DOE OSTI · 3382998
SPC-2918 Rev 0 MARVEL Test Loop Flowmeters
Abstract
This specification contains the requirements for the design, manufacture, testing, and delivery of magnetic flowmeters to be installed on the MARVEL Primary Coolant Apparatus Test (PCAT) system. The PCAT system is a heated test loop which will be used to simulate the coolant system of a proposed sodium or NaK cooled microreactor. The system has four identical cooling loops. Installation of flowmeters on all four loops is anticipated at this time, however, the number of flowmeters may be reduced by the Project. Note that the number of flowmeters described herein is not a commitment to a particular number of procured units. The number of flowmeter units procured shall be identified on the purchase order. The MARVEL reactor is still under design, so the PCAT flowmeter design may not be directly transferrable to the reactor. It is intended that the design and development effort for the PCAT flowmeters be leveraged to the extent practical for the reactor flowmeter design.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Baily, Carl E. 2020-11-16. SPC-2918 Rev 0 MARVEL Test Loop Flowmeters. https://www.osti.gov/biblio/3382998
Cite the original work for its findings. Save a collection to share your selection of sources.