Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Measurements of flow phenomena induced by suction through perforated and partially plugged surfaces

Efforts were directed towards completing construction of the windtunnel test section, assembling instrumentation, programming the data acquisition and reduction system, adjusting the streamwise pressure gradient of the test section, calibrating the hot-wire anemometer probe, and constructing and testing a smoke generator. The test section was installed in the wind tunnel and is completely operational. The streamwise pressure gradient was adjusted to be nominally zero at a free-stream velocity of 3.05 m/s (10 ft/s). This was accomplished by adjusting the upper wall of the test section to be slightly divergent. The change in static pressure between any two streamwise locations in the test section was less than one percent of the free-stream dynamic pressure. A suitable means was found for accurately calibrating the hot-wire probe which is used to measure boundary-layer velocity profiles and fluctuating velocities.

Wilkinson, S. P.↗

Life Testing of the Vapor Compression Distillation Urine Processing Assembly (VCD/UPA) at the Marshall Space Flight Center

Wastewater and urine generated on the International Space Station will be processed to recover pure water. The method selected is vapor compression distillation (VCD). To verify the long-term reliability and performance of the VCD Urine Processing Assembly (UPA), accelerated life testing was performed at the Marshall Space Flight Center (MSFC) from January 1993 to April 1996. Two UPAS, the VCD-5 and VCD-5A, were tested for 204 days and 665 days, respectively. The compressor gears and the distillation centrifuge drive belt were found to have an operating life of approximately 4800 hours. Precise alignment of the flex-spline of the fluids pump is essential to avoid failure of the pump after about 400 hours of operation. Also, leakage around the seals of the drive shaft of the fluids pump and purge pump must be eliminated for continued good performance. Results indicate that, with some design and procedural modifications and suitable quality control, the required performance and operational life can be met with the VCD/UPA.

Wieland, Paul O.↗

Testing and Comparative Evaluation of Space Shuttle Main Engine Flowmeter Bearings

This paper provides a summary of testing of Space Shuttle Main Engine (SSME) flowmeter bearings and cage material. These tests were con&cM over a several month period in 2004 at the Marshall Space Flight Center. The test program's primary objective was to compare the performance of bearings using the existing cage material and bearings using a proposed replacement cage material. In order to meet the test objectives for this program, a flowmeter test rig was designed and fabricated to measure both breakaway and running torque for a flowmeter assembly. Other test parameters,,such as motor current and shaft speed, were also recorded and provide a means of comparing bearing performance. The flowmeter and bearings were tested in liquid hydrogen to simulate the flowmeter's operating environment as closely as possible. Based on the results from this testing, the bearings with the existing cage material are equivalent to the bearings with the proposed replacement cage material. No major differences exist between the old and new cage materials. Therefore, the new cage material is a suitable replacement for the existing cage material.

Hissam, Andy↗

Ames Research Center Life Sciences Payload Project for Spacelab Mission 3

The Research Animal Holding Facility, developed to support rodent and squirrel monkey animal husbandry in the Spacelab environment, is to be tested during the Spacelab Mission 3 flight. The configuration and function of the payload hardware elements, the assembly and test program, the operational rationale, and the scientific approach of this mission are examined. Topics covered include animal life support systems, the squirrel monkey restraint, the camera-mirror system, the dynamic environment measurement system, the biotelemetry system, and the ground support equipment. Consideration is also given to animal pretests, loading the animals during their 12 hour light cycle, and animal early recovery after landing. This mission will be the first time that relatively large samples of monkeys and rats will be flown in space and also cared for and observed by man.

Callahan, P. X.↗

Brayton cycle solarized advanced gas turbine

Described is the development of a Brayton Engine/Generator Set for solar thermal to electrical power conversion, authorized under DOE/NASA Contract DEN3-181. The objective was to design, fabricate, assemble, and test a small, hybrid, 20-kW Brayton-engine-powered generator set. The latter, called a power conversion assembly (PCA), is designed to operate with solar energy obtained from a parobolic dish concentrator, 11 meters in diameter, or with fossil energy supplied by burning fuels in a combustor, or by a combination of both (hybrid model). The CPA consists of the Brayton cycle engine, a solar collector, a belt-driven 20-kW generator, and the necessary control systems for automatic operation in solar-only, fuel-only, and hybrid modes to supply electrical power to a utility grid. The original configuration of the generator set used the GTEC Model GTP36-51 gas turbine engine for the PCA prime mover. However, subsequent development of the GTEC Model AGT101 led to its selection as the powersource for the PCA. Performance characteristics of the latter, thermally coupled to a solar collector for operation in the solar mode, are presented. The PCA was successfully demonstrated in the fuel-only mode at the GTEC Phoenix, Arizona, facilities prior to its shipment to Sandia National Laboratory in Albuquerque, New Mexico, for installation and testing on a test bed concentractor (parabolic dish). Considerations relative to Brayton-engine development using the all-ceramic AGT101 when it becomes available, which would satisfy the DOE heat engine efficiency goal of 35 to 41 percent, are also discussed in the report.

