Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford nuclear reservation. Workers had to pass through metal detectors when they arrived at the plant and materials leaving the plant had to be scanned for security reasons. Whereas other high-security nuclear materials were shipped from the PFP to Savannah River, S.C. as part ofa Department of Energy (DOE) program to consolidate weapons-grade plutonium, it was determined that the SIF should remain onsite pending disposition to a national repository. Nevertheless, the SIF still requires a high level of security that the PFP complex has always provided. With the 60-year PFP mission of producing and storing plutonium concluded, the environmental cleanup plans for Hanford call for the demolition of the 63-building PFP complex. Consequently, if the SIF remained at PFP it not only would have interfered with the environmental cleanup plans, but would have required $100 million in facility upgrades to meet increased national security requirements imposed after the 9/11 terrorist attacks. A new smaller and more cost-effective area was needed to store this material, which led to the SIF Project. Once the SIF project was successfully completed and the SIF was safely removed from PFP, the existing Protected Area at PFP could be removed, and demolition could proceed more quickly without being encumbered by restrictive security requirements that an active Protected Area requires. The lightened PFP security level brought by safely removing and storing the SIF would also yield lowered costs for deactivation and demolition, as well as reduce overall life-cycle costs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Options of system integrated environment modelling in the predicated dynamic cyberspace

In this article there are briefly mentioned some selected options of contemporary conception of cybernetic system models in the corresponding and possible integratable environment with modern system dynamics thinking and all this in the cyberspace of possible projecting of predicted system characteristics. The key to new capabilities of system integration modelling in the considered cyberspace is mainly the ability to improve the environment and the system integration options, all this with the aim of modern control in the hierarchically arranged dynamic cyberspace, e.g. in the currently desired electronic business with information. The aim of this article is to assess generally the trends in the use of modern modelling methods considering the cybernetics applications verified in practice, modern concept of project management and also the potential integration of artificial intelligence in the new projecting and project management of integratable and intelligent models, e.g. with the optimal structures and adaptable behaviour.The article results from the solution of a specific research partial task at the faculty; especially the moments proving that the new economics will be based more and more on information, knowledge system defined cyberspace of modern management, are stressed in the text.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

2012 Annual Report Research Reactor Infrastructure Program

The Idaho National Laboratory (INL) manages and provides project management, technical support, quality engineering, quality inspection and nuclear material support for the Department of Energy (DOE) Research Reactor Infrastructure Program (RRI). This program provides fresh, unirradiated nuclear reactor fuel for United States domestic University Test, Research and Training Reactor Programs. The two fuel types fabricated for the program, plate fuel and Training, Research, Isotope Production, General Atomics (TRIGA) fuel are obtained through subcontracts with two fuel fabricators, Babcock and Wilcox Nuclear Operations Group (B&W) and TRIGA International (TI). Respectively, these subcontractors fabricate high and low enriched uranium aluminide, silicide and TRIGA fuel on a recurring basis. The program is also responsible for funding the return of the DOE-owned, irradiated nuclear fuel over the life of the program.

99 GENERAL AND MISCELLANEOUS↗

Taking learning to another level

As a technical project manager at Los Alamos National Laboratory, Scott Boise works on programs and projects that make a big impact. Although he spends most of his days in a quiet office, he also makes a big impact on his team. He's well-known for his character and integrity because of the way he develops leadership skills on the team, promotes respect for others and lives a commitment to learning. Scott joined the Lab in June 2021, the period of the COVID-19 pandemic when most new employees began their careers without ever having stepped foot on-site. That experience has continued to serve as a reminder to him that new employees face numerous challenges no matter how and when they start. He's made it his aim to do what he can to lift some of that load. Coming to the Lab from a career in the biomedical industry, Scott arrived with years of project management experience but without a deep understanding of nuclear operations. His dedication to continuous learning has helped him pursue experiential opportunities and ask the proper questions to understand his role.

99 GENERAL AND MISCELLANEOUS↗

Technical facilities catalog, volume II

This Technical Facilities Catalog has been developed in response to an increasing demand for general and specific information on NASA technical facilities. The Catalog is intended to: a)provide NASA management, facilities managers, program and project managers, individual research engineers and scientists, and other agencies of the Government with knowledge of existing NASA research, development, test and evaluation facilities and b)provide the reader with a basic concept of the capabilities and functions of the wide variety of NASA technical facilities and the technological areas they support.

Wind tunnel↗

Materials And Processes Technical Information System (MAPTIS) LDEF materials database

The Materials and Processes Technical Information System (MAPTIS) is a collection of materials data which was computerized and is available to engineers in the aerospace community involved in the design and development of spacecraft and related hardware. Consisting of various database segments, MAPTIS provides the user with information such as material properties, test data derived from tests specifically conducted for qualification of materials for use in space, verification and control, project management, material information, and various administrative requirements. A recent addition to the project management segment consists of materials data derived from the LDEF flight. This tremendous quantity of data consists of both pre-flight and post-flight data in such diverse areas as optical/thermal, mechanical and electrical properties, atomic concentration surface analysis data, as well as general data such as sample placement on the satellite, A-O flux, equivalent sun hours, etc. Each data point is referenced to the primary investigator(s) and the published paper from which the data was taken. The MAPTIS system is envisioned to become the central location for all LDEF materials data. This paper consists of multiple parts, comprising a general overview of the MAPTIS System and the types of data contained within, and the specific LDEF data element and the data contained in that segment.

