Supercharge NY

The Energy Program for Innovation Clusters (EPIC) Supercharge NY enabled The Clean Fight to execute an inaugural accelerator program focused on enabling world-class, growth-stage energy storage companies to successfully scale deployments and establish domestic manufacturing pathways in New York State. The Clean Fight has developed and tested a successful accelerator model designed to reduce the barriers growth-stage climate tech companies face by collapsing the sales cycle to scaling solutions at speed. The Clean Fight’s Supercharge NY project allowed for the exploration into the understanding of New York-focused energy storage opportunities, challenges, and methods for enabling successful projects. The Clean Fight’s Supercharge NY project enabled high-touch matchmaking with industry leading customer and capital partners, technical assistance to facilitate scaling supply chain and manufacturing capacity, and access to non-dilutive funding for first-of-a-kind or demonstration projects in New York State. The results of the program provide a public benefit by accelerating deployments of energy storage to provide value-added energy services and sustainability benefits to communities while boosting economic opportunity and job creation for all.

25 ENERGY STORAGE↗

Renewable Firming EnergyFarm Final Report

The American Recovery and Reinvestment Act (ARRA) of 2009 (Recovery Act) provided the U.S. Department of Energy (DOE) with funds to modernize the electric power grid. One program under this initiative is the Smart Grid Demonstration program (SGDP). The SGDP mandate is to demonstrate how a suite of existing and emerging smart grid technologies can be innovatively applied and integrated to prove technical, operational, and business-model feasibility. Primus Power is a provider of low cost, long life and long duration energy storage systems. The Company’s flow batteries are shipping to US and international microgrid, utility, military, commercial and industrial customers. Primus Power’s EnergyPod® is a modular battery system for grid scale applications available in configurations ranging from 25 kW to more than 25 MW. The EnergyPod provides nameplate power for 5 hours. This long duration unlocks economic benefits on both sides of the electric meter. It allows commercial and industrial customers to shift low cost electricity purchased at night to offset afternoon electrical peaks to reduce utility demand charges. It also allows utilities to economically reduce power peaks and defer costly upgrades to distribution infrastructure. An EnergyPod contains one or more EnergyCells-a highly engineered flow battery core made from low cost, readily available materials. An EnergyCell includes a membrane-free stack of titanium electrodes located above a novel liquid electrolyte management system. This patented design enables reliable, low maintenance operation for decades. It is safe and robust, featuring non-flammable aqueous electrolyte, sophisticated fault detection and built-in secondary containment. Unlike Li Ion batteries, the EnergyCell is not susceptible to thermal runaway. This cooperative agreement project was started in Feb 2010. The objectives of the project are: 1. Trigger rapid adoption of grid storage systems in the US by demonstrating a low cost, robust and flexible EnergyFarm®. 2. Accelerate adoption of renewable energy and enhance grid stability by firming the output of wind & solar farms. 3. Demonstrate improved grid asset utilization by storing energy during off-peak periods for dispatch during local load peaks. 4. Establish an advanced battery manufacturing industry in the U.S. 5. Reduce CO2 emissions from utilities. This report summarizes the key milestones, data, results and lessons learned from the project. The desired goals and benefits of the cooperative agreement with the DOE have all been achieved. The project has contributed to reducing power costs, accelerating adoption of renewable energy resources, reducing greenhouse gas emissions and establishing advanced battery manufacturing in the U.S. The Recovery Act funds provided thru the DOE have been leveraged multiple times by additional private equity investment. Primus Power continues to ship low cost, long life and long duration EnergyPod® flow battery systems to utilities, commercial/industrial, microgrid and data center customers. After the conclusion of this project, Primus Power has modified the EnergyPod® design to optimize around energy performance. Primus Power has moved to a prefabricated enclosure instead of multiple EnergyCells in a container. This lowers capital and maintenance costs and can optimize site design. Utilities are starting to adopt energy storage for a variety of functions. The market will grow as the technology is proven and profitable applications expand.

