Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Asset Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

SMARt-STEReO: Preliminary Model Description

Wildfires have increasingly become major threat to US towns and cities, with California alone having its most destructive wildfire seasons to date in 2017 and 2018 and 2020 already becoming one of the worst fire years on record, causing the large-scale evacuations, the destruction of towns and property, and a significant release of hazardous smoke over the entire west coast. Thus, the U.S. Forest Service recently spent over 50% of its budget on wildfire management – funds which could otherwise be directed to science that could support fire prevention. Aerial support plays a major role in fighting wildfires. Airtankers, helicopters, and other aerial assets support the construction of fire-lines, gather data, and transport crews and equipment. However, presently, aerial firefighting operations rely on relatively unsophisticated technologies for communications, such as over-the-air radios, which limit the ability of pilots and management to relay fire data and coordinate operations. Aerial operations in and around fires are additionally high-risk activities due to the variable, dangerous conditions and complex, technically difficult maneuvers which must be performed to, for example, conduct a retardant drop. Thus, between 2000 and 2013, of the 298 wildland firefighter fatalities, 26% were related to aerial operations. As a result, there is significant potential to both improve the performance and resiliency of wildfire response while reducing risk to human operators.

Daniel E Hulse↗

NNSA Master Asset Map - Sandia National Laboratories

This report gives information on the following topics related to Sandia National Laboratories: site leadership's vision, condition, footprint management, major gaps and risks, and proposed investment plan.

99 GENERAL AND MISCELLANEOUS↗

Workshop Report On Sustainable Urban Development

The key workshop goal was to explore and document how NASA technologies, such as remote sensing, climate modeling, and high-end computing and visualization along with NASA assets such as Earth Observing Satellites (EOS) and Unmanned Aerial Vehicles (UAVs) can contribute to creating and managing a sustainable urban environment. The focus was on the greater Bay Area, but many aspects of the workshop were applicable to urban management at the local, regional and global scales. A secondary goal was to help NASA better understand the problems facing urban managers and to make city leaders in the Bay Area more aware of NASA's capabilities. By bringing members of these two groups together we hope to see the beginnings of new collaborations between NASA and those faced with instituting sustainable urban management in Bay Area cities.

Langhoff, Stephanie↗

Safely Enabling UAS Operations in Low-Altitude Airspace

Flexibility where possible, and structure where necessary. Consider the needs of national security, safe airspace operations, economic opportunities, and emerging technologies. Risk-based approach based on population density, assets on the ground, density of operations, etc. Digital, virtual, dynamic, and as needed UTM services to manage operations.

UTM↗

Commercial Building Energy Asset Score System: Program Overview and Technical Protocol (Version 1.0)

The U.S. Department of Energy (DOE) is developing a national voluntary energy asset score system that includes an energy asset score tool to help building owners evaluate their buildings with respect to the score system. The goal of the energy asset score system is to facilitate cost-effective investment in energy efficiency improvements of commercial buildings. The system will allow building owners and managers to compare their building infrastructure against peers and track building upgrade progress over time. The system can also help other building stakeholders (e.g., building operators, tenants, financiers, and appraisers) understand the relative efficiency of different buildings in a way that is independent from their operations and occupancy. This report outlines the technical protocol used to generate the energy asset score, explains the scoring methodology, and provides additional details regarding the energy asset score tool. This report also describes alternative methods that were considered prior to developing the current approach. Finally, this report describes a few features of the program where alternative approaches are still under evaluation.

building energy use↗

Power Management Solution for Growing Loads at Airport Rental Facilities

Growing electrical loads across airport facilities could expand beyond local grid capacities. Coordinating flexible loads with generation and storage assets can reduce coincident peaks, mitigate costly upgrades, and reduce electricity costs. This report outlines how The Athena Team has developed a suite of tools, resources, and solutions to leverage load flexibility with energy assets to harness this value potential.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hierarchical Architecture for Transactive Wholesale-Retail Market Integration

Transactive control strategies for managing real-time energy consumption have been under study for a number of years. This work investigates a hierarchical control framework for such a system. This framework consist of two control layers to aggregate and reflect the flexibility of demand assets in the wholesale markets. Computation at each layer and communication across layers is designed to be minimal. The minimization of data exchange is done through demand curve approximation. To manage these two approximations, two intermediate layer dispatch strategies are compared: price-priority and quantity-priority. The price-priority dispatch results in significant differences between the wholesale cleared load and the actual retail load while the quantity-priority dispatch manages load much better at the cost of introducing uncertainty into the business cases of the intermediate layers.

Marinovici, Laurentiu D.↗

Distribution Transformer Demand: Understanding Demand Segmentation, Drivers, and Management Through 2050

The National Renewable Energy Laboratory (NREL) has been working closely with the U.S. Department of Energy's Office of Electricity (OE) to understand the critical drivers and potential means of managing distribution transformer demand through 2050. This effort has consulted with utility representative organizations and transformer manufacturers to understand the problem, characterized the in-service assets, and modeled future demand. Distribution transformers, or service transformers, range from 10 to 5,000 kilovolt-amperes (kVA), have a high-side voltage of less than 34.5 kilovolts, and have step-down power delivery for customer end use. This research will help the manufacturing sector understand production requirements and better inform utility strategies for managing their demand.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Managing systems faults on the commercial flight deck: Analysis of pilots' organization and prioritization of fault management information

In rare instances, flight crews of commercial aircraft must manage complex systems faults in addition to all their normal flight tasks. Pilot errors in fault management have been attributed, at least in part, to an incomplete or inaccurate awareness of the fault situation. The current study is part of a program aimed at assuring that the types of information potentially available from an intelligent fault management aiding concept developed at NASA Langley called 'Faultfinde' (see Abbott, Schutte, Palmer, and Ricks, 1987) are an asset rather than a liability: additional information should improve pilot performance and aircraft safety, but it should not confuse, distract, overload, mislead, or generally exacerbate already difficult circumstances.

Rogers, William H.↗

Double-Shell Tank Primary Bottom Visual Inspection Results - 20025

A pressing need for the Double-Shell Tank Integrity Program at Hanford is of the ability to inspect the bottom of the tanks. Though the DSTs' annulus spaces (the space between the internal and external tank walls) have been inspected visually since 1992 and with Ultrasonic Testing (UT) since 1996, inspections of the tank bottoms have been able to be conducted due to limitations of available technology, omitting about 40 percent of the tank surface below the maximum fill level from routine inspection. Visual inspections of the tank annulus have been conducted up to five times in some DSTs and portions of the annulus space for all of the DSTs has been inspected twice with UT. This region includes the walls of the primary tank and secondary liner along with accessible portions of the secondary liner bottom. Due to this lack of technology, the degradation of the primary tank bottom in Tank AY-102 was undetected until the tank leaked into its annulus space, confirmed in 2012. Since that time, WRPS has been working with the nondestructive examination community and the Pacific Northwest National Laboratory, to evaluate potential technologies to conduct these challenging remote inspections. Recent work has included the development, testing, and deployment of several remote visual inspection technologies to observe the condition of the primary tank bottom of the DSTs by leveraging air distribution slots in the refractory pad on which it rests. Robotic solutions to conduct this inspection were developed with a detailed understanding of the physical configuration and operational logistics. Understanding and subsequent communication of these details to vendors within the robotics and nondestructive examination community was a critical component to the successful production of these new tools. Throughout the FY16-FY18 years, vendors from nondestructive examination community were solicited for ideas to meet the tank bottom inspection challenge. Two tank bottom visual inspection solutions were then pursued to meet that challenge. Both tools were successfully deployed at Tank AP-107, and provided valuable visuals, never before obtained from the under tank environment of a double-shell tank. While there are minor opportunities for improvement identified with each system, general outcomes were overwhelmingly positive. Both systems were successfully able to navigate the refractory air slot pattern from the outer edge to the tank center and record video footage. The micro-crawler provided high quality and very stable footage through the air slot pattern, but took longer to deploy into the slots and traverse through them than the alternative system. The push-pull tethered camera was able to navigate all seven of its target air slots in a matter of a few hours, which included deployment, movement between slot entrances, and complete removal of the system from the annulus environment. Through these air slots, new information was gained about the tank bottom and refractory pad condition of tank AP-107, AP-106, AP-108, and AN-102. While some debris was noted in the air slots, including sand, chipped refractory, and construction materials, the refractory was found to be structurally stable and adequately supporting the primary tank bottom through the full diameter of the tank. Primary tank bottom steel exterior was found to be in good condition, free of ongoing or aggressive corrosion conditions. Looking toward the future, robotic access to and visual inspection of refractory air slots and the primary tank bottom steel has now proven viable. Incorporating periodic air slot inspections as a regular practice within the Double-Shell Tank Integrity Program is the next step, allowing trending of any changes in condition. As ultrasonic testing infrastructure was leveraged to complete the initial system deployments described in this report, it makes sense to adopt that same strategy for ongoing periodic examinations and deploy these primary tank bottom inspection tools alongside ultrasonic testing operations. Development of visual inspection tools to evaluate the primary tank bottom region of the double-shell tanks was planned as the first stage of inspection. Continued development of volumetric sensors and incorporation of these inspection tools into Hanford's ongoing Double-Shell Tank Integrity Program are the next steps, seeking to continuously expand understanding of asset integrity and remaining useful life. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Intern Deliverable Poster 2025

