Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Accelerator Design, Technology and Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Results of a Soil Flushing Treatability Test for Hanford Site Hexavalent Chromium Removal - 20446

U.S. Department of Energy contractor CH2M Hill Plateau Remediation Company has made significant progress remediating hexavalent chromium in groundwater near the Columbia River through the operation of pump and treat facilities and source removal activities. To mitigate risks associated with hexavalent chromium contamination, which was identified in a CERCLA interim action record of decision as the primary groundwater contaminant of concern for the 100-KR-4 Operable Unit from discharging to the Columbia River, three ion-exchange pump and treat systems were installed between 1997 and 2009. Between 2010 and 2016, operation of the K West pump and treat system, located near the former 105K West plutonium production reactor, reduced concentrations below the groundwater remediation target for hexavalent chromium. In 2016, a rebound study was performed to evaluate the effectiveness of the pump and treat remedy and assess the potential for any residual hexavalent chromium sources continuing to contribute to groundwater contamination. As a result of the rebound study, a source of continued groundwater contamination was identified. To address this condition, a soil flushing treatability test was written and approved by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The test included saturating about a 1-acre area of soil with treated water with the goal of forcing the residual hexavalent chromium to groundwater where existing extraction wells could remove it for treatment, accelerating the cleanup process. In spring and summer 2019, CH2M Hill Plateau Remediation Company installed and began operating a shallow underground leach system to support the treatability test. Preliminary sampling data show the test was effective in removing the residual contamination. Following further evaluation and analysis from the initial test, the process will be considered for implementation elsewhere on the Hanford Site, particularly at locations where there is a known or suspected continuing contamination source in the soil column. The paper will cover the goals of the study, as well as more details about the following: - Overview of pump and treat exit strategy (using U.S. Environmental Protection Agency guidance); - The design and installation of the soil flushing technology in the 100-K Area; - The testing process and results of sampling data; - Post-study evaluation and potential for implementation in other locations at the Hanford Site. Innovative solutions for cleanup, such as the soil flushing technology, have resulted in substantial progress in the removal of groundwater contaminants at the Hanford Site, potentially shortening the time frame required to meet cleanup goals and resulting in significant cost savings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Integrity Monitoring, Prediction and Assessment, Corrosion Control, and Repair of the Hanford Storage Tanks

DOE has launched a multi-year research program with the focus of preserving and increasing available volume for waste storage at Hanford. The long-term availability and operability of the Hanford Double Shell Tanks (DST) is critical to the completion of the Hanford mission. Maintaining the integrity of the tank will involve having a technology for repair or refurbishment of a DST should the tank function be compromised by degradation, monitoring the tank for indications of accelerated degradation, developing a means for mitigating accelerated degradation, and evaluating options for increasing the storage capacity in the tank farm without constructing new tanks. The project work was started in the middle of 2024; significant progress has been made in the following four areas: (i) tank refurbishment using a high performance grout and an epoxy sealant layer system, (ii) developing a chemically and radiologically stable reference electrode, (iii) designing and implementing a cathodic protection system to mitigate underside corrosion of DST secondary shells, and (iv) exploring evaporation to increase waste storage capacity.

Shukla, Pavan [Savannah River National Laboratory ↗

22 GeV CEBAF with Novel Fixed Field Alternating Gradient Design

Extending the energy reach of CEBAF up to 22 GeV within the existing tunnel is being explored. Proposed energy upgrade can be achieved by increasing the number of recirculations, while using the existing CEBAF SRF cavity system. Presented scheme is based on an exciting new approach to acceleratie electrons efficiently with multiple passes in a single FFA beam line. Encouraged by recent success of the CBETA Test Accelerator, a proposal was formulated raise CEBAF energy by replacing the highest-energy arcs with Fixed Field Alternating Gradient (FFA) arcs. The new pair of arcs configured with FFA lattice would support simultaneous transport of additional 6 passes with energies spanning a factor of two, using the non-scaling FFA principle implemented with Halbach-derived permanent magnets - a novel magnet technology that significantly saves energy and lowers operating costs. One of the challenges of the multi-pass (11) linac optics is to provide uniform focusing in a vast range of energies, using fixed field lattice. Here, we propose a triplet lattice scaled up with increasing momentum along the linac. This would provide a stable periodic solution covering energy ratio of 1:33. The current CEBAF configured with a 123 MeV injector, makes optical matching in the first linac virtually impossible due to extremely high energy span ratio (1:175). Therefore, we envision replacement of the current injector with a 650 MeV 3-pass recirculating injector based on the existing LERF facility. Finally, the 22 GeV CEBAF would promise to deliver in 10-passes a beam with normalized emittance of 80 mm·mrad and with a relative energy spread of 1.5 × 10-3. Further recirculation beyond 22 GeV is limited by large, 974 MeV per electron, energy loss due to synchrotron radiation.

Bogacz, Slawomir↗

Space Station Freedom (SSF) crew systems SE&I

Space Station program office planning and requirements activity has accelerated during the past year to bring the Space Station Freedom Program (SSF) through the program requirements review phase during 1988. The preliminary design review cycle began in Jan. 89, and is now planned for completion, with formal preliminary design reviews between Apr. and Sept., 1990. This paper briefly describes the PROGRAMMATIC aspects of the engineering and integration management of the SSF crew systems. Emphasis is given to the Crew Health Care System, which includes the Health Maintenance Facility, the Exercise Countermeasure Facility, and the Environmental Health System; all managed within the Man-Systems, one of the twelve 'distributed systems.' Medical and engineering requirements to meet the needs of the mature Space Station operations environment and highlights of critical technologies and equipment in development will be reviewed.

Austin, Frank H., Jr.↗

CALPHAD-based Bayesian optimization to accelerate alloy discovery for high-temperature applications

Two crucial properties influencing the performance of high-temperature alloys are coefficient of thermal expansion (CTE) and phase constitution. It is desirable to have alloys with low CTE, which reduces CTE mismatch with the surface oxide and the likelihood of oxide spallation. Reducing the amount of brittle intermetallic phases such as Sigma (σ) enhances alloy ductility and processability. Here, we propose a multi-objective Bayesian Optimization (BO) model to simultaneously minimize CTE (at an operational temperature of 1150 °C) and T σ (temperature when the Sigma phase completely dissolves in the metal matrix), properties which are obtained from high-throughput CALculation of PHAse Diagrams (CALPHAD). The model successfully identifies several alloys with CTE ≤ 2 × 10 –5 /K and T σ ≤ 500 °C by exploring just 7% of the nickel–chromium–cobalt–aluminum–iron (Ni–Cr–Co–Al–Fe) composition space. Such multi-objective alloy design frameworks can be used to inform additive manufacturing experiments and accelerate alloy discovery for high-temperature energy applications.

36 MATERIALS SCIENCE↗

Demonstration of the Plant Fuel Reload Process Optimization for an Operating PWR

The United States (U.S.) nuclear industry is facing a strong challenge to maintain regulatory-required levels of safety while ensuring economic competitiveness to stay in business. Safety remains a key parameter for all aspects related to the operation of light water reactor (LWR) nuclear power plants (NPPs) and can be achieved more economically by using a risk-informed ecosystem such as that being developed by the Risk-Informed Systems Analysis (RISA) Pathway under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program. The LWRS Program is promoting a wide range of research and development (R&D) activities with the goal to maximize both the safety and economically efficient performance of NPPs through improved scientific understanding, especially given that many plants are considering second license renewal. The RISA Pathway has two main goals: (1) the deployment of methodologies and technologies that enable better representation of safety margins and the factors that contribute to cost and safety; and (2) the development of advanced applications that enable cost-effective plant operation. This report summarizes the research outcomes in FY-2021, which the project progressed from the planning and methodology development phase to the early demonstration phase. The highlights of these activities are: (1) the development of a multi-objective optimization process using Genetic Algorithms (GAs); (2) the development and test of an approach for optimization process acceleration using artificial intelligence (AI) that significantly reduces the computational burden; (3) the demonstration of the fuel reload optimization framework for a generic pressurized water reactor (PWR); and (4) the demonstration of limiting design basis accident (DBA) scenarios for evaluation of the transition from deterministic to risk-informed approach for fuel reload optimization.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Compact Coaxial HOM Damper for SRF Cavities

SRF technology enable particle accelerators operate with greater average beam currents and higher duty cycles. In these regimes parasitic excitation of the cavity HOM spectrum become the limiting factor due to extra RF losses and instabilities appearing in the beam. We discuss the limitations of HOMs for large accelerator projects as the Fermilab MI upgrade and the proposed future circular and linear colliders EIC and ILC. A new compact HOM damper concept is suggested providing required HOM suppression. The idea is based on an oversized coaxial line with radial sections, which is directly connected to the axial region of the SRF cavity. Such radially sectioned coaxial works as a filter for the operating mode, while being transparent for the HOMs. Implementations of this design for the accelerator and crab cavities developed for the MI and EIC machines, respectively, are discussed.

Lunin, A. [Fermilab]↗

Uranus Orbiter and Probe: Mission Challenges and Concept Updates Since the Origins, Worlds, and Life Decadal Survey

Origins, Worlds, and Life: Planetary Science and Astrobiology in the Next Decade identified a Uranus Orbiter and Probe as the highest-priority strategic mission for the decade 2023–2032, as it enables broad cross-disciplinary science in the largely unexplored Uranian system. The mission architecture evaluated by the Decadal Survey was a singular proof of concept demonstrating that a moderately instrumented mission could deliver Decadal-priority science with a reduced cost and risk posture by leveraging existing technologies to the maximum extent possible. With revised assumptions since the Decadal, we have explored a large trade space including launch vehicles, propulsion options, cruise trajectories, available power sources, viable concept of operations, and science data return for later launch dates without a Jupiter gravity assist. The most repeatable trajectory solutions employ either a commercially derived solar electric propulsion (SEP) transfer stage or the availability of a more capable launch vehicle under development, such as the SpaceX Starship. Orbit insertion has been moved farther from Uranus to acknowledge the remaining uncertainty in Uranian ring structure. A streamlined, SEP-adaptable, orbiter design was developed using two Next Gen Radioisotope Thermoelectric Generators, and the probe design was matured, reducing the entry gravitational acceleration, and assuming the largest Decadal-recommended payload to provide margin for future instrument selections. With this updated design, we also constructed a detailed concept of operations for three representative science cases, returning 13–15 Gbit of science data and spacecraft telemetry per ∼34 day orbit.

Amy A Simon↗

ERF: Energy Research and Forecasting

The Energy Research and Forecasting (ERF) code is a new model that simulates the mesoscale and microscale dynamics of the atmosphere using the latest high-performance computing architectures. It employs hierarchical parallelism using an MPI+X model, where X may be OpenMP on multicore CPU-only systems, or CUDA, HIP, or SYCL on GPU-accelerated systems. ERF is built on AMReX (Zhang et al., 2019, 2021), a block-structured adaptive mesh refinement (AMR) software framework that provides the underlying performance-portable software infrastructure for block-structured mesh operations. The "energy" aspect of ERF indicates that the software has been developed with renewable energy applications in mind. In addition to being a numerical weather prediction model, ERF is designed to provide a flexible computational framework for the exploration and investigation of different physics parameterizations and numerical strategies, and to characterize the flow field that impacts the ability of wind turbines to extract wind energy. The ERF development is part of a broader effort led by the US Department of Energy's Wind Energy Technologies Office.

17 WIND ENERGY↗

Neutrino Interactions observed with Large Area Picosecond Photodetectors in ANNIE

The Accelerator Neutrino Neutron Interaction Experiment (ANNIE) is a 26-ton water-based neutrino detector located at Fermilab, approximately 110 m downstream of the Booster Neutrino Beam (BNB). ANNIE utilizes both photomultiplier tubes (PMTs) and advanced photodetectors, specifically Large Area Picosecond Photodetectors (LAPPDs), to detect Cherenkov light emitted by leptons produced in neutrino interactions within ANNIE. LAPPDs are a novel technology designed to detect photons with picosecond-level temporal resolution and sub-millimetre spatial precision. Multiple LAPPDs have been deployed in the ANNIE detector. This is the first use of this technology in a running particle physics experiment and has yielded the first detection of light from neutrino interactions in water with LAPPDs. In this poster, I will showcase the operational performance and functionality of LAPPDs in the ANNIE experiment. Neutrino beam data from the BNB is used to evaluate the timing precision, hit reconstruction performance, and beam response of deployed LAPPDs, demonstrating how this novel picosecond-resolution technology performs in a running neutrino water Cherenkov detector. This work highlights the successful integration of LAPPDs in ANNIE and provides quantitative benchmarks that inform their application in future neutrino experiments requiring high-resolution photon detection.

Aman, Mohammad Adil [Florida State U.] (ORCID:0009↗

20-mN Variable Specific Impulse (Isp) Colloid Thruster

Busek Company, Inc., has designed and manufactured an electrospray emitter capable of generating 20 mN in a compact package (7x7x1.7 in). The thruster consists of nine porous-surface emitters operating in parallel from a common propellant supply. Each emitter is capable of supporting over 70,000 electrospray emission sites with the plume from each emitter being accelerated through a single aperture, eliminating the need for individual emission site alignment to an extraction grid. The total number of emission sites during operation is expected to approach 700,000. This Phase II project optimized and characterized the thruster fabricated during the Phase I effort. Additional porous emitters also were fabricated for full-scale testing. Propellant is supplied to the thruster via existing feed-system and microvalve technology previously developed by Busek, under the NASA Space Technology 7's Disturbance Reduction System (ST7-DRS) mission and via follow-on electric propulsion programs. This project investigated methods for extending thruster life beyond the previously demonstrated 450 hours. The life-extending capabilities will be demonstrated on a subscale version of the thruster.

Demmons, Nathaniel↗

High-Power Magnetoplasmadynamic Thruster Being Developed

High-power electromagnetic thrusters have been proposed as primary in-space propulsion options for several of the bold new interplanetary and deep space missions envisioned by the Human Exploration and Development of Space (HEDS) Strategic Enterprise. As the lead center for electric propulsion, the NASA Glenn Research Center is actively involved in the design, development, and testing of high-power electromagnetic technologies to meet these demanding mission requirements. One concept of particular interest is the magnetoplasmadynamic (MPD) thruster, shown schematically in the preceding figure. In its basic form, the MPD thruster consists of a central cathode surrounded by a concentric cylindrical anode. A high-current arc is struck between the anode and cathode, which ionizes and accelerates a gas (plasma) propellant. In the self-field version of the thruster, an azimuthal magnetic field generated by the current returning through the cathode interacts with the radial discharge current flowing through the plasma to produce an axial electromagnetic body force, providing thrust. In applied field-versions of the thruster, a magnetic field coil surrounding the anode is used to provide additional radial and axial magnetic fields that can help stabilize and accelerate the plasma propellant. The following figure shows an experimental megawatt-class MPD thruster developed at Glenn. The MPD thruster is fitted inside a magnetic field coil, which in turn is mounted on a thrust stand supported by thin metal flexures. A calibrated position transducer is used to determine the force provided by the thruster as a function of thrust stand displacement. Power to the thruster is supplied by a 250-kJ capacitor bank, which provides up to 30- MW to the thruster for a period of 2 msec. This short period of time is sufficient to establish thruster performance similar to steady-state operation, and it allows a number of thruster designs to be quickly and economically evaluated. In concert with this experimental research, Glenn is also developing and using advanced numerical simulations to predict the performance of self-field and applied-field MPD thrusters.

