Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Uncertainties in estimates of the risks of late effects from space radiation

Methods used to project risks in low-Earth orbit are of questionable merit for exploration missions because of the limited radiobiology data and knowledge of galactic cosmic ray (GCR) heavy ions, which causes estimates of the risk of late effects to be highly uncertain. Risk projections involve a product of many biological and physical factors, each of which has a differential range of uncertainty due to lack of data and knowledge. Using the linear-additivity model for radiation risks, we use Monte-Carlo sampling from subjective uncertainty distributions in each factor to obtain an estimate of the overall uncertainty in risk projections. The resulting methodology is applied to several human space exploration mission scenarios including a deep space outpost and Mars missions of duration of 360, 660, and 1000 days. The major results are the quantification of the uncertainties in current risk estimates, the identification of factors that dominate risk projection uncertainties, and the development of a method to quantify candidate approaches to reduce uncertainties or mitigate risks. The large uncertainties in GCR risk projections lead to probability distributions of risk that mask any potential risk reduction using the "optimization" of shielding materials or configurations. In contrast, the design of shielding optimization approaches for solar particle events and trapped protons can be made at this time and promising technologies can be shown to have merit using our approach. The methods used also make it possible to express risk management objectives in terms of quantitative metrics, e.g., the number of days in space without exceeding a given risk level within well-defined confidence limits. Published by Elsevier Ltd on behalf of COSPAR.

Non-NASA Center↗

Space Radiation Cancer Risks

Space radiation presents major challenges to astronauts on the International Space Station and for future missions to the Earth s moon or Mars. Methods used to project risks on Earth need to be modified because of the large uncertainties in projecting cancer risks from space radiation, and thus impact safety factors. We describe NASA s unique approach to radiation safety that applies uncertainty based criteria within the occupational health program for astronauts: The two terrestrial criteria of a point estimate of maximum acceptable level of risk and application of the principle of As Low As Reasonably Achievable (ALARA) are supplemented by a third requirement that protects against risk projection uncertainties using the upper 95% confidence level (CL) in the radiation cancer projection model. NASA s acceptable level of risk for ISS and their new lunar program have been set at the point-estimate of a 3-percent risk of exposure induced death (REID). Tissue-averaged organ dose-equivalents are combined with age at exposure and gender-dependent risk coefficients to project the cumulative occupational radiation risks incurred by astronauts. The 95% CL criteria in practice is a stronger criterion than ALARA, but not an absolute cut-off as is applied to a point projection of a 3% REID. We describe the most recent astronaut dose limits, and present a historical review of astronaut organ doses estimates from the Mercury through the current ISS program, and future projections for lunar and Mars missions. NASA s 95% CL criteria is linked to a vibrant ground based radiobiology program investigating the radiobiology of high-energy protons and heavy ions. The near-term goal of research is new knowledge leading to the reduction of uncertainties in projection models. Risk projections involve a product of many biological and physical factors, each of which has a differential range of uncertainty due to lack of data and knowledge. The current model for projecting space radiation cancer risk relies on the three assumptions of linearity, additivity, and scaling along with the use of population averages. We describe uncertainty estimates for this model, and new experimental data that sheds light on the accuracy of the underlying assumptions. These methods make it possible to express risk management objectives in terms of quantitative metrics, i.e., the number of days in space without exceeding a given risk level within well defined confidence limits. The resulting methodology is applied to several human space exploration mission scenarios including lunar station, deep space outpost, and a Mars mission. Factors that dominate risk projection uncertainties and application of this approach to assess candidate mitigation approaches are described.

Cucinotta, Francis A.↗

The Art World's Concept of Negative Space Applied to System Safety Management

Tools from several different disciplines can improve system safety management. This paper relates the Art World with our system safety world, showing useful art schools of thought applied to system safety management, developing an art theory-system safety bridge. This bridge is then used to demonstrate relations with risk management, the legal system, personnel management and basic management (establishing priorities). One goal of this presentation/paper is simply to be a fun diversion from the many technical topics presented during the conference.

