Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “future accelerators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

LANSCE Wire Scanner System Prototype: Switchyard Test

On November 19, 2011, the beam diagnostics team of Los Alamos National Laboratory's LANSCE accelerator facility conducted a test of a prototype wire scanner system for future deployment within the accelerator's switchyard area. The primary focus of this test was to demonstrate the wire scanner control system's ability to extend its functionality beyond acquiring lower energy linac beam profile measurements to acquiring data in the switchyard. This study summarizes the features and performance characteristics of the electronic and mechanical implementation of this system with details focusing on the test results.

42 ENGINEERING↗

LASER STRIPPING COMPUTING WITH THE PYTHON ORBIT CODE

The laser assisted hydrogen stripping becomes a widely discussed alternative for the existing stripping foil approach. The simulation tool for this new approach is presented. The created application is implemented in form of extension module to the Python ORBIT parallel code that is under development at the SNS. The physical model of the application deals with quantum theory and allows calculating evolution and ionization of hydrogen atoms and ions affected by superposition of electromagnetic and laser fields. The algorithm, structure, benchmark cases, and results of simulations for several future and existing accelerators are discussed.

Gorlov, Timofey V↗

On the Future High Energy Colliders

High energy particle colliders have been in the forefront of particle physics for more than three decades. At present the near term US, European and international strategies of the particle physics community are centered on full exploitation of the physics potential of the Large Hadron Collider (LHC) through its high-luminosity upgrade (HL-LHC). A number of the next generation collider facilities have been proposed and are currently under consideration for the medium and far-future of accelerator-based high energy physics. In this paper we offer a uniform approach to evaluation of various accelerators based on the feasibility of their energy reach, performance potential and cost range.

43 PARTICLE ACCELERATORS↗

Experimental Demonstration of the Henon-Heiles Quasi-Integrable System at IOTA

IOTA is a research electron and proton storage ring recently commissioned at Fermilab to test novel techniques for improving bea m stability and quality, notably the concept of non -linear integrable optics . We present the first results of experimental investigation of a quasi -integrable system with one invariant of motion, a Henon Henon-Heiles type system implemented with octupole magnets . Good agreement with simulations is demonstrated on key parameters of achievable tune spread and dynamic aperture preservation . Resilience to perturbations and imperfections in the lattice is shown. We also outline research plans and discuss applicability to future high intensity accelerators.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

SLAC Next-Generation High Availability Power Supply

SLAC recently commissioned forty high availability (HA) magnet power supplies for Japan's ATF2 project. SLAC is now developing a next-generation N+1 modular power supply with even better availability and versatility. The goal is to have unipolar and bipolar output capability. It has novel topology and components to achieve very low output voltage to drive superconducting magnets. A redundant, embedded, digital controller in each module provides increased bandwidth for use in beam-based alignment, and orbit correction systems. The controllers have independent inputs for connection to two external control nodes. Under fault conditions, they sense failures and isolate the modules. Power supply speed mitigates the effects of fault transients and obviates subsequent magnet standardization. Hot swap capability promises higher availability and other exciting benefits for future, more complex, accelerators, and eventually the International Linear Collider project.

43 PARTICLE ACCELERATORS↗

Evaluating Emerging AI/ML Accelerators: IPU, RDU, and and NVIDIA/AMD GPUs

As the size and complexity of AI/ML workloads continue to increase, the demand for specialized hardware accelerators has grown rapidly. To better understand the landscape of commercial AI/ML accelerators, we evaluate and compare several popular platforms, including Graphcore IPU, Sambanova RDU, and GPUs, on a range of AI workloads. Our research aims to help researchers and developers understand the unique features of commercial AI/ML accelerators and provide reference design and performance numbers for research prototypes. By shedding light on the current landscape of commercial AI/ML accelerators, we hope to offer insights into the future development of specialized hardware accelerators for AI/ML.

Peng, Hongwu↗

Final Report for "Modeling Electron Cloud Diagnostics for High-Intensity Proton Accelerators"

Electron clouds in accelerators such as the ILC degrade beam quality and limit operating efficiency. The need to mitigate electron clouds has a direct impact on the design and operation of these accelerators, translating into increased cost and reduced performance. Diagnostic techniques for measuring electron clouds in accelerating cavities are needed to provide an assessment of electron cloud evolution and mitigation. Accurate numerical modeling of these diagnostics is needed to validate the experimental techniques. In this Phase I, we developed detailed numerical models of microwave propagation through electron clouds in accelerating cavities with geometries relevant to existing and future high-intensity proton accelerators such as Project X and the ILC. Our numerical techniques and simulation results from the Phase I showed that there was a high probability of success in measuring both the evolution of electron clouds and the effects of non-uniform electron density distributions in Phase II.

