Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Amine-Appended Metal–Organic Frameworks as Switch-Like Adsorbents for Energy-Efficient Carbon Capture

The goal of this final project report is to comprehensively summarize the work conducted on project FP-00006194. In accordance with the Project Management Plan (PMP) revised May 2019, and Statement of Project Objectives (SOPO) within, Lawrence Berkeley National Laboratory (LBNL), with industrial partners such as Mosaic Materials, Svante, and Electricore, as well as CCSI 2 , has developed a cost-effective post-combustion CO 2 capture system using diamineappended metal–organic frameworks (MOFs). This project involved (i) synthesis and characterization of framework materials that exhibit a switch-like CO 2 adsorption behavior, (ii) scaling-up of MOF production, development of production cost models, and fabrication of materials, and (iii) deployment of materials in a patented VeloxoTherm process and characterization to optimize the material’s performance in the context of real process streams and conditions. During each of the four project budget periods, the project team met Success Criteria for Year 1 to 3; however, because of the decision to halt the project in Q1 2021, Success Criteria for Year 4 were not achieved.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Oppenheimer's Box of Chocolates: Remediation of the Manhattan Project Landfill at Los Alamos National Laboratory - 12283

Material Disposal Area B (MDA B) is the oldest radioactive waste disposal facility at Los Alamos National Laboratory. Operated from 1944-48, MDA B was the disposal facility for the Manhattan Project. Recognized as one of the most challenging environmental remediation projects at Los Alamos, the excavation of MDA B received $110 million from the American Recovery and Reinvestment Act of 2009 to accelerate this complex remediation work. Several factors combined to create significant challenges to remediating the landfill known in the 1940's as the 'contaminated dump'. The secrecy surrounding the Manhattan Project meant that no records were kept of radiological materials and chemicals disposed or of the landfill design. An extensive review of historical documents and interviews with early laboratory personnel resulted in a list of hundreds of hazardous chemicals that could have been buried in MDA B. Also, historical reports of MDA B spontaneously combusting on three occasions -with 50-foot flames and pink smoke spewing across the mesa during the last incident in 1948-indicated that hazardous materials were likely present in MDA B. To complicate matters further, though MDA B was located on an isolated mesa in the 1940's, the landfill has since been surrounded by a Los Alamos commercial district. The local newspaper, hardware store and a number of other businesses are located directly across the street from MDA B. This close proximity to the public and the potential for hazardous materials in MDA B necessitated conducting remediation work within protective enclosures. Potential chemical hazards and radiological inventory were better defined using a minimally intrusive sampling method called direct push technology (DPT) prior to excavation. Even with extensive sampling and planning the project team encountered many surprises and challenges during the project. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. More than three years of effort by the LANL project team went into the planning for remediation of Material Disposal Area B. Hundreds of historical documents were reviewed; retired personnel were extensively interviewed and noninvasive techniques were used to characterize the site. The information collected was incorporated into the safety requirements, cost estimate, schedule and primary execution plan for the project. Ultimately the waste volume managed by the project approached 40000 m{sup 3}, more than double the original project estimate. This increase had a major impact on both project cost and schedule. Nuclear safety requirements for the project were based on an estimated MDA B radionuclide inventory of 12 PE-Ci. When excavation was complete over 123 PE-Ci had been removed from the trenches. The radionuclide inventory at MDA B was an order of magnitude higher than estimated. Work at MDA B could not have proceeded without the safety basis exemption from DOE-HQ. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The DOE Office of Environmental Management International Cooperative Program: Current Status and Plans for Expansion