25 ENERGY STORAGE↗

Energy Storage/Conservation and Carbon Emissions Reduction Demonstration Project

The U.S. Department of Energy (DOE) awarded the Center for Transportation and the Environment (CTE) federal assistance for the management of a project to develop and test a prototype flywheel-based energy recovery and storage system in partnership with Test Devices, Inc. (TDI). TDI specializes in the testing of jet engine and power generation turbines, which uses a great deal of electrical power for long periods of time. In fact, in 2007, the company consumed 3,498,500 kW-­hr of electricity in their operations, which is equivalent to the electricity of 328 households. For this project, CTE and TDI developed and tested a prototype flywheel-based energy recovery and storage system. This technology is being developed at TDI’s facilities to capture and reuse the energy necessary for the company’s core process. The new technology and equipment is expected to save approximately 80% of the energy used in the TDI process, reducing total annual consumption of power by approximately 60%, saving approximately two million kilowatt-hours annually. Additionally, the energy recycling system will allow TDI and other end users to lower their peak power demand and reduce associated utility demand charges. The use of flywheels in this application is novel and requires significant development work from TDI. Flywheels combine low maintenance costs with very high cycle life with little to no degradation over time, resulting in lifetimes measured in decades. All of these features make flywheels a very attractive option compared to other forms of energy storage, including batteries. Development and deployment of this energy recycling technology will reduce energy consumption during jet engine and stationary turbine development. By reengineering the current inefficient testing process, TDI will reduce risk and time to market of efficiency upgrades of gas turbines across the entire spectrum of applications. Once in place the results from this program will also help other US industries to utilize energy recycling technology to lower domestic energy use and see higher net energy efficiency. The prototype system and results will be used to seek additional resources to carry out full deployment of a system. Ultimately, this innovative technology is expected to be transferable to other testing applications involving energy-based cycling within the company as well as throughout the industry.

25 ENERGY STORAGE↗

Autonomous Sampling Platform Development: Radiological Contamination Mapping at SRS

From 1961 to 1964, radioactive elements were released from the Savannah River Site into local bodies of water via cooling water charges from the reactors on site. In 1983, the extent of the radioactive contamination was first studied, and elements such as 137 Cs, 90 Sr, 238 Pu, 241 Am, 244 Cm, and tritium were found to have seeped from local bodies of water into sediment and the surrounding flora and fauna. The current method of tracking and monitoring radioactive contamination at the SRS is to gather samples and conduct measurements in a laboratory. A cheaper, and safer, method to conduct such measurements would be to automate the process by using an autonomous boat that can travel to locations, conduct measurements, and return home all without human intervention. To introduce this idea, the construction of an autonomous boat prototype was completed to demonstrate the practicality and feasibility of such an idea. The prototype travels to a set of waypoints, stops at each waypoint, and returns when all waypoints have been reached. It does this by employing a simple battery-powered boat with an Arduino controller that steers the boat using a steering algorithm incorporated into a Proportional Integral Derivative (PID) function. A total of three tests were conducted at two different bodies of water; and after working out some hardware problems, the boat drone was able to successfully steer and reach all programmed waypoints. With the prototype complete, the next steps to realizing the final product of the boat drone will include adopting a processing unit with higher-bit architecture, using a bigger boat with a more powerful trolling motor, and incorporating a solar panel for continuous power and round-the-clock performance.

42 ENGINEERING↗

ARPA-E: Actively Managing Projects to Accelerate Impact

The ARPA-E model is unique in that the agency does not just provide teams funding. Throughout the lifetime of an ARPA-E award, ARPA-E Program Directors and Tech-to-Market Advisors also provide teams with expert advice through quarterly reviews and onsite visits. This hands-on approach helps ensure teams can meet ambitious milestones, target and tackle problems early on, and advance their technologies towards commercialization. Program Director Dr. Isik Kizilyalli explains the importance of this active project management approach in helping teams identify and overcome barriers. In this video, Energy Storage Systems (ESS) from the GRIDS program and Monolith Semiconductors from the SWITCHES program discuss how ARPA-E’s active project management approach helped them find solutions to technical challenges.