Goodin, James Ronald (Ronnie)↗

Assessment and Validation of Collision "Consequence" Method of Assessing Orbital Regime Risk Posed by Potential Satellite Conjunctions

Collision risk management theory requires a thorough assessment of both the likelihood and consequence of potential collision events. Satellite conjunction risk assessment has produced a highly-developed theory for assessing the likelihood of collision but neglects to account for the consequences of a given collision. While any collision may compromise the operational survival of a spacecraft, the amount of debris produced by the potential collision, and therefore the degree to which the orbital corridor may be compromised, can vary greatly among satellite conjunctions. Previous studies leveraged work on satellite collision modeling to develop a method to estimate whether a particular collision is likely to produce a relatively large or relatively small amount of resultant debris. The approximation of the number of debris pieces is dependent on a mass estimation process for the secondary objects utilizing the radar cross section of said object. This study examines the validity of the mass estimation process and establishes uncertainty bounds on the secondary object mass, which will be used to best approximate the possible consequences of a potential collision. This process is then applied to a large set of historical conjunctions to assess the frequency at which possible collisions may significantly augment the orbital debris environment in operational spacecraft.

Collision Consequence↗

Using DNA Damage to Investigate the Individual Variability of Human Sensitivity to Ionizing Radiation

High-LET ionizing radiation is a major occupational health hazard for astronauts, but risk assessment remains elusive due to limited epidemiological data. Identifying genetic factors modulating the individual radiation response may be the most effective strategy to provide individualized risk management for long-duration high-radiation missions. We have started tackling the challenge of predicting individual risks by identifying human genetic loci associated with various radiation sensitivity phenotypes in primary blood mononuclear cells from a relatively large healthy human cohort. To date, we have performed the isolation of PBMCs from 768 subjects of the same ethnicity, and irradiated PBMCs from 576 subjects with 1 and 3 particles/100µm2 of 600 MeV/n 56Fe, 350 MeV/n 40Ar and 350 MeV/n 28Si ions. The phenotypes of interest were: number of radiation-induced foci (or RIFs), CellROX oxidative stress responses and cell death, at 4h and 24h following irradiation. We have observed a significant inter-individual variability at 0 Gy between the 576 studied subjects, with a mean fold difference between the 10% lowest and highest responders of 5.6 of RIFs/cell, 7.9 in mean CellRox intensity, and 9.3 in percentage of dead cells. In order to better assess genetic factors influencing DNA repair, we used a metric previously introduced by our group to sort out radiation sensitivity phenotypes in mice: i.e. the ratio of the first to the second slope of RIFs/cell (between 0 and 1, and between 1 and 3 particle/100µm2). Preliminary data on 192 individuals showed a distribution of low-dose responders (ratio > 1) to high-dose responders (ratio < 1) at 4h of 12%, 55% and 52% respectively for Fe, Ar and Si. The average value for the first and the second slopes was very similar for the two lowest LET (0.10 [-0.26;0.58] and 0.09 [-0.45;0.41] for Ar, 0.07 [-0.27;0.38] and 0.08 [-0.19;0.42] for Si), indicating a linear dose response across both fluence. Fe showed clear saturation for the highest dose with a slope of -0.09 [-0.86;1.51] against 0.68 [-2.21;2.20] for the low dose range, which probably reflects that many PBMCs are beyond repair at the high dose. Note that other significances were found for additional factors such as BMI and age whereas none were found for sex. GWAS will be performed on all phenotypes upon completion of measurements.

