Plug-in electric vehicles (PEVs) can help to reduce worldwide dependence on petroleum and carbon emissions. In the past a few years, PEVs have received considerable attention as an eco-friendly and cost-effective alternative to conventional gasoline vehicles. PEVs consume higher power from the grid during charging compared to conventional residential loads. Therefore, the emerging fleet of PEVs will introduce a considerable amount of additional load on power system. On the other hand, majority of PEVs are parked for more than 90% of the time, making them ideal for providing various services through Electric Vehicle Supply Equipment (EVSE), a.k.a. charging stations which are PEVs’ connection points to the power system. In this project, coordinated PEV charging are developed to provide distribution system services, considering PEV characteristics, realistic travel pattern, charging behaviors, and EVSE power rating and availability. The main efforts and contributions are summarized as follows. • Mobility models and EVSE charging capability/availability are indispensable for evaluating PEV charging coordination strategies and developing PEV charging control. Many existing studies utilize simplified mobility models assuming that the entire vehicle fleet returns home in the evening and is parked at home until the next morning. Some other PEV models better represent diversified home arrival and departure time, but cannot capture varying charging flexibility and capability at different locations, and therefore are not appropriate to study the impacts of public EVSE on PEV load and utilization. In this work, a mobility and charging flexibility model is proposed to better represent the temporal availability and varying charging capability from PEV onboard charger and EVSE. • Based on the mobility model, a generalized optimization method is proposed to evaluate different PEV charging coordination strategies. In existing literature, different algorithms and methods need to be designed to evaluate each charging strategy from both vehicle owners’ and system’s perspective. With the optimization method proposed in this work, different charging control strategies can be studied and compared by only updating objective functions. Moreover, optimization tricks are provided to convert the optimization problems to equivalent linear programming problems, which can be efficiently solved with existing solvers. • An innovative scheduling and control framework is proposed to enable smart PEV charging for grid services while meeting PEV owners’ travel needs. In the proposed framework, each set of EVSE is equipped with a controller that estimates charging power and energy flexibility based on vehicle characteristics, EVSE power rating, battery energy state, and upcoming trip information. With the simplified charging flexibility model received from each EVSE controller, the central coordinator determines the optimal power allocation for a look-ahead time window for the given grid services. The proposed charging control can help reduce the computational complexity and communication requirement compared with existing methods. It is also scalable to the expanding PEV fleet and robust to uncertainties in upcoming vehicle trips and future system condition. • The proposed charging strategy evaluation and smart charging control methods are applied to one of the prototypical feeders developed by the Pacific Northwest National Laboratory (PNNL) for case studies. Detailed trip information extracted from the National Household Travel Survey (NHTS) is used to represent travel and parking patterns. Different scenarios are simulated to evaluate the performance of the proposed methods and understand how PEV mobility and public EVSE availability affect PEV load and potential grid services.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Wu, Di, Radhakrishnan, Nikitha, Ke, Xinda, Huang, Sen, Reiman, Andrew P., Kalsi, Karanjit. 2019-07-26. Coordinated PEV Charging for Distribution System Management. https://doi.org/10.2172/1562254

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Building the Business Case with JUSTIFI: Quantifying Multiple Benefits in the Automotive Industry

The Michigan State University Industrial Training and Assessment Center (MSU ITAC) conducted a pilot study at an automotive parts manufacturer in Michigan. The study identified energy-productivity enhancements through the application of the JUSTIFI software. Key recommendations included replacing six inefficient rooftop units (RTUs) with a new air rotational unit. By quantifying operational savings for this project, the expected payback period went from 6.6 years to 1.4 years. Additionally, the installation of variable frequency drives (VFDs) on condenser tower motors was suggested. By including all operational benefits, the payback period was reduced from 8.2 years to 1.3 years. This comprehensive analysis aims to bolster the manufacturer's goals of reducing energy while enhancing overall operational efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Physics-Informed Reinforcement Learning Framework for Economic-Thermal Co-Optimization of Crypto Mining Data Centers: Preprint

The rapid expansion of cryptocurrency mining has created a new class of high-density data centers characterized by extreme thermal flux and high sensitivity to volatile economic markets. Traditional thermal management strategies, typically reliant on rule-based control, maintain static setpoints that fail to account for fluctuating electricity prices and cryptocurrency values - factors critical to mining profitability. To address this, we present a physics-informed reinforcement learning (PIRL) framework for economic-thermal co-optimization in crypto mining data centers. This framework consists of a proximal policy optimization (PPO) agent, a virtual testbed powered by high-fidelity physics-based models, and an interactive frontend dashboard. The PPO agent is trained using the virtual testbed and strict hardware safety limits. This physics-informed approach allows the agent to learn a stochastic policy that dynamically balances mining revenue against operational costs by co-optimizing HVAC cooling setpoints and IT computational hashrate. The simulation results demonstrate that the integrated framework achieved an 8.62% increase in net operational profit compared to traditional baseline strategies while strictly adhering to safety-critical temperature constraints (coolant supply temperature < 32 degrees C). This work provides a scalable template for the deployment of reinforcement learning in mission critical facilities where economic volatility and physical safety must be managed simultaneously.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