Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal Programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Impact of E4 Training and Field Auditing of GSA Heartland Region Facilities

To assess the impact of energy efficiency expert evaluation (E4) training and field audits performed since 2007, the Federal Energy Management Program (FEMP) undertook a follow-up study on the implementation of E4 recommendations and an analysis of energy savings. The building property manager and O and M contractor of each facility were interviewed to obtain feedback and implementation status of the E4 recommendations. Overall, there were more than 160 recommendations documented in the E4 reports; about 50% of these recommendations were fully implemented and the remaining 50% either partially implemented or not implemented. In four buildings, the E4 recommendations were aligned with American Recovery and Reinvestment Act of 2009 (ARRA) projects replacing HVAC equipment or upgrading the building control system. The E4 recommendations were not followed-up in two buildings because of uncertainty of the long-term use of the facility or personnel changes. Results of this followon study are reported in this document.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Characteristics of the Department of Energy's Building Inventory 2005-2010

The Pacific Northwest National Laboratory (PNNL) as part of their on-going support to the Department of Energy's Federal Energy Management Program (FEMP) was asked to analyze special building data for an agency to gain a better understanding of the portfolio characteristics to help better shape implementation of their alternative financing activities. This report provides information for one agency, Department of Energy (DOE), and how those characteristics have changed over time.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Electric Vehicle Preparedness Task 2: Identification of Joint Base Lewis McChord Vehicles for Installation of Data Loggers

The U.S. Department of Energy and the U.S. Department of Defense signed a memorandum of understanding on July 22, 2010, for the purpose of strengthening the coordination of efforts to enhance national energy security and to demonstrate federal government leadership in transitioning America to a low-carbon economy. The memorandum of understanding included efforts in the areas of energy efficiency, fossil fuels, alternative fuels, efficient transportation technologies and fueling infrastructure, grid security, smart grid, and storage. In support of the memorandum of understanding, the Idaho National Laboratory, with funding provided by the U.S. Department of Energy’s Vehicle Technologies Office and Federal Energy Management Program, directed ECOtality North America to conduct several U.S. Department of Defense base studies to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of electric drive vehicles.

99 GENERAL AND MISCELLANEOUS↗

Electric Vehicle Preparedness Task 1: Assessment of Data and Survey Results for Joint Base Lewis McChord

The U.S. Department of Energy and the U.S. Department of Defense signed a memorandum of understanding on July 22, 2010, for the purpose of strengthening the coordination of efforts to enhance national energy security and to demonstrate federal government leadership in transitioning America to a low-carbon economy. The memorandum of understanding included efforts in the areas of energy efficiency, fossil fuels, alternative fuels, efficient transportation technologies and fueling infrastructure, grid security, smart grid, and storage. In support of the memorandum of understanding, the Idaho National Laboratory, with funding provided by U.S. Department of Energy’s Vehicle Technologies Office and Federal Energy Management Program, directed ECOtality North America to conduct several U.S. Department of Defense base studies to identify potential U.S. Department of Defense transportation systems that are strong candidates for the introduction or expansion of electric drive vehicles.

99 GENERAL AND MISCELLANEOUS↗

Electric Vehicle Preparedness Task 1: Assessment of Data and Survey Results for NAS Jacksonville and NS Mayport

The U.S. Department of Energy and the U.S. Department of Defense signed a memorandum of understanding on July 22, 2010, for the purpose of strengthening the coordination of efforts to enhance national energy security and to demonstrate federal government leadership in transitioning America to a low-carbon economy. The memorandum of understanding included efforts in the areas of energy efficiency, fossil fuels, alternative fuels, efficient transportation technologies and fueling infrastructure, grid security, smart grid, and storage. In support of the memorandum of understanding, the Idaho National Laboratory, with funding provided by the U.S. Department of Energy’s Vehicle Technologies Office and Federal Energy Management Program, directed ECOtality North America to conduct several U.S. Department of Defense base studies to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of electric drive vehicles.

99 GENERAL AND MISCELLANEOUS↗

DNDO Analysis Cell Concept

The Domestic Nuclear Detection Office (DNDO) has a mission of implementing rad/nuc interdiction capabilities for a managed and coordinated response to threats, integration of federal nuclear forensics programs, and coordinating the development of the global nuclear detection and reporting architecture. In the process of executing this mission, DNDO has generated substantial information, data, technical results, operational workflows and analytical tools. The effective utilization of these resources is an overarching goal of the organization. After nearly a decade of performing work, DNDO faces a challenge in capitalizing on the large amount of data, reports, processes, tools, and people. As new work is being planned, managers and researchers need to have an understating of what information has been collected, what tools are available, the collaborations which can be utilized to propel the work forward, processes to plan and execute, and how to present conclusions and results that can assist the government in making decisions. This type of challenge can be met through the use of a series of organized and connected elements which form a broader structure (cell) that promotes cross utilization of elements such that they can be tailored (analyzed) to fit the context of the problem to be solved. The development of an analysis cell for DNDO will address the challenges of utilizing existing elements, identifying gaps, annually reporting the performance of rad/nuc interdiction instrumentation, and planning the execution of future work.

Pagh, Richard T.↗

Evaluation of Side Stream Filtration Technology at Oak Ridge National Laboratory

This technology evaluation was performed by Pacific Northwest National Laboratory and Oak Ridge National Laboratory on behalf of the Federal Energy Management Program. The objective was to quantify the benefits side stream filtration provides to a cooling tower system. The evaluation assessed the performance of an existing side stream filtration system at a cooling tower system at Oak Ridge National Laboratory’s Spallation Neutron Source research facility. This location was selected because it offered the opportunity for a side-by-side comparison of a system featuring side stream filtration and an unfiltered system.

side stream filtration↗

Trial Demonstration of Area Lighting Retrofit: Yuma Border Patrol, Yuma Arizona

The Yuma Sector Border Patrol Area is a high flux lighting application in a high temperature environment, presenting a formidable challenge for light-emitting diodes (LEDs). This retrofit is an Energy Savings Performance Contract ENABLE project under the U.S. Department of Energy (DOE) Federal Energy Management Program. If high flux LED technology performs well in a region with high ambient temperature and solar radiation, it can perform well in most outdoor environments. The design process for the Yuma retrofit has already provided valuable knowledge to CBP and DOE. The LED lighting system selected for the retrofit is expected to reduce energy consumption 69% compared to the incumbent quartz metal halide (QMH) lighting system. If the LED lighting system is installed, GATEWAY will continue to document and disseminate information regarding the installation and long-term performance so that others may also gain valuable knowledge from the Yuma Sector Border Patrol Area lighting retrofit.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Updated Estimates of the Remaining Market Potential of the U.S. ESCO Industry

The energy service company (ESCO) industry has a well-established track record of delivering energy and economic savings in the public and institutional buildings sector, primarily through the use of performance-based contracts. The ESCO industry often provides (or helps arrange) private sector financing to complete public infrastructure projects with little or no up-front cost to taxpayers. In 2014, total U.S. ESCO industry revenue was estimated at $5.3 billion. ESCOs expect total industry revenue to grow to $7.6 billion in 2017—a 13% annual growth rate from 2015-2017. Researchers at Lawrence Berkeley National Laboratory (LBNL) were asked by the U.S. Department of Energy Federal Energy Management Program (FEMP) to update and expand our estimates of the remaining market potential of the U.S. ESCO industry. We define remaining market potential as the aggregate amount of project investment by ESCOs that is technically possible based on the types of projects that ESCOS have historically implemented in the institutional, commercial, and industrial sectors using ESCO estimates of current market penetration in those sectors. In this analysis, we report U.S. ESCO industry remaining market potential under two scenarios: (1) a base case and (2) a case “unfettered” by market, bureaucratic, and regulatory barriers. We find that there is significant remaining market potential for the U.S. ESCO industry under both the base and unfettered cases. For the base case, we estimate a remaining market potential of $92-$201 billion ($2016). We estimate a remaining market potential of $190-$333 billion for the unfettered case. It is important to note, however, that there is considerable uncertainty surrounding the estimates for both the base and unfettered cases.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Guide to Federal Funding, Financing, and Technical Assistance for Plug-in Electric Vehicles and Charging Stations

The U.S. Department of Energy and the U.S. Department of Transportation have published a guide to highlight examples of federal support and technical assistance for plug-in electric vehicles (PEVs) and charging stations. The guide provides a description of each opportunity and a point of contact to assist those interested in advancing PEV technology. The Department of Energy’s Alternative Fuels Data Center provides a comprehensive database of federal and state programs that support plug-in electric vehicles and infrastructure.

33 ADVANCED PROPULSION SYSTEMS↗

Biological Select Agents and Toxins: Risk-Based Assessment Management and Oversight

Sandia National Laboratories' International Biological and Chemical Threat Reduction (SNL/IBCTR) conducted, on behalf of the Federal Select Agent Program (FSAP), a review of risk assessment in modern select agent laboratories. This review and analysis consisted of literature review, interviews of FSAP staff, entities regulated by FSAP, and deliberations of an expert panel. Additionally, SNL/IBCTR reviewed oversight mechanisms used by industries, US agencies, and other countries for high-consequence risks (e.g, nuclear, chemical, or biological materials, aviation, off-shore drilling, etc.) to determine if alternate oversight mechanisms existed that might be applicable to FSAP oversight of biological select agents and toxins. This report contains five findings, based on these reviews and analyses, with recommendations and suggested actions for FSAP to consider.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Guidance and Recommendations for Streamlining Reporting for Federal Energy and Water Efficiency Projects

