Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

NASA GeneLab Platform Utilized for Space Radiation Dosimetry Biological Response Compared to Radiation Ground Studies

Ionizing radiation from Galactic Cosmic Rays (GCR) is one of the major risk factors factor that will impact health of astronauts on extended missions outside the protective effects of the Earth's magnetic field. Currently there are gaps in our knowledge of the health risks associated with chronic low dose, low dose rate ionizing radiation, specifically ions associated with high (H) atomic number (Z) and energy (E). The NASA GeneLab project (genelab.nasa.gov) aims to provide a detailed library of Omics datasets associated with biological samples exposed to HZE. The GeneLab Data System (GLDS) includes datasets from both spaceflight and ground-based studies, a majority of which involved exposure to ionizing radiation. Recently GeneLab has also assessed radiation dosimetry data with omics datasets associated with samples flown to the International Space Station (ISS). The combination of the detailed information on radiation exposure for ground-based studies and curated dosimetry information for spaceflight experiments allows GeneLab to be the first comprehensive Omics database for space related research from which an investigator can generate hypotheses to direct future experiments utilizing both ground and space biological radiation data. We demonstrate the usefulness of these datasets by analyzing multiple GeneLab datasets associated with both radiation ground-based studies and spaceflight studies. The radiation ground based studies we analyzed includes both in vivo and in vitro work with a range ions from protons to iron particles with doses from 0.1Gy to 2Gy. These datasets were compared to both in vivo and in vitro datasets from samples flown to the ISS and on shorter shuttle missions with total doses of 0.1 mGy to 30 mGys. From this analysis we were able to associate distinct biological signatures associating specific ions to specific biological response to radiation exposure in space. For example, we discovered radiation biological response related to cardiovascular effects from proton ground studies are the dominating response for samples related to cardiovascular effects on the ISS. With this work we will provide a summary of how different ions will impact different biological response in space and how this can be used in future studies to assess optimal ground experiments to simulate space radiation.

Beheshti, Afshin↗

Mars Small Spacecraft Studies: Overview

NASA’s Mars Exploration Program is studying a potential Mars Sample Return (MSR) campaign consisting of a series of missions over the next decade that would return samples collected at Mars for analyses in terrestrial laboratories. It is anticipated that during such a campaign, many in the Mars science community would seek to continue high-priority science investigations in parallel to those provided by geological and astrobiological sample return investigations. To respond to this anticipated desire of the science community, JPL is performing a study of small spacecraft mission concepts to Mars that could bridge the gap between MSR and other desired science investigations at Mars. The goal of the study is to utilize smaller, affordable missions in performing highpriority science investigations as defined in the National Academy of Sciences Decadal Survey, Mars Exploration Program Analysis Group (MEPAG) goals, and Human Exploration and Operations (HEO) Strategic Knowledge Gaps. The study targets the use of small spacecraft with greater science capability than currently achievable with CubeSats. The target spacecraft wet mass is approximately 100 to 350 kilograms. Methods of access to Mars considered in this study include a self-propelled transit from Earth geosynchronous transfer orbit (GTO) to Mars as a secondary payload in a rideshare configuration. The study investigates mission concepts, science objectives, mission designs, concept of operations, enhancing technologies, and mission costs, along with launch vehicle interfaces. The cost estimates of the mission concepts studied range from below $100 million to less than $300 million for development through launch. This paper concludes with an outline of several examples of small spacecraft mission concepts to Mars that demonstrate significant scientific capability, are technically feasible, and fit within the desired cost range.

Edwards, Charles D.↗

Framework for NASA Space Relay Satellite Services over the Next Decade: Space Relay Partnership and Services Study

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, the anticipated initial NASA near-Earth space relay operating capability over the next decade will be comprised of the existing NASA-owned Space Network infrastructure supplemented with commercially-owned and -provided relay satellites and their associated ground stations. NASA awarded contracts to eight study vendors in May 2019 to investigate the feasibility of applying commercial services concepts to the NASA user mission community. The studies, managed by NASA Glenn Research Center, detailed ten study topic areas. NASA completed the analysis and synthesis of these eight industry studies and other relevant information. The responses from the study vendors indicated a strong interest in providing commercial services to NASA missions, and included a wide range of proposed architectures and demonstration ideas. Overall, the responses indicated that a mature and healthy competitive environment exists across a broad spectrum of industry to deliver high-rate space relay services in the next three to five years. This paper will present an overview of the study, analysis and synthesis processes along with common themes and conclusions, and provide next steps and recommendations. The results of this study serve as a foundation for ongoing efforts to acquire interoperable space relay services for NASA missions from multiple commercial service providers.

Eric Knoblock↗

Framework for NASA Space Relay Satellite Services over the Next Decade: Space Relay Partnership and Services Study

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, the anticipated initial NASA near-Earth space relay operating capability over the next decade will be comprised of the existing NASA-owned Space Network infrastructure supplemented with commercially-owned and -provided relay satellites and their associated ground stations. NASA awarded contracts to eight study vendors in May 2019 to investigate the feasibility of applying commercial services concepts to the NASA user mission community. The studies, managed by NASA Glenn Research Center, detailed ten study topic areas. NASA completed the analysis and synthesis of these eight industry studies and other relevant information. The responses from the study vendors indicated a strong interest in providing commercial services to NASA missions, and included a wide range of proposed architectures and demonstration ideas. Overall, the responses indicated that a mature and healthy competitive environment exists across a broad spectrum of industry to deliver high-rate space relay services in the next three to five years. This paper will present an overview of the study, analysis and synthesis processes along with common themes and conclusions, and provide next steps and recommendations. The results of this study serve as a foundation for ongoing efforts to acquire interoperable space relay services for NASA missions from multiple commercial service providers.

Eric Knoblock↗

Remote Concurrent Engineering: A-Team Studies in the Virtual World

NASA Jet Propulsion Laboratory’s (JPL’s)Architecture Team (A-Team) has nearly a decade of experiencein maturing early formulation mission and technology conceptsby combining innovative collaborative engineering methodswith cutting-edge subject matter expertise and advancedanalysis tools in an in-person environment. When COVID-19forced JPL’s workforce to work remotely in March 2020, ATeamhad to quickly pivot from an in-person collaborativeenvironment to a remote working environment.Through introspection, careful planning, and considerablepractice, A-Team was able to develop new operating proceduresto effectively continue early formulation studies in a virtualenvironment. A-Team has held over 57 remote studies in the 10months since the start of mandatory telework at JPL in March2020. In the remote setting, A-Team conducts studies in half-daysessions with clients and subject matter experts (SMEs) viavideoconferencing, shared computer screens, and digitalcollaborative tools.The key lesson is that increased staffing and planning is neededto prepare and successfully run remote A-Team studies. RemoteA-Team studies require careful selection of the appropriatetools for security, accessibility, and usability within theNASA/JPL environment. Knowledge capture methods andtemplates need to be thought out and agreed upon in advance asthere is less room for improvising in a remote format. Variouscommunication channels have to be monitored to allow for teamcoordination while maintaining fruitful participant engagementduring a session. In addition, technical backup for all roleswithin the A-Team have to be identified to allow the study tocontinue even if a team member’s connectivity is temporarilyinterrupted. Finally, careful thought has to be put into methodsand processes to create a collaborative environment in a virtualspace such that a group of experts who are only connected viathe internet can experience the creative spark and flow of a greatcollaborative and innovative study.