25 ENERGY STORAGE↗

Annual BTMS Testing Section (SNL)

One of the first milestones of the Behind the Meter Storage (BTMS) program was to develop testing protocols so that the state-of-the-art cell chemistries and form factors could be evaluated against BTMS aggressive performance and lifetime metrics. To help guide this conversation, a pack estimation calculation was run. At the time the team was assuming a worst-case scenario in which the battery alone would need to charge an electric vehicle in 15 minutes with no support from the grid. This calculation varied the amount of current applied by each string or module in the storage system and estimated how many cells (and estimated cost) would be needed to charge an electric vehicle in 15 minutes under the current applied.

25 ENERGY STORAGE↗

Energy Paths for the Yurok People

This Yurok Tribe energy strategic planning study examined electricity usage, costs and infrastructure, as well as electricity needs on the Reservation. It also assessed the Tribe’s energy resources. Equipped with this information, the project team conducted an energy options analysis that examined different project opportunities and identified key projects that are both feasible to implement and will help the Tribe reach its stated Energy Vision. A key finding of the energy needs assessment is that there are still numerous households that are without grid electric power, and it is likely that most of them will remain disconnected from the grid because of their remoteness. To provide these community members with reliable, affordable, modern energy services their homes will need to be electrified via a robust off-grid energy services program that installs and maintains off-grid energy systems. This is the key need that is explored and addressed in this plan. The approach taken is to establish a new business entity, a Tribal Energy Authority or Utility, that will operate a Tribal Energy Program. The Energy Strategic Plan identifies a number of potential funding sources that could be used to support both the On-grid and Off-grid Energy Programs. This plan also promotes continued efforts to reduce electricity consumption through the implementation of energy efficiency measures in existing facilities and the enforcement of a strong energy-efficient building code for all new construction on the Reservation. Finally, the plan promotes added resilience at critical Tribal facilities on the Reservation by recommending that battery energy storage systems and microgrid controls be coupled with rooftop solar PV systems to create cutting edge microgrid facilities that can provide critical power services to Tribal facilities when the main electric grid is shutdown.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Low-Cost Preform and Molding Processes

The entry cost for prototyping a composite component for manufacture using automated, high rate processes is prohibitively expensive in many cases, especially for small business, where tooling costs may be several $100k. Discussions with industry also indicate that many small companies, tier 1 and 2 suppliers, have an interest to mold composite parts but do not want to deal with the capital cost, material handling issues, and labor associated with dry fiber preforming operations. While the molders may locate near the end user for logistics reasons, it may be more cost effective for the performer to remain regional and invest in capital equipment to support preform automation, thus keeping costs to a minimum. This project was designed to explore and demonstrate several options to meet these industry needs. Dry fiber preforming approaches were evaluated which allow for low pressure resin infusion, single sided tooling options such a vacuum assisted resin transfer molding (VARTM) or low pressure resin transfer molding (RTM-light). Unlike sheet molding compound, SMC compression molding where typical molding pressures of 1000 psi are required to push material into the desired location; positioning of a dry fiber preform into the desired location on the tool allows for low molding pressures of 10-50 psi. Lower molding pressures allow for use of low cost, additive fabrication of polymeric tooling. Polymeric tooling is suitable for rapid part prototyping and limited production. Dry fiber preforming approaches evaluated included use of commercial chopped strand mat, robotic chopper gun deposition, and continuous fiber preform augmentation using tailored fiber placement (TFP). Use of chopped strand mat does not require a robotic deposition method, however a cutting table is generally required and there is typically 20-30% scrap generation. While various fiber areal weights are available, the preform is not readily optimized for minimal fiber use or weight savings. In contrast, a robotic chopper gun approach allows for localized deposition where fiber is required to meet structural requirements. The robotic method is highly automated and minimizes fiber scrap, however the capital cost of the equipment and engineering labor for programming can result in higher preform cost compared to chopped strand mat in certain cases depending on preform complexity. Dry fiber preforming using the robotic chopper gun method allows for creation of three dimensional forms. This approach may be ideal for molding in-house, or if the preforms stack together densely to allow for efficient shipping. Applications evaluated for this program considered trade-off between fabrication of a fully 3D preform versus production of a flat preform which is designed to readily drape into the final desired shape. Such a preform design greatly simplifies robotic programming and requires no specialized tooling. The flat preforms are easily stacked and shipped to the final molding location. Flat preforms are much easier to augment with TFP continuous fiber to provide local reinforcement. The demonstration and evaluation of these preforming and tooling methods were completed on three component applications. The first application was a battery box cover for an electric vehicle which was highly three dimensional. The second demonstrator article was comprised of complex contours and was used to demonstrate the use of TFP and RTM-light molding process. The third demonstration article was the roof of an operator’s cab for large construction equipment. The roof is relatively flat however it is comprised of complex changes in thickness which clearly demonstrate the advantage of robotic chopper gun approach as compared to using numerous preform layers of chopped strand mat. The cost trades for the various preforming methods are summarized to help guide the reader as to preforming method considerations. Finally, these demonstrations all used glass fiber roving. A fourth, exploratory task was added to evaluate the ability to make preforms using Zoltek’s carbon fiber split tow roving. We were able to adapt the chopper gun to make flat preforms for laminate testing, but further development effort would be required to make suitable preforms.

