Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “jwst”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

The James Webb Space Telescope: Observatory Status and Preparations for Launch

The James Webb Space Telescope (JWST) is a large (6.5 meter) segmented aperture telescope equipped with near- and mid-infrared instruments (0.6-28 microns), all of which are passively cooled to approximately 40 degrees Kelvin by a 5-layer sunshield while the mid-infrared instrument is actively cooled to 7 degrees Kelvin. The JWST telescope recently completed its cryogenic test program and the sunshield has been fully integrated and deployed. JWST is currently in the final stages of the test program at the Observatory level. The current estimated JWST performance metrics will be presented, such as the image quality, pointing stability, sensitivity, and stray light backgrounds. The JWST development status and future plans will be described for the final testing, launch, and commissioning.

McElwain, Michael↗

Precious Cargo: Transporting Contamination-Sensitive Instruments & Optics

The James Webb Space Telescope (JWST) is a multi-national program with instruments and hardware supplied by companies all over the world and numerous states in the United States. In order to transport larger assemblies, like the Optical Telescope Element / Integrated Science Instrument Module (OTIS), and ultimately JWST, the Space Telescope Transporter for Air, Road and Sea (STTARS) was designed and constructed. STTARS is a massive mobile cleanroom (longer than 2 semi-trailers) that provides an ISO class 7 payload environment while being transported by road, airborne and marine vehicles. Temperature, humidity, and particle counts are controlled and continuously tracked, with fallout and NVR witness samples placed in strategic locations for confirmation. Instruments or sensitive hardware were purged continuously during transport. STTARS has 5 main components: the upper tent frame, lower tent frame, pallet, strong back and lid. After transporting OTIS to Northrup Grumman (NG), STTARS was modified to increase its height to house the JWST Observatory on its voyage to French Guiana. This new configuration was designated Observatory STTARS (OSTTARS). OSTTARS was too tall to travel by C5 aircraft, so the trip to the launch site was made by ship. Through JWST’s land, air, and sea transports, STTARS and OSTTARS kept JWST hardware exceptionally clean and safe.

James Webb Space Telescope↗

Precious Cargo: Transporting contamination-sensitive instruments & optics

The James Webb Space Telescope (JWST) is a multi-national program with instruments and hardware supplied by companies all over the world and numerous states in the United States. In order to transport larger assemblies, like the Optical Telescope Element / Integrated Science Instrument Module (OTIS), and ultimately JWST, the Space Telescope Transporter for Air, Road and Sea (STTARS) was designed and constructed. STTARS is a massive mobile cleanroom (longer than 2 semi-trailers) that provides an ISO class 7 payload environment while being transported by road, airborne and marine vehicles. Temperature, humidity, and particle counts are controlled and continuously tracked, with fallout and NVR witness samples placed in strategic locations for confirmation. Instruments or sensitive hardware were purged continuously during transport. STTARS has 5 main components: the upper tent frame, lower tent frame, pallet, strong back and lid. After transporting OTIS to Northrup Grumman (NG), STTARS was modified to increase its height to house the JWST Observatory on its voyage to French Guiana. This new configuration was designated Observatory STTARS (OSTTARS). OSTTARS was too tall to travel by C5 aircraft, so the trip to the launch site was made by ship. Through JWST’s land, air, and sea transports, STTARS and OSTTARS kept JWST hardware exceptionally clean and safe.