The DOE-EM Office of Engineering and Technology is responsible for implementing EM’s international cooperative program. The Office of Engineering and Technology’s international efforts are aimed at supporting EM’s mission of risk reduction and accelerated cleanup of the environmental legacy of the nation's nuclear weapons program and government-sponsored nuclear energy research. To do this, EM pursues collaborations with government organizations, educational institutions, and private industry to identify and develop technologies that can address the site cleanup needs of DOE. Currently, DOE-EM is performing collaborative work with researchers at the Khlopin Radium Institute (KRI) and the SIA Radon Institute in Russia and the Ukraine’s International Radioecology Laboratory (IRL). Additionally, a task was recently completed with the Nuclear Engineering Technology Institute (NETEC) in South Korea. The objectives of these collaborations were to explore issues relating to high-level waste and to investigate technologies that could be leveraged to support EM site cleanup needs. In FY09, continued collaboration with the current partners is planned. Additionally, new research projects are being planned to expand the International Program. A collaborative project with Russian Electrotechnical University is underway to evaluate CCIM control and monitoring technologies. A Statement of Intent was recently signed between DOE-EM and the U.K. Nuclear Decommissioning Authority (NDA) to work cooperatively on areas of mutual interest. Under this umbrella, discussions were held with NDA representatives to identify potential areas for collaboration. Information and technical exchanges were identified as near-term actions to help meet the objectives of the Statement of Intent. Technical exchanges in identified areas are being pursued in FY09

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Identifying and Estimating Project Development Costs [Slides]

This presentation focuses on renewable energy project development and planning and highlights common project costs at each stage of a project's lifecycle. The presentation was produced as part of a series of trainings for awardees of the Energizing Rural Communities prize.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Health impact assessment of Roma housing policies in Central and Eastern Europe: A comparative analysis

Marginalised Roma communities in European countries live in substandard housing conditions the improvement of which has been one of the major issues of the Decade of Roma Inclusion, the ongoing intergovernmental European Roma programme. The paper presents EU-funded health impact assessments of national Roma housing policies and programmes in 3 Central and Eastern European countries in light of the evaluation of a completed local project in a fourth CEE country so as to compare predicted effects to observed ones. Housing was predicted to have beneficial health effects by improving indoor and outdoor conditions, access to services, and socioeconomic conditions. Negative impacts were predicted only in terms of maintenance expenses and housing tenure. However, observed impacts of the completed local project did not fully support predictions especially in terms of social networks, satisfaction with housing and neighbourhood, and inhabitant safety. In order to improve the predictive value of HIA, more evidence should be produced by the careful evaluation of locally implemented housing projects. In addition, current evidence is in favour of planning Roma housing projects at the local rather than at the national level in alignment with the principle of subsidiarity. - Highlights: Black-Right-Pointing-Pointer Predictive validity of HIA of national Roma housing policies - in light of current evidence - is low. Black-Right-Pointing-Pointer Implemented housing projects should be comprehensively evaluated to improve reliability of HIA. Black-Right-Pointing-Pointer Roma housing projects should be planned at the local rather than at the national level. Black-Right-Pointing-Pointer HIA should be used to plan Roma housing projects at the local level.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of AP-Farm Simulant Composition for Rotary Microfilter Testing

In spring 2011, the Technology Maturation Plan (TMP) for the Supplemental Treatment Project (RPP-PLAN-49827, Rev. 0), Technology Maturation Plan for the Treatment Project (T4S01) was developed. This plan contains all identified actions required to reach technical maturity for a field-deployable waste feed pretreatment system. The supplemental pretreatment system has a filtration and a Cs-removal component. Subsequent to issuance of the TMP, rotary microfiltration (RMF) has been identified as the prime filtration technology for this application. The prime Cs-removal technology is small column ion exchange (ScIX) using spherical resorcinol formaldehyde (sRF) as the exchange resin. During fiscal year 2011 (FY2011) some of the tasks identified in the TMP have been completed. As of September 2011, the conceptual design package has been submitted to DOE as part of the critical decision (CD-1) process. This document describes the remaining tasks identified in the TMP to reach technical maturity and evaluates the validity of the proposed tests to fill the gaps as previously identified in the TMP. The potential vulnerabilities are presented and the completed list of criteria for the DOE guide DOE G 413.3-4 different technology readiness levels are added in an attachment. This evaluation has been conducted from a technology development perspective - all programmatic and manufacturing aspects were excluded from this exercise. Compliance with the DOE G 413.3-4 programmatic and manufacturing requirements will be addressed directly by the Treatment Project during the course of engineering design. The results of this evaluation show that completion of the proposed development tasks in the TMP are sufficient to reach TRL 6 from a technological point of view. The tasks involve actual waste tests using the current baseline configuration (2nd generation disks, 40 psi differential pressure, 30 C feed temperature) and three different simulants - the PEP, an AP-Farm and an S-saltcake. Based on FY2011 dollars used in the TMP, these tests will have ROM costs of $950K and require up to 10 months to complete. Completion of the simulant testing will satisfy the TRL 5 and TRL 6 criteria that are related to system testing with materials that represent the full range of properties in a relevant environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of a Heat Integrated Post-combustion CO 2 Capture System with Hitachi Advanced Solvent into Existing Coal-Fired Power Plant (Final Technical Report)

The goal of this final project report is to comprehensively summarize the work conducted on project DE-FE0007395. In accordance with the Project Management Plan (PMP), Revision F dated 5/10/2019, and Statement of Project Objectives (SOPO) within, the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) has successfully demonstrated a unique, versatile CO 2 capture system (CCS) using a heat integrated process combined with two-stage stripping for process intensification, heat recovery and demineralized (DM) water generation. This project involved the design, fabrication, installation, testing of and data analysis from the UK CAER 0.7 MWe small pilot scale CO2 capture process installed at Kentucky Utilities (KU) E.W. Brown Generating Station in Harrodsburg, KY. During each of the four project Budget Periods (BPs), UK CAER met all project deliverables, all project milestones, with National Energy Technology Laboratory (NETL) approved adjustments made to the campaign long-term hours during BP4. The CCS was constructed in modular skids. Two solvent campaigns were initially conducted; the first with a 30 wt% monoethanolamine (MEA) as a baseline, and the second with the Hitachi H3-1 advanced solvent. Additional tests were performed with two advanced solvents including CAER and Proprietary Solvent C. Short-period testing with a higher concentration of 40 wt% MEA was conducted to evaluate the potential saving with high alkalinity. From the various solvent campaigns, unique aspects of the UK CAER CCS technology, as well as its flexibility and versatility were experimentally validated and demonstrated. With respect to solvent evaluation efforts in identifying candidates with significant operational and capital cost savings potential, performance of solvents were evaluated to determine the energy requirements for regeneration; environmental impacts from secondary emissions and degradation products; degradation rates, solvent make-up rates and stability. The assessments were done from parametric tests that determined optimum operating conditions for the individual solvents to maximize process efficiency and minimize the parasitic load of the power plant, and from long term campaigns (1000 hours for 30 wt% MEA and 1000 hours for H3-1) which collectively informed the techno-economic analyses (TEA) of the process. The long term campaigns included corrosion studies which used three types of metal coupons in different sections of the process: (absorber, primary stripper, lean carbon-loaded and rich carbon loaded flow streams in process) to mimic heat and flow dynamics process equipment were exposed to. The estimated corrosion rates were used to elucidate corrosion mechanisms and to further guide process material selection for potential capital cost savings.

gas separation↗

Capacity Density Considerations for Floating Offshore Wind Farms in Ultradeep Waters

Capacity density describes the concentration of wind energy development in an area and is often specified in terms of megawatts-per-square-kilometer (MW/km2). Understanding capacity density trends in wind energy projects helps to inform both energy system and spatial planning efforts. Borrman et al. (2018) and Mulas Hernando et al. (2023) analyze capacity density trends for fixed-bottom offshore wind farms in Europe and the United States, respectively, and Cooperman et al. (2022) explores how floating offshore wind mooring technology choices may impact wind plant layout through setbacks from lease area boundaries in waters up to 1,300 m deep. Technical challenges facing floating offshore wind development in ultradeep waters (beyond 1,300 m) could impact achievable capacity densities, with potential implications to marine spatial planning and project economics. When compared to fixed-bottom commercial-scale wind farms, mooring system footprints from floating offshore wind systems can constrain capacity density in some circumstances. In this study, we conduct an initial investigation of how taut mooring configurations may constrain floating offshore wind turbine placement and estimate capacity density for representative floating wind plants in generic lease areas. In addition, we explore floating wind plant capacity density drivers in ultradeep waters by characterizing area utilization for a range of lease area characteristics. This analysis highlights the primary challenges that floating offshore wind systems may encounter in achieving capacity densities comparable to commercial-scale fixed-bottom projects at ultradeep water depths, from a technical standpoint.

capacity density↗

Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

FEED Study of CarbonCapture Inc DAC and CarbonCure Utilization Technologies Using United States Steel’s Gary Works Plant Waste Heat (Final Report)

The University of Illinois at Urbana-Champaign (UIUC) led this project to produce a front-end engineering design (FEED) study of an advanced Direct Air Capture and Utilization System (DACUS) system that can remove a minimum of 5,000 tonnes/yr net of carbon dioxide from air (based on cradle-to-gate LCA) and utilizing the CO 2 to produce low carbon intensity ready mix concrete. The designed system, if built, would be larger than any currently existing Direct Air Capture (DAC) collector in the U.S. Such carbon capture technologies are critical to meeting the goals of the DOE’s program to accelerate climate-critical technology. In addition to the power sector, industrial facilities for the manufacture of steel and cement/concrete are among the major sources of anthropogenic CO 2 . DAC is a promising new technology for reducing CO 2 , a potent greenhouse gas, in the atmosphere but is expensive, in part due to the energy required to adsorb and desorb captured CO 2 during cycles. By integrating CarbonCapture Inc. (CCI) DAC modules at United States Steel's Gary Works (USS) and utilizing the site's waste heat, energy, and location this project evaluates the feasibility of utilizing the captured CO 2 and the logistics of transportation. CarbonCapture Inc. has developed an innovative DAC system using novel adsorbents to cost-effectively capture CO 2 . The captured, liquified gas will be trucked to ready-mix concrete plants within the region, the closest of which is approximately 3.5 miles away, where CarbonCure will inject it into concrete during the mixing process at the facilities. The carbon dioxide reacts with concrete, mineralizing into calcium carbonate (CaCO 3 ), permanently locking the greenhouse gas into the matrix of the building material. This FEED study demonstrated a full CO 2 value chain for DACUS from industrial facilities. It also provided a means for Visage Energy Corp. (Visage) to assess the impact of this holistic approach on job creation, regional economic impact, and environmental justice. The project team also included Sargent & Lundy (S&L) to provide the constructability review and costing of the integration of the DAC with the steel plant. Ecotek Engineering USA, LLC designed the outside battery limit (OSBL) infrastructure to connect the DAC and the plant. Activities performed during the project included: (1) Project Management Plan; (2) Technology Maturation Plan (TMP); (3) Initial Workforce Readiness Plan; (4) Workforce Readiness Plan; (5) Front-End Engineering Design (FEED) Study; (6) Project Design Basis; (7) Hazards and Operability (HAZOP) Study; (8) Constructability Review; (9) Project Cost Assessment; (10) Logistics Analysis of CO 2 Transportation to the Utilization Site; (11) Business Case Analysis; (12) Life Cycle Analysis (LCA); (13) Environmental Health and Safety (EH&S) Analysis; (14) Environmental Justice Analysis; and (15) Economic Revitalization and Job Creation Outcomes Analysis. This report provides a summary of the outcomes and results of the project, which was performed between Oct. 1, 2022, through Sept. 30, 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of an Execution Strategy Analysis (ESA) Capability and Tool for the Management of Spent Nuclear Fuel (SNF) - 16575