Source record↗

Tests of an alternate mobile transporter and extravehicular activity assembly procedure for the Space Station Freedom truss

Results are presented from a ground test program of an alternate mobile transporter (MT) concept and extravehicular activity (EVA) assembly procedure for the Space Station Freedom (SSF) truss keel. A three-bay orthogonal tetrahedral truss beam consisting of 44 2-in-diameter struts and 16 nodes was assembled repeatedly in neutral buoyancy by pairs of pressure-suited test subjects working from astronaut positioning devices (APD's) on the MT. The truss bays were cubic with edges 15 ft long. All the truss joint hardware was found to be EVA compatible. The average unit assembly time for a single pair of experienced test subjects was 27.6 sec/strut, which is about half the time derived from other SSF truss assembly tests. A concept for integration of utility trays during truss assembly is introduced and demonstrated in the assembly tests. The concept, which requires minimal EVA handling of the trays, is shown to have little impact on overall assembly time. The results of these tests indicate that by using an MT equipped with APD's, rapid EVA assembly of a space station-size truss structure can be expected.

Heard, Walter L., Jr.↗

Effect of thermal cycling ramp rate on CSP assembly reliability

A JPL-led chip scale package consortium of enterprises recently joined together to pool in-kind resources for developing the quality and reliability of chip scale packages for a variety of projects. The experience of the consortium in building more than 150 test vehicle assemblies, single and double sided multilayer PWBs, and the environmental test results has now been published as a chip scale package guidelines document.

accelerated thermal cycle chip scale package solde↗

Integrated Advanced Microwave Sounding Unit-A(AMSU-A). Performance Verification Report, METSAT Phase Locked Oscillator Assembly, P/N 1348360-1, S/N's F07 and F08

Two Flight Model AMSU-A Phase Locked Oscillators (PIN 1348360-1, S/N F07 and F08) have been tested per AES Test Procedure AE-26758 Rev. B, which include full functional testing, vibration testing, thermal testing, and AM/FM Noise testing. Both assemblies satisfactorily passed all performance requirements of the AE-26633 Product Specification. During the thermal cycling of both units, spurs developed 1 MHz from the carrier when the units were cold, and TARs were written to document the anomaly. The symptoms observed in both cases were consistent with inadequate tuning. The units were successfully re-tuned. In the case of F08, re-tuning required a design change which allowed a greater range of possible values for tuning resisters. Both units completed thermal cycling without further delay. The results of the required tests are presented in the following section as test data. As indicated on the test data sheets, all measured data passed all requirements.

Pines, D.↗

Experimental system for the control of surgically induced infections

The development tests to be performed on the experimental system are described in detail. The test equipment, conditions, and procedures are given. The portable clean room tests include assembly, collapsability, portability, and storage; laminar flow rate; static pressure; air flow pattern; and electrostatic buildup. The other tests are on the ventilation system, human factors evaluation, electrical subsystem, and material compatibility.

Tevebaugh, M. D.↗

L’Ralph Integration and Testing

This paper describes the plans, flows, key facilities, components and equipment necessary to fully integrate, functionally test, qualify and calibrate the L’Ralph instrument on the Lucy observatory. Lucy is currently in the final design and fabrication phase (phase C) of mission development. It is scheduled to launch out of Cape Canaveral, Florida, in October 2021. Lucy will be the first space mission to study the Trojan asteroids associated with Jupiter, that are thought to be remnants of the primordial material that formed the outer planets. Lucy will fly by and carry out remote sensing on six different Trojan asteroids. The mission takes its name from the fossilized human ancestor (called “Lucy” by her discoverers) whose skeleton provided unique insight into humanity's evolution. Likewise, the Lucy mission will revolutionize our knowledge of planetary origins and the formation of the solar system. L’Ralph is one of the instruments on Lucy and it is provided by the NASA Goddard Space Flight Center (GSFC). L’Ralph is a combined multi-band visible imager (the Multi-spectral Visible Imaging Camera, MVIC, 0.4-0.85 microns) and wedge-filter infrared spectrometer (Linear Etalon Imaging Spectral Array, LEISA, 1-3.6 microns). LEISA will allow the team to look for the absorption lines that serve as the fingerprints for different silicates, ices and organics that likely will be on the surface of the Trojan asteroids. MVIC will take color images of the Trojan asteroid targets, and help determine how active they are. This paper will focus on the Integration and Test (I&T) activities for L’Ralph while it is at the NASA GSFC. L’Ralph has two assemblies, the telescope detector assembly (TDA) and main electronics box (MEB). The TDA is a single telescope feeding two focal planes, MVIC and LEISA. L’Ralph integration consists of assembly and alignment of the telescope, electronics box integration, thermal systems integration and the final assembly and testing. This I&T phase will be followed by the L’Ralph calibration and characterization, environmental tests which include electromagnetic interference (EMI)/electromagnetic compatibility (EMC), vibration with sine sweep, acoustics, shock, thermal balance, thermal vacuum, mass properties and center of gravity determination. This paper will briefly discuss L’Ralph shipment and delivery to the spacecraft vendor for observatory level I&T as well as some launch preparation activities.