James Webb Space Telescope↗

25 Years of Contamination Control on the James Webb Space Telescope

The James Webb Space Telescope (JWST) has actively been in process since 1996, and at last, on Christmas Day 2021, it launched. This launch was the fulfillment of an astounding level of work performed by thousands of people across the globe in dozens of disciplines. From the start, effective contamination control was considered essential for the JWST mission due to the large, exposed optics and tight sensitivity required to measure first light and faint signals at the dawn of the universe. This paper will present the JWST mission and requirements overview, including mission requirements that led to optimizing performance for collecting light in the Near Infrared (NIR, 0.6μm) – Mid Infrared (MIR, 29μm) range. Molecular films absorb in the IR bands and can alter thermal emissivity, resulting in increased noise at the longer wavelengths (MIRI). Particles increase light scatter and background noise levels at the shorter wavelengths (NIRSpec, NIRCam and FGS). The passively cooled design of JWST led to an open architecture for the optical telescope element (OTE), presenting the challenge of maintaining cleanliness throughout assembly, integration, and test in a multitude of environments. The paper will describe the mission and will introduce the specific areas of contamination control developed and advanced to keep JWST clean at an unsurpassed level of cleanliness.

Contamination Control↗

25 Years of Contamination Control on the James Webb Space Telescope

The James Webb Space Telescope (JWST) has actively been in process since 1996, and at last, on Christmas Day 2021, it launched. This launch was the fulfillment of an astounding level of work performed by thousands of people across the globe in dozens of disciplines. From the start, effective contamination control (CC) was considered essential for the JWST mission due to the large, exposed optics and tight sensitivity required to measure first light and faint signals at the dawn of the universe. This presentation will present the JWST mission and requirements overview, including mission requirements that led to optimizing performance for collecting light in the Near Infrared (NIR, 0.6μm) – Mid Infrared (MIR, 29μm) range. Molecular films absorb in the IR bands and can alter thermal emissivity, resulting in increased noise at the longer wavelengths (MIRI). Particles increase light scatter and background noise levels at the shorter wavelengths (NIRSpec, NIRCam and FGS). The passively cooled design of JWST led to an open architecture for the optical telescope element (OTE), presenting the challenge of maintaining cleanliness throughout assembly, integration, and test in a multitude of environments for over 2 decades. The presentation will describe CC for the mission starting with the first architecture in 1996, then introducing the specific areas of contamination control developed and advanced to keep JWST clean at an unsurpassed level of cleanliness.

Contamination Control↗

The Webb Space Telescope - An Engineering Marvel Story

This presentation will provide an overview of the James Webb Space Telescope (JWST) and its engineering development process. JWST has succeeded the Hubble Space Telescope in our quest for the first galaxies formed out of the darkness of the early universe. Since its launch in December 2021, JWST has helped us understand how these galaxies evolved over billions of years, how stars and planetary systems form, what exoplanets look like and if they can harbor life. JWST uses a ~6.5-m-diameter primary mirror to collect infrared light, which is sent to four scientific instruments. It operates at the second Sun-Earth Lagrange point and has a five-layer sunshield to be able to operate at cryogenic temperatures. JWST is an international effort of NASA and the European and Canadian Space Agencies.

James Webb Space Telescope↗

James Webb Space Telescope Core 2 Test - Cryogenic Thermal Balance Test of the Observatorys Core Area Thermal Control Hardware

The James Webb Space Telescope (JWST), successor to the Hubble Space Telescope, will be the largest astronomical telescope ever sent into space. To observe the very first light of the early universe, JWST requires a large deployed 6.5-meter primary mirror cryogenically cooled to less than 50 Kelvin. Three scientific instruments are further cooled via a large radiator system to less than 40 Kelvin. A fourth scientific instrument is cooled to less than 7 Kelvin using a combination pulse-tube Joule-Thomson mechanical cooler. Passive cryogenic cooling enables the large scale of the telescope which must be highly folded for launch on an Ariane 5 launch vehicle and deployed once on orbit during its journey to the second Earth-Sun Lagrange point. Passive cooling of the observatory is enabled by the deployment of a large tennis court sized five layer Sunshield combined with the use of a network of high efficiency radiators. A high purity aluminum heat strap system connects the three instrument's detector systems to the radiator systems to dissipate less than a single watt of parasitic and instrument dissipated heat. JWST's large scale features, while enabling passive cooling, also prevent the typical flight configuration fully-deployed thermal balance test that is the keystone of most space missions' thermal verification plans. This paper describes the JWST Core 2 Test, which is a cryogenic thermal balance test of a full size, high fidelity engineering model of the Observatory's 'Core' area thermal control hardware. The 'Core' area is the key mechanical and cryogenic interface area between all Observatory elements. The 'Core' area thermal control hardware allows for temperature transition of 300K to approximately 50 K by attenuating heat from the room temperature IEC (instrument electronics) and the Spacecraft Bus. Since the flight hardware is not available for test, the Core 2 test uses high fidelity and flight-like reproductions.