Zusack, Steven↗

Identification and Study of Validation Level Test Cases for Computational Modeling of Non-Charring Ablators

Computational modeling of Thermal Protection System (TPS) materials, used for aerospace applications, provides numerous advantages in preliminary selection and design of a heatshield material and shape for atmospheric entry vehicles. However, to serve as a reliable tool for prediction of material thermal and ablative behavior, the modeling approach needs to be validated against real experimental and flight data, preferably at a range of applied conditions. The validation study is typically very complex as it requires reliable measured data not only for the material thermal response and surface recession, but also well characterized environmental conditions. The validation problem becomes even more complex when the material thermal response is dictated by multi-physics effects such as solid conduction, in-depth thermal decomposition, pyrolysis gas flow and chemical reactions. The multi-physics effects complicate not only the modeling effort, but also the experimental measurement for validation of various aspects of the highly coupled problem. In this study, an attempt is made to identify suitable experimental data that could serve as a source for validation of material thermal response modeling tools. To reduce the computational complexity, this study focuses only on non-charring ablators, where the material thermal response could be modeled with a single governing equation for solid conduction and the ablation is limited only to the surface of the material. With a well characterized and publicly available experimental data being sparse, the study is limited in presenting test cases for only three materials: camphor, graphite and FiberForm® in the sequence of increased modeling complexity. Graphite is a commonly used TPS material for aerospace applications, both for leading edges of high-speed vehicles and internal insulation of solid rocket motors. FiberForm® is a porous carbon pre-form used in preparation of the well known PICA material Tran et al. [1996]. Inclusion of camphor into the list is conditioned with the relative simplicity in modeling the material thermal and chemical response and the low-enthalpy flow environment. In addition, camphor has been used as a simple test material for study of flow transition behavior by Stock and Ginoux [1973] and assessment of a heatshield shape change at flight relevant conditions by Rotondi et al. [2022]. In this work, the identified experimental data was extracted from the public literature and test cases that yet have been published. As it was found from the review, not a single test case contains an exhaustive set of data that would validate every aspect of the material physics. However, in the data collected, various aspects of the material behavior can be still validated, such as surface and in-depth temperature, amount of recession and a shape change. The identified experimental data for each case is accompanied with a characterized flow environment and simulated boundary conditions predicted by a Data-Parallel Line Relaxation (DPLR) code Wright et al. [1998]. In addition, material thermal response numerical simulations in each test case are performed with Kentucky Aerothermodynamics and Thermal Response System (KATS-MR) Zibitsker et al. [2022] providing a comparative study and a sanity check for the proposed validation data. Sample results from the performed numerical study are shown below. Figure 1 shows distribution of surface heat flux and pressure values on a hemi-cylinder model made of FiberForm® and tested in HyMETS arc-jet facility. The results are shown for the high pressure condition among the two tests. Flow simulation was performed with DPLR code on a quarter of original geometry. In the figure, the quarter shape was mirrored across zx and xy planes to show the complete distribution. Figure 2 shows the material response results for the high pressure case (7500 Pa), simulated with KATS-MR and a comparison to the experimental data for the surface temperature and shape shape. The simulation was performed on a 2-D slice, extracted in the xy plane at the middle of the sample. Figure 3 shows the material response simulation for the low pressure case (3500 Pa) and a comparison to the experimental data for surface temperature and shape change.

ablation↗

Lunar Terrain Vehicle (LTV) Remote Teleoperation Studies Under Four Lunar Communication Latencies