LaPointe, Michael R.↗

Simulation Study of Monoenergetic Photon Source LiDAR System Performance for Emergency Response Applications

The following report summarizes the results of a Monte Carlo simulation and modeling study of the Lawrence Berkeley National Laboratory’s (LBL) Monoenergetic Photon Source (MPS) as part of a high-energy LiDAR system for use in emergency response applications. A set of image quality indicators (IQI) and nonsensitive phantoms or generalized surrogates for search targets have been identified for use in the planned measurement campaign at the Berkeley Lab Laser Accelerator (BELLA) Center toward the end FY2023. These items were modeled and the time-of-flight (TOF) spectral responses following irradiation were calculated for a set of varying operating conditions. The goal of this study was to both predict the LiDAR system performance as well as determine if minor modifications to the IQI and phantom designs were required before fabrication. It was found that the IQI and target designs both overlap and extend towards the limit of performance of the system and are thus suitable for the final project measurement campaign.

43 - PARTICLE ACCELERATORS↗

Hybrid Power Purchase Agreements for Flexible 24/7 Energy Delivery – A Comprehensive Review of Current Practices and Research Pathways

Power Purchase Agreements (PPAs) are becoming increasingly preferred among large energy consumers, such as data centers, to secure cost-effective energy and meet accelerating demand growth. Traditionally, variable renewable energy (VRE)-based PPAs operate on a pay-as-produced basis, balancing supply and demand for a relatively longer duration (e.g., annually). However, the focus is shifting toward matching supply and demand on an hourly basis to fully meet energy needs. This shift requires the integration of flexible energy resources, such as hydropower, thermal generation, and energy storage, to complement VRE sources like wind and solar, forming the foundation for 24/7 PPA. This work contributes by: (i) reviewing emerging market trends and current practices in PPA procurement, supported by data on PPA prices and technology portfolios; (ii) synthesizing the existing literature on modeling approaches for contract pricing, quantities, hybrid resource procurement, and risk management in 24/7 PPA design, while identifying key research gaps; and (iii) proposing an integrated 24/7 PPA design framework along with two contracting mechanisms from the perspectives of both PPA providers and consumers. The proposed framework highlights critical modeling challenges, risk-allocation issues, and future research opportunities for 24/7 PPA design.

24/7↗

Reducing the Energy Consumption of Magnetic Resonance Imaging and Computed Tomography Scanners: Integrating Ecodesign and Sustainable Operations

This review aims to provide valuable insights into how energy consumption in magnetic resonance imaging (MRI) and computed tomography (CT) scanners can be effectively monitored, managed, and reduced, thereby contributing to more sustainable medical imaging practices. Demand for advanced imaging technologies such as MRI and CT scanners continues to increase, and understanding the resultant impact on greenhouse gas emissions requires a thorough evaluation of their energy consumption. Here, this review examines the energy monitoring and consumption characteristics of MRI and CT scanners, highlighting potential approaches for energy savings. An overview of MRI and CT principles, hardware components, and their associated energy consumption is provided. After addressing the technical aspects, the hardware and software requirements essential for accurate energy metering are detailed. Baseline measurements of energy consumption data are then provided as a foundation to understand current usage patterns and identify areas for improvement. Ongoing efforts to reduce energy consumption are categorized into 3 main strategies: operations, scanner design enhancements, and active scanning techniques, including accelerated MRI protocols. Ultimately, we emphasize that achieving sustainability in medical imaging requires collaboration across disciplines. By incorporating eco-friendly design in new imaging equipment, we can reduce the environmental impact, promote sustainability, and set a health care industry standard for a healthier planet.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