JWST Thermal Core 2 Test↗

The Home Stretch Almost! Science with the Hubble and James Webb Space Telescope V

JWST has Made tremendous progress in the last few years. JWST Is fully immersed in integration and test, but testing JWST is a formable challenge. JWST's size, complexity, and cryogenic characteristics require a multifaceted test plan to verify mission readiness. Each of these tests are opportunities to uncover issues which must be corrected to be able to move forward. All observatory control, science planning, and science data processing operational systems are on schedule.

JWST Hubble↗

Enabling Robust Exoplanet Atmospheric Retrievals with Gaussian Processes

Atmospheric retrievals are essential tools for interpreting exoplanet transmission and eclipse spectra, enabling quantitative constraints on the chemical composition, aerosol properties, and thermal structure of planetary atmospheres. The James Webb Space Telescope (JWST) offers unprecedented spectral precision, resolution, and wavelength coverage, unlocking transformative insights into the formation, evolution, climate, and potential habitability of planetary systems. However, this opportunity is accompanied by challenges: modeling assumptions and unaccounted-for noise or signal sources can bias retrieval outcomes and their interpretation. To address these limitations, we introduce a Gaussian process (GP)-aided atmospheric retrieval framework that flexibly accounts for unmodeled features and correlated noise in exoplanet spectra. We validate this method on synthetic JWST observations, and show that GP-aided retrievals reduce bias in inferred abundances and better capture model–data mismatches than traditional approaches. We also introduce the concept of mean squared error to quantify the trade-off between bias and variance, arguing that this metric more accurately reflects retrieval performance than bias alone. We then reanalyze the NIRISS/SOSS JWST transmission spectrum of WASP-96 b, finding that GP-aided retrievals yield broader constraints on CO 2 and H 2 O, possibly alleviating tension between previous retrieval results and equilibrium predictions. Our GP framework provides precise and accurate constraints while highlighting regions where models fail to explain the data. As JWST matures and future facilities come online, a deeper understanding of the limitations of both data and models will be essential, and GP-enabled retrievals like the one presented here offer a principled path forward.