Remotely operating a lunar rover from Earth while subject to an Earth-Moon time delay of multiple seconds could result in a dangerous state where the roving vehicle is either damaged or lost, thereby potentially compromising an entire mission or series of missions. Providing the right capabilities to the remote operator to manage inherent communication latencies will be important for remote driving to be successful. NASA conducted two studies to investigate the average speed and number of kilometers per day that an operator on Earth could teleoperate a notional Artemis unpressurized rover with minimal remote operator capabilities under 0- and 4-second communication delays (April 2023 study) and 6- and 8-second delays (August 2023 study). A primary goal of these studies was to understand if an Artemis Lunar Terrain Vehicle (LTV) could cover 6 kilometers (km) in 24 hours when operated remotely. During the April 2023 evaluation, eight test operators used an in-house simulation of the lunar surface South Pole to teleoperate a NASA government reference LTV. Each operator received approximately 30 minutes of remote driving familiarization/training prior to their test run. Operators viewed the surrounding terrain via a single, rover mast-mounted, high-resolution camera with pan/tilt/zoom capabilities; continuous communication was provided throughout all testing. In the August 2023 evaluation, remote operators received approximately 3 hours of familiarization training in each latency, and the simulation environment provided remote operators with an operator-selected rate limiter to enable finer sensitivity in the hand controller and a predictive circle function to better assist operators with predicting the path the vehicle could take. All test operators were able to successfully navigate and drive through six different types of terrain and five planned traverse scenarios using natural lighting under all communication delays. Results for average speeds for each communication delay, computed by averaging the data from all test conditions for that latency and all operators, are shown in the table below. The average speed data was then used to derive the total time needed to cover 6 km, 8 km, and 20 km (distances relevant to LTV-SYS071 and -029 requirements). Remote operators drove slower and used the brake more frequently when subject to a communication latency as opposed to no communication latency. Subjective workload assessments revealed that while operating in a latency the overall workload significantly increased when compared to a 0-s delay with mental demand, frustration, and performance being the primary contributing factors. Driving strategies in the 0-s delay did not vary significantly among subjects; however, in the 4-s delay condition, three different driving strategies were identified. In the 6-s and 8-s latency conditions the operator’s use of the cruise control to maintain speed was more apparent. Additionally, over the course of the August study, the operator took advantage of the predictive circle indicator on the navigation display and over 95% of the operator’s navigation used the mast camera 180-degree panning function for ground truthing in terms of boulders and craters. Operators started to define more specific parameters in driving strategies for general operations. This consisted of setting the vehicle into a low-speed cruise mode of approximately 11.5 kph and noticing driving performance of the vehicle seemed to be much harder at slower speeds 0.4–0.8 kph; however, the vehicle was more responsive at speeds of 2.9–3.6 kph. Regardless of communication delay, operators used both the horizontal translation rails and the vehicle fenders as guides to predict a path for the vehicle through heavily concentrated terrain features. Test operators acknowledged that the teleoperations training for this study was substantially less than what an actual LTV remote operator will ultimately receive. They estimated a minimum of 20 to 100 hours spread across multiple days and weeks (e.g., strategies included immersion training over a 3-day period, to a short 8-week starter program) would be needed to get an operator ~ 60% proficient (i.e., able to complete a subset of remote driving tasks), to a yearlong program for full proficiency in remote driving tasks under all terrain types and natural lighting conditions. Remotely operating a vehicle on another planetary body while subject to communication latency is a complex task. Speed, distance covered, time spent driving, time spent navigating, brake usage and rock contacts are all affected by operator workload, driving strategies, workstation ergonomics and training. These studies provided a “first-look” answer to a potential system requirement (namely if a remote operator could cover a given distance in a given amount of time); however, considerable general knowledge was gained to begin to understand what it will take to make a successful lunar rover teleoperator.

LTV↗

Terrestrial Analogue Studies from ISRO’s Venus Mission Perspective: Polarimetric Radar Properties of Hawaiian Lava Flows