An Execution Strategy Analysis (ESA) capability and tool are being developed to evaluate alternative execution strategies for future deployment of a consolidated Interim Storage Facility using a consent-based siting process per the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (Strategy). Application of an ESA approach not only leverages but also goes beyond traditional project analysis tools. The ESA tool allows for ongoing performance assessment of the evolving project execution plan that takes into account significant assumptions, risks, and uncertainties throughout the project lifecycle. The ESA process and tool will be used to support the development of plans, budgets, and alternative execution/implementation strategies for meeting the goals of the Strategy. This paper describes the development of the ESA capability and tool and identifies the value of applying such a capability in implementing a long-term strategy for managing spent nuclear fuel and high-level radioactive waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating Commercial Ready Autonomous Robotic Platforms to Enhance Worker Safety and Efficiency - 20053

This paper will explore the challenges and triumphs of implementing advanced robotic systems and the supporting technology for the waste management industry. Deployment-ready solutions for autonomous robotic platforms are new to the radioactive waste management industry and have been slow to implement across the complex. Specifically, it will explore Hanford Tank Operations Contractor's implementation of ground-based autonomous robotic platforms to enhance workforce safety and efficiency. The first objective of the project is to demonstrate safe operation of autonomous instrumented robots, followed by a scaling up of capabilities for the platform to meet any additional requests of internal stakeholders. Autonomous robotics platforms offer a fantastic range of capabilities that will aid in decreasing long-term liability of radioactive waste management industry by enhancing clean-up efforts and worker safety. Over the past five years, deployment-ready solutions for autonomous robotic platforms have come a long way. Autonomous robotic platforms are increasingly available to purchase from many vendors, often for prices under $100,000. Additionally, the vendors who produce these products are efficient in accommodating customized solutions to unique challenges, such as those often found in the radioactive waste management industry. However, the newness of this technology to the radioactive waste management industry and has resulted in a slow implementation across the complex. This paper will explore the challenges and triumphs of implementing advanced robotic systems and supporting technology for the waste management industry. Specifically, it will explore Hanford Tank Operations Contractor's implementation of ground based autonomous robotic platforms to enhance workforce safety and efficiency. While the company has utilized robots in many parts of the tank farms mission, this was first attempted in the deployment of an autonomous platform that required no operator with only minor maintenance and created challenges not yet encountered. These challenges included stakeholder buy-in, operational safety, procurement uncertainties, adaption of 'off the shelf products, overcoming the 'Fukushima complexity' perception, security concerns, and the initial criteria down select. Hanford Tank Operations Contractor's management identified the need for a workforce protecting low cost robotics solution in the fall of 2017. The project scope generated was part of the response to the Tank Vapor Assessment Team recommendation to enhance the safety of the workforce by utilizing new technology. Since the projects inception, it has been incorporated into the Tank Stewardship Plan. This project was unique to Hanford Tank Operations Contractor, as the company does not frequently incorporate advanced technology for field deployment quickly. The project was also progressive to the Hanford Tank Operations Contractor as it functions as a partnership project with a local university. The first objective of the project is to demonstrate safe operations of autonomous instrumented robotics, monitoring and collecting data, and the wireless transmission of data to a central computing system. Following the completion of this first objective, the project will scale up capabilities of the platform to meet the requests of additional internal stakeholders throughout the tank farms - including completion of specific in-field tasks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using VE to Strategically Plan Our Future

The Value Engineering (VE) Methodology is an effective tool for business or project strategic planning. In conjunction with the “Balanced Scorecard Approach” (Drs. Robert Kaplan, PhD, and David Norton, PhD, from the Balanced Scorecard Collaborative/Palladium Group), function analysis can be used to develop strategy maps and scorecards. The FAST diagram provides an integrated approach to strategy map development by formulating a cause and effect relationship and establishing the “how” and “why” behind the strategy map. By utilizing the VE Job Plan, one is able to move from strategic thinking all the way through to execution of the strategy.

