Engineering PapersSearch

DOE OSTI · 3005271

Life-Cycle Cost Analysis Framework for Water Efficiency Measures

Abstract

Life-Cycle Cost Analysis Framework for Water Efficiency Measures: Guidance Designed for Federal Agencies (hereafter referred to as “this report”) provides a technical framework for federal agencies to conduct a life-cycle cost analysis (LCCA) for water efficiency projects in accordance with 42 U.S.C. § 8253. This report leverages insights from the 2023 report, PNNL-34006, Water and Wastewater Annual Price Escalation Rates for Selected Cities Across the United States: 2023 Edition (Unger et al. 2023). The primary objective of this report is to provide a framework to assist federal agencies with evaluating the full economic impact of water efficiency projects by assessing both initial investments and long-term operational benefits. An LCCA can provide a comprehensive view of all costs associated with a water efficiency project, including initial investment, ongoing operations and maintenance (O&M), and eventual disposal or replacement, ensuring the most cost-effective solution is selected. The LCCA methodology outlined in this report enables users to compare base case scenarios with potential alternatives using a standardized present value approach. It incorporates key cost components such as energy, water and wastewater, installation, O&M, and equipment replacement. Additionally, the framework introduces relevant evaluation metrics, such as the net savings and the savings-to-investment ratio, to ensure that water efficiency measures are economically justified over the lifespan of the project. To support practical application, this report also describes various water efficiency strategies that may be analyzed using an LCCA, including plumbing retrofits, irrigation upgrades, alternative water use, and cooling system improvements. By applying this framework, federal agencies can ensure compliance with regulatory mandates while maximizing the return on investment and contributing to resilient water management practices. The information provided in this report is aligned with the Federal Energy Management Program (FEMP) life-cycle cost (LCC) methodology, as conveyed in National Institute of Standards and Technology (NIST) Handbook 135 (Kneifel and Webb 2022). This report is intended to provide relatively high-level guidance, acting as a complement to, rather than a substitute for, that resource.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

King, Abigail G. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)], Elliott, Douglas B. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)] (ORCID:000900026665750X), Semrod, Kelsey A. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)]. 2025-08-01. Life-Cycle Cost Analysis Framework for Water Efficiency Measures. https://doi.org/10.2172/3005271

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Building the Business Case with JUSTIFI: Quantifying Multiple Benefits in the Automotive Industry

The Michigan State University Industrial Training and Assessment Center (MSU ITAC) conducted a pilot study at an automotive parts manufacturer in Michigan. The study identified energy-productivity enhancements through the application of the JUSTIFI software. Key recommendations included replacing six inefficient rooftop units (RTUs) with a new air rotational unit. By quantifying operational savings for this project, the expected payback period went from 6.6 years to 1.4 years. Additionally, the installation of variable frequency drives (VFDs) on condenser tower motors was suggested. By including all operational benefits, the payback period was reduced from 8.2 years to 1.3 years. This comprehensive analysis aims to bolster the manufacturer's goals of reducing energy while enhancing overall operational efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

A Physics-Informed Reinforcement Learning Framework for Economic-Thermal Co-Optimization of Crypto Mining Data Centers: Preprint

The rapid expansion of cryptocurrency mining has created a new class of high-density data centers characterized by extreme thermal flux and high sensitivity to volatile economic markets. Traditional thermal management strategies, typically reliant on rule-based control, maintain static setpoints that fail to account for fluctuating electricity prices and cryptocurrency values - factors critical to mining profitability. To address this, we present a physics-informed reinforcement learning (PIRL) framework for economic-thermal co-optimization in crypto mining data centers. This framework consists of a proximal policy optimization (PPO) agent, a virtual testbed powered by high-fidelity physics-based models, and an interactive frontend dashboard. The PPO agent is trained using the virtual testbed and strict hardware safety limits. This physics-informed approach allows the agent to learn a stochastic policy that dynamically balances mining revenue against operational costs by co-optimizing HVAC cooling setpoints and IT computational hashrate. The simulation results demonstrate that the integrated framework achieved an 8.62% increase in net operational profit compared to traditional baseline strategies while strictly adhering to safety-critical temperature constraints (coolant supply temperature < 32 degrees C). This work provides a scalable template for the deployment of reinforcement learning in mission critical facilities where economic volatility and physical safety must be managed simultaneously.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI