Field Emission Mitigation in CEBAF SRF Cavities Using Deep Learning

The Continuous Electron Beam Accelerator Facility (CEBAF) operates hundreds of superconducting radio frequency (SRF) cavities in its two main linear accelerators. Field emission can occur when the cavities are set to high operating RF gradients and is an ongoing operational challenge. This is especially true in newer, higher gradient SRF cavities. Field emission results in damage to accelerator hardware, generates high levels of neutron and gamma radiation, and has deleterious effects on CEBAF operations. So, field emission reduction is imperative for the reliable, high gradient operation of CEBAF that is required by experimenters. Here we explore the use of deep learning architectures via multilayer perceptron to simultaneously model radiation measurements at multiple detectors in response to arbitrary gradient distributions. These models are trained on collected data and could be used to minimize the radiation production through gradient redistribution. This work builds on previous efforts in developing machine learning (ML) models, and is able to produce similar model performance as our previous ML model without requiring knowledge of the field emission onset for each cavity.

Ahammed, K.↗

Optimizing Insulation Design for Transformers in Medium Voltage Power Conversion Systems

Medium-frequency transformers (MFTs) play a crucial role in medium-voltage (MV) solidstate transformer (SST) systems, particularly in extreme fast charging applications. Achieving partial discharge (PD)-free operation while maintaining high power density is a significant challenge due to the high electric field (E-field) stresses inherent in MV applications. This dissertation focuses on the insulation design and optimization of MFTs used in both the main power electronics circuits and auxiliary power supplies. The study begins with an overview of insulation testing methodologies, including high potential tests, basic insulation level tests, and PD tests, which are critical for evaluating MFT insulation reliability. Given the importance of PD-free operation for long-term reliability, particular emphasis is placed on understanding PD mechanisms, including void, corona, and surface discharge, and their mitigation strategies. A high voltage isolated auxiliary power supply is then introduced, utilizing a gapped transformer encapsulated in silicone gel. This design achieves PD-free insulation up to 18 kV RMS while maintaining low coupling capacitance to minimize common-mode current. The proposed solution ensures reliable operation in MV environments and offers a scalable approach for auxiliary power in cascaded SST architectures. To improve MFT insulation in main power conversion circuits, a novel structure is developed using polypropylene sheets and potting compounds to create a void-free air gap, effectively mitigating E-field intensity. A prototype transformer with this insulation structure is built and achieves PD-free operation up to 30 kV RMS. This design is experimentally validated in a resonant converter operating at 46 kW, demonstrating its feasibility for MV SST applications. Further optimization is implemented to enhance MFT performance for dual-active-bridge(DAB) converters by integrating a semiconductive shielding layer within the insulation structure. This shielding layer improves the magnetic coupling coefficient while effectively confining the E-field within high insulation materials, thereby reducing eddy current losses. The optimized MFT achieves PD-free operation at 12.6 kV RMS and is successfully tested in a DAB converter operating at 43 kW, which meets the insulation requirements for a 13.2 kV SST system. This dissertation advances MFT insulation design by introducing and experimentally validating novel approaches that improve high voltage insulation while optimizing magnetic coupling and manufacturability. The proposed insulation structures enable PD-free operation while minimizing insulation material usage and simplifying assembly, making them ideal for high power, high voltage applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

It's Not Just About the Megawatts - ARC Industry Forum, The Future of Power Generation

As the world transitions to less carbon intensive energy portfolios, much of the attention understandably centers on generating capacity – replacing megawatts of fossil fuel with megawatts of solar, wind, nuclear, hydroelectric, hydrogen, and more. The actual operation of a reliable grid needs more than just megawatts though: adequate quantities of a portfolio of essential reliability services; flexible and capable power delivery systems; governance to operate in 5-10 minute intervals, forecast hourly, and plan and build on a generational time horizon; and dependable and secure communications. We can choose our fuel mix for climate reasons, but the grid itself and the society that relies upon it impose constraints on those choices that we ignore at our peril.

13 HYDRO ENERGY↗

Residual-based error correction for neural operator accelerated infinite-dimensional Bayesian inverse problems

We explore using neural operators, or neural network representations of nonlinear maps between function spaces, to accelerate infinite-dimensional Bayesian inverse problems (BIPs) with models governed by nonlinear parametric partial differential equations (PDEs). Neural operators have gained significant attention in recent years for their ability to approximate the parameter-to-solution maps defined by PDEs using as training data solutions of PDEs at a limited number of parameter samples. The computational cost of BIPs can be drastically reduced if the large number of PDE solves required for posterior characterization are replaced with evaluations of trained neural operators. However, reducing error in the resulting BIP solutions via reducing the approximation error of the neural operators in training can be challenging and unreliable. We provide an a priori error bound result that implies certain BIPs can be ill-conditioned to the approximation error of neural operators, thus leading to inaccessible accuracy requirements in training. To reliably deploy neural operators in BIPs, we consider a strategy for enhancing the performance of neural operators: correcting the prediction of a trained neural operator by solving a linear variational problem based on the PDE residual. We show that a trained neural operator with error correction can achieve a quadratic reduction of its approximation error, all while retaining substantial computational speedups of posterior sampling when models are governed by highly nonlinear PDEs. The strategy is applied to two numerical examples of BIPs based on a nonlinear reaction–diffusion problem and deformation of hyperelastic materials. We demonstrate that posterior representations of the two BIPs produced using trained neural operators are greatly and consistently enhanced by error correction.

97 MATHEMATICS AND COMPUTING↗

Design and Operation of Energy Systems with Large Amounts of Variable Generation: IEA Wind TCP Task 25 (Final Summary Report)

This report summarizes findings on wind integration from the 17 countries or sponsors participating in the International Energy Agency Wind Technology Collaboration Program (IEA Wind TCP) Task 25 from 2006-2020. Both real experience and studies are reported. Many wind integration studies incorporate solar energy, and most of the results discussed here are valid for other variable renewables in addition to wind. The national case studies address several impacts of wind power on electric power systems. In this report, they are grouped under long-term planning issues and short-term operational impacts. Long-term planning issues include grid planning and capacity adequacy. Short-term operational impacts include reliability, stability, reserves, and maximizing the value of wind in operational timescales (balancing related issues). The first section presents the variability and uncertainty of power system-wide wind power, and the last section presents recent studies toward 100% shares of renewables. The appendix provides a summary of ongoing research in the national projects contributing to Task 25 for 2021-2024. The design and operation of power and energy systems is an evolving field. As ambitious targets toward net-zero carbon energy systems are announced globally, many scenarios are being made regarding how to reach these future decarbonized energy systems, most of them involving large amounts of variable renewables, mainly wind and solar energy. The secure operation of power systems is increasingly challenging, and the impacts of variable renewables, new electrification loads together with increased distribution system resources will lead to somewhat different challenges for different systems. Tools and methods to study future power and energy systems also need to evolve, and both short-term operational aspects (such as power system stability) and long-term aspects (such as resource adequacy) will probably see new paradigms of operation and design. The experience of operating and planning systems with large amounts of variable generation is accumulating, and research to tackle the challenges of inverter-based, nonsynchronous generation is on the way. Energy transition and digitalization also bring new flexibility opportunities, both short and long term.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operational Experience and Development of a Reliability Model for the ATR Demineralizer System (Slides)

The Advanced Test Reactor (ATR) is a light water reactor with aluminum clad driver fuel. Strict limits are implemented on pH, conductivity, and filterable solids to assure the performance of the driver fuel limit corrosion of the primary coolant system (PCS) pressure boundary components. A bypass demineralizer system is used to maintain PCS coolant within allowable bands for each of the aforementioned variables. Unlike many other reactors, the ATR does not have a filtration system. As such, failure of ion exchange resin in the bypass demineralizer can defeat the purpose of the system and result in high filterable solids in the PCS. Power operations with high filterable solids is prohibited by a technical safety requirement. This paper discusses recent failures of the ATR bypass demineralizer system. The testing and analysis done to deduce the cause of the failures is covered, as well as short term mitigative steps that were taken. To prevent the likelihood of future issues, historical data from the ATR and industry is used to develop a reliability model of the ATR bypass demineralizer system. Evidence of radiolytic decomposition of ion exchange resin was found in the cause investigation. As such, special attention is given to ion exchange resin failure due to high radiation environments. The reliability model is used to develop the ATR testing and maintenance program. Specifically, limits on resin service life are discussed.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Evaluation of Component Reliability in Photovoltaic Systems using Field Failure Statistics

Ongoing operations and maintenance (O&M) are needed to ensure photovoltaic (PV) systems continue to operate and meet production targets over the lifecycle of the system. Although average costs to operate and maintain PV systems have been decreasing over time, reported costs can vary significantly at the plant level. Estimating O&M costs accurately is important for informing financial planning and tracking activities, and subsequently lowering the levelized cost of electricity (LCOE) of PV systems. This report describes a methodology for improving O&M planning estimates by using empirically-derived failure statistics to capture component reliability in the field. The report also summarizes failure patterns observed for specific PV components and local environmental conditions observed in Sandia's PV Reliability, Operations & Maintenance (PVROM) database, a collection of field records across 800+ systems in the U.S. Where system-specific or fleet-specific data are lacking, PVROM-derived failure distribution values can be used to inform cost modeling and other reliability analyses to evaluate opportunities for performance improvements.

14 SOLAR ENERGY↗

Situational Awareness of Grid Anomalies (SAGA) for Visual Analytics—Near-Real-Time Cyber-Physical Resiliency Through Machine Learning

The Situational Awareness of Grid Anomalies (SAGA) project built upon foundational power system tools developed at the National Renewable Energy Laboratory (NREL) integrated with an ever-increasing set of Gridmetrics data extracted from the cable television (CATV) broadband network infrastructure while assimilating other time-series geospatial data and information, such as weather and cyber-physical phenomena, to demonstrate a disruptive technology for power system data analytics relying on existing infrastructure. Three research thrusts supported (1) visual analytics, (2) cyber-physical power system simulation, and (3) anomaly detection. SAGA created technology that leverages, couples, and fortifies two vastly different realms - power and broadband - to increase the resiliency of the power grid in the face of increasing cyberattacks and operational challenges related to integrating DERs. The exploration of potential synergies of broadband-enabled grids resulted in identifying a mutually beneficial symbiosis that can increase the resiliency of both power and broadband services. Broadband networks perform better with reliable power and are good at providing real-time measurements that identify where the grid is under attack, is failing, or is weak. Likewise, sensor-starved distribution grids perform better and can be more reliable when their operation is buttressed with observations of broadband-detected anomalies. Future research can explore broadband's contribution to continuing to improve grid resiliency, reliability, and cost-effective operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Lead-Free Flexible Perovskite Solar Cells with Interfacial Native Oxide Have >10% Efficiency and Simultaneously Enhanced Stability and Reliability

Here we demonstrate an innovative compositional and interfacial engineering approach to achieve Pb-free flexible perovskite solar cells (f-PSCs) with an unprecedented combination of the highest efficiency reported to date (10.43%), together with enhanced operational stability and mechanical reliability. The key to this approach is alloying of an FASnI3 metal halide perovskite (MHP) thin film with Ge2+ to stabilize the Sn2+ oxidation state in the MHP, together with the use of a NiOx hole-transport layer. We show that this results in the in situ formation of a thin amorphous GeO2 native oxide layer at the NiOx/FASn0.9Ge0.1I3 interface. This layer not only passivates that critical interface but also enhances the interfacial mechanical bonding.

efficiency↗

Communication-Constrained Robust Control and Learning of Grid-Connected

The electric grid of things (EGoT) promises great potential for innovative grid services by tapping into vast load flexibility. However, the unique characteristics of EGoT, being a part of the cyber-physical electric power system, present both opportunities and challenges, especially concerning supply-demand balancing, stability, and communication constraints. Traditionally, centralized control was employed to ensure balance and stability in power systems. However, with the massive influx of EGoT devices, new strategies are needed to efficiently coordinate and control these distributed devices for optimal grid operations. While some studies have explored efficiency and economic models, there remains a gap in ensuring reliability under everyday operations and resilience during extreme conditions. Addressing this gap, this project develops the technology for an Energy Service Interface (ESI) that includes novel pricing, control, learning, and distributed optimization algorithms, which will enable utilities to recruit EGoT assets for crucial grid services such as load flexibility, voltage regulation, and situation-awareness. The key novelty of the proposed technology is the careful distribution of learning and control functions across utility and EGoT asset owners such that provably efficient and resilient grid operations are attained while respecting communication and information-exchange constraints. Specifically, the project team develops machine-learning enhanced load modeling methods to allow EGoT asset owners to learn their load capability and flexibility, and develops pricing-based and decentralized learning-based control so that asset owners can coordinate to meet system-wide demand-supply balance and reliability goals. For extreme situations involving high-impact, low-probability catastrophic events (termed the “black-sky” events), the team also develops (1) a “Feeder-Operating Center-on-a-Laptop” (FOCAL) software that can assist utility personnel in leveraging EGoT assets to accelerate the service recovery of damaged feeders, and (2) distributed optimization algorithms that can coordinate the operation points of EGoT devices under severe communication constraints. The proposed technology has been extensively tested and evaluated through simulations and on a testbed. In summary, as we transition into a more interconnected and digital power grid era, our project’s findings and developments offer a pivotal step toward guaranteeing both efficiency and resilience in the face of both everyday operations and rare “black-sky” events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cloud Droplet Measurement System for the ARM Tethered Balloon System (TBS) Field Campaign Report

The Mesa Photonics' cloud droplet measurement system (CDMS) performs in situ measurement of droplet size distribution and droplet number density in clouds. These characteristics are important cloud microphysical properties that are critical input parameters for atmospheric models and are also useful for proper calibration and validation of performance of other atmospheric measurement instrumentation. This small campaign was the first project (out of two) that involved integration of the CDMS into the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility’s tethered balloon system (TBS) and its initial testing at the ARM Southern Great Plains (SGP) atmospheric observatory. The follow-up campaign (AFC07016) involved testing of the CDMS under relevant conditions at the third ARM Mobile Facility (AMF3) at Oliktok Point, Alaska and making in situ measurements in clouds. The goal of this small field campaign was to deploy the CDMS on the ARM TBS, demonstrate its integrity and compatibility with the TBS, and test the wireless telecommunication system in preparation for subsequent in-cloud measurements at ARM’s North Slope of Alaska (NSA) observatory at Utqiagvik (formerly Barrow). The specific technical objectives included: (1) Integration of the Mesa Photonics' CDMS into the ARM TBS, (2) testing of the wireless telecommunication system of the CDMS, (3) evaluating the data acquisition software and image processing algorithms especially under high-background-illumination conditions, and (4) testing the ruggedness of the instrument's optical alignment and other performance characteristics. All objectives have been successfully met. The mounting hardware was designed and built mostly at Sandia National Laboratories (SNL), which allowed reliable mounting of the CDMS on the TBS and co-locating the CDMS with other instruments. The field tests were performed by the principal investigator (PI) in collaboration with the TBS operational crew led by D. Dexheimer. The field testing demonstrated good compatibility of the CDMS with the TBS. During the TBS flights, the crew did not experience any operational issues with the CDMS. The instrument demonstrated reliable operational characteristics, including sufficient battery life and good thermal management. The wireless telecommunication system has been successfully tested at TBS flight altitudes of up to 1000 m. During all flights, the CDMS raw data were wirelessly transmitted to the ground station and processed in real time. The ruggedness of the instrument's optical alignment was evaluated by performing calibration of the CDMS (using Mesa Photonics' fixed-size monodisperse droplet generator) before and after the campaign. The calibration was stable within the instrument's measurement precision. In summary, the campaign demonstrated good compatibility of the Mesa Photonics' CDMS with the ARM TBS. The flight tests confirmed the mechanical integrity of the CDMS and stability of its optical layout, as well as reliability of the wireless telecommunication system. Successful completion of this campaign provided a solid basis for the next campaign (AFC07016, November 2020), that involved testing of the CDMS during in-cloud TBS flights at AMF3 at Oliktok Point.

