Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

STARPAHC. Part 1: Final summary report

A ground-based demonstration of IMBLMS Space Technology was conducted in a remote geographical area of the U.S. The STARPAHC program, designed to improve the capability for delivering health care to the Papago Indians, is divided into three areas: (1) design and definition; (2) system assembly, test, installation, checkout, and training; and (3) operations and evaluation. The accomplishments achieved in the program are summarized emphasizing system requirements in the areas of communication, specialized medical equipment, display, and computer software. Budgetary history and future cost plans are presented and planned activities are summarized.

Riley, F. E.↗

Conduct overall test operations and evaluate two Doppler systems to detect, track and measure velocities in aircraft wake vortices

A program plan for system evaluation of the two-dimensional Scanning Laser Doppler System (SLDS) is presented. In order to meet system evaluation and optimization objectives the following tests were conducted: (1) noise tests; (2) wind tests; (3) blower flowfield tests; (4) single unit (1-D) flyby tests; and (5) dual unit (2-D) flyby tests. Test results are reported. The final phase of the program included logistics preparation, equipment interface checkouts, and data processing. It is concluded that the SLDS is capable of accurately tracking aircraft wake vortices from small or large aircraft, and in any type of weather.

Wilson, D. J.↗

Apollo experience report: Electrical wiring subsystem

The general requirements of the electrical wiring subsystems and the problem areas and solutions that occurred during the major part of the Apollo Program are detailed in this report. The concepts and definitions of specific requirements for electrical wiring; wire-connecting devices; and wire-harness fabrication, checkout, and installation techniques are discussed. The design and development of electrical wiring and wire-connecting devices are described. Mission performance is discussed, and conclusions and recommendations for future programs are presented.

White, L. D.↗

Tug fleet and ground operations schedules and controls. Volume 2: part 2, addenda

The results of a study to assess the tug safing requirements at postlanding are presented. The study considered the normal (green light) conditions from orbiter landing to completion of preparations for the next launch. Normal tug ground turnaround operations include handling and transportation activities and the performance of inspections, tests, and checkout functions. These activities dictate that hazards to ground personnel, the tug, GSE, facilities, and ecology be reduced to the lowest practical level consistent with program objectives, cost, and schedules. During flight operations, the tug contains energy sources that constitute potential hazards but are required for mission accomplishment. These potential hazards have been reduced to an acceptable level for flight operation by design features and by providing for control of energy sources.

Source record↗

Spacelab user implementation assessment study. Volume 1: Concept development and evaluation

The total matrix of alternate Spacelab processing concepts and the rejection rationale utilized to reduce the matrix of 243 alternates to the final candidate processing concepts are developed. The work breakdown structure used for the systematic estimation and compilation of integration and checkout resources is presented along with descriptors of each element. Program models are provided of the space transportation system, the Spacelab, the orbiter, and the ATL that were used as the basis for the study trades, analyses, and optimizations. Resource requirements for all processing concepts are summarized along with the optimizations of the processing concepts. Concept evaluations including flight-rate sensitivities of the GSE, facilities, Spacelab hardware elements, and personnel are delineated. An analysis is presented of the applicability of the candidate concepts to potential spacelab users. The impact of the use of the western test range as an orbiter/spacelab launch site on the candidate processing concepts is evaluated. An assessment of the geographical co-location of experiment, Spacelab, and orbiter-cargo integration is included. Ownership options of the support module/system igloo are discussed.

Source record↗

Spacelab user implementation assessment study. Volume 2: Concept optimization

The integration and checkout activities of Spacelab payloads consist of two major sets of tasks: support functions, and test and operations. The support functions are definitized and the optimized approach for the accomplishment of these functions are delineated. Comparable data are presented for test and operations activities.

Source record↗

Solar residential heating and cooling system development test program

A solar heating and cooling system is described, which was installed in a simulated home at Marshall Space Flight Center. Performance data are provided for the checkout and initial operational phase for key subsystems and for the total system. Valuable information was obtained with regard to operation of a solar cooling system during the first summer of operation. Areas where improvements and modifications are required to optimize such a system are discussed.