43 PARTICLE ACCELERATORS↗

US Accelerator R&D Program Toward Intensity Frontier Machines

The 2014 P5 report indicated the accelerator-based neutrino and rare decay physics research as a centerpiece of the US domestic HEP program. Operation, upgrade and development of the accelerators for the near-term and longer-term particle physics program at the Intensity Frontier face formidable challenges. Here we discuss key elements of the accelerator physics and technology R&D program toward future multi-MW proton accelerators.

43 PARTICLE ACCELERATORS↗

FERMILAB ACCELERATOR R&D PROGRAM TOWARDS INTENSITY FRONTIER ACCELERATORS : STATUS AND PROGRESS

The 2014 P5 report indicated the accelerator-based neutrino and rare decay physics research as a centrepiece of the US domestic HEP program at Fermilab. Operation, upgrade and development of the accelerators for the near- term and longer-term particle physics program at the Intensity Frontier face formidable challenges. Here we discuss key elements of the accelerator physics and technology R&D program toward future multi-MW proton accelerators and present its status and progress. INTENSITY FRONTIER ACCELERATORS

43 PARTICLE ACCELERATORS↗

The Future of High Energy Polarized Proton Beams

The acceleration and storage of high energy polarized proton beams has made tremendous progress over the last forty years challenging along the way the technologies, precision and the understanding of the beam dynamics of accelerators. This progress is most evident in that one can now contemplate high energy colliders with polarized beams and high luminosity at the same time. After a brief summary of the development and history of polarized proton beam acceleration the paper will focus on the highest energy polarized beams and the possibility of accelerating polarized beams to even higher energies in the future.

43 PARTICLE ACCELERATORS↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): A Sub-Basin Framework for Future CO 2 Infrastructure Development (Task 4.1.a)

The “Southeast Regional CO 2 Utilization and Storage Acceleration Partnership” (SECARB-USA) project supports the U.S. Department of Energy (DOE) Office of Fossil Energy's (FE) mission to help the United States meet its need for secure, affordable, and environmentally sound fossil energy supplies by utilizing the advancements made since 2003 by the Regional Carbon Sequestration Partnership (RCSP) Initiative to continue to identify and address knowledge gaps. The SECARB-USA regional initiative encompasses the states of Alabama, Arkansas, Florida, Georgia, Louisiana, Mississippi, North Carolina, South Carolina, Tennessee, Virginia, and portions of Kentucky, Missouri, Oklahoma, Texas, and West Virginia as noted in Figure 1.1. The primary objective of the project is to identify and address regional onshore storage and transport challenges facing commercial deployment of carbon dioxide (CO 2 ) capture, utilization, and storage (CCUS) technologies.

42 ENGINEERING↗

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]↗

Optimization of transformer ratio and beam loading in a plasma wakefield accelerator with a structure-exploiting algorithm

Plasma-based acceleration has emerged as a promising candidate as an accelerator technology for a future linear collider or a next-generation light source. We consider the plasma wakefield accelerator (PWFA) concept where a plasma wave wake is excited by a particle beam and a trailing beam surfs on the wake. For a linear collider, the energy transfer efficiency from the drive beam to the wake and from the wake to the trailing beam must be large, while the emittance and energy spread of the trailing bunch must be preserved. One way to simultaneously achieve this when accelerating electrons is to use longitudinally shaped bunches and nonlinear wakes. In the linear regime, there is an analytical formalism to obtain the optimal shapes. In the nonlinear regime, however, the optimal shape of the driver to maximize the energy transfer efficiency cannot be precisely obtained because currently no theory describes the wake structure and excitation process for all degrees of nonlinearity. In addition, the ion channel radius is not well defined at the front of the wake where the plasma electrons are not fully blown out by the drive beam. We present results using a novel optimization method to effectively determine a current profile for the drive and trailing beam in PWFA that provides low energy spread, low emittance, and high acceleration efficiency. We parameterize the longitudinal beam current profile as a piecewise-linear function and define optimization objectives. For the trailing beam, the algorithm converges quickly to a nearly inverse trapezoidal trailing beam current profile similar to that predicted by the ultrarelativistic limit of the nonlinear wakefield theory. For the drive beam, the beam profile found by the optimization in the nonlinear regime that maximizes the transformer ratio also resembles that predicted by linear theory. Furthermore, the current profiles found from the optimization method provide higher transformer ratios compared with the linear ramp predicted by the relativistic limit of the nonlinear theory.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Shielding Analyses for SNS Accelerator Power Upgrade