Davis, John M.↗

Conference Report: Masters Forum IV, February 2002

The purpose of the APPL Masters Forum is to bring together some of the best project managers at NASA, as well as those in industry and other government agencies, for 2 1/2 days of knowledge sharing. The project managers come eager to reflect on their project experiences, to learn new things from one another--and to unlearn a few things, too. This was the fourth Masters Forum, and the first one held outside Washington, DC. Fifty participants from across the country came to Dallas at the American Airlines Conference Center, a wonderful facility that was conveniently located by the airport and yet still seemed isolated from the rest of the world. Masters Forum IV was also the first one held during the winter. Previous Masters Forums have been during the summer. Hot, sticky Washington, D.C. in the summer may sound unpleasant, but frankly the popularity of earlier Forums is what led to this annual event becoming a semiannual one.

Post, Todd↗

Airspace Systems Program: Virtual Airspace Modeling and Simulation Project

The Airspace Systems Program (ASP) has identified a set of goals based on projections of annual passenger demands. The topics of discussion include: 1) Virtual Airspace Modeling and Simulation Project (VAMS) Project Description; 2) VAMS Project Management; 3) VAMS Project Schedule; and 4) Technical Interchange Meeting (TIM). This paper is in viewgraph form.

Jacobsen, Robert↗

United States Domestic Research Reactor Infrastrucutre TRIGA Reactor Fuel Support

The United State Domestic Research Reactor Infrastructure Program at the Idaho National Laboratory manages and provides project management, technical, quality engineering, quality inspection and nuclear material support for the United States Department of Energy sponsored University Reactor Fuels Program. This program provides fresh, unirradiated nuclear fuel to Domestic University Research Reactor Facilities and is responsible for the return of the DOE-owned, irradiated nuclear fuel over the life of the program. This presentation will introduce the program management team, the universities supported by the program, the status of the program and focus on the return process of irradiated nuclear fuel for long term storage at DOE managed receipt facilities. It will include lessons learned from research reactor facilities that have successfully shipped spent fuel elements to DOE receipt facilities.

99 GENERAL AND MISCELLANEOUS↗

Corrective Action Unit Deliverable/Task Status Tracking Tool

The CDSTool is a project management tool designed specifically to manage environmental restoration projects. The tool allows users to capture all projects in their baseline, develop and assign approaches, assign documents and reviews to particular projects and approaches, track and measure progress and status of each document/phase/activity in the project, based on the approach. The CDSTtool provides the ability to assign responsible personnel to each activity, provide status to scheduling software, track WBS, capture issues, comments, and history of development or performance related to the activity, document or phase.

Nelson, Jerel↗

International Developments on Uncertainties in NPP Decommissioning costs and planned work on Benchmarking at the OECD-NEA - 17074

The ability to decommission NPPs shut down after normal operation has been proven technically. Issues of current concern include the ability to accurately calculate and demonstrate the validity of decommissioning cost estimates, and to control costs during decommissioning. This paper describes recent international developments concerning addressing uncertainties in NPP decommissioning cost estimation, and work currently being planned relating to decommissioning cost benchmarking at the OECD Nuclear Energy Agency. The process of decommissioning cost estimation is evolving, with a general trend towards showing greater levels of detail in the estimate. The International Structure for Decommissioning Costing was published in 2012 and presents a common reporting format for decommissioning costing undertaken on a deterministic basis. However, this does not address probabilistic methods or associated presentation formats for the inclusion of uncertainties in decommissioning estimates. A consistent and comparable treatment of uncertainties in decommissioning cost estimation would further facilitate comparison between different cost estimates and enhance understanding of and confidence in the estimates themselves. There is growing interest in benchmarking decommissioning costs, reflecting a need to better understand the relationships between estimates and actual costs, to give greater confidence that funding will be sufficient, and as a useful tool in project management and enhancing project delivery. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A system safety model for developmental aircraft programs

Basic tenets of safety as applied to developmental aircraft programs are presented. The integration of safety into the project management aspects of planning, organizing, directing and controlling is illustrated by examples. The basis for project management use of safety and the relationship of these management functions to 'real-world' situations is presented. The rationale which led to the safety-related project decision and the lessons learned as they may apply to future projects are presented.

