Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Design of the LBNF Beamline Target Station

The Long Baseline Neutrino Facility (LBNF) project will build a beamline located at Fermilab to create and aim an intense neutrino beam of appropriate energy range toward the DUNE detectors at the SURF facility in Lead, South Dakota. Neutrino production starts in the Target Station, which consists of a solid target, magnetic focusing horns, and the associated sub-systems and shielding infrastructure. Protons hit the target producing mesons which are then focused by the horns into a helium-filled decay pipe where they decay into muons and neutrinos. The target and horns are encased in actively cooled steel and concrete shielding in a chamber called the target chase. The reference design chase is filled with air, but nitrogen and helium are being evaluated as alternatives. A replaceable beam window separates the decay pipe from the target chase. The facility is designed for initial operation at 1.2 MW, with the ability to upgrade to 2.4 MW, and is taking advantage of the experience gained by operating Fermilab’s NuMI facility. We discuss here the design status, associated challenges, and ongoing R&D and physics-driven component optimization of the Target Station.

Tariq, S.↗

Space vehicle field unit and ground station system

A field unit and ground station may use commercial off-the-shelf (COTS) components and share a common architecture, where differences in functionality are governed by software. The field units and ground stations may be easy to deploy, relatively inexpensive, and be relatively easy to operate. A novel file system may be used where datagrams of a file may be stored across multiple drives and/or devices. The datagrams may be received out of order and reassembled at the receiving device.

Judd, Stephen↗

Space vehicle field unit and ground station system

A field unit and ground station may use commercial off-the-shelf (COTS) components and share a common architecture, where differences in functionality are governed by software. The field units and ground stations may be easy to deploy, relatively inexpensive, and be relatively easy to operate. A novel file system may be used where datagrams of a file may be stored across multiple drives and/or devices. The datagrams may be received out of order and reassembled at the receiving device.

33 ADVANCED PROPULSION SYSTEMS↗

Devices, base stations, and methods for communicating scheduling requests via an underlay control channel in a wireless communication system

Wireless communication systems, base stations, and user equipment are disclosed that enable communication of scheduling requests via an underlay control channel that has an energy below a noise level of the spectrum. The scheduling requests may be sent and received at any time, including during downlink and uplink data communication periods of the base station.

42 ENGINEERING↗

Registration station for assembling insulating glass windows

An insulating glass unit (IGU) assembly line comprising a registration station capable of interleaving double and triple pane IGUs in accordance with an IOU production schedule. Visual indicators or prompts instruct operators at the assembly line in configuring a sequence of IGUs. Triple pane IGUs are assembled with minimal contamination of a center glass lite. A non-contact Bernoulli pad is used to lift a glass lite off from a horizontal or vertical support that conveys it from a glass washer to the registration station. Each of multiple pads has a capacity to lift approximately seven to ten pounds. Use of multiple pads per glass sheet or lite allows lites having dimensions up to 70 by 100 inches (assuming glass thickness of one quarter inch) to be assembled.

42 ENGINEERING↗

Risk Methodology for Assessment of Fuel Debris Retrieval Options at the Fukushima Daiichi Nuclear Power Station

The mission of the Nuclear Damage Compensation and Decommissioning Facilitation Corporation (NDF) includes the mid-to-long-term decommissioning planning of the reactors at the Fukushima Daiichi Nuclear Power Station. To carry out its mission, NDF needs to be able to assess worker safety and public health risks that currently exist at the Fukushima Daiichi Nuclear Power Station and the implications of various actions that may be taken to reduce such risks. Pacific Northwest National Laboratory (PNNL) entered into a contract with NDF to support NDF’s mission by developing a risk assessment methodology that will support NDF’s evaluation of options for transitioning molten and solidified fuels within each unit into safer, more stable, configurations given the ever-changing state of knowledge and large uncertainties. The underpinning of this approach, which incorporates both expert elicitation and adapts probabilistic risk assessment and hazard analysis techniques, is its organization of potential release mechanisms and accident scenarios into a more manageable set of safety issues, which are systematically characterized to allow for useful comparison between fuel debris retrieval options as well as the identification of risk drivers and discriminators. The approach also lends itself to be easily updated as the general state of knowledge improves and will serve as a vital input to prioritizing future investigations associated with human health and safety at the Fukushima site. This paper describes the overall approach developed by PNNL to risk-inform the comparison between fuel debris retrieval strategies and discusses lessons learned from implementing the approach.