36 MATERIALS SCIENCE↗

High-Voltage Solid Polymer Batteries for Electric Drive Vehicles

The purpose of this project was for Seeo to develop a high energy lithium based technology with targets of over 500 Wh/l and 325 Wh/kg. Seeo would leverage the work already achieved with its unique proprietary solid polymer DryLyteTM technology in cells which had a specific energy density of 220 Wh/kg. The development work was focused on establishing a dual electrolyte system, coated cathode particle techniques, various types of additives, and different conductive salts. The program had a duration of three years, with Seeo delivering the final cells at the end of 2014 for evaluation by a DOE laboratory.

25 ENERGY STORAGE↗

Draft Methodology for Cybersecurity Analysis for Adoption of Wireless Technology in Nuclear Power Plants

The report is delivered as DOE-NE Cybersecurity Program Milestone M2CT-22IN1104014-Industry cybersecurity guidance adoption status. The milestone is specifically to document the process and the status of the efforts towards developing guidance in support of industry’s adoption of wireless communication technologies. To transform the operation of nuclear power plants, including domestic light-water reactors, advanced reactors, microreactors, and fission battery, for grid and non-grid applications, secure and resilient wireless capabilities are required. In addition, to realize new operational concepts such as autonomous operation and remote monitoring, advanced sensor, and instrumentation, wireless technology is essential. However, industry implementation is low, and there is no technical basis for how to understand and address potential risks for wireless communications for critical plant functions. A methodology with a technical basis for implementing secure wireless communication is crucial. This wireless adoption methodology is intended to assist a licensee in identifying an appropriate technological approach for securing wireless communications in nuclear power plant. However, this methodology does not provide guidance for addressing wireless design criteria or for addressing all the cybersecurity commitments in licensees’ cybersecurity plans (CSPs) including addressing security impact analysis that a licensee must perform before an update to a Critical Digital Asset (CDA). This methodology guides a licensee through a process of evaluating a proposed wireless implementation and drafting a plant change notification for an example use case. The example is a generic/nonproprietary version of the first test case of the methodology, which, if successfully implemented, is part of the consideration for protecting other functions’ use of wireless in a cybersecure manner.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integrated Building Energy Systems Design Considering Storage Technologies