Amberboy, E. J.↗

Rapid Response Risk Assessment Turnaround System (R3ATS)

The Rapid Response Risk Assessment Turnaround System (R3ATS) is a decision support system that can be used for cost and schedule risk assessment as prescribed by the US Department of Energy (DOE) Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. Unlike complex and training-intensive project control and accounting risk systems - or naive and statistically incorrect risk assessment approaches - employed throughout the DOE complex R3ATS is a powerful and yet simple decision support system for conducting project risk assessments. Output from R3ATS include: (1) establishing a project risk register which can be periodically updated to regularly monitor and assess a dynamic risk picture, (2) producing statistically derived and justifiable cost and schedule contingency probability density functions, and (3) inclusion, via Bayesian updating, of significant trigger events that result in project cost, schedule or technical risk events. During FY2007, R3ATS was used by the Oak Ridge Transuranic (TRU) Waste Processing Center (TWPC) project to examine the FY 2008 through FY 2009 budget ({approx}$70 million) and the life cycle budget (over $500 million). In less than eight weeks, Oak Ridge DOE personnel and TWPC project management were trained on - and subsequently incorporated - the R3ATS approach thus demonstrating its significance as a viable and rapid turn-around decision support tool for cost and schedule risk assessment. In conclusion: The R3ATS was developed to meet the mission need for a defensible risk-oriented decision support system. We have demonstrated how R3ATS meets DOE ORO budget planning efforts associated with the TWPC life cycle from FY 2008 through FY 2018. We have further identified the critical shortcomings in the entire approach that DOE takes perform risk management. When we realized that DOE guidance for risk management is naive and can easily produce results are not reliable or repeatable, we applied a defensible systems engineering approach to develop R3ATS. The TWPC approach to risk management offers a risk-balancing approach for performance management and ensures that future investment in training enables all users to use risk management as a tool for successful TWPC mission accomplishment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

ASK Magazine

What makes a successful team? In this issue our contributors look closely at the subject and come up with several answers. Working on team chemistry is the "Activation Energy" Dr. Owen Gadeken's story is about. Scott Cameron thinks it's getting to know people one to one. Tony Maturo says it's getting the most out of your support staff. Dr. Michael Hecht finds the best people he can and build the team around their talents. Teamwork is a theme we explore often in Academy Sharing Knowledge (ASK), but never so directly as in this issue. You'll not only find formulas for building successful teams, you'll see examples of ones in action, strategies for how project managers can motivate their teams, and expert advice on how to choose who to work with and who not to work with. It seems like all the stories make one common point: everyone on a team counts. Few project managers can pull off a project alone, and when the whole team is performing to everyone's potential, the chances of pulling off a successful project goes up exponentially. If that doesn't seem like enough by itself, listen to this... Discerning fans of ASK will note the last two issues our Special Feature was "There are no Mistakes, Only Lessons." We have not abandoned this feature, but for now we want to broaden our repertoire. In this issue we add a new Special Feature, "My Metaphor," starting with Paul Espinosa's article "My Big Wall" about his rock climbing adventures on El Capitan in Yosemite National Park. If you think getting to Mars is work, read what it's like to scale a 3,000-foot rock face. This issue we're also welcoming two new members to our Review Board, Hugh Woodward and Jody Kusek. Hugh and Jody are our first reviewers from outside NASA, and we are delighted to have them on our team. Read their bios on the ASK Review Board page and see why we feel privileged to have them on our team.

Post, Todd↗

Return to Flight Resource Reel 2 of 2

A continuation of the tests performed on the Space Shuttle Discovery in preparation for its return to flight is presented. The tests include: 1) Shuttle Robot Arm Recertification; 2) Michael Hiltz Systems Group Leader; 3) Orbiter Boom Fabrication; 4) Orbiter Boom Final Development; 5) Gary Searle Manager of Orbiter Boom Sensor System (OBSS) Manufacturing and Assembly; 6) Orbiter Boom Qualification Unit; 7) STS-114 Crew Inspects Orbiter Boom at Kennedy Space Center; 8) Orbiter Boom Inspection of Thermal Protection System Animation; 9) External Tank Bipod Redesign; 10) External Tank Flange Redesign; 11) External Tank Bellows Redesign; 12) Shuttle Main Engine Testing and Delivery to Kennedy Space Center; 13) Ronnie Rigney Project Manager Space Shuttle Main Engine Program Office; 14) Gene Goldmman NASA Project Manager Space Shuttle Main Engine Project; 15) Mike Cosgrove Boeing-Rocketdyne Flow Manager; 16) Shuttle Rocket Booster Build-Up; 17) Ascent Imagery Improvements; and 18) STS-114 Flight Control Team and Mission Management Team.

Source record↗

How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

Kea, Howard↗

STS-114: Discovery Propulsion System Modification Briefing

A briefing on the propulsion system modification of the STS-114 Discovery is presented. June Malone, NASA Public Affairs, introduces the panel who consists of: Sandy Coleman, External Tank Project Manager, Neil Otte, External Tank Chief Engineer, and Tom Williams, Solid Rocket Booster, Deputy Project Manager. Neil Otte presents charts on new requirements for foam debris reduction on the external tank. He also presents charts describing the Forward Bipod Redesign, LO2 Feedline Bellows Location, LH2 Intertank Flange Location, and In-Flight Imagery. Tom Williams presents charts describing Solid Rocket Booster Activities and Return to Flight efforts.

Source record↗