Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “jwst”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

The James Webb Space Telescope and its Potential for Exoplanet Science

The James Webb Space Telescope (JWST) is a large aperture (6.5 meter), cryogenic space telescope with a suite of near and mid-infrared instruments covering the wavelength range of 0.6 microns to 28 microns. JWST s primary science goal is to detect and characterize the first galaxies. It will also study the assembly of galaxies, star formation, and the formation of evolution of planetary systems. Recent progress in hardware development for the observatory will be presented, including a discussion of the status of JWST s optical system and Beryllium mirror fabrication, progress with sunshield prototypes, and recent changes in the integration and test configuration. We also review the expected scientific performance of the observatory for observations of exosolar planets by means of transit imaging and spectroscopy and direct imaging. We also review the recent discovery of Fomalhaut B and implications for debris disk imaging nd exoplanet detection with JWST.

Clampin, Mark↗

Progress on the James Webb Space Telescope

I will describe the scientific program anticipated for the James Webb Space Telescope and the progress in its construction. When the JWST was conceived in 1995 it was expected to make its greatest contributions in the study of the first objects to form after the Big Bang, in the evolution of galaxies, and in the formation and evolution of stars and planetary systems. Since then, the age-distance-redshift relation has become clear with the precise measurement of the Hubble constant, the discovery of the accelerating universe, and the remarkable agreement of CMBR calculations with direct measurements of the large-scale structure. So what is left and what has changed? Galaxy formation and growth is still mysterious, star formation is still hidden, the dark matter and dark energy are still unobservable, and the tools at hand may or may not help enough. But the JWST, as a general-purpose observatory, will be available for imaginative use, and is just what Simon White's polemic seems to request. As an example, the JWST should be quite capable of observing transiting exoplanets with remarkable precision, even though there was no requirement to do so, and its coronagraphs will be very good even without a monolithic primary mirror. The JWST mission has now been officially approved by NASA and is in the Federal budget. It is planned for launch in 2014. Flight instruments will begin to arrive at Goddard in mid-2010, and the first flight mirror segments have already passed their first cryogenic tests. The flight detectors have been selected and have remarkable performance; for example, the near IR detectors have dark currents of the order of 10 electrons per pixel per hour.

Mather, John C.↗

ATLAST-9.2: A Deployable Large Aperture UVOIR Space Telescope

We present the results of a study of a deployable version of the Advanced Technology Large Aperture Space Telescope (ATLAST) that could be launched on an Evolved Expendable Launch Vehicle (EELV). ATLAST is a concept for a next-generation UVOIR observatory to follow HST and JWST. The observatory retains significant heritage from JWST, thereby taking advantage of technologies and engineering already developed for that mission. At the same time, we have identified several design changes to the JWST architecture, some of which are required due to the demanding wavefront error requirements at visible wavelengths. The optical telescope assembly has a segmented 9.2-meter aperture and consists of 36 hexagonal glass mirrors, each of which is I.3l5m in size (flat-to-flat). The telescope can be folded to fit in the 6.5m fairing on the planned upgrade to the Delta-IV heavy launch vehicle. Near-real time wavefront sensing and control is performed on-board the telescope using stars in the field of view to deliver diffraction limited imaging performance at 500nm wavelength. The optical design of the telescope provides an 8x20 arcmin FOV in which 4-5 instruments can be accommodated, plus fine guidance and wavefront sensors. Unlike JWST, the OTA sits at the end of a multi-gimbaled arm, allowing pitch and roll motion, and is isolated from the sunshield and spacecraft bus by an active isolation system. Our design permits servicing in order to extend the life of the observatory.

Oegerle, William R.↗

Hybrid Architecture Active Wavefront Sensing and Control

A method was developed for performing relatively high-speed wavefront sensing and control to overcome thermal instabilities in a segmented primary mirror telescope [e.g., James Webb Space Telescope (JWST) at L2], by using the onboard fine guidance sensor (FGS) to minimize expense and complexity. This FGS performs centroiding on a bright star to feed the information to the pointing and control system. The proposed concept is to beam split the image of the guide star (or use a single defocused guide star image) to perform wavefront sensing using phase retrieval techniques. Using the fine guidance sensor star image for guiding and fine phasing eliminates the need for other, more complex ways of achieving very accurate sensing and control that is needed for UV-optical applications. The phase retrieval occurs nearly constantly, so passive thermal stability over fourteen days is not required. Using the FGS as the sensor, one can feed segment update information to actuators on the primary mirror that can update the primary mirror segment fine phasing with this frequency. Because the thermal time constants of the primary mirror are very slow compared to this duration, the mirror will appear extremely stable during observations (to the level of accuracy of the sensing and control). The sensing can use the same phase retrieval techniques as the JWST by employing an additional beam splitter, and having each channel go through a weak lens (one positive and one negative). The channels can use common or separate detectors. Phase retrieval can be performed onboard. The actuation scheme would include a coarse stage able to achieve initial alignment of several millimeters of range (similar to JWST and can use a JWST heritage sensing approach in the science camera) and a fine stage capable of continual updates.

Feinberg, Lee↗

Engineering the Future: Cell 6

This slide presentation reviews the development of the James Webb Space Telescope (JWST), explaining the development using a systems engineering methodology. Included are slides showing the organizational chart, the JWST Science Goals, the size of the primary mirror, and full scale mockups of the JSWT. Also included is a review of the JWST Optical Telescope Requirements, a review of the preliminary design and analysis, the technology development required to create the JWST, with particular interest in the specific mirror technology that was required, and views of the mirror manufacturing process. Several slides review the process of verification and validation by testing and analysis, including a diagram of the Cryogenic Test Facility at Marshall, and views of the primary mirror while being tested in the cryogenic facility.

Stahl, P. H.↗

Overview of the James Webb Space Telescope

The James Webb Space Telescope (JWST) is a large aperture (6.5 meter), cryogenic space telescope with a suite of near and mid-infrared instruments covering the wavelength range of 0.6 microns to 28 microns. JWST's primary science goals are to detect and characterize the first galaxies, and study the assembly of galaxies, star formation, and the formation of evolution of planetary systems. JWST is a segmented mirror telescope operating at approx.40K, a temperature achieved by passive cooling of the observatory, via a large, 5-layer membrane-based sunshield. We will review the scientific capabilities of JWST in the context of their synergy with survey facilities, and with the next generation of ground-based Extremely Large Telescopes. We will also present an overview of the observatory design, and report on recent progress in the construction of the observatory and its science instruments.

Clampin, Mark↗

Status Update on the James Webb Space Telescope Project

The James Webb Space Telescope (JWST) is a large (6.6 m), cold (<50 K), infrared (IR)-optimized space observatory that will be launched in approx.2018. The observatory will have four instruments covering 0.6 to 28 micron, including a multi-object spectrograph, two integral fie ld units, and grisms optimized for exoplanets. I will review JWST's k ey science themes, as well as exciting new ideas from the recent JWST Frontiers Workshop. I will summarize the technical progress and miss ion status. Recent highlights: All mirrors have been fabricated, polished, and gold-coated; the mirror is expected to be diffraction-limite d down to a wavelength of 2 micron. The MIRI instrument just complete d its cryogenic testing. STScI has released exposure time calculators and sensitivity charts to enable scientists to start thinking about how to use JWST for their science.

Rigby, Jane R.↗

Status Update on the James Webb Space Telescope Project

The James Webb Space Telescope (JWST) is a large (6.6 m), cold <50 K), infrared (IR)-optimized space observatory that will be launched in approx.2018. The observatory will have four instruments covering 0.6 to 28 micron, including a multi-object spectrograph, two integral field units, and grisms optimized for exoplanets. I will review JWST's key science themes, as well as exciting new ideas from the recent JWST Frontiers Workshop. I will summarize the technical progress and mission status. Recent highlights: All mirrors have been fabricated, polished, and gold-coated; the mirror is expected to be diffraction-limited down to a wavelength of 2 microns. The MIRI instrument just completed its cryogenic testing. STScI has released exposure time calculators and sensitivity charts to enable scientists to start thinking about how to use JWST for their science.

Rigby, Jane R.↗

James Webb Space Telescope Optical Telescope Element Mirror Coatings

James Webb Space Telescope (JWST) Optical Telescope Element (OTE) mirror coating program has been completed. The science goals of the JWST mission require a uniform, low stress, durable optical coating with high reflectivity over the JWST spectral region. The coating has to be environmentally stable, radiation resistant and compatible with the cryogenic operating environment. The large size, 1.52 m point to point, light weight, beryllium primary mirror (PM) segments and flawless coating process during the flight mirror coating program that consisted coating of 21 flight mirrors were among many technical challenges. This paper provides an overview of the JWST telescope mirror coating program. The paper summarizes the coating development program and performance of the flight mirrors.

Keski-Kuha, Ritva A.↗

The James Webb Space Telescope and its Capability for for Exoplanet Observations

The James Webb Space Telescope (JWST) is a large aperture (6.5 .meter), cryogenic space telescope with a suite of near and mid-infrared instruments covering the wavelength range of 0.6 micron to 28 micron. JWST's primary science goal is to detect and characterize the first galaxies. It will also study the assembly of galaxies, star formation, and the formation of evolution of planetary systems. In this presentation we will discuss the status of the JWST project and review the expected scientific performance of the observatory for observations of exosolar planets by means of transit observations, and direct coronagraphic imaging. In particular we will discuss recent simulations of photometric and spectroscopic transit observations that demonstrate the capabilities of JWST to characterize superearth atmospheres in the light of recent Kepler and Corot discoveries

Clampin, Mark↗

Science Operations with the James Webb Space Telescope

The James Webb Space Telescope (JWST) will be a powerful space observatory whose four science instruments will deliver rich imaging and multiplexed spectroscopic datasets to the astronomical and planetary science communities. The ground segment for JWST, now being designed and built, will carry out JWST's science operations. The ground segment includes: (1) software that the scientific community will use to propose and specify new observations; (2) software that will schedule both science and calibration observations in a way that optimizes observing efficiency while managing the accumulation of momentum; (3) the infrastructure to regularly measure and maintain the telescope's wavefront; (4) orbit determination, ranging, and tracking; (5) communication via the Deep Space Network to command the observatory and retrieve scientific data; (6) onboard scripts that execute each observing program in an event-driven fashion, with occasional interruptions for targets of opportunity or time-critical observations; and (7) a system that processes and calibrates the data into science ready products, automatically recalibrates when calibrations improve, and archives the data for timely access by the principal investigator and later worldwide access by the scientific community. This ground system builds on experience from operating the Hubble Space Telescope, while solving challenges that are unique to the James Webb Space Telescope. In this paper, we describe the elements of the JWST ground system, how it will work operationally from the perspective of the observatory itself, and how a typical user will interact with the system to turn his/her idea into scientific discovery.

Rigby, Jane↗

Telescope Innovations Improve Speed, Accuracy of Eye Surgery

One of the main components of NASA's vision for the future of space exploration will actually have a keen eye for the past. The James Webb Space Telescope (JWST), scheduled to launch in 2018, will have spectacular sight, after it reaches orbit, one of its main goals is to observe the first galaxies that formed in the early universe. "JWST offers new capabilities in the infrared well beyond what we can see from current telescopes, either on the ground or in space. It will let us explore the early universe, extrasolar planets, and really, all branches of astrophysics," says Lee Feinberg, optical telescope element manager for the JWST at Goddard Space Flight Center. Building such a keen space telescope is an astronomic task. Because JWST will gaze over such incredible distances, it requires very large mirrors. In fact, the primary mirror will be more than two stories in diameter and consists of 18 separate segments. Each segment must be perfectly smooth, flat, and scratch-free in order to deliver a view 13 billion light years away. Construction of the 18 mirror segments involved measuring, grinding, polishing, and testing - and more measuring, grinding, polishing, and testing - and more measuring, grinding, polishing, and testing (you get the idea). One of the most time consuming steps of the mirror development process, the grinding phase, can take years.

Source record↗

James Webb Space Telescope Launch Window Trade Analysis

The James Webb Space Telescope (JWST) is a large-scale space telescope mission designed to study fundamental astrophysical questions ranging from the formation of the universe to the origin of planetary systems and the origins of life. JWSTs orbit design is a Libration Point Orbit (LPO) around the Sun-EarthMoon (SEM) L2 point for a planned mission lifetime of 10.5 years. The launch readiness period for JWST is from Oct 1st, 2018 November 30th, 2018. This paper presents the first launch window analysis for the JWST observatory using finite-burn modeling; previous analysis assumed a single impulsive midcourse correction to achieve the mission orbit. The physical limitations of the JWST hardware stemming primarily from propulsion, communication and thermal requirements alongside updated mission design requirements result in significant launch window within the launch readiness period. Future plans are also discussed.

James Webb Space Telescope↗

James Webb Space Telescope Orbit Determination Analysis

The James Webb Space Telescope (JWST) is designed to study and answer fundamental astrophysical questions from an orbit about the Sun-EarthMoon L2 libration point, 1.5 million km away from Earth. Three mid-course correction (MCC) maneuvers during launch and early orbit phase and transfer orbit phase are required for the spacecraft to reach L2. These three MCC maneuvers are MCC-1a at Launch+12 hours, MCC-1b at L+2.5 days and MCC-2 at L+30 days. Accurate orbit determination (OD) solutions are needed to support MCC maneuver planning. A preliminary analysis shows that OD performance with the given assumptions is adequate to support MCC maneuver planning. During the nominal science operations phase, the mission requires better than 2 cmsec velocity estimation performance to support stationkeeping maneuver planning. The major challenge to accurate JWST OD during the nominal science phase results from the unusually large solar radiation pressure force acting on the huge sunshield. Other challenges are stationkeeping maneuvers at 21-day intervals to keep JWST in orbit around L2, frequent attitude reorientations to align the JWST telescope with its targets and frequent maneuvers to unload momentum accumulated in the reaction wheels. Monte Carlo analysis shows that the proposed OD approach can produce solutions that meet the mission requirements.

