The Transfer of Improved Cavity Processing Protocols to Industry for LCLS-II: N-Doping and Electropolishing

Based on the R&D efforts of colleagues at FNAL, Cornell, and JLab, the LCLS-II project adopted a modification to the rather standard niobium SRF cavity surface processing protocol that incorporates a high temperature diffusion doping with nitrogen gas. This change was motivated by the resulting higher Q0 and the prospect of significantly lower cryogenic heat load for LCLS-II. JLab is responsible for managing the cavity procurement for the LCLS-II project. The first phase of the procurement action is to transfer the nitrogen-doping protocol to the industrial vendors. We also seek to exploit improvements in understanding of the niobium electropolishing process as part of the production processing of the TESLA-style LCLS-II cavities. We report on the technology transfer activities and progress toward the envisaged performance demonstration of vendor-processed cavities.

Reece, Charles E.↗

ESPC ESA Training Series: Site-Specific/Stand-Alone Contract Vehicle

This webinar provides instructions and resources for financing distributed energy projects (e.g., on–site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the site–specific/stand–alone contract vehicle. The site–specific/stand–alone contract vehicle is a procurement process using a request for proposal (RFP). Topics covered during the webinar include forming a strong project team, validating the feasibility of the distributed energy project at a site, acquisition planning, RFP development, procurement, proposal evaluation and contract award, and the construction and performance period. This webinar also provides an overview of the resources available in the ESPC ESA Toolkit, such as checklists and templates.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Fabrication experience of the pre-production PIP-II SSR2 cavities at Fermilab

The Proton Improvement Plan-II (PIP-II, [1]) linac will include 35 Single Spoke Resonators type 2 (SSR2). A total of eight pre-production SSR2 jacketed cavities will be procured and five installed in the first pre-production cryomodule. The mechanical design of the jacketed cavity has been finalized and it will be presented in this paper along with fabrication and processing experience. The importance of interfaces, quality controls and procurement aspects in the design phase will be remarked as well as lessons learned during the fabrication process. Furthermore, development studies will be presented together with other design validation tests.

43 PARTICLE ACCELERATORS↗

Techno-Economic Analysis

This National Energy Technology Laboratory presentation was given at the Carbon Conversion Procurement Grant Program Regional Workshops. The workshops are organized collaboratively by the DOE Office of Fossil Energy and Carbon Management and the United States Energy Association. There are a series of four workshops scheduled: 1) August 30, 2022 in Knoxville, TN (University of Tennessee) 2) September 13, 2022 in Emeryville, CA (Lawrence Berkeley National Laboratory 3) September 27, 2022 in New York, NY (Orrick, Herrington, & Sutcliffe LLP) 4) October 18, 2022 in Minneapolis, MN (TBD) The intent of the workshop is to provide potential applicants with background on the Procurement Grants program and the types of information requested. The specific purpose of this presentation is to give a high-level overview of techno-economic analysis to an audience that has little to no experience conducting them. The intent is to help the audience understand why techno-economic analysis is requested in the application process and to educate on its utility.

Hackett, Gregory↗

Advancing Federal Infrastructure Through Innovation: Selecting Electric Vehicle Charging Infrastructure Wisely

The Biden Administration's issuance of Executive Orders directly addressing and accelerating Federal fleet electrification places an onus on both fleet and facility managers. This panel will help fleet and facility personnel understand how to select EVSE infrastructure in terms of implementation, energy management, and costs of procurement, installation/deployment, and electricity. The panel will cover technology aspects to include managed EVSE, bi-directional charging, implications on local electrical systems and storage needs in certain cases to buffer power demand. Discussion will include various considerations relevant to ensuring adequate EVSE, balancing infrastructure needs, and upgrades with fleet needs. The panelists will discuss how to provide sufficient infrastructure support, including which stakeholders to involve, procurement impediments, easement locations, and requirements that arise during the design and implementation process.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

An Initial Evaluation of the Elevated-Temperature Cyclic Properties of Optimized 316H Stainless Steel Fabricated by Powder Metallurgy Hot Isostatic Pressing