42 ENGINEERING↗

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]↗

E2C Cohorts: Implementation Funding Projects - Impact Summary [Slides]

From August 2024 to October 2025, 11 Clean Cities and Communities coalitions supported projects to advance transportation goals by gathering input from local stakeholders, and using the resulting insights to develop new plans and programs for local partners. This effort leveraged information and best practices shared during the 2024 E2C Cohort on Integrating Community Priorities into Electric Vehicle Plans and Projects. These coalitions supported partners across the country to develop plans for electric vehicle integration through one-on-one technical assistance and tailored local engagement. This deck summarizes the individual projects completed by coalitions, and the overall reach and impact of all of this program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Continuous Electron Beam Accelerator Facility at 12 GeV

This review paper describes the energy-upgraded Continuous Electron Beam Accelerator Facility (CEBAF) accelerator. This superconducting linac has achieved 12 GeV beam energy by adding 11 new high-performance cryomodules containing 88 superconducting cavities that have operated cw at an average accelerating gradient of 20 MV / m . After reviewing the attributes and performance of the previous 6 GeV CEBAF accelerator, we discuss the upgraded CEBAF accelerator system in detail with particular attention paid to the new beam acceleration systems. In addition to doubling the acceleration in each linac, the upgrade included improving the beam recirculation magnets, adding more helium cooling capacity to allow the newly installed modules to run cold, adding a new experimental hall, and improving numerous other accelerator components. We review several of the techniques deployed to operate and analyze the accelerator performance and document system operating experience and performance. In the final portion of the document, we present much of the current planning regarding projects to improve accelerator performance and enhance operating margins, and our plans for ensuring CEBAF operates reliably into the future. For the benefit of potential users of CEBAF, the performance and quality measures for the beam delivered to each of the experimental halls are summarized in the Appendix. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

An Asset-Based Approach to Tribal Community Energy Planning

Community energy planning is a vital component of successful energy resource development and project implementation. Planning can help tribes develop a shared vision and strategies to accomplish their energy goals. This paper explores the benefits of an asset-based approach to tribal community energy planning. While a framework for community energy planning and federal funding already exists, some areas of difficulty in the planning cycle have been identified. This paper focuses on developing a planning framework that offsets those challenges. The asset-based framework described here takes inventory of a tribe’s capital assets, such as: land capital, human capital, financial capital, and political capital. Such an analysis evaluates how being rich in a specific type of capital can offer a tribe unique advantages in implementing their energy vision. Finally, a tribal case study demonstrates the practical application of an asset-based framework.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Monitoring Avian Productivity and Survivorship at the Sandia Wetlands at Los Alamos National Laboratory (2014-2019)

Biologists at Los Alamos National Laboratory completed six years (2014–2019) of demographic monitoring of passerines (songbirds) during the breeding season in Los Alamos, New Mexico. We captured songbirds at a mist netting station located in the Sandia Wetlands in Sandia Canyon (Technical Areas 60 and 61). We identified, measured, and then banded captured birds with federal migratory bird bands. Banding operations took place between May and August of each year, with 10 mist netting sessions annually. We conducted this project as part of the implementation of the Biological Resources Management Plan. The project complies with the 2013 Memorandum of Understanding between the United States Fish and Wildlife Service (USFWS) and the United States Department of Energy regarding the implementation of Executive Order 13186. The overall number of birds and species captured was variable, and we saw no decreases over the course of six years in bird species diversity, abundance, or the percentage of breeding birds. Our results indicate that the Sandia Wetlands support numerous species of breeding birds, including species of conservation concern. We did not see a declining trend for the top 10 most-captured species or for any of the species of conservation concern over time; however, we need more years of data to make robust conclusions about population trends through time. Our results indicated that adult recapture rates at the Sandia Wetlands are at least twice as low when compared with estimated adult survival in migratory passerines from peer-reviewed literature. We also did not recapture any birds that were banded as juveniles in subsequent years throughout the entire six-year period. Low recapture rates for adults and the non-existent recapture rates for juveniles should be explored further. To accurately assess individual species survival rates for adults and juveniles using mark-recapture models, we need a longer dataset, which would allow for a more robust analysis.

59 BASIC BIOLOGICAL SCIENCES↗