Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Differential requirement for irf 8 in formation of embryonic and adult macrophages in zebrafish

Interferon regulatory factor 8 (Irf8) is critical for mammalian macrophage development and innate immunity, but its role in teleost myelopoiesis remains incompletely understood. Specifically, genetic tools to analyze the role of irf 8 in zebrafish macrophage development at larval and adult stages are lacking. In this study, we generated irf 8 null mutants in zebrafish using TALEN-mediated targeting. Our analysis defines different requirements for irf 8 at different stages. irf 8 is required for formation of all macrophages during primitive and transient definitive hematopoiesis, but not during adult-phase definitive hematopoiesis starting at 5-6 days postfertilization. At early stages, irf 8 mutants have excess neutrophils and excess cell death in pu.1-expressing myeloid cells. Macrophage fates were recovered in irf 8 mutants after wildtype irf 8 expression in neutrophil and macrophage lineages, suggesting that irf 8 regulates macrophage specification and survival. In juvenile irf 8 mutant fish, mature macrophages are present, but at numbers significantly reduced compared to wildtype, indicating an ongoing requirement for irf 8 after embryogenesis. As development progresses, tissue macrophages become apparent in zebrafish irf 8 mutants, with the possible exception of microglia. Our study defines distinct requirement for irf 8 in myelopoiesis before and after transition to the adult hematopoietic system.

59 BASIC BIOLOGICAL SCIENCES↗

Evaluation of the applicability of existing nuclear power plant regulatory requirements in the U.S. to advanced small modular reactors.

The current wave of small modular reactor (SMR) designs all have the goal of reducing the cost of management and operations. By optimizing the system, the goal is to make these power plants safer, cheaper to operate and maintain, and more secure. In particular, the reduction in plant staffing can result in significant cost savings. The introduction of advanced reactor designs and increased use of advanced automation technologies in existing nuclear power plants will likely change the roles, responsibilities, composition, and size of the crews required to control plant operations. Similarly, certain security staffing requirements for traditional operational nuclear power plants may not be appropriate or necessary for SMRs due to the simpler, safer and more automated design characteristics of SMRs. As a first step in a process to identify where regulatory requirements may be met with reduced staffing and therefore lower cost, this report identifies the regulatory requirements and associated guidance utilized in the licensing of existing reactors. The potential applicability of these regulations to advanced SMR designs is identified taking into account the unique features of these types of reactors.

LaChance, Jeffrey L.↗

Evaluation on the Feasibility of Using Ultrasonic Testing of Reactor Pressure Vessel Welds for Assessing Flaw Density/Distribution per 10 CFR 50.61a, Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock

This technical letter report provides the status of an assessment undertaken by PNNL at the request of the NRC to verify the capability of periodic ASME-required volumetric examinations of reactor vessels to characterize the density and distribution of flaws of interest for applying §50.61a on a plant-by-plant basis. The PTS rule, described in the Code of Federal Regulations, Title 10, Section 50.61 (§50.61), "Fracture Toughness Requirements for Protection against Pressurized Thermal Shock Events," establishes screening criteria to ensure that the potential for a reactor vessel to fail due to a PTS event is deemed to be acceptably low. Recently, the NRC completed a research program that concluded that the risk of through-wall cracking due to a PTS event is much lower than previously estimated. The NRC subsequently developed and promulgated an alternate PTS rule, §50.61a, that can be implemented by PWR licensees. The §50.61a rule differs from §50.61 in that it requires licensees who choose to follow this alternate method to analyze the results from periodic volumetric examinations required by the ASME Code, Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plants.

alternate PTS rule↗

Coupled optical/thermal/fluid analysis and design requirements for operation and testing of a supercritical CO 2 solar receiver.

Recent studies have evaluated closed-loop supercritical carbon dioxide (s-CO 2 ) Brayton cycles to be a higher energy-density system in comparison to conventional superheated steam Rankine systems. At turbine inlet conditions of 923K and 25 MPa, high thermal efficiency (~50%) can be achieved. Achieving these high efficiencies will make concentrating solar power (CSP) technologies a competitive alternative to current power generation methods. To incorporate a s-CO 2 Brayton power cycle in a solar power tower system, the development of a solar receiver capable of providing an outlet temperature of 923 K (at 25 MPa) is necessary. To satisfy the temperature requirements of a s-CO 2 Brayton cycle with recuperation and recompression, it is required to heat s-CO 2 by a temperature of ~200 K as it passes through the solar receiver. Our objective was to develop an optical-thermal-fluid model to design and evaluate a tubular receiver that will receive a heat input ~1 MWth from a heliostat field. We also undertook the documentation of design requirements for the development, testing and safe operation of a direct s-CO 2 solar receiver. The main purpose of this document is to serve as a reference and guideline for design and testing requirements, as well as to address the technical challenges and provide initial parameters for the computational models that will be employed for the development of s-CO 2 receivers.