Pariset, E.↗

Using DNA Damage to Investigate the Individual Variability of Human Sensitivity to Ionizing Radiation

High-LET ionizing radiation is a major occupational health hazard for astronauts, but risk assessment remains elusive due to limited epidemiological data. Identifying genetic factors modulating the individual radiation response may be the most effective strategy to provide individualized risk management for long-duration high-radiation missions. We have started tackling the challenge of predicting individual risks by identifying human genetic loci associated with various radiation sensitivity phenotypes in primary blood mononuclear cells from a relatively large healthy human cohort. To date, we have performed the isolation of PBMCs from 768 subjects of the same ethnicity, and irradiated PBMCs from 576 subjects with 1 and 3 particles/100µm2 of 600 MeV/n 56Fe, 350 MeV/n 40Ar and 350 MeV/n 28Si ions. The phenotypes of interest were: number of radiation-induced foci (or RIFs), CellROX oxidative stress responses and cell death, at 4h and 24h following irradiation. We have observed a significant inter-individual variability at 0 Gy between the 576 studied subjects, with a mean fold difference between the 10% lowest and highest responders of 5.6 of RIFs/cell, 7.9 in mean CellRox intensity, and 9.3 in percentage of dead cells. In order to better assess genetic factors influencing DNA repair, we used a metric previously introduced by our group to sort out radiation sensitivity phenotypes in mice: i.e. the ratio of the first to the second slope of RIFs/cell (between 0 and 1, and between 1 and 3 particle/100µm2). Preliminary data on 192 individuals showed a distribution of ?low-dose responders? (ratio > 1) to ?high-dose responders? (ratio < 1) at 4h of 12%, 55% and 52% respectively for Fe, Ar and Si. The average value for the first and the second slopes was very similar for the two lowest LET (0.10 [-0.26;0.58] and 0.09 [-0.45;0.41] for Ar, 0.07 [-0.27;0.38] and 0.08 [-0.19;0.42] for Si), indicating a linear dose response across both fluence. Fe showed clear saturation for the highest dose with a slope of -0.09 [-0.86;1.51] against 0.68 [-2.21;2.20] for the low dose range, which probably reflects that many PBMCs are beyond repair at the high dose. Note that other significances were found for additional factors ? such as BMI and age ? whereas none were found for sex. GWAS will be performed on all phenotypes upon completion of measurements.

Pariset, E.↗

Transfer Function Models and Sensitivity Analysis

In many situations, real or induced flaws such as tight cracks with known morphology cannot be manufactured in part configuration specimens or in real parts. Typically, fatigue cracks are manufactured in simple geometry specimens such as flat plates, dog-bone shaped flat or round specimens. If a nondestructive evaluation (NDE) technique is required to provide a reliably detectable target flaw size denoted as α_(90/95) for induced flaws in real part, then the direct method for qualifying the NDE procedure is to use the appropriate induced flaw specimens and perform probability of detection analysis using these flaws. This can be described as direct POD demonstration testing, which may follow guidelines of MIL-HDBK-1823. This paper considers a case, where induced flaws are not available in part configuration specimens. Therefore, a direct POD demonstration study cannot be undertaken. In such situation, general practice for NDE procedure qualification is to use artificial flaws in simple geometry and part configuration specimens, and induced flaws in the chosen simple geometry specimens. Signal response data is taken on all sets of artificial and induced flaws. NDE procedure testing on induced flaw in simple geometry specimen is called NDE demonstration testing here. A transfer function NDE procedure qualification method for forward case calculates predicted induced flaw size for demonstration using a chosen target flaw size. Another transfer function method for inverse case, calculates the target flaw size using a given demonstration flaw size. The transfer function analysis assumes relationship of artificial flaw signal responses in real parts and simple geometry specimens; and induced flaw responses in simple geometry specimens to induced flaws in real parts. The signal response transfer relationships model should be defined before transfer function models can be devised. Assuming that the signal response transfer relationships model is valid, forward and inverse case transfer function methods have been devised. Because of lack of signal response data from induced flaws in real part, 90/95% POD/confidence (P/C) cannot be demonstrated directly. However, the transfer function method may be assessed using simulation to evaluate whether the resulting target flaw size or demonstration flaw size provides adequate confidence to the assumed signal response transfer relationships model. Therefore, the transfer function approach is a risk assessment approach. Both the signal response transfer relationships model and the transfer function model are important in managing risk in results provided by the transfer function NDE technique qualification or assessment. The signal response transfer relationships model needs to be validated with empirical data and then transfer function model needs to be validated for desired P/C on case-by-case basis.

Nondestructive evaluation↗

Risk analysis simulation of rover operations for Mars surface exploration

Risk management advocates have long sought to directly influence the early stages of the systems engineering process through a more effective role in system design trade studies. The principal obstacle to this has been the lack of credible ways to represent and quantify mission risk—that is, a combination of the probability of mission success (“system safety”) and science value—for the project manager and the rest of the design team. If it were possible to quantify mission risk, then the effects of proposed mission and system design changes could be calculated, and along with life-cycle costs, could be used to explore the design space more extensively and select better designs. JPL has been working to build the capability to quantify the probability of mission success using a federation of diverse simulations and models, each of which contributes some vital piece of the puzzle. The initial institutional focus has been on Mars surface operations. This ensemble computing framework enables the diverse models and simulations to work together seamlessly. Recent work at JPL has demonstrated the capability to exercise this ensemble from end-to-end using an Oracle-based database to automatically move results from one model/simulation to the next stage in the analysis.

Shishko, Robert↗

Large-scale Hydrogen Storage – Risk Assessment Seattle City Light and Port of Seattle [Abstract]

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support Seattle City Light (SCL), and the Port of Seattle (Port) in performing a risk assessment of large-scale hydrogen storage. Risk assessment is often used to ensure that adequate measures are taken to protect workers and the public, the environment, infrastructure, and assets. A detailed risk assessment can also be used to direct funding and upgrades, to specific components and sub-systems in order to mitigate risks to the larger system. In this way risk assessments are often employed as a part of a larger risk management strategy, with the goal of minimizing the occurrence of hazards and to identify means to limit their consequences. Risk assessment is often used to engage and inform regulators, and to communicate how specific regulations are being met. However, it is important to note that the proposed work is not intended for SCL and the Port to use in order to gain regulatory acceptance for their proposed activities. The work performed as a part of this effort will be a preliminary risk assessment for early-stage component and system designs and should be considered research and development (R&D). As such, the proposed work will be performed to a quality level and design maturity consistent with R&D and is not considered appropriate for final safety analysis and regulatory compliance purposes. Previous and on-going work at SCL and the Port demonstrated the utility of deploying hydrogen systems at the Port. The deployment of hydrogen at the Port is a part of a larger vision of using hydrogen to address a range of issues for SCL and the Port. These include large-scale fueling of MD/HD vehicles, cargo-handling equipment (CHE), and harbor vessels to reduce emissions; support of adjacent LD vehicles; support of critical port operations during extreme events (i.e., resiliency); deferral of more capital- and time-intensive electrical distribution system upgrades while still supporting evolving port operations and decarbonization efforts; facilitating electrification by establishing energy storage as a grid resource, starting at strategic port locations; creation of a flexible market resource that can be used by SCL to generate revenue via arbitrage; support of planned future maritime operations that involve heavy use of hydrogen for ocean-going vessels; and future end-use applications involving natural gas pipeline hydrogen injection. Ultimately, the success of these activities is underpinned by the deployed storage capacity. Large-scale deployment of hydrogen systems will require hydrogen storage at a scale that has not been demonstrated. In addition, the ideal location for such multi-use systems is near the end user which will often necessitate deploying into urban and/or industrial areas. A detailed risk assessment using the Port as a test case is necessary to ensure the deployment of large-scale hydrogen is successful. Many technologies have been proposed for hydrogen storage; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for the Port will be analyzed, and a risk assessment for compressed hydrogen, liquified hydrogen, and Liquid Organic Hydrogen Carrier (LOHC) storage will be performed. These risk assessments will be useful for understanding how each of these technologies would perform in terms of facility and public safety. The operating states of the proposed hydrogen systems at the Port will be analyzed and incorporated into the storage risk assessment. Scalability will also be analyzed to understand how future port uses would affect the overall risk assessment. Finally, using the risk assessment as a tool to inform engagement and to gain stakeholder acceptance will be explored.