Federal agencies are required to report on their progress in meeting various energy and water management requirements. These reporting requirements encompass energy and water projects at federal facilities, including projects that are alternatively financed, e.g., conducted through energy savings performance contracts (ESPCs) or utility energy service contracts (UESCs). The purpose of this guidance is to provide recommendations to streamline federal agency reporting. The guidance recommends the use of eProject Builder (ePB), a project development and archiving tool for energy projects. ePB carries additional value in its simplification of federal agency reporting by dovetailing with the Federal Energy Management Program’s (FEMP’s) EISA 432 Compliance Tracking System (CTS).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Technical Resilience Navigator: Risk-Informed Decision Making to Support Resilience Planning

The Technical Resilience Navigator (TRN) helps organizations manage the risk to critical functions at a site from disruptions in energy and water services. Developed in partnership by the Pacific Northwest National Laboratory and the National Renewable Energy Laboratory, under direction and funding from the Department of Energy’s Federal Energy Management Program, the TRN helps organizations enhance their resilience to a variety of disruptive events, both natural and human-caused, that could interrupt normal operations for an unknown period of time. This report provides an overview of the TRN’s risk-informed approach to resilience planning and formally describes how it uses a streamlined risk model to identify effective strategies for improving resilience.

99 GENERAL AND MISCELLANEOUS↗

Life-Cycle Cost Analysis Framework for Water Efficiency Measures

Life-Cycle Cost Analysis Framework for Water Efficiency Measures: Guidance Designed for Federal Agencies (hereafter referred to as “this report”) provides a technical framework for federal agencies to conduct a life-cycle cost analysis (LCCA) for water efficiency projects in accordance with 42 U.S.C. § 8253. This report leverages insights from the 2023 report, PNNL-34006, Water and Wastewater Annual Price Escalation Rates for Selected Cities Across the United States: 2023 Edition (Unger et al. 2023). The primary objective of this report is to provide a framework to assist federal agencies with evaluating the full economic impact of water efficiency projects by assessing both initial investments and long-term operational benefits. An LCCA can provide a comprehensive view of all costs associated with a water efficiency project, including initial investment, ongoing operations and maintenance (O&M), and eventual disposal or replacement, ensuring the most cost-effective solution is selected. The LCCA methodology outlined in this report enables users to compare base case scenarios with potential alternatives using a standardized present value approach. It incorporates key cost components such as energy, water and wastewater, installation, O&M, and equipment replacement. Additionally, the framework introduces relevant evaluation metrics, such as the net savings and the savings-to-investment ratio, to ensure that water efficiency measures are economically justified over the lifespan of the project. To support practical application, this report also describes various water efficiency strategies that may be analyzed using an LCCA, including plumbing retrofits, irrigation upgrades, alternative water use, and cooling system improvements. By applying this framework, federal agencies can ensure compliance with regulatory mandates while maximizing the return on investment and contributing to resilient water management practices. The information provided in this report is aligned with the Federal Energy Management Program (FEMP) life-cycle cost (LCC) methodology, as conveyed in National Institute of Standards and Technology (NIST) Handbook 135 (Kneifel and Webb 2022). This report is intended to provide relatively high-level guidance, acting as a complement to, rather than a substitute for, that resource.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Drone Fleet Summary: NNLEMS UxS Rolodex entry for Sandia

Sandia’s UAS Aviation Operations Unit (UAOU) was established in 2019 to be the single entity at Sandia conducting UAS Ops in support the labs Uncrewed Aircraft Systems (UAS) activities. The UAOU currently consists of >330 FAA Registered UAS with a large variety of primarily Class 1&2 UAS: fixed wing (>90), multi-rotor (>230), hybrids, VTOLs, jets, and balloons. Many of these are threat vehicles presented as targets to Counter-UAS (CUAS) systems as part of performance tests, with the remainder in support of other projects across Sandia often with custom payload needs. The UAOU has ~15 primary pilots and reach back to another ~45 FAA Certified Remote Pilots across Sandia. The team conducts flight and CUAS operations at many test locations, including OCONUS. Sandia was awarded the 2024 DOE Federal Aviation Safety Program Award.

42 ENGINEERING↗

Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring, and Evaluation, FY08 Annual Report

The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included 1) subgroup meetings; 2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, Pisces; 4) quarterly project status reports; and 5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on hydrosystem operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring and Evaluation FY08 Annual Report.

The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration (BPA), U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included (1) subgroup meetings; (2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via BPA's project tracking system, Pisces; (4) quarterly project status reports; and (5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on FCRPS operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.

13 HYDRO ENERGY↗