54 ENVIRONMENTAL SCIENCES↗

Anomaly Detection in Accelerator Facilities Using Machine Learning

Synchrotron light sources are user facilities and usually run about 5000 hours per year to support many beamlines operations in parallel. Reliability is a key parameter to evaluate machine performance. Even many facilities have achieved >95% beam reliability, there are still many hours of unscheduled downtime and every hour lost is a waste of operation costs along with a big impact on individual scheduled user experiments. Preventive maintenance on subsystems and quick recovery from machine trips are the basic strategies to achieve high reliability, which heavily depends on experts’ dedication. Recently, SLAC, APS, and NSLS-II collaborated to develop machine-learning-based approaches aiming to solve both situations, hardware failure prediction and machine failure diagnosis to find the root sources. In this paper, we report our facility operation status, development progress, and plans.

Accelerator Physics↗

Impact of Uncertainty on Energy Storage Operation Decisions: Motivation and Framework

Energy Storage Systems (ESSs) are gaining great attention, as they can help operate grid power grids more reliably. The ESS acquisition and operation is motivated by the economics revolving around its provided services and revenue streams. These economics are greatly impacted by uncertainties in predicting the parameters which influence the ESS operation. The main goal of this paper is in addressing these uncertainties. We organize sources of uncertainties which directly impact the value-driven operation of the ESS and propose a framework which combines the uncertain requirements from processes both internal and external to ESS.

Hanif, Sarmad↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Near-Term Reliability and Resilience (NTRR) (Final Report)

The Near-Term Reliability and Resiliency (NTRR) was awarded in December 2020 as an inter-lab project to examine the reliability and resilience of the electricity grid and natural gas transportation availability. The project builds on studies conducted by The North American Electric Reliability Corporation (NERC), the U.S. Department of Energy (DOE), and other non-governmental research and operational focused on reliability and resilience analyses challenges. The research was conceived to address near-term scenarios (within 10 years), when many local and regional policy transitions could begin to impact grid reliability, resilience, and supporting infrastructure availability. To integrate the natural gas interdependency, the team began with the generating capacity and demand projections from the 2020 NERC Long-Term Reliability Assessment and the Bulk Electric System (BES) transmission topologies defined in the Western Electricity Coordinating Council (WECC) Anchor Data Set, Eastern Interconnection Reliability Assessment Group Multi-Regional Modeling Working Group (ERAG/MMWG) Data Set, the team calculated baseline regional power sector gas demands from present electricity delivery year through the end of delivery year 2030/31 by applying security constrained economic dispatch. This demand was compiled along with demand projections for regional residential, commercial, and industrial natural gas demands from the most recent Energy Information Administration (EIA) Annual Energy Outlook Reference Case into Deloitte’s MarketBuilder® North American Gas Model. Through the application of these demands, MarketBuilder® was projected the topology of natural gas flows in the natural gas pipeline network across the interconnected North American system along with regional natural gas prices that may be seen by market participants in future years Additionally, contingencies and sensitivities focused on the built models of the Eastern Interconnection (EI) and Western Interconnection (WI). They address challenges from the following with the outcomes being an identification of performance under the extreme conditions and an identification of potential grid weaknesses that should be addressed to mitigate the reduced performance and improve the resilience and reliability of the specific regions as well as the National Grid: • Weather events including extreme heat, extreme cold, high wind, no wind, wind and solar forecasting errors, and wildfires. • Gas availability, factoring in supply disruption (contractual and physical), seasonal availability constraints, and infrastructure limitations; and • Transmission availability and congestion.

03 NATURAL GAS↗

An Overview of Renewable Energy Desk Activities for Power Grid Operations and Planning

This document summarizes how grid operators can address gaps in their planning and operations to maintain reliability as they pursue clean energy goals. When transitioning to higher renewable energy levels, many system operators configure a dedicated renewable energy desk to manage variable renewable energy resource operation. Establishing such a desk in the control room can be a key step in the modernization effort. A renewable energy desk in a control room is a specialized hub focused solely on monitoring, predicting, and managing the influx of energy from renewable sources.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