second of a two-volume series, is intended to facilitate the transfer of formal methods to the avionics and aerospace community. The 1st volume concentrates on administrative and planning issues [NASA-95a], and the second volume focuses on the technical issues involved in applying formal methods to avionics and aerospace software systems. Hereafter, the term "guidebook" refers exclusively to the second volume of the series. The title of this second volume, A Practitioner's Companion, conveys its intent. The guidebook is written primarily for the nonexpert and requires little or no prior experience with formal methods techniques and tools. However, it does attempt to distill some of the more subtle ingredients in the productive application of formal methods. To the extent that it succeeds, those conversant with formal methods will also nd the guidebook useful. The discussion is illustrated through the development of a realistic example, relevant fragments of which appear in each chapter. The guidebook focuses primarily on the use of formal methods for analysis of requirements and high-level design, the stages at which formal methods have been most productively applied. Although much of the discussion applies to low-level design and implementation, the guidebook does not discuss issues involved in the later life cycle application of formal methods.

Source record↗

Capacitance Meter

Anders Precision Instrument Co.'s original meter could not measure dissipation leakage in capacitors. Seeking to add that capability, the company planned an advanced model. Before starting work, company president, Thomas Anderson, sought technical assistance from NASA's NERAC (New England Research Application Center). Anderson wanted a survey of the status and capabilities of NASA's electronic measuring devices. NERAC performed a search of six databases, including NASA's and provided a comprehensive report on state of the art worldwide.

Source record↗