The Proton Power Upgrade (PPU) project [1] at Spallation Neutron Source (SNS) is aiming at increasing the neutron beam intensities at the First Target Station (FTS) and advancing accelerator capability to additionally power a future Second Target Station (STS) [2]. PPU will involve upgrading the SNS accelerator complex to double the currently available proton beam power from 1.4 to 2.8 MW, by increasing the proton beam energy from 1 GeV to 1.3 GeV and by increasing the proton beam current.PPU will enable new science capabilities enhancing the experiment throughput of the 19 existing FTS instruments, which are heavily oversubscribed. STS will include 22 additional neutron scattering instruments. Numerous neutronics analyses are performed to support PPU evaluating the FTS systems for higher beam power and for system upgrades. Part of the PPU scope is an extension of the Ring to Target Beam Transport (RTBT) line, a stub out of the accelerator tunnel for the future Ring to STS Transport (RTST) line[3]. As the RTST tunnel will not be built within the PPU project, the stub will be shielded by a plug, which is planned to be made from regular concrete.In order to provide radiation protection safety, analyses are required to design adequate plug thickness for the stub. The thickness of the stub is driven by the criterion that the area downstream of the plug is “unrestricted access area”, demanding the dose rate downstream the stub be below 0.25 mrem/h at 30 cm from the surface at normal operation and below 20 Rem/hr for accident cases. Additionally, analyses verifying the amount of soil for shielding the accelerator tunnel to the above stated requirements are performed.

Popova, Irina I.↗

Early Commissioning Experience and Future Plans for the 12 GeV Continuous Electron Beam Accelerator Facility

Jefferson Lab has recently completed the accelerator portion of the 12 GeV Upgrade for the Continuous Electron Beam Accelerator Facility. All 52 SRF cryomodules have been commissioned and operated with beam. The initial beam transport goals of demonstrating 2.2 GeV per pass, greater than 6 GeV in 3 passes to an existing experimental facility and greater than 10 GeV in 5-1/2 passes have all been accomplished. These results along with future plans to commission the remaining beamlines and to increase the performance of the accelerator to achieve reliable, robust and efficient operations at 12 GeV are presented.

Spata, Michael F.↗

Jefferson Lab Science: Present and Future

The Continuous Electron Beam Accelerator Facility (CEBAF) and associated experimental equipment at Jefferson Lab comprise a unique facility for experimental nuclear physics. Furthermore, this facility is presently being upgraded, which will enable a new experimental program with substantial discovery potential to address important topics in nuclear, hadronic, and electroweak physics. Further in the future, it is envisioned that the Laboratory will evolve into an electron-ion colliding beam facility.

43 PARTICLE ACCELERATORS↗

Analysis of Nb$_3$Sn Accelerator Magnet Training

Nb 3 Sn accelerator magnet technology has made significant progress during the past decades. For the first time, it is planned to be used in a real accelerator. A relatively small number of Nb 3 Sn quadrupoles and dipoles will be installed in the LHC to increase machine luminosity. Although it will prove the possibility of using Nb 3 Sn magnets in real machines, many questions of scaling this technology up remain. One of them is related to slow training of Nb 3 Sn magnets compared to the traditional Nb-Ti accelerator magnets. Since the goal is to operate thousands of Nb 3 Sn magnets in a future post-LHC accelerator, the slow training will affect both the practical design margin and the nominal operation field. Consequently, the cost of the project to reach the design field level is also increased. Furthermore, to improve our understanding of slow magnet training the existing Fermilab data from Nb 3 Sn magnet tests were re-analyzed. A summary of coil training features and correlations with fabrication parameters observed is presented in this paper.

43 PARTICLE ACCELERATORS↗