Fukushima, Risk Assessmnet, Nuclear Decommissionin↗

Chemical System Decontamination at PWR Power Stations Biblis A and B by Advanced System Decontamination by Oxidizing Chemistry (ASDOC-D) Process Technology - 13081

For chemical decontamination of PWR primary systems the so called ASDOC-D process has been developed and qualified at the German PWR power station Biblis. In comparison to other chemical decontamination processes ASDOC-D offers a number of advantages: - ASDOC-D does not require separate process equipment but is completely operated and controlled by the nuclear site installations. Feeding of chemical concentrates into the primary system is done by means of the site's dosing systems. Process control is performed by standard site instrumentation and analytics. - ASDOC-D safely prevents any formation and precipitation of insoluble constituents - Since ASDOC-D is operated without external equipment there is no need for installation of such equipment in high radioactive radiation surrounding. The radioactive exposure rate during process implementation and process performance may therefore be neglected in comparison to other chemical decontamination processes. - ASDOC-D does not require auxiliary hose connections which usually bear high leakage risk. The above mentioned technical advantages of ASDOC-D together with its cost-effectiveness gave rise to Biblis Power station to agree on testing ASDOC-D at the volume control system of PWR Biblis unit A. By involving the licensing authorities as well as expert examiners into this test ASDOC-D received the official qualification for primary system decontamination in German PWR. As a main outcome of the achieved results NIS received contracts for full primary system decontamination of both units Biblis A and B (each 1.200 MW) by end of 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reactor Vessel and Reactor Vessel Internals Segmentation at Zion Nuclear Power Station - 13230

Zion Nuclear Power Station (ZNPS) is a dual-unit Pressurized Water Reactor (PWR) nuclear power plant located on the Lake Michigan shoreline, in the city of Zion, Illinois approximately 64 km (40 miles) north of Chicago, Illinois and 67 km (42 miles) south of Milwaukee, Wisconsin. Each PWR is of the Westinghouse design and had a generation capacity of 1040 MW. Exelon Corporation operated both reactors with the first unit starting production of power in 1973 and the second unit coming on line in 1974. The operation of both reactors ceased in 1996/1997. In 2010 the Nuclear Regulatory Commission approved the transfer of Exelon Corporation's license to ZionSolutions, the Long Term Stewardship subsidiary of EnergySolutions responsible for the decommissioning of ZNPS. In October 2010, ZionSolutions awarded Siempelkamp Nuclear Services, Inc. (SNS) the contract to plan, segment, remove, and package both reactor vessels and their respective internals. This presentation discusses the tools employed by SNS to remove and segment the Reactor Vessel Internals (RVI) and Reactor Vessels (RV) and conveys the recent progress. SNS's mechanical segmentation tooling includes the C-HORCE (Circumferential Hydraulically Operated Cutting Equipment), BMT (Bolt Milling Tool), FaST (Former Attachment Severing Tool) and the VRS (Volume Reduction Station). Thermal segmentation of the reactor vessels will be accomplished using an Oxygen- Propane cutting system. The tools for internals segmentation were designed by SNS using their experience from other successful reactor and large component decommissioning and demolition (D and D) projects in the US. All of the designs allow for the mechanical segmentation of the internals remotely in the water-filled reactor cavities. The C-HORCE is designed to saw seven circumferential cuts through the Core Barrel and Thermal Shield walls with individual thicknesses up to 100 mm (4 inches). The BMT is designed to remove the bolts that fasten the Baffle Plates to the Baffle Former Plates. The FaST is designed to remove the Baffle Former Plates from the Core Barrel. The VRS further volume reduces segmented components using multiple configurations of the 38i and horizontal reciprocating saws. After the successful removal and volume reduction of the Internals, the RV will be segmented using a 'First in the US' thermal cutting process through a co-operative effort with Siempelkamp NIS Ingenieurgesellschaft mbH using their experience at the Stade NPP and Karlsruhe in Germany. SNS mobilized in the fall of 2011 to commence execution of the project in order to complete the RVI segmentation, removal and packaging activities for the first unit (Unit 2) by end of the 2012/beginning 2013 and then mobilize to the second unit, Unit 1. Parallel to the completion of the segmentation of the reactor vessel internals at Unit 1, SNS will segment the Unit 2 pressure vessel and at completion move to Unit 1. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prairie Island Nuclear Station Spent Filter Processing for Direct Disposal - 12333