High Energy Systems for Transforming CO 2 to Valuable Products (Final Report)

The objective of this project is to develop the Direct E-Beam Synthesis (DEBS) process that uses high-energy electron beams (E-Beam) to break chemical bonds. This allows the production of valuable chemicals, such as acetic acid, methanol, and carbon monoxide, at relatively low severity (pressure near one atmosphere and temperatures <150°C) from near-pure CO 2 captured from a pulverized coal-fired power plant and methane, imported as natural gas. Creating such valuable products will offset the cost of carbon capture and storage. Through this project, we have designed, constructed, and operated an E-Beam reactor to examine the feasibility of performing dry reforming reaction without a catalyst using only DEBS. We have verified the production of syngas with 1:1 H2:CO ratio and calculated that the energy cost for conversion is about 5.2 eV/molecule of product for dry reforming reaction which is similar to the energy cost for conversion using conventional thermochemical conversion but under significantly milder conditions (room temperature and atmospheric pressure). We have performed a technoeconomic analysis (TEA) to estimate the total capital requirement and the cost of production for a 99.4 MMSCFD syngas production plant via non-catalytic Direct E-Beam Synthesis (DEBS) technology utilizing a high-energy electron beam (E-Beam) accelerator. No assumption is made for syngas utilization downstream, and the incoming reactants are pure CO 2 from carbon capture (assumed to be at zero cost) and natural gas. The Total As-Spent Cost (TASC) was calculated to be $\$242.5$ million, resulting in a levelized cost of syngas (LCOS) of $\$175.84$/tonne (metric) at a natural gas price of $\$6.24$/MMBTU1. The cost of syngas is primarily determined by the price of natural gas. If the cost of the CO 2 feedstock is assumed to be non-zero, then the price of the CO 2 feed also heavily influences the levelized cost of syngas. The potential impact on the cost of electricity from syngas revenue is significant. Following DOE NETL’s guidance, a lifecycle analysis (LCA) was conducted to compare the cradle-to-gate life cycle emissions of GTI Energy’s novel Direct E-Beam Synthesis (DEBS) process that produces syngas via the reaction of methane and carbon dioxide to the emissions of a state-of-the-art Steam Methane Reforming (SMR) process that also produces syngas via the reaction of methane and steam. The DEBS process results in less GHG emissions than SMR (with CO product as the basis of comparison). openLCA was used for the LCA and the results show that the total global warming potential (GWP) of DEBS is 0.981 kg CO 2 e per kg CO product, while the SMR process has a global warming potential of 2.573 kg CO 2 e per kg CO product. The ratio of the GWP of the proposed product system to the comparison product system is 0.381. This percent change is 61.9% lower GWP than SMR.

20 FOSSIL-FUELED POWER PLANTS↗

Accomplishments of the Advanced Reusable Technologies (ART) RBCC Project at NASA/Marshall Space Flight Center