14 SOLAR ENERGY↗

ASC-ATDM Performance Portability Requirements for 2015-2019

This report outlines the research, development, and support requirements for the Advanced Simulation and Computing (ASC ) Advanced Technology, Development, and Mitigation (ATDM) Performance Portability (a.k.a., Kokkos) project for 2015 - 2019 . The research and development (R&D) goal for Kokkos (v2) has been to create and demonstrate a thread - parallel programming model a nd standard C++ library - based implementation that enables performance portability across diverse manycore architectures such as multicore CPU, Intel Xeon Phi, and NVIDIA Kepler GPU. This R&D goal has been achieved for algorithms that use data parallel pat terns including parallel - for, parallel - reduce, and parallel - scan. Current R&D is focusing on hierarchical parallel patterns such as a directed acyclic graph (DAG) of asynchronous tasks where each task contain s nested data parallel algorithms. This five y ear plan includes R&D required to f ully and performance portably exploit thread parallelism across current and anticipated next generation platforms (NGP). The Kokkos library is being evaluated by many projects exploring algorithm s and code design for NGP. Some production libraries and applications such as Trilinos and LAMMPS have already committed to Kokkos as their foundation for manycore parallelism an d performance portability. These five year requirements includes support required for current and antic ipated ASC projects to be effective and productive in their use of Kokkos on NGP. The greatest risk to the success of Kokkos and ASC projects relying upon Kokkos is a lack of staffing resources to support Kokkos to the degree needed by these ASC projects. This support includes up - to - date tutorials, documentation, multi - platform (hardware and software stack) testing, minor feature enhancements, thread - scalable algorithm consulting, and managing collaborative R&D.

97 MATHEMATICS AND COMPUTING↗

Data Crosscutting Requirements Review

In April 2013, a diverse group of researchers from the U.S. Department of Energy (DOE) scientific community assembled to assess data requirements associated with DOE-sponsored scientific facilities and large-scale experiments. Participants in the review included facilities staff, program managers, and scientific experts from the offices of Basic Energy Sciences, Biological and Environmental Research, High Energy Physics, and Advanced Scientific Computing Research. As part of the meeting, review participants discussed key issues associated with three distinct aspects of the data challenge: 1) processing, 2) management, and 3) analysis. These discussions identified commonalities and differences among the needs of varied scientific communities. They also helped to articulate gaps between current approaches and future needs, as well as the research advances that will be required to close these gaps. Moreover, the review provided a rare opportunity for experts from across the Office of Science to learn about their collective expertise, challenges, and opportunities. The "Data Crosscutting Requirements Review" generated specific findings and recommendations for addressing large-scale data crosscutting requirements.

ASCR↗

IDC Re-Engineering Phase 2 System Requirements Document V1.3.

This System Requirements Document (SRD) defines waveform data processing requirements for the International Data Centre (IDC) of the Comprehensive Nuclear Test Ban Treaty Organization (CTBTO). The IDC applies, on a routine basis, automatic processing methods and interactive analysis to raw International Monitoring System (IMS) data in order to produce, archive, and distribute standard IDC products on behalf of all States Parties. The routine processing includes characterization of events with the objective of screening out events considered to be consistent with natural phenomena or non-nuclear, man-made phenomena. This document does not address requirements concerning acquisition, processing and analysis of radionuclide data but includes requirements for the dissemination of radionuclide data and products.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

IDC Re-Engineering Phase 2 System Requirements Document Version 1.4

This System Requirements Document (SRD) defines waveform data processing requirements for the International Data Centre (IDC) of the Comprehensive Nuclear Test Ban Treaty Organization (CTBTO). The IDC applies, on a routine basis, automatic processing methods and interactive analysis to raw International Monitoring System (IMS) data in order to produce, archive, and distribute standard IDC products on behalf of all States Parties. The routine processing includes characterization of events with the objective of screening out events considered to be consistent with natural phenomena or non-nuclear, man-made phenomena. This document does not address requirements concerning acquisition, processing and analysis of radionuclide data, but includes requirements for the dissemination of radionuclide data and products.

97 MATHEMATICS AND COMPUTING↗

STREAM2016: Streaming Requirements, Experience, Applications and Middleware Workshop

The Department of Energy (DOE) Office of Science (SC) facilities including accelerators, light sources and neutron sources and sensors that study, the environment, and the atmosphere, are producing streaming data that needs to be analyzed for next-generation scientific discoveries. There has been an explosion of new research and technologies for stream analytics arising from the academic and private sectors. However, there has been no corresponding effort in either documenting the critical research opportunities or building a community that can create and foster productive collaborations. The two-part workshop series, STREAM: Streaming Requirements, Experience, Applications and Middleware Workshop (STREAM2015 and STREAM2016), were conducted to bring the community together and identify gaps and future efforts needed by both NSF and DOE. This report describes the discussions, outcomes and conclusions from STREAM2016: Streaming Requirements, Experience, Applications and Middleware Workshop, the second of these workshops held on March 22-23, 2016 in Tysons, VA. STREAM2016 focused on the Department of Energy (DOE) applications, computational and experimental facilities, as well software systems. Thus, the role of “streaming and steering” as a critical mode of connecting the experimental and computing facilities was pervasive through the workshop. Given the overlap in interests and challenges with industry, the workshop had significant presence from several innovative companies and major contributors. The requirements that drive the proposed research directions, identified in this report, show an important opportunity for building competitive research and development program around streaming data. These findings and recommendations are consistent with vision outlined in NRC Frontiers of Data and National Strategic Computing Initiative (NCSI) [1, 2]. The discussions from the workshop are captured as topic areas covered in this report's sections. The report discusses four research directions driven by current and future application requirements reflecting the areas identified as important by STREAM2016. These include (i) Algorithms, (ii) Programming Models, Languages and Runtime Systems (iii) Human-in-the-loop and Steering in Scientific Workflow and (iv) Facilities.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Fusion Energy Sciences Exascale Requirements Review. An Office of Science review sponsored jointly by Advanced Scientific Computing Research and Fusion Energy Sciences, January 27-29, 2016, Gaithersburg, Maryland

The additional computing power offered by the planned exascale facilities could be transformational across the spectrum of plasma and fusion research — provided that the new architectures can be efficiently applied to our problem space. The collaboration that will be required to succeed should be viewed as an opportunity to identify and exploit cross-disciplinary synergies. To assess the opportunities and requirements as part of the development of an overall strategy for computing in the exascale era, the Exascale Requirements Review meeting of the Fusion Energy Sciences (FES) community was convened January 27–29, 2016, with participation from a broad range of fusion and plasma scientists, specialists in applied mathematics and computer science, and representatives from the U.S. Department of Energy (DOE) and its major computing facilities. This report is a summary of that meeting and the preparatory activities for it and includes a wealth of detail to support the findings. Technical opportunities, requirements, and challenges are detailed in this report (and in the recent report on the Workshop on Integrated Simulation). Science applications are described, along with mathematical and computational enabling technologies. Also see http://exascaleage.org/fes/ for more information.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Engineering Analysis Baseline Model Requirements

The purpose of this document is to set requirements for the development, documentation, implementation, and maintenance of engineering analysis baseline models used by the Advanced Engineering and Analysis group to model and simulate systems. The intended audience of this document is the Engineering Technology and Design division Advanced Engineering and Analysis group—in particular the baseline model owners and users—and the Group Leaders and members of the Systems Engineering groups. Section 1 presents a discussion of general concepts related to engineering analysis models and baseline models, including definitions of common terms used in this requirements document. It also presents the purpose and intentions of creating and using baseline models and exposes some underlying assumptions about what baseline models are supposed to be. Section 2 presents requirements on the general categories of: the Advanced Engineering and Analysis Group Leader and the baseline model owner; parts, materials, and load cases; the process of generating and using the model; and how the baseline model will be stored, maintained, and documented. This document presents requirements on the baseline model as well as some aspects of the development process and the people responsible for the development; it does not address how the results of simulations utilizing these models will be used to make assessments

42 ENGINEERING↗

Universal Utility Data Exchange (UUDEX) Functional Design Requirements: Cybersecurity of Energy Delivery Systems Research and Development

This document provides a set of high-level functional design requirements for Universal Utility Data Exchange (UUDEX). These requirements include a set of use cases, data exchanges supported by UUDEX, both for grid operations and for cyber security data, functional requirements for data exchange, data models used by UUDEX, data exchange architectures, and security considerations. These functional design requirements are intended to be used in more detailed design documents.

97 MATHEMATICS AND COMPUTING↗

FRMAC Laboratory Analysis Rad Responder Enhancements Requirements

This document will describe the requirements for improvements to the Rad Responder platform to meet the needs of FRMAC Lab Analysis and other users of the sample control and lab analysis modules. The report is broken down into specific sections and organized by the specific deliverables under the FY19 FEMA-NIRT project. This report describes requirements that go beyond what was originally funded under the FY19 FEMA-NIRT project since auxiliary funding is being used on top of FEMA-NIRT funding through the DOE eFRMAC working group. This document describes all the lab analysis requirements for FRMAC Lab Analysis operations. Under each section the reader will find specific user "stories" or use-cases along with specific and technical requirements for each feature. Mock ups and data models will be provided as needed.