Rotman, Yoav [Arizona State Univ., Tempe, AZ (Unit↗

Comparative NIR Detector Characterization for NGST

List of publications for final perfomance report are: Detectors for the JWST Near-Infrared Spectrometer Rauscher, B.J., Strada, P., Regan, M.W., Figer, D.F., Jakobsen, P., Moseley, H.S., & Boeker, T. 2004, SPIE Detectors for the JWST Near-Infrared Spectrometer Rauscher, B.J., Strada, P., Regan, M.W., Figer, D.F., Jakobsen, P., Moseley, H.S., & Boeker, T. 2004, AAS, 203, 124.07 Independent Testing of JWST Detector Prototypes Figer, D.F., Rauscher, B. J., Regan, M. W., Morse, E., Balleza, J., Bergeron, L., & Stockman, H. S. 2003 , SPIE, 5 167 The Independent Detector Testing Laboratory and the NGST Detector Program Figer, D.F., Agronin, M., Balleza, J., Barkhouser, R., Bergeron, L., Greene, G. R., McCandliss, S. R., Rauscher, B. J., Reeves, T., Regan, M. W., Sharma, U., Stockman, H. S. 2003, SPIE, 4850,981 Intra-Pixel Sensitivity in NIR Detectors for NGST Sharma, U., Figer, D.F., Sivaramakrishnan, A., Agronin, M., Balleza, J., Barkhouser, R., Bergeron, L., Greene, G. R., McCandliss, S. R., Rauscher, B. J., Reeves, T., Regan, M. W., Stockman, H. S. 2003, SPIE, 4850,1001 NIRCAM Image Simulations for NGST Wavefiont SensinglPS A. Sivaramakrishnan, D. Figer, H. Bushouse, H. S. Stockman (STScI),C. Ohara , D. Redding (JPL), M. Im (IPAC), & J. Offenberg (Raytheon) 2003, SPIE, 4850,388 Ultra-Low Background Operation of Near-Infrared Detectors for NGS Rauscher, B. J., Figer, D. F., Agronin, M., Balleza, J., Barkhouser, R., Bergeron, L., Greene, G. R., McCandliss, S. R., Reeves, T., Regan, M. W., Sharma, U., Stockman, H. S. 2003, SPIE, 4850,962 The Independent Detector Testing Laboratory and the JWST Detector Program Figer, D.F. et a1.2003, AAS201, #131.05

Greenhouse, Matthew↗

James Webb Space Telescope: Supporting Multiple Ground System Transitions in One Year

Ideas, requirements, and concepts developed during the very early phases of the mission design often conflict with the reality of a situation once the prime contractors are awarded. This happened for the James Webb Space Telescope (JWST) as well. The high level requirement of a common real-time ground system for both the Integration and Test (I&T), as well as the Operation phase of the mission is meant to reduce the cost and time needed later in the mission development for re-certification of databases, command and control systems, scripts, display pages, etc. In the case of JWST, the early Phase A flight software development needed a real-time ground system and database prior to the spacecraft prime contractor being selected. To compound the situation, the very low level requirements for the real-time ground system were not well defined. These two situations caused the initial real-time ground system to be switched out for a system that was previously used by the Bight software development team. To meet the high-!evel requirement, a third ground system was selected based on the prime spacecraft contractor needs and JWST Project decisions. The JWST ground system team has responded to each of these changes successfully. The lessons learned from each transition have not only made each transition smoother, but have also resolved issues earlier in the mission development than what would normally occur.

Detter, Ryan↗

An Overview of the James Webb Space Telescope Project

The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is in place with the selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

Sabelhaus, Phillip A.↗

James Webb Space Telescope Status

The James Webb Space Telescope (JWST) is the first deployable infrared to millimeter wave space telescopes. We will describe the progress on JWST and introduce other speakers in the session. The JWST will operate at the Sun-Earth Lagrange point L2, where radiative cooling lowers the telescope and instrument temperatures to about 35 K. It will have an 18-segment beryllium primary mirror with a 25 m2 area fitting inside a 6.6m circumscribed circle, and will provide spectroscopy and imaging over the wavelength range from 0.6 to 28 microns. It is planned for launch in 2011 on an Ariane 5 rocket. The project is a partnership of NASA, ESA, and CSA, and the prime contractor is Northrop Grumman. See http://www.jwst.nasa.gov for more details on JWST.

Mather, John C.↗

The Realities of Managing Complex Space Missions like the James Webb Space Telescope

An overview of the James Webb Space Telescope (JWST) project and its status are presented. The JWST is a deployable infrared telescope with a 6.5 meter diameter segmented, adjustable primary mirror. It has a cryogenic temperature telescope and instruments suited for infrared performance. It will be launched in 2013 on an European Space Agency-supplied Ariane 5 rocket 20 Sun-Earth L2 for a 5-year mission. Compared to other telescopes the JWST: has a 2.7 time longer diameter and 2.7 time longer wavelength capability than the Hubble Space Telescope (HST), 38 times increased sensitivity at K band and 8 times increased sensitivity at H band than the HST NICMOS; and, 8-24 times better angular resolution than the Spitzer. An instrument overview and integration and test flow overview are provided. The JWST project management approach, including organizational chart, program phases, technology status, and project critical path summary, are included. Additionally, project management tools and guidelines are are outlined.