Detection of present and past volcanism on Venus is one of the major goals of the proposed ISRO’s Venus orbiter mission. The S-band, high-resolution (40 m/pixel) fully Polarimetric Synthetic Aperture Radar (PolSAR) instrument on this mission [1] may have the capabilities to detect volcanism within the mission lifetime using repeated PolSAR imagery, and possibly SAR Interferometry (InSAR, experimental mode). The global mapping efforts of Venus by Magellan mission has enabled comprehensive mapping of lava flows and indicated that Venus has an extensive history of volcanism, the ages of which are largely unknown (e.g. [2]). While Magellan radar emissivity data (e.g. [3, 4]) and Near Infrared emissivity data from VIRTIS [5] suggested the occurrence of recent episodes of volcanic activity (e.g. Maat Mons and Ganis Chasma), as well as the presence of stratigraphically young lava flows (e.g. Idunn Mons), measuring changes in radar backscatter amplitude alone to identify lava flows has many challenges. Although very large changes in the shape of the terrain can be observed in radar backscatter amplitude changes (e.g. [6]), smaller, or relatively flat lava flows are difficult to detect. Previous terrestrial studies suggest that PolSAR and InSAR techniques are very effective for mapping lava flows (e.g. [7-9]), and can be used when changes cannot be distinguished in radar backscatter images. We use the unvegetated lava flows on Hawaiʻi island as a terrestrial analogue to study Venus lava flows for the following reasons: (a) It is extensively studied at several wavelengths commonly used in remote sensing studies (including PolSAR and InSAR methods); and (b) it is a volcanically active area with new lava flows frequently covering older emplaced flows. To investigate the surface roughness, texture, and fine-grained mantling associated with Mauna Loa and Kilauea lava flows, we utilize C- and L-band PolSAR datasets obtained from RISAT-1A (EOS-4) and ALOS PALSAR missions respectively. In particular, we will use the quad-polarized backscatter and polarimetric parameters to characterize the texture of the terrestrial lava flows to understand whether the Venus crust is continuously disrupted during flow emplacement. While some previous studies (e.g. [10, 11]) suggested that surface roughness of most of the Venus flows is comparable to that of terrestrial pāhoehoe flows, other studies indicated that fractal dimensions of some large lava flows on Venus imply high eruption rates which favour the formation of a’a flows (e.g. [12]). We will also analyse the terrestrial flows for the presence/absence of pyroclastic mantling as radar-bright diffuse deposits near the summit regions of some coronae on Venus have been proposed to be young pyroclastics, and possible evidence of a renewed epoch of mantle volcanism that taps into deeper volatiles [13]. A recent study using EOS-4 RISAT-1 data of a part of fresh Mauna Loa lava flows (2022 eruption) emphasizes the ability of fully polarimetric SAR data to understand the diversity of physical properties (e.g. texture and morphology) associated with them (Sreejith et al. 2024); and we will apply similar methods to the PolSAR data obtained from ISRO’s Venus mission for our proposed objectives.

Sriram S Bhiravarasu↗

Lunar Terrain Vehicle (LTV) Remote Teleoperation Studies Under Four Lunar Communication Latencies

Remotely operating a lunar rover from Earth while subject to an Earth-Moon time delay of multiple seconds could result in a dangerous state where the roving vehicle is either damaged or lost, thereby potentially compromising an entire mission or series of missions. Providing the right capabilities to the remote operator to manage inherent communication latencies will be important for remote driving to be successful. The National Aeronautics and Space Administration (NASA) conducted two studies to investigate the average speed and number of kilometers per day that an operator on Earth could teleoperate a notional Artemis unpressurized rover with minimal remote operator capabilities under 0- and 4-second communication delays (April 2023 study) and 6- and 8-second delays (August 2023 study). A primary goal of these studies was to understand if an Artemis Lunar Terrain Vehicle (LTV) could cover 6 kilometers (km) in 24 hours when operated remotely. During the April 2023 evaluation, eight test operators used an in-house simulation of the lunar surface South Pole to teleoperate a NASA government reference LTV. Each operator received approximately 30 minutes of remote driving familiarization/training prior to their test run. Operators viewed the surrounding terrain via a single, rover mast-mounted, high-resolution camera with pan/tilt/zoom capabilities; continuous communication was provided throughout all testing. In the August 2023 evaluation, remote operators received approximately 3 hours of familiarization training in each latency, and the simulation environment provided remote operators with an operator-selected rate limiter to enable finer sensitivity in the hand controller and a predictive circle function to better assist operators with predicting the path the vehicle could take. All test operators were able to successfully navigate and drive through six different types of terrain and five planned traverse scenarios using natural lighting under all communication delays. Results for average speeds for each communication delay, computed by averaging the data from all test conditions for that latency and all operators, are shown in the table below. The average speed data was then used to derive the total time needed to cover 6 km, 8 km, and 20 km. Remote operators drove slower and used the brake more frequently when subject to a communication latency as opposed to no communication latency. Subjective workload assessments revealed that while operating in a latency the overall workload significantly increased when compared to a 0-s delay with mental demand, frustration, and performance being the primary contributing factors. Driving strategies in the 0-s delay did not vary significantly among subjects; however, in the 4-s delay condition, three different driving strategies were identified. In the 6-s and 8-s latency conditions the operator’s use of the cruise control to maintain speed was more apparent. Additionally, over the course of the August study, the operator took advantage of the predictive circle indicator on the navigation display and over 95% of the operator’s navigation used the mast camera 180-degree panning function for ground truthing in terms of boulders and craters. Operators started to define more specific parameters in driving strategies for general operations. This consisted of setting the vehicle into a low-speed cruise mode of approximately 1–1.5 kph and noticing driving performance of the vehicle seemed to be much harder at slower speeds 0.4–0.8 kph; however, the vehicle was more responsive at speeds of 2.9–3.6 kph. Regardless of communication delay, operators used both the horizontal translation rails and the vehicle fenders as guides to predict a path for the vehicle through heavily concentrated terrain features. Test operators acknowledged that the teleoperations training for this study was substantially less than what an actual LTV remote operator will ultimately receive. They estimated a minimum of 20 to 100 hours spread across multiple days and weeks (e.g., strategies included immersion training over a 3-day period, to a short 8-week starter program) would be needed to get an operator ~ 60% proficient (i.e., able to complete a subset of remote driving tasks), to a yearlong program for full proficiency in remote driving tasks under all terrain types and natural lighting conditions. Remotely operating a vehicle on another planetary body while subject to communication latency is a complex task. Speed, distance covered, time spent driving, time spent navigating, brake usage and rock contacts are all affected by operator workload, driving strategies, workstation ergonomics and training. These studies provided a “firstlook” answer to a potential system requirement (namely if a remote operator could cover a given distance in a given amount of time); however, considerable general knowledge was gained to begin to understand what it will take to make a successful lunar rover teleoperator.

