Medium-frequency transformers (MFTs) play a crucial role in medium-voltage (MV) solidstate transformer (SST) systems, particularly in extreme fast charging applications. Achieving partial discharge (PD)-free operation while maintaining high power density is a significant challenge due to the high electric field (E-field) stresses inherent in MV applications. This dissertation focuses on the insulation design and optimization of MFTs used in both the main power electronics circuits and auxiliary power supplies. The study begins with an overview of insulation testing methodologies, including high potential tests, basic insulation level tests, and PD tests, which are critical for evaluating MFT insulation reliability. Given the importance of PD-free operation for long-term reliability, particular emphasis is placed on understanding PD mechanisms, including void, corona, and surface discharge, and their mitigation strategies. A high voltage isolated auxiliary power supply is then introduced, utilizing a gapped transformer encapsulated in silicone gel. This design achieves PD-free insulation up to 18 kV RMS while maintaining low coupling capacitance to minimize common-mode current. The proposed solution ensures reliable operation in MV environments and offers a scalable approach for auxiliary power in cascaded SST architectures. To improve MFT insulation in main power conversion circuits, a novel structure is developed using polypropylene sheets and potting compounds to create a void-free air gap, effectively mitigating E-field intensity. A prototype transformer with this insulation structure is built and achieves PD-free operation up to 30 kV RMS. This design is experimentally validated in a resonant converter operating at 46 kW, demonstrating its feasibility for MV SST applications. Further optimization is implemented to enhance MFT performance for dual-active-bridge(DAB) converters by integrating a semiconductive shielding layer within the insulation structure. This shielding layer improves the magnetic coupling coefficient while effectively confining the E-field within high insulation materials, thereby reducing eddy current losses. The optimized MFT achieves PD-free operation at 12.6 kV RMS and is successfully tested in a DAB converter operating at 43 kW, which meets the insulation requirements for a 13.2 kV SST system. This dissertation advances MFT insulation design by introducing and experimentally validating novel approaches that improve high voltage insulation while optimizing magnetic coupling and manufacturability. The proposed insulation structures enable PD-free operation while minimizing insulation material usage and simplifying assembly, making them ideal for high power, high voltage applications.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Teng, Fei [North Carolina State University, Raleigh, NC (United States)]. 2025-02-03. Optimizing Insulation Design for Transformers in Medium Voltage Power Conversion Systems. https://www.osti.gov/biblio/2561317

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Building the Business Case with JUSTIFI: Quantifying Multiple Benefits in the Automotive Industry

The Michigan State University Industrial Training and Assessment Center (MSU ITAC) conducted a pilot study at an automotive parts manufacturer in Michigan. The study identified energy-productivity enhancements through the application of the JUSTIFI software. Key recommendations included replacing six inefficient rooftop units (RTUs) with a new air rotational unit. By quantifying operational savings for this project, the expected payback period went from 6.6 years to 1.4 years. Additionally, the installation of variable frequency drives (VFDs) on condenser tower motors was suggested. By including all operational benefits, the payback period was reduced from 8.2 years to 1.3 years. This comprehensive analysis aims to bolster the manufacturer's goals of reducing energy while enhancing overall operational efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

A Physics-Informed Reinforcement Learning Framework for Economic-Thermal Co-Optimization of Crypto Mining Data Centers: Preprint

The rapid expansion of cryptocurrency mining has created a new class of high-density data centers characterized by extreme thermal flux and high sensitivity to volatile economic markets. Traditional thermal management strategies, typically reliant on rule-based control, maintain static setpoints that fail to account for fluctuating electricity prices and cryptocurrency values - factors critical to mining profitability. To address this, we present a physics-informed reinforcement learning (PIRL) framework for economic-thermal co-optimization in crypto mining data centers. This framework consists of a proximal policy optimization (PPO) agent, a virtual testbed powered by high-fidelity physics-based models, and an interactive frontend dashboard. The PPO agent is trained using the virtual testbed and strict hardware safety limits. This physics-informed approach allows the agent to learn a stochastic policy that dynamically balances mining revenue against operational costs by co-optimizing HVAC cooling setpoints and IT computational hashrate. The simulation results demonstrate that the integrated framework achieved an 8.62% increase in net operational profit compared to traditional baseline strategies while strictly adhering to safety-critical temperature constraints (coolant supply temperature < 32 degrees C). This work provides a scalable template for the deployment of reinforcement learning in mission critical facilities where economic volatility and physical safety must be managed simultaneously.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI