Engineering Papers⌕ Search

NASA NTRS · 20140008973

James Webb Space Telescope Orbit Determination Analysis

Abstract

The James Webb Space Telescope (JWST) is designed to study and answer fundamental astrophysical questions from an orbit about the Sun-EarthMoon L2 libration point, 1.5 million km away from Earth. Three mid-course correction (MCC) maneuvers during launch and early orbit phase and transfer orbit phase are required for the spacecraft to reach L2. These three MCC maneuvers are MCC-1a at Launch+12 hours, MCC-1b at L+2.5 days and MCC-2 at L+30 days. Accurate orbit determination (OD) solutions are needed to support MCC maneuver planning. A preliminary analysis shows that OD performance with the given assumptions is adequate to support MCC maneuver planning. During the nominal science operations phase, the mission requires better than 2 cmsec velocity estimation performance to support stationkeeping maneuver planning. The major challenge to accurate JWST OD during the nominal science phase results from the unusually large solar radiation pressure force acting on the huge sunshield. Other challenges are stationkeeping maneuvers at 21-day intervals to keep JWST in orbit around L2, frequent attitude reorientations to align the JWST telescope with its targets and frequent maneuvers to unload momentum accumulated in the reaction wheels. Monte Carlo analysis shows that the proposed OD approach can produce solutions that meet the mission requirements.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Yoon, Sungpil, Rosales, Jose, Richon, Karen. 2014-05-09. James Webb Space Telescope Orbit Determination Analysis. https://ntrs.nasa.gov/citations/20140008973

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Precious Cargo: Transporting Contamination-Sensitive Instruments & Optics

The James Webb Space Telescope (JWST) is a multi-national program with instruments and hardware supplied by companies all over the world and numerous states in the United States. In order to transport larger assemblies, like the Optical Telescope Element / Integrated Science Instrument Module (OTIS), and ultimately JWST, the Space Telescope Transporter for Air, Road and Sea (STTARS) was designed and constructed. STTARS is a massive mobile cleanroom (longer than 2 semi-trailers) that provides an ISO class 7 payload environment while being transported by road, airborne and marine vehicles. Temperature, humidity, and particle counts are controlled and continuously tracked, with fallout and NVR witness samples placed in strategic locations for confirmation. Instruments or sensitive hardware were purged continuously during transport. STTARS has 5 main components: the upper tent frame, lower tent frame, pallet, strong back and lid. After transporting OTIS to Northrup Grumman (NG), STTARS was modified to increase its height to house the JWST Observatory on its voyage to French Guiana. This new configuration was designated Observatory STTARS (OSTTARS). OSTTARS was too tall to travel by C5 aircraft, so the trip to the launch site was made by ship. Through JWST’s land, air, and sea transports, STTARS and OSTTARS kept JWST hardware exceptionally clean and safe.

James Webb Space Telescope↗

Optical Testing of the James Webb Space Telescope

The James Webb Space Telescope (JWST) will be a large infrared telescope with a 6.5-meter primary mirror, working to an October 2018 launch date. Ground testing for the JWST occurred in two test campaigns, at NASAs Goddard Space Flight Center and Johnson Space Center. The talk describes the JWST and its optical ground testing.

James Webb Space Telescope↗

Characterizing Cool Giant Planets in Reflected Light

While the James Webb Space Telescope will detect and characterize extrasolar planets by transit and direct imaging, a new generation of telescopes will be required to detect and characterize extrasolar planets by reflected light imaging. NASA's WFIRST space telescope, now in development, will image dozens of cool giant planets at optical wavelengths and will obtain spectra for several of the best and brightest targets. This mission will pave the way for the detection and characterization of terrestrial planets by the planned LUVOIR or HabEx space telescopes. In my presentation I will discuss the challenges that arise in the interpretation of direct imaging data and present the results of our group's effort to develop methods for maximizing the science yield from these planned missions.

James Webb Space Telescope↗