LTV↗

Communication Delays in Cislunar Space: A Lab Study Examining Human System Integration Architecture (HSIA) and Team Risk Concerns

BACKGROUND: Communication delays are an inherent challenge of space missions to the Moon and beyond. Past research studies showed that 50+ second delays adversely affected individual well-being, team cohesion, and overall task performance (Kintz et al., 2016; Larson et al., 2019). However, there is a dearth of research on the effects of shorter delays (on the order of 4-12 seconds one-way) that may present a more immediate challenge during the upcoming Artemis missions. Even these shorter delays could make it difficult or infeasible for ground control to provide real-time support to Artemis astronauts, especially in complex and time-critical tasks such as extra-vehicular activities (EVAs). Results from studies on longer or Mars-like delays cannot be directly applied to Artemis-like delays, due to the large differences in delay magnitude and task types between these mission categories. For example, real-time oversight and guidance from ground control is impossible under Mars-like delays but may be performed under Artemis-like delays, albeit with potentially high workload and communication difficulty. Thus, a better understanding of the effects of Artemis-like communication delays on collaborative task performance is needed. Additionally, there is a need to develop reliable task paradigms that can be used in future studies on communication delays. METHODS: This project will study the effects of Artemis-like communication delays on collaborative task performance in a simulated space-to-ground team task via a lunar Gateway-like interface prototype. Teams of two astronaut-like participants - one serving as “crewmember” and one as “flight controller” - will perform a spaceflight-relevant task under six delay conditions (i.e., 0, 4, 6, 8, 10, and 12 seconds). Audio, video, texting, and file transfer will be delayed between the participants to mimic lunar-like communication delays. Measures related to workload, situation awareness, system usability, task performance, team cohesion, well-being, and communication strategies will be collected. These measures will be compared across delay levels, participant roles, and off-nominal and nominal tasks. Participants will be given the choice to use any combination of video and text communication in order to study preferences in interaction modality. RESEARCH AIMS: One aim is to identify a delay level or range of levels at which there may be significant decrements in individual and team-based measures. Identifying such ranges may help design novel workload management or communication countermeasures for future space missions. Also, the spaceflight-relevant research tasks and corresponding communication delay technology developed as part of this effort may be used for future studies on communication delays. Results from this work are also expected to inform study scenarios in the Human Exploration Research Analog (HERA) Campaign.