An Incident Response Plan (IRP) is a document that is created and maintained by an organization that provides guidance in the event of a cyber incident. The primary objectives of an IRP are to aid in the detection, response, and recovery from incidents, as well as to enhance preparation and preventative measures. An IRP should outline specific procedures at each stage of an incident, with the goal of minimizing asset damage, data leakage, and operational impact. By investing in a well-defined IRP, organizations can better manage and mitigate risks associated with cyber threats, ensuring business continuity and resilience. This poster summarizes incident response guidelines for wind energy, which faces unique cybersecurity and physical challenges.

17 - WIND ENERGY↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Integrated Paradigm for the Management of Delivery Risk in Electricity Markets: From Batteries to Insurance and Beyond [Slides]

In wholesale electricity markets today, flexibility from a limited number of distributed energy resources (DERs) is offered daily, and the value of flexibility is not yet recognized for economic hedging of delivery risk. Under a three-year project funded by the ARPA-E PERFORM program, a collaborative team is working towards developing an integrated risk management framework that will leverage flexibility from distributed and bulk resources to cost-effectively and reliably manage delivery risk of intermittent resources. Two concepts are at the core of the proposed integrated risk management framework: (A) flexibility options, which are a novel type of options and enable wholesale electricity market participants to hedge uncertainty by buying flexibility. (B) DER flexibility scores, which provide a way for utilities or aggregators to classify assets in groups with different likelihood of delivering contracted flexibility. This report presentation will focus on the proposed ISO-product "flexibility options," which is complementary to ramp and other products being introduced by ISOs/RTOs to manage net load uncertainties. Participating resources with imbalance risk can buy flexibility options to hedge their production, whereas grid-connected resources that can provide physical flexibility can offer flexibility options. We will present basics of the formulation for a day-ahead ISO market that matches buyers and sellers of this hedge in coordination with existing capabilities to schedule energy and ancillary services, and outline how their settlements mitigate the impact of imbalance risk.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic IT Security Database and Analytics for Launch Control Systems Software

During the Summer 2020 session, I worked with intern Destani S. Van Arsdalen of EGS Software. Together, we co-created a tool to aid the dynamic investigation, updated over time,of the security compliance of LCS COTS and open source software. We originally planned touse spreadsheet software for management and analysis, but through this exploratoryproject, chose to use Python and JSON after receiving feedback on our project’s current anddesired capabilities at that time.At first, the project was solely designed to help on-board new COTS software, based on aquestionnaire that could be filled out for each software package. This, combined with usingthe spreadsheet application’s web-query capabilities to fetch information from the NVD,allowed presentation and analytics cells to automatically populate as elements of themanually-filled questionnaire changed. While this system was promising, we decided tochange technologies for a few reasons. In the spreadsheet, single cells could not hold complexdata like arrays and objects. The automatic population of cells and dynamic updates made itdifficult to manage and add new features. And finally, it had limited extensibility sinceadding new software required significant understanding of how both the spreadsheet wasconstructed, and the more obscure, proprietary scripting languages packaged with it.The pivot to a standard computer science database language of JSON, aided by thescripting capabilities of Python, greatly helped to improve the project’s functionality. First,and most importantly, the script’s import and analysis of database data is easilyreproducible. Additional data analysis can be modularly added without requiringmodification of the script and is capable of routine scheduling. The revised process can besplit into three parts. First, the conversion of LCS asset and software documentation into theJSON hierarchical database format. Second, the merging of this database with the NVD,forming a new data structure, using CPEs of the CVE object as a linking element betweenthem. And third, the automatically performed analytics and analysis of the combined data,in a modular and extensible format, to produce better informed business decisions. The outputted graphs, for example, are automatically generated by the Python script inconnection with the combined database. This allows updated graphs and any analytics to be re-rendered automatically following updates to the LCS’s initial asset documentation. Afinal report can then be programmatically and easily constructed from these sources to allow fully reproducible metrics for heavily evidenced risk management decisions.