This paper will discuss WMG's filter processing experience within the commercial nuclear power industry, specifically recent experience processing high activity spent filters generated by Xcel Energy's Prairie Island Nuclear Station (Prairie Island), located in Welch, MN. WMG processed for disposal eighty-four 55-gallon drums filled with varying types of high activity spent filters. The scope of work involved characterization, packaging plan development, transport to the WMG's Off-Site Processing location, shredding the filter contents of each drum, cement solidifying the shredded filter material, and finally shipping the solidified container of shredded filter material to Clive, Utah where the container was presented to EnergySolutions Disposal site for disposal in their Containerised Waste Facility. This sequence of events presented in this paper took place a total of nine (9) times over a period of four weeks. All 1294 filters were successfully solidified into nine (9) -WMG 142 steel liners, and each was successfully disposed of as Class A Waste at EnergySolutions Disposal Site in Clive, Utah. Prairie Island's waste material was unique in that all its filters were packaged in 55-gallon drums; and since the station packaged its filters in drums it was much easier to develop packaging plans for such a large volume of legacy filters. For this author, having over 20-years of waste management experiences, storing and shipping waste material in 55-gallon drums is not immediately thought of as a highly efficient method of managing its waste material. However, Prairie Island's use of 55-gallon drums to store and package its filters provided a significant advantage. Drums could be mixed and matched to provide the most efficient processing method while still meeting the Waste Class A limits required for disposal. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transportation of Radioactive Waste in Support of Ontario Power Generation's Darlington Nuclear Generating Station Refurbishment Project - 19384

Ontario Power Generation's (OPG) Darlington Nuclear Generating Station (DNGS) is currently executing a major refurbishment of the first of their four Candu reactors. As expected, the volumes of Low and Intermediate Level Waste (LILW) generated from this large-scale project have been significant. As a result, unique solutions were needed for the safe and efficient transportation of radioactive waste from the Darlington Nuclear Generating Station to OPG's Western Waste Management Facility for volume reduction and interim storage. OPG's Nuclear Waste Management Division and the Darlington Refurbishment Project worked together to identify unique radioactive waste transportation solutions. These solutions included staging and temporary storage facilities, new waste containers and specialized transportation packages, additional human resources and enhanced planning and logistics required to transport large volumes of routine and non-routine radioactive waste in a manner that minimized the impact on employee and public safety, project schedule and project costs. From a facilities perspective a shielded 'Marshalling Area' that allowed for loaded transportation packages to be staged was built on the Darlington site and a temporary licensed off-site radioactive waste storage facility close to the DNGS was contracted through a third party vendor. These two facilities allowed for more consistent and efficient schedules that limited radioactive waste shipments during off-hours and avoided peak traffic periods thereby limiting the risk to Refurbishment critical path activities. Special purpose-built transportation packages and waste containers were designed and fabricated to handle unique waste streams such as feeder pipes and other miscellaneous intermediate level waste items associated with reactor dismantling. Twenty-four Type A qualified transportation packages mounted to six flat deck trailers were designed and fabricated to support the shipment of contaminated feeder pipes. An Intermediate Level Waste Utility Container (ILWUC) to be used in conjunction with the Type B qualified Trillium Transportation Package was designed and fabricated to handle unique intermediate level waste streams arising from the reactor dismantling process. Logistics software was used to plan the shipments to ensure waste transportation packages could be loaded, transported, unloaded and returned safely to the project site in a timely manner without impacting project schedules. Several shipping scenarios were simulated and adjusted using the software to ensure that the most efficient use of equipment and resources for the radioactive waste transportation aspects of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Shielding Analyses at Oak Ridge National Laboratory’s Spallation Neutron Source Second Target Station

The Neutronics Group of the Second Target Station project at Oak Ridge National Laboratory is responsible for all neutronics analyses related to design and construction. This paper provides an overview of four neutronics analyses performed for the Second Target Station project, which is representative of all the ongoing work but especially tasks related to shielding. These analyses extend from the proton accelerator through the target monolith and bunker to the end of a neutron beamline. Each example highlights the tools and methods the Neutronics Group uses for analysis. The primary tool is the Monte Carlo radiation transport code MCNP 6.2, but this is augmented by other codes that supplement the input of MCNP. The other codes specifically highlighted in this paper include Attila4MC, ADVANTG, and AARE.

Miller, Thomas↗

Humidified sample preparation station for serial crystallography

Humidified sample preparation station for serial crystallography according to one embodiment is a humidified enclosure that delivers relative humidities above 95% and preferably above 97% in standard operation, and that can allow microscope observation of samples within. Humidified sample preparation station for serial crystallography can be used for preparation of protein crystal samples for examination using X-rays and for protein structure determination by X-ray crystallography, involving addition of liquid to the sample and removal of liquid from the sample using vacuum or suction.