S Upasani↗

Space Power Heritage Study Final Results

NASA space missions have long employed Radioisotope Power Systems (RPS) and solar-based power generation architectures. RPS have been used to enable or significantly enhance missions that venture deep into the solar system to distances from the sun which can make using solar architectures unfeasible and to areas where the sun is obscured due to shadows or atmospheric phenomena. The destination, however, is not the absolute factor of the determination of RPS or solar. This is highlighted by the Jupiter missions Galileo and Juno, which employed RPS and solar architectures, respectively. When baselining either RPS or solar architectures for a planetary mission, numerous factors must be considered, including scientific objectives, cost, schedule, and mass just to name a few. In an effort to better understand the decision-making process and provide insight for potential future missions, the NASA RPS Program Office tasked The Aerospace Corporation (Aerospace) to study historical missions that used RPS and solar architectures. Data was collected for a variety of RPS and solar missions to look for possible trends from the selected implementation. Additionally, mission case studies were developed based on interviews with mission personnel who were responsible for defining the power architecture of their mission. Informed by the data collected and case studies, two Measures of Effectiveness (MoEs) were produced: one based on cost of RPS versus solar, and one based on science mission cost effectiveness. The final results of this study have been captured in this briefing package which is available for full and open release. Additionally, a final report document also provides the same details of this package. This briefing package also includes an appendix which contains data not for public release which was used to provide detailed answers to questions raised during this study. The results of these inquiries are discussed in the report, but the proprietary data is not included. Finally, an executive summary package is also publicly available which was used to present the results of the study at the 2018 Aerospace Space Power Workshop.

Study↗

Remote lift fan study program, volume 4

A study program to select and conduct preliminary design of advanced technology lift fan systems to meet low noise goals of future V/STOL transport aircraft is discussed. This volume contains results of additional studies conducted to support the main preliminary design effort done under the Remote Lift Fan Study Program (Contract NAS3-14406) and a companion effort, the Integral Lift Fan Study (NAS3-14404). These results cover engine emission study, a review of existing engines for research aircraft application and support data for aircraft studies.

Source record↗

Application of the ERTS system to the study of Wyoming resources with emphasis on the use of basic data products

Many potential users of ERTS data products and other aircraft and satellite imagery are limited to visual methods of analyses of these products. Illustrations are presented from Wyoming studies that have employed these standard data products for a variety of geologic and related studies. Possible economic applications of these studies are summarized. Studies include regional geologic mapping for updating and correcting existing maps and to supplement incomplete regional mapping; illustrations of the value of seasonal images in geologic mapping; specialized mapping of such features as sand dunes, playa lakes, lineaments, glacial features, regional facies changes, and their possible economic value; and multilevel sensing as an aid in mineral exploration. Examples of cooperative studies involving botanists, plant scientists, and geologists for the preparation of maps of surface resources that can be used by planners and for environmental impact studies are given.

Houston, R. S.↗

IUS/TUG Orbital Operations and Mission Support Study: Executive Summary - Volume 1

The space transportation system (STS) is discussed which will include a propulsive stage that is carried into low earth orbit by the space shuttle. Data were accumulated from the analyses of various stage concepts, operating modes, and projected missions (space tug systems studies, growth stage studies, engine studies, and critical area studies). The foundation formulated by these studies aided in establishing a tentative two-phase approach for the extension of the STS operating regime beyond the space shuttle including plane changes, higher orbits, geosynchronous orbits and beyond. The orbital operations study, was conducted to provide the generation and analysis of operational plans, requirement, and concepts for the utilization of these vehicles. Primary emphasis was placed on methods and techniques to provide a sound technical approach to operations at reduced cost for the STS mission period.