The focus of the NASA / Marshall Space Flight Center (MSFC) Advanced Reusable Technologies (ART) project is to advance and develop Rocket-Based Combined-Cycle (RBCC) technologies. The ART project began in 1996 as part of the Advanced Space Transportation Program (ASTP). The project is composed of several activities including RBCC engine ground testing, tool development, vehicle / mission studies, and component testing / development. The major contractors involved in the ART project are Aerojet and Rocketdyne. A large database of RBCC ground test data was generated for the air-augmented rocket (AAR), ramjet, scramjet, and ascent rocket modes of operation for both the Aerojet and Rocketdyne concepts. Transition between consecutive modes was also demonstrated as well as trajectory simulation. The Rocketdyne freejet tests were conducted at GASL in the Flight Acceleration Simulation Test (FAST) facility. During a single test, the FAST facility is capable of simulating both the enthalpy and aerodynamic conditions over a range of Mach numbers in a flight trajectory. Aerojet performed freejet testing in the Pebble Bed facility at GASL as well as direct-connect testing at GASL. Aerojet also performed sea-level static (SLS) testing at the Aerojet A-Zone facility in Sacramento, CA. Several flight-type flowpath components were developed under the ART project. Aerojet designed and fabricated ceramic scramjet injectors. The structural design of the injectors will be tested in a simulated scramjet environment where thermal effects and performance will be assessed. Rocketdyne will be replacing the cooled combustor in the A5 rig with a flight-weight combustor that is near completion. Aerojet's formed duct panel is currently being fabricated and will be tested in the SLS rig in Aerojet's A-Zone facility. Aerojet has already successfully tested a cooled cowl panel in the same facility. In addition to MSFC, other NASA centers have contributed to the ART project as well. Inlet testing and parametrics were performed at NASA / Glenn Research Center (GRC) and NASA / Langley Research Center (LaRC) for both the Aerojet and Rocketdyne concepts. LaRC conducted an Air-Breathing Launch Vehicle (ABLV) study for several vehicle concepts with RBCC propulsion systems. LaRC is also performing a CFD analysis of the ramjet mode for both flowpaths based on GASL test conditions. A study was performed in 1999 to investigate the feasibility of performing an RBCC flight test on the NASA / Dryden Flight Research Center (DFRC) SR-71 aircraft. Academia involvement in the ART project includes parametric RBCC flowpath testing by Pennsylvania State University (PSU). In addition to thrust and wall static pressure measurements, PSU is also using laser diagnostics to analyze the flowfield in the test rig. MSFC is performing CFD analysis of the PSU rig at select test conditions for model baseline and validation. Also, Georgia Institute of Technology (GT) conducted a vision vehicle study using the Aerojet RBCC concept. Overall, the ART project has been very successful in advancing RBCC technology. Along the way, several major milestones were achieved and "firsts" accomplished. For example, under the ART project, the first dynamic trajectory simulation testing was performed and the Rocketdyne engine A5 logged over one hour of accumulated test time. The next logical step is to develop and demonstrate a flight-weight RBCC engine system.

Nelson, Karl W.↗

National Reactor Innovation Center NRC Early Site Permit Roadmap

The National Reactor Innovation Center (NRIC) at Idaho National Laboratory (INL) in Idaho Falls, Idaho, was authorized under the Nuclear Energy Innovation Capabilities Act (Public Law 115–248) to provide private sector technology developers with resources and infrastructure for testing, demonstration, and performance assessment to accelerate deployment of new advanced reactor technology concepts. NRIC’s mission is to enable clean, affordable, reliable energy by supporting U.S. government investments in nuclear energy research, development, demonstration, and commercialization of new nuclear energy systems. It intends to provide existing facilities and other undeveloped and previously developed sites at INL to advanced reactor vendors for prototype technology testing and deployment. Some of these demonstration projects may be subject to DOE authorization, while other projects may require approval by the U.S. Nuclear Regulatory Commission (NRC) prior to construction and operation. NRIC and INL are considering whether to pursue one or more ESPs to help facilitate new reactor deployment at the INL Site. An ESP would allow early investment in licensing infrastructure in advance of a reactor design being ready to deploy. Through the ESPs, NRIC would help reduce the cost and time required to deploy demonstration reactors at the INL Site. This also will allow INL to bring its nuclear and siting experience to the ESP development process allowing for better and more efficient improvements and utilization of the Site. A preapproved ESP at INL will also remove the uncertainty of NRC siting approvals from the demonstration project proponents, who may not be well positioned to complete the analyses in a timely manner. The purpose of this NRIC ESP roadmap is to provide rigor and understanding needed for INL and DOE decision-makers to make data-informed decisions on pursuing NRC ESPs in support of future advanced reactor demonstrations at INL. The roadmap provides a structured method for addressing potential challenges and identifying options for resolution.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