Jayne, Richard↗

Optics and Systems Design of the Ring-to-Second Target Transport Beam-Line for the SNS Second Target Station

The Second Target Station (STS) project at the Spallation Neutron Source (SNS) is being developed to provide world-leading cold neutron brightness for next-generation neutron scattering experiments. The STS Accelerator Systems (AS) scope includes the design and implementation of the Ring-to-Second Target (RTST) proton beam transport line, which extracts 1.3 GeV proton beam pulses from the existing Ring-to-Beam Transport (RTBT) system and delivers them to the STS target. The RTST design emphasizes operational reliability [high reliability], low activation [minimum activation of components and the tunnel], maintainability, and compatibility with existing SNS infrastructure through extensive reuse of proven RTBT systems and components. The beamline includes a new extraction region, a transport lattice consisting of dipole, quadrupole, and corrector magnets, beam instrumentation systems, vacuum systems, personnel protection systems, and radiation shielding systems. Beam optics and particle tracking studies were performed using PyORBIT to validate extraction trajectories, beam transport, and target beam spot requirements [60–90 cm² beam spot area]. This paper presents the optics design philosophy, extraction system architecture, transport lattice design, instrumentation strategy, vacuum system approach, and radiation protection integration for the RTST beamline. Particle tracking simulations indicate successful beam transport without beam loss under nominal operating conditions. The RTST is designed to transport 1.3 GeV proton beam pulses at repetition rates up to 15 Hz, delivering nominal beam power of 700 kW to the Second Target Station.

Baron, Alex [ORNL]↗

An Agent-Based Modeling Approach for Spatiotemporal Optimization of Electric Vehicle Fast-Charging Station Demand

With increasing electric vehicle (EV) adoption, managing public fast-charging demand effectively is crucial to avoid grid strain. This study investigates the potential of using dynamic pricing schemes to address this challenge. Presented in this study is a scalable agent-based simulation framework, which is applied to a case study in Richmond, Virginia, that assumes a 50% EV adoption rate in 2040. Two pricing schemes are compared: (1) a dynamic-pricing scheme based on station utilization and (2) a dynamic-pricing scheme based on peak power at the station. These schemes are compared to two baseline scenarios: (1) unscheduled first-come, first-served and (2) scheduled with constant price. The study’s results suggest that dynamic pricing has the potential to influence EV charging behavior, inducing both spatial and temporal shifts, but does so at the cost of inducing inconvenience to EV drivers. The results suggest the peak-power dynamic pricing scheme has the potential to mitigate peak demand pressures on the grid with minimal inconvenience, offering a promising approach for sustainable EV charging infrastructure expansion.

33 - ADVANCED PROPULSION SYSTEMS↗

PIP-II LLRF Master Oscillator and Precision Reference Line- Station Level Design and Testing

The PIP-II superconducting linac at Fermilab requires a highly stable RF Reference Line to maintain phase synchronization throughout the accelerator. Temperature-induced changes in the electrical length of long coaxial cables can introduce phase drift and measurement errors. The reference-line architecture mitigates these effects by phase averaging the forward and reflected RF signals, while a phase-locked loop anchors the system to the master oscillator. This work focuses on the characterization, validation, and mechanical integration of station-level RF assemblies using CAD modeling, vector network analyzer measurements, and spectrum analyzer testing. PID-controlled thermal plates will stabilize critical RF components and further reduce temperature-dependent phase and amplitude variations. These methods support repeatable, standardized designs that can be reliably integrated across the different reference-line stations.

Mosher, Alexander [U. Illinois, Chicago; Fermilab]↗

Reconfigurable Assembly Station for Precision Manufacture of Nuclear Fusion Ignition Targets

This paper explores the design and testing of a reconfigurable assembly station developed for assembling the inertial confinement nuclear fusion ignition targets that will be fielded in the National Ignition Facility (NIF) laser [1]. The assembly station, referred to as the Flexible Final Assembly Machine (FlexFAM) and shown in Figure 1, is a companion system to the earlier Final Assembly Machine (FAM) [2]. Both machines consist of a manipulator system integrated with an optical coordinate measuring machine (OCMM). The manipulator system has six groups of stacked axis used to manipulate the millimeter-sized target components with submicron precision, and utilizes the same force and torque feedback sensing as the FAM. Real-time dimensional metrology is provided by the OCMM's vision system and through-the-lens (TTL) laser-based height measuring probe. The manually actuated manipulator system of the FlexFAM provides a total of thirty degrees-of-freedom to the target components being assembled predominantly in a cubic centimeter work zone.

42 ENGINEERING↗

Utah FORGE Seismic Stations and Wells GPS Survey Data, 2021

This is a CSV spreadsheet containing UTM and Latitude and Longitude coordinates and elevations for Wells 78-32, 58-32, and 16A(78)-32 and BOR1, BOR2, BOR3, FOR2, FOR5, FORK, FORU, and FORW seismic stations. These are from a GPS survey conducted by the Utah Geological Survey in June, 2021.

15 GEOTHERMAL ENERGY↗

Utah FORGE: MT Stations and Raw Data

There are two zipped folders in this submission. One contains a shapefile with the position of MT stations around the Milford FORGE Site, while the other has the raw MT data.

15 GEOTHERMAL ENERGY↗