Humphries, W. R.↗

Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report

Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

Source record↗

The development of a solar residential heating and cooling system

The MSFC solar heating and cooling facility was assembled to demonstrate the engineering feasibility of utilizing solar energy for heating and cooling buildings, to provide an engineering evaluation of the total system and the key subsystems, and to investigate areas of possible improvement in design and efficiency. The basic solar heating and cooling system utilizes a flat plate solar energy collector, a large water tank for thermal energy storage, heat exchangers for space heating, and an absorption cycle air conditioner for space cooling. A complete description of all systems is given. Development activities for this test system included assembly, checkout, operation, modification, and data analysis, all of which are discussed. Selected data analyses for the first 15 weeks of testing are included, findings associated with energy storage and the energy storage system are outlined, and conclusions resulting from test findings are provided. An evaluation of the data for summer operation indicates that the current system is capable of supplying an average of 50 percent of the thermal energy required to drive the air conditioner. Preliminary evaluation of data collected for operation in the heating mode during the winter indicates that nearly 100 percent of the thermal energy required for heating can be supplied by the system.

Source record↗

Repair of major system elements on Skylab

In-flight maintenance, as conceived and preplanned for the Skylab mission was limited to simple scheduled and unscheduled replacement tasks and minor contingency repairs. Tools and spares were provided accordingly. However, failures during the mission dictated complicated and sophisticated repairs to major systems so that the mission could continue. These repairs included the release of a large structure that failed to deploy, the assembly and deployment of large mechanical devices, the installation and checkout of precision electronic equipment, troubleshooting and repair of precision electromechanical equipment, and tapping into and recharging a cooling system. The repairs were conducted both inside the spacecraft and during extravehicular activities. Some of the repair tasks required team effort on the part of the crewmen including close procedural coordination between internal and extravehicular crewmen. The Skylab experience indicates that crewmen can, with adequate training, make major system repairs in space using standard or special tools. Design of future spacecraft systems should acknowledge this capability and provide for more extensive in-flight repair and maintenance.

Pace, R. E., Jr.↗

IUS/TUG orbital operations and mission support study. Volume 3: Space tug operations

A study was conducted to develop space tug operational concepts and baseline operations plan, and to provide cost estimates for space tug operations. Background data and study results are presented along with a transition phase analysis (the transition from interim upper state to tug operations). A summary is given of the tug operational and interface requirements with emphasis on the on-orbit checkout requirements, external interface operational requirements, safety requirements, and system operational interface requirements. Other topics discussed include reference missions baselined for the tug and details for the mission functional flows and timelines derived for the tug mission, tug subsystems, tug on-orbit operations prior to the tug first burn, spacecraft deployment and retrieval by the tug, operations centers, mission planning, potential problem areas, and cost data.

Source record↗

Apollo experience report: Engineering and analysis mission support

The tasks performed by the team of specialists that evaluated hardware performance during prelaunch checkout and in-flight operation are discussed. The organizational structure, operational procedures, and interfaces as well as the facilities and software required to perform these tasks are discussed. The scope of the service performed by the team and the evaluation philosophy are described. Summaries of problems and their resolution are included as appendixes.

Fricke, R. W., Jr.↗

Space tug avionics definition study. Volume 3: Avionics baseline configuration definition

The baseline avionics systems for the space tug is comprised of a central digital computer that integrates the functions of all of the tug's subsystems by means of a redundant digital data bus. The major subsystems of the avionics system are: data management; communications; guidance, navigation, and control; rendezvous and docking; electrical power; and instrumentation. The baseline avionics system for the space tug resulting from system and subsystem trade studies is defined. Tug interfaces with the spacecraft, orbiter and the ground, and the baseline philosophy and configuration for onboard checkout of the tug are included. Baseline configurations, functional and operational features, component details and characteristics, and the supporting software are included in the subsystem descriptions.

Source record↗

A leading edge heating array and a flat surface heating array - operation, maintenance and repair manual

A general description of the leading edge/flat surface heating array is presented along with its components, assembly instructions, installation instructions, operation procedures, maintenance instructions, repair procedures, schematics, spare parts lists, engineering drawings of the array, and functional acceptance test log sheets. The proper replacement of components, correct torque values, step-by-step maintenance instructions, and pretest checkouts are described.

Source record↗

Shuttle ground turnaround operations

It is pointed out that a Shuttle turnaround of two weeks will require new innovative and creative ideas for ground operations. The approach selected implements proven techniques and reduces system level checkout as performance confidence is achieved. Details of operational turnaround are discussed, giving attention also to external tank processing, solid rocket booster (SRB) processing, the SRB recovery concept, and payload processing.

Buckley, R. H.↗