it↗

A Learning-based Power Management Method for Networked Microgrids Under Incomplete Information

In this paper, we present a model-free reinforcement learning (RL)-based technique to solve the power management problem of networked microgrids (MGs), when the utility has only limited or no detailed knowledge of the MG asset models.The proposed method consists of two levels: at the first level, using an approximate RL strategy and aggregated data, a utility agent determines the locational price signals to maximize its profit under incomplete information on the MGs’ private data behind their points of common coupling (PCC). The proposed RL strategy enables the utility to adapt to changing system conditions and learn from previous experiences, while respecting the data ownership of the MGs. At the second level, the MGs receive the price signals to dispatch their generation/storage assets individually over look-ahead decision time window, while considering power flow constraints. The performance of the proposed RL technique has been verified under realistic operational scenarios.

Zhang, Qianzhi↗

Marine Corps Base Camp Lejeune - Forest Burn Data

Critical military training and testing on lands along the nation’s coastal and estuarine shorelines are increasingly placed at risk because of encroachment pressures in surrounding areas, impairments due to other anthropogenic disturbances, and changes in climate and sea level. The U.S. Department of Defense (DoD) intends to enhance and sustain its training and testing assets and also optimize its stewardship of natural resources through the development and application of an ecosystem-based management approach on DoD installations. To accomplish this goal, particularly for installations in estuarine/coastal environments, the Strategic Environmental Research and Development Program (SERDP) launched the Defense Coastal/Estuarine Research Program (DCERP) as a 10-year effort at Marine Corps Base Camp Lejeune (MCBCL) in North Carolina. The results of the second 5 years of the program (DCERP2) are presented in the DCERP2 Final Report.There were four overarching objectives of DCERP2. The first objective was to understand the effects of climate change impacts, including warming temperatures, variability in the hydrological cycle, storm events, and sea level rise on the coastal ecosystems at MCBCL from observations and measurements made over the 10-year program. The second objective was to understand the carbon cycle of the coastal and terrestrial ecosystems at MCBCL through a highly integrated sampling program. The third objective was to develop models, tools, and indicators to evaluate current and projected future ecosystem state changes and translate scientific findings into actionable information for installation managers. The last objective was to recommend adaptive management strategies to sustain ecosystem natural resources within the context of an active military installation.This data package contains burn and wildfire history and time enabled service data.

54 ENVIRONMENTAL SCIENCES↗

Marine Corps Base Camp Lejeune LiDAR Vegetation Height

Critical military training and testing on lands along the nation’s coastal and estuarine shorelines are increasingly placed at risk because of encroachment pressures in surrounding areas, impairments due to other anthropogenic disturbances, and changes in climate and sea level. The U.S. Department of Defense (DoD) intends to enhance and sustain its training and testing assets and also optimize its stewardship of natural resources through the development and application of an ecosystem-based management approach on DoD installations. To accomplish this goal, particularly for installations in estuarine/coastal environments, the Strategic Environmental Research and Development Program (SERDP) launched the Defense Coastal/Estuarine Research Program (DCERP) as a 10-year effort at Marine Corps Base Camp Lejeune (MCBCL) in North Carolina. The results of the second 5 years of the program (DCERP2) are presented in the DCERP2 Final Report.There were four overarching objectives of DCERP2. The first objective was to understand the effects of climate change impacts, including warming temperatures, variability in the hydrological cycle, storm events, and sea level rise on the coastal ecosystems at MCBCL from observations and measurements made over the 10-year program. The second objective was to understand the carbon cycle of the coastal and terrestrial ecosystems at MCBCL through a highly integrated sampling program. The third objective was to develop models, tools, and indicators to evaluate current and projected future ecosystem state changes and translate scientific findings into actionable information for installation managers. The last objective was to recommend adaptive management strategies to sustain ecosystem natural resources within the context of an active military installation.GIS layers of 2013 NC Light Detection and Ranging (LiDAR) processed to provide vegetation height within MCBCL boundaries.

54 ENVIRONMENTAL SCIENCES↗