Spaceflight Instruments↗

Telerobotics test bed for space structure assembly

A cooperative research on super long distance space telerobotics is now in progress both in Japan and USA. In this program. several key features will be tested, which can be applicable to the control of space robots as well as to terrestrial robots. Local (control) and remote (work) sites will be shared between Electrotechnical Lab (ETL) of MITI in Japan and Jet Propulsion Lab (JPL) in USA. The details of a test bed for this international program are discussed in this report.

Kitami, M.↗

High pressure pulsed capillary viscometry

An analytical and test program was conducted in order to establish the feasibility of a multichamber pulsed-capillary viscometer. The initial design incorporated a piston, ram, and seals which produced measured pulses up to 30,000 psi in the closed chamber system. Pressure pulses from one to ten milliseconds were investigated in a system volume of 1 cuin. Four test fluids: a MIL-L-7808, a 5P4E polyphenyl ether, a MIL-L-23699A, and a synthetic hydrocarbon were examined in the test pressure assembly. The pressure-viscosity coefficient and viscosity delay time were determined for the MIL-L-7808 lubricant tested.

Smith, R. L.↗

AVHRR/1-FM Advanced Very High Resolution Radiometer

The advanced very high resolution radiometer is discussed. The program covers design, construction, and test of a breadboard model, engineering model, protoflight model, mechanical/structural model, and a life test model. Special bench test and calibration equipment was developed for use on the program. The flight model program objectives were to fabricate, assemble and test four of the advanced very high resolution radiometers along with a bench cooler and collimator.

Source record↗

Large-Scale Hollow Retroreflectors for Lunar Laser Ranging at Goddard Space Flight Center

Laser ranging to the retroreflector arrays placed on the lunar surface by the Apollo astronauts and the Soviet Luna missions have dramatically increased our understanding of gravitational physics along with Earth and Moon geophysics, geodesy, and dynamics. Although the precision of the range measurements has historically been limited by the ground station capabilities, advances in the APOLLO instrument at the Apache Point facility in New Mexico is beginning to be limited by errors associated with the lunar arrays. We report here on efforts at Goddard Space Flight Center to develop the next generation of lunar retroreflectors. We will describe a new facility that is being used to design, assemble, and test large-scale hollow retroreflectors. We will also describe results from investigations into various bonding techniques used to assemble the open comer cubes and mirror coatings that have dust mitigation properties.

Preston, Alix↗

Development Status of the Fission Power System Technology Demonstration Unit

This paper summarizes the progress that has been made in the development of the Fission Power System Technology Demonstration Unit (TDU). The reactor simulator core and Annular Linear Induction Pump have been fabricated and assembled into a test loop at the NASA Marshall Space Flight Center. A 12 kWe Power Conversion Unit (PCU) is being developed consisting of two 6 kWe free-piston Stirling engines. The two 6 kWe engines have been fabricated by Sunpower Inc. and are currently being tested separately prior to integration into the PCU. The Facility Cooling System (FCS) used to reject convertor waste heat has been assembled and tested at the NASA Glenn Research Center (GRC). The structural elements, including a Buildup Assembly Platform (BAP) and Upper Truss Structure (UTS) have been fabricated, and will be used to test cold-end components in thermal vacuum prior to TDU testing. Once all components have been fully tested at the subsystem level, they will be assembled into an end-to-end system and tested in thermal vacuum at GRC.

Briggs, Maxwell H.↗

Development Status of the Fission Power System Technology Demonstration Unit

This paper summarizes the progress that has been made in the development of the Fission Power System Technology Demonstration Unit (TDU). The reactor simulator core and Annular Linear Induction Pump have been fabricated and assembled into a test loop at the NASA Marshall Space Flight Center. A 12 kWe Power Conversion Unit (PCU) is being developed consisting of two 6 kWe free-piston Stirling engines. The two 6 kWe engines have been fabricated by Sunpower Inc. and are currently being tested separately prior to integration into the PCU. The Facility Cooling System (FCS) used to reject convertor waste heat has been assembled and tested at the NASA Glenn Research Center (GRC). The structural elements, including a Buildup Assembly Platform (BAP) and Upper Truss Structure (UTS) have been fabricated, and will be used to test cold-end components in thermal vacuum prior to TDU testing. Once all components have been fully tested at the subsystem level, they will be assembled into an end-to-end system and tested in thermal vacuum at NASA GRC.

Briggs, Maxwell H.↗

Design, Fabrication and Testing of 30-cm Dia. Dished Carbon-Carbon Ion Engine Grids

Two sets of 30-cm dia. dished carbon-carbon ion engine grid sets were fabricated, assembled and tested. The carbon-carbon grid blanks were fabricated from unidirectional prepreg tape, having a very high fiber volume fraction of 57 percent and resulting in the strongest quasi-isotropic carbon-carbon material known to the authors. The flexural modulus of the panel material was measured at 275 MPa, corresponding to 80 percent of the value of molybdenum.

ion↗