08 HYDROGEN↗

Optimizing spacecraft design - optimization engine development : progress and plans

At JPL and NASA, a process has been developed to perform life cycle risk management. This process requires users to identify: goals and objectives to be achieved (and their relative priorities), the various risks to achieving those goals and objectives, and options for risk mitigation (prevention, detection ahead of time, and alleviation). Risks are broadly defined to include the risk of failing to design a system with adequate performance, compatibility and robustness in addition to more traditional implementation and operational risks. The options for mitigating these different kinds of risks can include architectural and design choices, technology plans and technology back-up options, test-bed and simulation options, engineering models and hardware/software development techniques and other more traditional risk reduction techniques.

risk↗

The Integrated Medical Model: Statistical Forecasting of Risks to Crew Health and Mission Success

The Integrated Medical Model (IMM) helps capture and use organizational knowledge across the space medicine, training, operations, engineering, and research domains. The IMM uses this domain knowledge in the context of a mission and crew profile to forecast crew health and mission success risks. The IMM is most helpful in comparing the risk of two or more mission profiles, not as a tool for predicting absolute risk. The process of building the IMM adheres to Probability Risk Assessment (PRA) techniques described in NASA Procedural Requirement (NPR) 8705.5, and uses current evidence-based information to establish a defensible position for making decisions that help ensure crew health and mission success. The IMM quantitatively describes the following input parameters: 1) medical conditions and likelihood, 2) mission duration, 3) vehicle environment, 4) crew attributes (e.g. age, sex), 5) crew activities (e.g. EVA's, Lunar excursions), 6) diagnosis and treatment protocols (e.g. medical equipment, consumables pharmaceuticals), and 7) Crew Medical Officer (CMO) training effectiveness. It is worth reiterating that the IMM uses the data sets above as inputs. Many other risk management efforts stop at determining only likelihood. The IMM is unique in that it models not only likelihood, but risk mitigations, as well as subsequent clinical outcomes based on those mitigations. Once the mathematical relationships among the above parameters are established, the IMM uses a Monte Carlo simulation technique (a random sampling of the inputs as described by their statistical distribution) to determine the probable outcomes. Because the IMM is a stochastic model (i.e. the input parameters are represented by various statistical distributions depending on the data type), when the mission is simulated 10-50,000 times with a given set of medical capabilities (risk mitigations), a prediction of the most probable outcomes can be generated. For each mission, the IMM tracks which conditions occurred and decrements the pharmaceuticals and supplies required to diagnose and treat these medical conditions. If supplies are depleted, then the medical condition goes untreated, and crew and mission risk increase. The IMM currently models approximately 30 medical conditions. By the end of FY2008, the IMM will be modeling over 100 medical conditions, approximately 60 of which have been recorded to have occurred during short and long space missions.