The addition of storage technologies such as flow batteries, conventional batteries, and heat storage can improve the economic, as well as environmental attraction of micro-generation systems (e.g., PV or fuel cells with or without CHP) and contribute to enhanced demand response. The interactions among PV, solar thermal, and storage systems can be complex, depending on the tariff structure, load profile, etc. In order to examine the impact of storage technologies on demand response and CO2 emissions, a microgrid's distributed energy resources (DER) adoption problem is formulated as a mixed-integer linear program that can pursue two strategies as its objective function. These two strategies are minimization of its annual energy costs or of its CO2 emissions. The problem is solved for a given test year at representative customer sites, e.g., nursing homes, to obtain not only the optimal investment portfolio, but also the optimal hourly operating schedules for the selected technologies. This paper focuses on analysis of storage technologies in micro-generation optimization on a building level, with example applications in New York State and California. It shows results from a two-year research projectperformed for the U.S. Department of Energy and ongoing work. Contrary to established expectations, our results indicate that PV and electric storage adoption compete rather than supplement each other considering the tariff structure and costs of electricity supply. The work shows that high electricity tariffs during on-peak hours are a significant driver for the adoption of electric storage technologies. To satisfy the site's objective of minimizing energy costs, the batteries have to be charged by grid power during off-peak hours instead of PV during on-peak hours. In contrast, we also show a CO2 minimization strategy where the common assumption that batteries can be charged by PV can be fulfilled at extraordinarily high energy costs for the site.

25 ENERGY STORAGE↗

Circular economy framework for automobiles: Closing energy and material loops

Abstract Corporations, including automotive manufacturers, are increasingly exploring extended circular economy strategies as a means to enhance the sustainability of their products. The circular economy paradigm focuses on reducing nonrenewable materials and energy, promoting renewable feedstocks and energy, and keeping products/materials in use across the life cycle of a system. As such, life cycle environmental burdens associated with vehicle manufacturing, use, and disposal could potentially be reduced through circular economy strategies; however, no such comprehensive circular economy framework currently exists for the automotive industry. We develop the first circular economy schematic of automobiles, derived from the Ellen MacArthur Foundation's framework. Further, we characterize the current automotive circular economy using metrics of renewable energy and recycled materials. Specifically, for current U.S. average sedans, we find that internal combustion engine vehicles (ICEVs) use ∼6% renewable life cycle primary energy and 27% recycled materials; for battery electric vehicles (BEVs), these measures are ∼8% and 21%, respectively. On a vehicle‐miles‐traveled basis, BEVs use ∼47% less nonrenewable life cycle primary energy than ICEVs, highlighting the importance of electrification as a strategy for automotive manufacturers to reduce environmental burdens. Our proposed circular economy framework is then applied to Ford Motor Company's sustainability programs and initiatives as an example. This schematic aims to provide a starting point for the automotive industry to operationalize circular economy strategies, the application of which could advance its overall sustainability performance.

Aguilar Esteva, Laura C.↗

Commercially Scalable Process to Fabricate Porous Silicon

Navitas Advanced Solutions Group proposes a novel, commercially scalable approach to supply microporous silicon (μpSi) to lithium ion battery manufacturers. If successful, this project will result in a significant reduction in the cost and environmental impact of high capacity anodes that are needed to meet the EV Everywhere battery goals. Silicon nanocomposite materials have been identified as a viable anode technology for EV batteries. Presently, high capacity silicon-based anodes rely either on materials that are expensive (e. g., silane or nano-silicon powder) or on processes that are limited by low yield methods (e.g., chemical vapor deposition). Microporous silicon potentially avoids these limitations and is attracting increasing attention as a lower cost alternative for the manufacture of high capacity silicon-based anodes. Microporous silicon suitable for EV batteries is not currently available as a commodity material. Microporous silicon can be produced at lab scale through a metal catalyzed hydrofluoric acid etching process. However, this process is expensive and hazardous. Our proposed production route will facilitate the availability of μpSi to lithium ion battery producers and developers at a scale and cost able to support EV battery production. Under the Vehicle Technologies FOA AOI 4 seeks Advances in Existing and Next-Generation Battery Material Manufacturing to reduce the cost of EV batteries. The EV Everywhere initiative establishes a goal of $100/kWh system level cost for an EV battery. This cost target can be met with moderate risk through pairing silicon-based high capacity anodes with lithium metal-rich nickel manganese cobalt oxide 'LMR-NMC' cathodes. For this set of assumptions, the silicon anode active material cost would need to be <$25/kg. The Navitas µpSi powder manufacturing process will reach this target through a combination of low-cost commodity raw materials and reactants with scalable and low environmental impact processes. Processing will involve mechanical milling and thermal reduction operations that are in wide application at industrial scale. The goal of this program is to reach most or all of the MRL 6 criteria in a pilot scale demonstration for the manufacturing of porous silicon powder, while minimizing raw material added cost and limiting hazardous and environmental impact and using scalable industrial processing (i.e. mechanical milling, thermal reduction). The Navitas μpSi fabrication process represents a novel approach to reduce the cost of silicon anode material manufacturing. This process has been shown to be more efficient (higher yield) and economical on scaling up than conventional metal-assisted etching. The process significantly reduces the cost on $/mAh basis versus existing anode materials. The μpSi powders can be modified to form nanocomposite structures through blending with graphite or coating with carbon or a metal oxide to decrease initial capacity loss (ICL) and improve cell cycle life, a key barrier to adoption of silicon anodes into EV batteries. The impact of this technology will be driven by the projected rate of EV adoption and market share. By reducing battery cost, the proposed technology will stimulate EV adoption rate. Assuming this technology enables capturing an additional 6% of the present PHEV + EV market the reduction in petroleum consumption would be 90,000 gallons of gasoline per day, or 1.6M barrels per year. The carbon emissions from a gallon of gasoline = 2.4 kg/gallon. Thus, if the proposed technology was incorporated into just 0.1% of all new vehicles produced and if all the electricity to power those electric-drive vehicles was produced from clean, renewable sources such as wind and solar, it would result in 15K metric tons/yr reduction of CO2 emissions.

25 ENERGY STORAGE↗

Robust optimisation-based microgrid scheduling with islanding constraints

This paper proposes a robust optimization based optimal scheduling model for microgrid operation considering constraints of islanding capability. Our objective is to minimize the total operation cost, including generation cost and spinning reserve cost of local resources as well as purchasing cost of energy from the main grid. In order to ensure the resiliency of a microgrid and improve the reliability of the local electricity supply, the microgrid is required to maintain enough spinning reserve (both up and down) to meet local demand and accommodate local renewable generation when the supply of power from the main grid is interrupted suddenly, i.e., microgrid transitions from grid-connected into islanded mode. Prevailing operational uncertainties in renewable energy resources and load are considered and captured using a robust optimization method. With proper robust level, the solution of the proposed scheduling model ensures successful islanding of the microgrid with minimum load curtailment and guarantees robustness against all possible realizations of the modeled operational uncertainties. Numerical simulations on a microgrid consisting of a wind turbine, a PV panel, a fuel cell, a micro-turbine, a diesel generator and a battery demonstrate the effectiveness of the proposed scheduling model.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessment of Energy Storage Alternatives in the Puget Sound Energy System

As part of an ongoing study co-funded by the Bonneville Power Administration, under its Technology Innovation Grant Program, and the U.S. Department of Energy, the Pacific Northwest National Laboratory (PNNL) has developed an approach and modeling tool for assessing the net benefits of using energy storage located close to the customer in the distribution grid to manage demand. PNNL in collaboration with PSE and Primus Power has evaluated the net benefits of placing a zinc bromide battery system at two locations in the PSE system (Baker River / Rockport and Bainbridge Island). Energy storage can provide a number of benefits to the utility through the increased flexibility it provides to the grid system. Applications evaluated in the assessment include capacity value, balancing services, arbitrage, distribution deferral and outage mitigation. This report outlines the methodology developed for this study and Phase I results.