James Webb Space Telescope↗

Launch Window Trade Analysis for the James Webb Space Telescope

The James Webb Space Telescope (JWST) is a large-scale space telescope mission designed to study fundamental astrophysical questions ranging from the formation of the universe to the origin of planetary systems and the origins of life. JWSTs orbit design is a Libration Point Orbit (LPO) around the Sun-Earth/Moon (SEM) L2 point for a planned mission lifetime of 10.5 years. The launch readiness period for JWST is from Oct 1st, 2018 November 30th, 2018. This paper presents the first launch window analysis for the JWST observatory using finite-burn modeling; previous analysis assumed a single impulsive midcourse correction to achieve the mission orbit. The physical limitations of the JWST hardware stemming primarily from propulsion, communication and thermal requirements alongside updated mission design requirements result in significant launch window within the launch readiness period. Future plans are also discussed.

window↗

Alignment and Testing of Critical Interface Fixtures for the James Webb Space Telescope

NASA's James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy. The JWST Observatory architecture includes the Primary Mirror Backplane Support Structure (PMBSS) and Integrated Science Instrument Module (ISIM) Electronics Compartment (IEC) which is designed to integrate to the spacecraft bus via six cup/cone interfaces. Prior to integration to the spacecraft bus the JWST observatory must undergo environmental testing, handling, and transportation. Multiple fixtures were developed to support these tasks including the vibration fixture and handling and integration fixture (HIF). This work reports on the development of the nominal alignment of the six interfaces and metrology operations performed for the JWST observatory to safely integrate them for successful environmental testing.

technology development↗

Application of Molecular Adsorber Coatings in Chamber A for the James Webb Space Telescope

As a coating made of highly porous zeolite materials, the Molecular Adsorber Coating (MAC) was developed to capture outgassed molecular contaminants, such as hydrocarbons and silicones. For spaceflight applications, the adsorptive capabilities of the coating can alleviate on-orbit outgassing concerns on or near sensitive surfaces and instruments within the spacecraft. Similarly, this sprayable paint technology has proven to be significantly beneficial for ground-based space applications, in particular, for vacuum chamber environments. This presentation describes the application of the MAC technology for the James Webb Space Telescope (JWST) at NASA Johnson Space Center (JSC). The coating was used as a mitigation tool to entrap outgassed contaminants, specifically silicone-based diffusion pump oil, from within JSCs cryogenic optical vacuum chamber test facility called Chamber A. This presentation summarizes the background, fabrication, installation, chemical analysis test results, and future plans for the MAC technology, which was effectively used to protect the JWST test equipment from vacuum chamber contamination. As a coating made of highly porous zeolite materials, the Molecular Adsorber Coating (MAC) was developed to capture outgassed molecular contaminants, such as hydrocarbons and silicones. For spaceflight applications, the adsorptive capabilities of the coating can alleviate on-orbit outgassing concerns on or near sensitive surfaces and instruments within the spacecraft. Similarly, this sprayable paint technology has proven to be significantly beneficial for ground-based space applications, in particular, for vacuum chamber environments. This presentation describes the application of the MAC technology for the James Webb Space Telescope (JWST) at NASA Johnson Space Center (JSC). The coating was used as a mitigation tool to entrap outgassed contaminants, specifically silicone-based diffusion pump oil, from within JSCs cryogenic optical vacuum chamber test facility called Chamber A. This presentation summarizes the background, fabrication, installation, chemical analysis test results, and future plans for the MAC technology, which was effectively used to protect the JWST test equipment from vacuum chamber contamination.

molecular contamination↗

Alignment and Testing of Critical Interface Fixtures for the James Webb Space Telescope

NASAs James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy. The JWST Observatory architecture includes the Primary Mirror Backplane Support Structure (PMBSS) and Integrated Science Instrument Module (ISIM) Electronics Compartment (IEC) which is designed to integrate to the spacecraft bus via six cupcone interfaces. Prior to integration to the spacecraft bus the JWST observatory must undergo environmental testing, handling, and transportation. Multiple fixtures were developed to support these tasks including the vibration fixture and handling and integration fixture (HIF). This work reports on the development of the nominal alignment of the six interfaces and metrology operations performed for the JWST observatory to safely integrate them for successful environmental testing.

instrument development↗