Fitts, M. A.↗

Science Goals in Radiation Protection for Exploration

Space radiation presents major challenges to future missions to the Earth s moon or Mars. Health risks of concern include cancer, degenerative and performance risks to the central nervous system, heart and lens, and the acute radiation syndromes. The galactic cosmic rays (GCR) contain high energy and charge (HZE) nuclei, which have been shown to cause qualitatively distinct biological damage compared to terresterial radiation, such as X-rays or gamma-rays, causing risk estimates to be highly uncertain. The biological effects of solar particle events (SPE) are similar to terresterial radiation except for their biological dose-rate modifiers; however the onset and size of SPEs are difficult to predict. The high energies of GCR reduce the effectiveness of shielding, while SPE s can be shielded however the current gap in radiobiological knowledge hinders optimization. Methods used to project risks on Earth must be modified because of the large uncertainties in projecting health risks from space radiation, and thus impact mission requirements and costs. We describe NASA s unique approach to radiation safety that applies probabilistic risk assessments and uncertainty based criteria within the occupational health program for astronauts and to mission design. The two terrestrial criteria of a point estimate of maximum acceptable level of risk and application of the principle of As Low As Reasonably Achievable (ALARA) are supplemented by a third requirement that protects against risk projection uncertainties using the upper 95% confidence level (CL) in radiation risk projection models. Exploration science goals in radiation protection are centered on ground-based research to achieve the necessary biological knowledge, and in the development of new technologies to improve SPE monitoring and optimize shielding. Radiobiology research is centered on a ground based program investigating the radiobiology of high-energy protons and HZE nuclei at the NASA Space Radiation Laboratory (NSRL) located at DoE s Brookhaven National Laboratory in Upton, NY. We describe recent NSRL results that are closing the knowledge gap in HZE radiobiology and improving exploration risk estimates. Linking probabilistic risk assessment to research goals makes it possible to express risk management objectives in terms of quantitative metrics, which include the number of days in space without exceeding a given risk level within well defined confidence limits, and probabilistic assessments of the effectiveness of design trade spaces such as material type, mass, solar cycle, crew selection criteria, and biological countermeasures. New research in SPE alert and risk assessment, individual radiation sensitivity, and biological countermeasure development are described.

Cucinotta, Francs A.↗

Uncertainties in Estimates of the Risks of Late Effects from Space Radiation

The health risks faced by astronauts from space radiation include cancer, cataracts, hereditary effects, and non-cancer morbidity and mortality risks related to the diseases of the old age. Methods used to project risks in low-Earth orbit are of questionable merit for exploration missions because of the limited radiobiology data and knowledge of galactic cosmic ray (GCR) heavy ions, which causes estimates of the risk of late effects to be highly uncertain. Risk projections involve a product of many biological and physical factors, each of which has a differential range of uncertainty due to lack of data and knowledge. Within the linear-additivity model, we use Monte-Carlo sampling from subjective uncertainty distributions in each factor to obtain a Maximum Likelihood estimate of the overall uncertainty in risk projections. The resulting methodology is applied to several human space exploration mission scenarios including ISS, lunar station, deep space outpost, and Mar's missions of duration of 360, 660, and 1000 days. The major results are the quantification of the uncertainties in current risk estimates, the identification of factors that dominate risk projection uncertainties, and the development of a method to quantify candidate approaches to reduce uncertainties or mitigate risks. The large uncertainties in GCR risk projections lead to probability distributions of risk that mask any potential risk reduction using the "optimization" of shielding materials or configurations. In contrast, the design of shielding optimization approaches for solar particle events and trapped protons can be made at this time, and promising technologies can be shown to have merit using our approach. The methods used also make it possible to express risk management objectives in terms of quantitative objective's, i.e., the number of days in space without exceeding a given risk level within well defined confidence limits.

Cucinotta, F. A.↗

Evaluation of Machine Learning and Deep Learning Algorithms for Fire Prediction in Southeast Asia

Vegetation fires are prevalent in South/Southeast Asian countries, making fire prediction crucial due to their potential environmental, economic, and social impacts. Accurate predictions of fires facilitate timely interventions, helping to mitigate uncontrolled fires that can lead to biodiversity loss and air quality issues. In this study, we utilize VIIRS satellite-derived fire data alongside six machine learning and deep learning models—Simple Persistence, Multi-Layer Perceptron (MLP), Convolutional Neural Network (CNN), Long Short-Term Memory (LSTM), CNN-LSTM, and ConvLSTM—to determine the most effective fire prediction model, using Root Mean Square Error (RMSE) as the metric. Our results indicate that the CNN model is the most reliable in regions with spatial dependencies, such as Brunei, Indonesia, Malaysia, the Philippines, Timor-Leste, and Thailand. Conversely, the ConvLSTM model excels in countries with complex spatiotemporal dynamics like Laos, Myanmar, and Vietnam. The CNN-LSTM hybrid model also performed well in Cambodia, suggesting a need for a balanced approach in areas requiring both spatial and temporal feature extraction. Furthermore, simpler models like Persistence and MLP showed limitations in capturing dynamic patterns and temporal dependencies. Our findings highlight the importance of evaluating models before implementing any decision support systems (DSS) in fire management. By tailoring models to specific regional fire data, we can enhance prediction accuracy and responsiveness, ultimately improving fire risk management in Southeast Asia and beyond.

Deep learning↗

Implementing a Sleep Health Education and Sleep Disorders Screening Program in Fire Departments

The lost productivity from fatigue adds something like $2,000 per worker per year to an organization's overall costs. The human and financial burden of fatigue has prompted specialists to develop fatigue risk management plans, which have been implemented with success in industries like aviation, manufacturing, and first responders. We'll explore the common risk factors for fatigue and delve into successful programs from major players in the American marketplace, and provide actionable recommendations for change within your organization to prevent fatigue and encourage greater holistic wellness among your workers. Learning Objectives - Explain the causes and effects of the fatigue problem - Illustrate the difference between physical and chronic sleep-related fatigue - Explore fatigue management case studies from aviation, manufacturing, and warehousing - Demonstrate fatigue conclusions from research conducted at NASA - Answer common questions on fatigue management - Share recommendations from our experts on creating a fatigue management plan.

alertness↗

Requirements, architectures and risks

We advocate the use of risk-based reasoning to help make good architectural decisions. We explore the adaptation of a risk management process and tool to this purpose.

risk requirements architectures↗

CIE Curriculum Guide (V.2.0)

The Cyber-Informed Engineering (CIE) Curriculum Guide offers a comprehensive framework, guidance, and resources for integrating CIE into university-level engineering programs and related educational activities. The primary goal is to help educators adopt CIE principles into their teaching to produce future engineers and technicians who understand digital risks in modern engineered systems, thereby addressing the nation’s infrastructure resilience needs. This guide outlines practical integration examples, links to resources to accelerate CIE adoption, and shares insights from partner academic institutions on various implementation strategies. CIE is a framework for embedding engineered controls that mitigate the impact of cyber-attacks in any cyber-physical system used in critical energy infrastructure and other sectors. Developed by the U.S. Department of Energy’s Office of Cybersecurity, Energy Security, and Emergency Response (CESER), the National Cyber-Informed Engineering Strategy emphasizes embedding CIE into formal education, training, and credentialing. This guide supports this strategic objective by providing examples of integrating CIE concepts into engineering curricula, from class activities to new courses and certificate programs. The importance of educating cyber-informed engineers is underscored by the evolving cybersecurity threats facing engineered systems. As industrial control systems (ICS) increasingly incorporate digital technologies, the responsibility for security extends to both cyber professionals and engineers. CIE addresses critical gaps in designing and protecting physical systems with digital components against cyber risks, ensuring engineers consider digital risk throughout the engineering design lifecycle. Currently, engineering education does not routinely include cyber-informed principles, highlighting a gap in addressing modern engineering system risks. This guide advocates for updating engineering curricula to include digital risk management as a fundamental element. By doing so, future engineers will be equipped to design resilient systems that mitigate digital risks from the outset. Through this guide, engineering faculty can integrate CIE into their curricula, bridging the gap between digital risk and engineering. This approach prepares a cyber-informed workforce capable of safeguarding the cyber-physical systems crucial to national security and public welfare. By embedding CIE into education and training, institutions can produce engineers and technicians who can effectively mitigate cyber impacts throughout the engineering design lifecycle, resulting in more secure critical infrastructures.

42 - ENGINEERING↗