Powder metallurgy hot isostatic pressing (PM-HIP) is a mature advanced manufacturing technology, which can consolidate metallic powder under high temperature and pressure to generate near-net shape components. This process can lower production costs and reduce component lead times for nuclear reactor construction and can be readily deployed in the near term for microreactor components because of their smaller size. The purpose of this work is to continue the evaluation of elevated-temperature cyclic material properties for PM-HIP 316H stainless steel. Prior scoping results have shown that the commercially procured PM-HIP stainless-steel materials have reduced creep-fatigue performance compared to wrought 316 stainless steels. To better understand how PM-HIP processed material properties compare to traditional manufacturing methods, additional billets of PM-HIP 316H stainless steel were procured and tested. This testing is necessary to understand how elevated-temperature properties are influenced by the PM-HIP process and what data are needed for incorporating PM HIP 316H into the American Society of Mechanical Engineers Boiler Pressure Vessel Code, Section III, Division 5 for high temperature reactor construction. Specifically, an additional PM-HIP 316H stainless steel billet with lower oxygen and nitrogen concentrations was fabricated by the Nuclear Advanced Manufacturing Research Centre of the United Kingdom and tested to understand if elevated-temperature cyclic properties can be improved. The creep-fatigue resistance of the material from this new billet did not show appreciable improvement compared to prior testing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Practical Application of Integrated Systems Engineering and Project Management on a Complex EPC Project - 17207

This paper introduces how an integrated set of Systems Engineering (SE) and Project Management (PM) processes were applied in a practical way, to address the challenges on a complex, highly technical, Engineering Procurement Construction project within the nuclear field. This approach was inspired by: - the principles contained in a Community of Practice on Lean in Program Management jointly established in May 2012 by MIT, PMI and INCOSE; - an opportunity to apply international standard ISO/IEC 15288:2008(E) Systems and software engineering - System life cycle processes on a real-life situation; - and the belief that there is great value in applying Systems Engineering and Project Management in an integrated manner on a project. The project offering this opportunity was the Detail Engineering, Procurement, Construction and Cold Commissioning (EPC) of the Silo Direct-encapsulation Plant (SDP). This project was undertaken by the Joint Venture (JV) formed by Areva, Mace and Atkins (a.m.a. Nuclear Ltd). Unfortunately, early termination of the project, at a stage when only a part of the processes and tools were being implemented, did not allow this integrated approach to be demonstrated in full. However, the benefits achieved in the early stages in aligning and forming an integrated project execution team, showed potential for great benefits. This paper covers an introductory analysis of the situation, the successes and benefits achieved from implementing an integrated SE - PM approach up to the stage when the project was terminated, and possible path forward had the project continued. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Immobilized Low-Activity Waste Transportation System - 18496

The transportation of radioactive immobilized low-activity waste (ILAW) containers at the United States Department of Energy's (DOE) Hanford site is planned with a new ILAW transporter system. A project will design, procure, and fabricate components to support the safe and efficient transport of the radioactive ILAW containers, generated at the Hanford Tank Waste Treatment and Immobilization Plant (WTP), Low-Activity Waste (LAW) production facility, to the Integrated Disposal Facility (IDF) final disposal site. Prototype design was completed in fiscal year (FY) 2017. Fabrication of the transportation trailer/pallet system is occurring in FY2018, with testing to be completed in early FY2019. Any design modification will be incorporated into the design, and procurement of additional systems will then occur, to support WTP LAW hot commissioning, as soon as 2022. This project is implemented by the DOE tank farm contractor, Washington River Protection Solutions LLC (WRPS), with primary prototype design and fabrication being performed by SNC-Lavalin (Atkins). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Are Initiative Port Granby Project - Water Management in Extreme Weather Conditions - 19257

The Port Granby Project is part of the Port Hope Area Initiative (PHAI) through which Canadian Nuclear Laboratory (CNL) is managing long-term historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. Port Granby remediation scope includes 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF), which accepted waste until the 1980's, to the newly constructed LTWMF. This paper provides an overview of the challenges of water management (control of storm and groundwater at the LTWMF and PGWMF) on a large-scale construction project with changing and unpredictable weather patterns. Consistent with increased observations of extreme weather events, over two consecutive construction seasons, weather changed from one of the driest on record (high temperatures, dry conditions and strong wind) to one of the wettest on record (short duration high-intensity rainfall that flooded the LTWMF, excavations and on-site PGWMF and LTWMF retention ponds). This paper describes the collaborative approach among Wood (Constructor), AECOM (Engineer of Record), and CNL to adjust to extremes in weather to control dust and excessive water during construction. The summer of 2016, one of the driest summers on record in southern Ontario, was followed by one of the wettest in 2017. In 2016, the project team used water from the uncontaminated on-site storm water ponds, applied a polymer product for dust control across the site to augment water applications, obtained a Permit to Take Water from the provincial government to pump water from Lake Ontario, procured large tanks for storage of Lake Ontario water to meet peak demand, and retained additional water trucks/operators for day to day site operations. In stark contrast, to accommodate heavy rains in 2017 the project team installed ∼6 million liter aboveground storage tanks with secondary containment for contaminated water storage; procured 100+ mobile water storage tanks to supplement the on-site storage, utilized LTWMF cells sumps, excavations and retention ponds to store and manage onsite water; and adjusted additional staff resources (more staff and longer shifts) during anticipated periods of high-intensity rainfall, at times managing water around the clock. Recognizing the need to minimize the release of contaminated soil and water from the construction site at all times, these efforts illustrate the importance of anticipating and reacting to extreme weather events on a more regular basis. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Component Testing Supporting SHINE Medical Technologies

SHINE is going to be implementing a tritium gas processing system to support their Mo-99 work. They have requested that the Hydrogen Process Group of SRNL does some required testing on the system components before startup. The lab plans on conducting both seismic and valve testing. Test Plan: - Testing 10 1C valves 750,000 cycles or until failure; - Testing intervals will be every couple thousand; - 1C valves will have metal stem tips instead of Polymer due to being in a tritium prone area; - Hope that the valves will still have enough force to create a sufficient seal with metal stem tips; - Goal is for a more cost and space efficient alternative to the 5C valves. Status: - Received half the parts, waiting on the other half due to long procurement times; - Waiting on the LabVIEW program which will perform the testing. Path Forward: - R and DE to change out the stem tips (July 2018); - Assemble Manifold (July 2018); - Perform Testing (August 2018); - Report (September 2018). Since SRNL does not own a shaker table, the test will be conducted at a facility like the NTS Facility in Huntsville, Alabama. Test Plans: - Leak Testing; - Use LabVIEW to monitor for leaks before, during and after seismic testing with an Electronic Pressure Transducer; - If leak is detected, sniff for location using Helium Leak Detector; - Connector Testing; - Use LabVIEW to test for electrical continuity before, during and after seismic testing; - If a connectors continuity is interrupted, further testing will be performed; - Each Pin in faulty connector will be testing to determine specific location of disruption. Path Forward: - Pick a Qualified Vender for testing (July 2018); - Procure the connector plugs (July 2018); - Send components and test plan to facility for testing (August 2018); - Perform Testing (August-September 2018); - Report Results (September 2018)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Addressing embedded digital devices in safety-related systems of nuclear power plants - 307

The purpose of this paper is to provide an overview of the development of the approach to addressing embedded digital devices (EDD) in safety-related systems of nuclear power plants in the U.S. and around the world. In April, 2016, the U.S. Nuclear Regulatory Commission (US NRC) issued RIS 2016-05 to heighten awareness that EDDs might exist in procured equipment used in safety-related systems without the devices having been explicitly identified in procurement documentation. Inadequate consideration of these devices in digital technology system upgrades, component replacements, and new equipment applications could lead to an adverse safety consequence. The US NRC request was for addressees to implement early efforts to identify these devices. An area where this is being addressed is in regard to the performance of Diversity and Defense-In-Depth (D3) analyses, as addressed in US NRC Branch Technical Position 7-19. Nuclear facilities have increased their use and reliance on digital technology in systems and equipment (e.g., I and C, electrical systems, and fluid systems). In addition to digital instrumentation and control (I and C) systems, examples of safety-related equipment that may use digital technology include emergency diesel generators, pumps, valve actuators, motor control centers, breakers, priority logic modules, time-delay relays, and uninterruptible power sources. In the U.S. and around the world, engineering and licensing activities in standards and guidance have been, and are being developed to address this important consideration in protecting safety-related systems. This paper addresses development of an extended approach to evaluating common-cause failure vulnerability and mitigation in regard to equipment with an EDD. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Rescue of Unique Liquid IP-2 Portable Tanks at Savannah River Site – 25078

Westinghouse Savannah River Company, the SRS Management and Operations Contractor at the time, procured six large IP-2 portable tanks capable of transporting liquids in 2003 to support the layup of the F Canyon at SRS. F Canyon was one of two full-scale hardened radiochemical separations facilities built at SRS in the 1950s as part of the initial construction of the Site. F Canyon and H Canyon provided actinide separations capabilities for SRS through the end of the Cold War. Following the end of the Cold War era, the decision was eventually made that only one of these radiochemical separations facilities at SRS would still be needed moving forward. As H Canyon was considered better suited for ongoing SRS missions, F Canyon was placed into a layup state in the first decade of the 21st Century, with F Area deactivation completing in 2006. This process resulted in the creation of excess, radioactively contaminated solutions, which required disposition. These solutions included contaminated organic solutions as well as DU-bearing aqueous solutions. The six portable tanks were procured to support the transportation of these solutions.

Fee, Nathaniel C. [Savannah River Nuclear Solution↗

BESS Digital Assurance, Supply Chain Risk Management, and Emerging Regulation Session Two

The TADA BESS Supply Chain Workshops are designed to equip participants with the knowledge and tools necessary to address the evolving challenges at the intersection of battery energy storage systems (BESS), cybersecurity, and supply chain vulnerabilities. The workshops emphasize the application of Cyber-Informed Engineering (CIE) principles using INL’s procurement guide and the CIE-BAT tool. Attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their BESS projects. Additionally, the program fosters a collaborative network of practitioners and provides guidance on navigating emerging regulatory requirements, including FEOC rules under the OBBB framework, to assess and enhance organizational readiness. A comprehensive exploration of BESS cybersecurity supply chain risks, systematic vendor risk assessment through the BESS Procurement Guide, and practical application of the INL SCRM Chatbot for enhanced supply chain resilience. This is Session 2 of 3. (Full Version)

25 - ENERGY STORAGE↗

SPC-2918 Rev 0 MARVEL Test Loop Flowmeters

This specification contains the requirements for the design, manufacture, testing, and delivery of magnetic flowmeters to be installed on the MARVEL Primary Coolant Apparatus Test (PCAT) system. The PCAT system is a heated test loop which will be used to simulate the coolant system of a proposed sodium or NaK cooled microreactor. The system has four identical cooling loops. Installation of flowmeters on all four loops is anticipated at this time, however, the number of flowmeters may be reduced by the Project. Note that the number of flowmeters described herein is not a commitment to a particular number of procured units. The number of flowmeter units procured shall be identified on the purchase order. The MARVEL reactor is still under design, so the PCAT flowmeter design may not be directly transferrable to the reactor. It is intended that the design and development effort for the PCAT flowmeters be leveraged to the extent practical for the reactor flowmeter design.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70486 Rev 0 Stirling Engine Prototype Performance Specification

Idaho National Laboratory (INL) is developing a small microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. The purpose of this performance specification is to define requirements to build and test the Stirling Engine prototype, including interfacing with Kinnetech in the development/test of the engines. This specification includes prototyping components only and are not for use in the reactor. Prototype testing is a preliminary test to be conducted with conceptual equipment from which a final design will be developed. The results of the testing defined herein will not be used as a qualification test. The Stirling Engines have an engine controller module (QEC). Currently, the QEC doesn’t have a means to stop the engine. An analog controlled engine braking system must be developed and tested with the engine prototype. Any conflict between this specification and any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Sample Preparation Laboratory (SPL) Best Practices: CGD as the Primary Acceptance Method

The traditional paradigm applied to the construction of nuclear safety related systems, structures, and components (SSCs), like SPL, involves an owner/licensee hiring an EPC firm with an NQA 1 program to manage the engineering, procurement, and construction of the desired SSC. This traditional approach would have posed significant barriers to the successful completion of the SPL. As a smaller capital project, in the $\$$100–$\$$200 million range, there was concern that employing one of the larger EPC companies would escalate costs and extend the projected schedule beyond what would be feasible for the Department of Energy (DOE). The traditional acceptance method employed for nuclear facilities with credited safety functions requires the use of an EPC firm applying American Society of Mechanical Engineers (ASME) NQA 1 nuclear quality assurance (NQA) to accept safety SSCs. In lieu of this approach, INL elected to apply its own NQA 1 program to hire an EPC firm operating a commercial quality program. This method used commercial grade dedication (CGD) as outlined in NQA 1 which had not been applied at this scale. Use of the commercial supply chain was identified as a key factor to the successful completion of SPL. Favorable conditions enabling the use of CGD included: • INL serving as both the designer and the design authority • Design created by an NQA 1 qualified source • A mature CGD program • Availability of a CGD subject matter expert (SME) • A strong construction management program. This white paper elaborates on the methodology employed in the construction of the SPL, the successes achieved, and best practices implemented.

42 - ENGINEERING↗

Determinants of contract duration: further evidence from coal-fired power plants

Transactions cost theory predicts that the availability of alternatives is one of the determinants of contract duration. Over the last 20 years, the coal market has seen many regulatory changes that have generally increased the number of alternatives in the process of procuring coal. In this paper data from long-term coal contracts for electricity generation signed before 1999 are used to estimate the effect of increasing alternatives on contract duration. Empirical results tend to match transactions cost theory that increased alternatives reduces contract duration.

01 COAL, LIGNITE, AND PEAT↗