25 ENERGY STORAGE↗

Coordinated PEV Charging for Distribution System Management

Plug-in electric vehicles (PEVs) can help to reduce worldwide dependence on petroleum and carbon emissions. In the past a few years, PEVs have received considerable attention as an eco-friendly and cost-effective alternative to conventional gasoline vehicles. PEVs consume higher power from the grid during charging compared to conventional residential loads. Therefore, the emerging fleet of PEVs will introduce a considerable amount of additional load on power system. On the other hand, majority of PEVs are parked for more than 90% of the time, making them ideal for providing various services through Electric Vehicle Supply Equipment (EVSE), a.k.a. charging stations which are PEVs’ connection points to the power system. In this project, coordinated PEV charging are developed to provide distribution system services, considering PEV characteristics, realistic travel pattern, charging behaviors, and EVSE power rating and availability. The main efforts and contributions are summarized as follows. • Mobility models and EVSE charging capability/availability are indispensable for evaluating PEV charging coordination strategies and developing PEV charging control. Many existing studies utilize simplified mobility models assuming that the entire vehicle fleet returns home in the evening and is parked at home until the next morning. Some other PEV models better represent diversified home arrival and departure time, but cannot capture varying charging flexibility and capability at different locations, and therefore are not appropriate to study the impacts of public EVSE on PEV load and utilization. In this work, a mobility and charging flexibility model is proposed to better represent the temporal availability and varying charging capability from PEV onboard charger and EVSE. • Based on the mobility model, a generalized optimization method is proposed to evaluate different PEV charging coordination strategies. In existing literature, different algorithms and methods need to be designed to evaluate each charging strategy from both vehicle owners’ and system’s perspective. With the optimization method proposed in this work, different charging control strategies can be studied and compared by only updating objective functions. Moreover, optimization tricks are provided to convert the optimization problems to equivalent linear programming problems, which can be efficiently solved with existing solvers. • An innovative scheduling and control framework is proposed to enable smart PEV charging for grid services while meeting PEV owners’ travel needs. In the proposed framework, each set of EVSE is equipped with a controller that estimates charging power and energy flexibility based on vehicle characteristics, EVSE power rating, battery energy state, and upcoming trip information. With the simplified charging flexibility model received from each EVSE controller, the central coordinator determines the optimal power allocation for a look-ahead time window for the given grid services. The proposed charging control can help reduce the computational complexity and communication requirement compared with existing methods. It is also scalable to the expanding PEV fleet and robust to uncertainties in upcoming vehicle trips and future system condition. • The proposed charging strategy evaluation and smart charging control methods are applied to one of the prototypical feeders developed by the Pacific Northwest National Laboratory (PNNL) for case studies. Detailed trip information extracted from the National Household Travel Survey (NHTS) is used to represent travel and parking patterns. Different scenarios are simulated to evaluate the performance of the proposed methods and understand how PEV mobility and public EVSE availability affect PEV load and potential grid services.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Numerical Modeling and Parametric Study of a Dual Purpose Underground Thermal Battery

Buildings’ thermal energy systems for providing space heating/cooling consume a considerable amount of electricity nationwide. Integrating thermal energy storage with buildings’ thermal systems has the potential to shave the peak electric demand and to overcome the mismatch between the intermittent renewable power and the fluctuating daily demand for electricity. A novel dual-purpose underground thermal battery (DPUTB) has been developed to provide diurnal thermal energy storage in conjunction with a dual-source heat pump (DSHP)system. A two-dimensional numerical model is developed to simulate the transient performance of the DPUTB. This model has similar accuracy as a detailed three-dimensional model developed with commercial heat transfer and fluid dynamics simulation program but with 1000 times faster computational speed. A parametric study is performed to identify a design of the DPUTB that can provide 14 kWh thermal storage capacity for each charging and discharging cycle. A system simulation has been developed to assess the performance of the designed DPUTB when it is integrated with a DSHP for conditioning a typical residential building in summer and winter. Simulation results indicate that the DPUTB can meet all the design requirements in both summer and winter with the simple rule-based control strategy and the overall integrated DPUTB and DSHP system can shift the electric load for meeting the thermal demand from the peak hours to off-peak hours during a day, which would result in considerable energy cost savings if a Time of Use electricity tariff is applicable.

25 ENERGY STORAGE↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.