Source record↗

An exploratory study to determine the integrated technological air transportation system ground requirements of liquid-hydrogen-fueled subsonic, long-haul civil air transports

An exploratory study was conducted to evaluate the feasibility and cost impact of implementing a liquid-hydrogen-fueled (LHz), air transport support system at Chicago-O’Hare International Airport. The study assumed an available supply of hydrogen to the airport boundary. It also assumed that the present widebody fleet at O’Hare was replaced by 400 passenger, LH2-fueled aircraft operating on the current frequency schedule and route network. The LH2 aircraft configurations used in this study were developed during a previous NASA-sponsored study. A baseline air terminal concept was developed which permitted airlines and the airport to operate JP- or LH2-fueled aircraft at common terminal gates. The concept included installation of a hydrogen liquefaction and storage facility on airport property, as well as the fuel distribution system. The capital investment and hydrogen-related operating costs to the airlines were estimated. The study concluded that the system would be technically and operationally feasible at O’Hare, and that economics would be a prime factor in future decisions regarding the use of LH2 as an air transport fuel. Research and technology recommendations were made to improve component efficiency/reliability. The study also concluded that additional investigation should be conducted on the implementation of a nationwide or worldwide LH2 air transportation system, to understand fully the operational and economic implications of the total system, before decisions could be made relative to committing to this option.

Hydrogen↗

Simulation studies related to the design of post-FGGE observing systems

The results of three detailed simulation studies are presented. The first study consists of a comparative assessment of the performance of an advanced moisture/temperature sounder (AMTS) being proposed by NASA as a follow-on replacement to the current HIRS-2 operational sounder aboard the NOAA weather satellites. The second study was concerned with assessing the relative accuracies of inferred atmospheric states for idealized lidar wind profiling systems, temperature profiling systems, temperature profiling systems, surface pressure systems, and composite systems. The third study incorporated the above systems into a highly realistic data analysis/forecast cycle from which a series of forecast impact studies were conducted. These studies, taken together, give us a picture of the potential that emerging technoloies can offer in the determination of the basic atmospheric variables required for long-range numerical weather and climate prediction.

Halem, M.↗

Laser microprobe study of cosmic dust (IDPs) and potential source materials

The study of cosmic dust or interplanetary dust particles (IDP) can provide vital information about primitive materials derived primarily from comets and asteroids along with a small unknown fraction from the nearby interstellar medium. The study of these particles can enhance our understanding of comets along with the decoding of the history of the early solar system. In addition the study of the cosmic dust for IDP particles can assist in the elucidation of the cosmic history of the organogenic elements which are vital to life processes. Studies to date on these particles have shown that they are complex, heterogeneous assemblages of both amorphous and crystalline components. In order to understand the nature of these particles, any analytical measurements must be able to distinguish between the possible sources of these particles. A study was undertaken using a laser microprobe interfaced to a quadrupole mass spectrometer for the analysis of the volatile components present in cosmic dust particles, terrestrial contaminants present in the upper atmosphere, and primitive carbonaceous chondrites. From the study of the volatiles released from the carbonaceous materials it is hoped that one could distinguish between components and sources in the IDP particles analyzed. The technique is briefly described and results for the CI, CM, and CV chondrites and cosmic dust particle W7027B8 are presented.

Gibson, E. K., Jr.↗

Long term cryogenic storage facility systems study

The Long Term Cryogenic Storage Facility Systems Study (LTCSFSS) is a Phase A study of a large capacity propellant depot for the space based, cryogenic orbital transfer vehicle. The study is being performed for Marshall Space Flight Center by General Dynamics Space Systems Division and has five principal objectives: (1) Definition of preliminary concept designs for four storage facility concepts; (2) Selection of preferred concepts through the application of trade studies to candidate propellant management system components; (3) Preparation of a conceptual design for an orbital storage facility; (4) Development of supporting research and technology requirements; and (5) Development of a test program to demonstrate facility performance. The initial study has been completed, and continuation activities are just getting under way to provide greater detail in key areas and accommodate changes in study guidelines and assumptions.

Schuster, John R.↗