97 MATHEMATICS AND COMPUTING↗

Requirements Document for a Replacement Data Acquisition System

A flight vehicle is in the developmental stages. While in development flight testing is required by both the manufacturer and customer to rate design performance. The performance of the vehicle must fulfill the agreed upon requirements. Testing of a flight vehicle during operation requires various sensors in order to record and monitor performance for evaluation. A Data Acquisition System (DAQ) is needed in order to control and capture data from various sensors placed throughout the vehicle during flight. This DAQ will receive the analog data from the suite of sensors and convert them to a digital signal that can be transmitted to a recording station where the data will later be analyzed by test experts. Some of the key features to be included in the DAQ will be a self-check operation to verify the health of all sensors including the DAQ. The DAQ will also have the capability to store sensor calibration data files loaded during assembly and transmit those files to the recording station during flight. Breakthroughs in new technologies has allowed for higher resolution recording systems and faster sampling rates. Improved sensor data using a new Data Acquisition System (DAQ) can provide important answers to questions discovered during the last few flight tests. These questions arose when the flight system expressed unexpected behaviors. Having the capability of the new DAQ in flight tests would allow for more high-fidelity data to be captured from the system during flight tests and ultimately reducing the number of required flight test. Reducing the number of flight tests also reduce developmental cost and schedule.

42 ENGINEERING↗

National Rotor Testbed Requirements. Draft

This document serves both as a guide and a record for requirements management associated with design of retrofit rotors for the Sandia SWiFT turbines. The rotors will support a long-term experimental campaign. Data gathered during the campaign will support formal verification and validation of complex flow numerical models for prediction of metrics deemed important for wind energy plant efficiency. These integrated projects involve multiple years of effort, dozens of engineers and collaborators, and dozens of stakeholders in the form of the research community, National Lab staff, and DOE staff. Creating of formal, written requirements will ensure flow-down of activities from high-level goals, aid communication, and enable clear verification of activities. A custom requirements schema is created and described. Commercial requirements management software —IBM Rational DOORS—is used to organize the information and ensure traceability. This document serves as a record of the process as well as a record of the exported, detailed contents of the DOORS database.

17 WIND ENERGY↗

Recommendations for Data-in-Transit Requirements for Securing DER Communications

With the adoption of Distributed Energy Resource (DER) interoperability standards, common communication protocols are now being deployed between power system operators and DER devices. In 2018, a revision to the US interconnection and interoperability standard, Institute of Electrical and Electronics Engineers (IEEE) Std. 1547, required DER equipment to have an IEEE 2030.5, IEEE 1815, or SunSpec Modbus communication exchange interface. This change supports the future transition to secure connection and exchange of information between the DER equipment and implementing parties, such as grid operators. Adoption of standardized communication protocols and associated information models is a critical step toward interoperability between power system operators and DER, such as photovoltaic (PV) and energy storage systems. However, security requirements for these standardized communication protocols are not comprehensive, resulting in non-standard and vendor-specific implementation that may leave DER equipment susceptible to cyberattacks. This paper examines the data-in-flight security requirements for standardized DER communication protocols, per IEEE 1547-2018 revision, as it relates to device authentication, key management, and encryption. The state of the art for these security features is also explored, addressing their impact on communication and performance of low-cost single board computers, which are typical of DER devices. In conclusion, a recommendation is provided to adopt a common set of communication requirements, which are intended to achieve interoperability and implement data security over DER network pathways, while ensuring reliable, secure, and real-time information delivery.

42 ENGINEERING↗

Rules of Use Report Engineering evaluations of nuclear material storage containers against the packaging requirements at TA-55

A set of obligations in the yearly storage container surveillance program, ensures that a retrospective approach is applied with loaded containers in inventory to confirm compliance with all “users” to ensure nuclear material storage container requirements are being followed. Validation that packaged containers are properly used, within a specific set of container types prescribed “bounding conditions of use,” is based on meeting requirements as identified in operating procedures associated with TA55-DOP-091, TA-55 Nuclear Material Packaging, and PA-RD-01022, Nuclear Material Packaging Requirements. The surveillance plan obligation requires the application of local area nuclear material accountability software or (LANMAS) to produce queries. The data queries are used to assess attributes of containers in storage these investigations are conducted on a bi-annual basis. This rules of use (ROU) compliance process ensures proper usage of storage containers as containment systems and therefore provides effective worker protection. It is structured as a supporting effort by implementing aspects of PA-AP-01207, Nuclear Material Container Safety Management at TA-55.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Universal Utility Data Exchange (UUDEX) Functional Design Requirements - Rev 1

This document provides a set of high-level functional design requirements for Universal Utility Data Exchange (UUDEX). These requirements include a set of use cases, data exchanges supported by UUDEX, both for grid operations and for cyber security data, functional requirements for data exchange, data models used by UUDEX, data exchange architectures, and security considerations. These functional design requirements are intended to be used in more detailed design documents.

97 MATHEMATICS AND COMPUTING↗