Sabelhaus, Phil↗

James Webb Space Telescope - L2 Communications for Science Data Processing

JWST is the first NASA mission at the second Lagrange point (L2) to identify the need for data rates higher than 10 megabits per second (Mbps). JWST will produce approximately 235 Gigabits of science data every day that will be downlinked to the Deep Space Network (DSN). To get the data rates desired required moving away from X-band frequencies to Ka-band frequencies. To accomplish this transition, the DSN is upgrading its infrastructure. This new range of frequencies are becoming the new standard for high data rate science missions at L2. With the new frequency range, the issues of alternatives antenna deployment, off nominal scenarios, NASA implementation of the Ka-band 26 GHz, and navigation requirements will be discussed in this paper. JWST is also using Consultative Committee for Space Data Systems (CCSDS) standard process for reliable file transfer using CCSDS File Delivery Protocol (CFDP). For JWST the use of the CFDP protocol provides level zero processing at the DSN site. This paper will address NASA implementations of Ground Stations in support of Ka-band 26 GHz and lesson learned from implementing a file base (CFDP) protocol operational system.

Johns, Alan↗

MEMS Microshutter Array System for James Webb Space Telescope

A complex MEMS microshutter array system has been developed at NASA Goddard Space Flight Center (GSFC) for use as a multi-object aperture array for a Near-Infrared Spectrometer (NIRSpec). The NIRSpec is one of the four major instruments carried by the James Webb Space Telescope (JWST), the next generation of space telescope after the Hubble Space Telescope retires. The microshutter arrays (MSAs) are designed for the selective transmission of light with high efficiency and high contrast. It is demonstrated in Figure 1 how a MSA is used as a multiple object selector in deep space. The MSAs empower the NIRSpec instrument simultaneously collect spectra from more than 100 targets therefore increases the instrument efficiency 100 times or more. The MSA assembly is one of three major innovations on JWST and the first major MEMS devices serving observation missions in space. The MSA system developed at NASA GSFC is assembled with four quadrant fully addressable 365x171 shutter arrays that are actuated magnetically, latched and addressed electrostatically. As shown in Figure 2, each MSA is fabricated out of a 4' silicon-on-insulator (SOI) wafer using MEMS bulk-micromachining technology. Individual shutters are close-packed silicon nitride membranes with a pixel size close to 100x200 pm (Figure 3). Shutters are patterned with a torsion flexure permitting shutters to open 90 degrees with a minimized mechanical stress concentration. In order to prevent light leak, light shields are made on to the surrounding frame of each shutter to cover the gaps between the shutters and the Game (Figure 4). Micro-ribs and sub-micron bumps are tailored on hack walls and light shields, respectively, to prevent sticktion, shown in Figures 4 and 5. JWST instruments are required to operate at cryogenic temperatures as low as 35K, though they are to be subjected to various levels of ground tests at room temperature. The shutters should therefore maintain nearly flat in the entire temperature range between 35K and 300K. Through intensive numerical simulations and experimental studies, an optically opaque and electrically conductive metal-nitride thin film was selected as a coating material deposited on the shutters with the best thermal-expansion match to silicon nitride - the shutter blade thin film material. A shutter image shown in Figure 6 was taken at room temperature, presenting shutters slightly bowing down as expected. Shutters become flat when the temperature decreases to 35K. The MSAs are then bonded to silicon substrates that are fabricated out of 6" single-silicon wafers in the thickness of 2mm. The bonding is conducted using a novel single-sided indium flip-chip bonding technology. Indium bumps fabricated on a substrate are shown in Figure 7. There are 180,000 indium bumps for bonding a flight format MSA array to its substrate. Besides a MSA, each substrate houses five customer-designed ASIC (Application Specific Integrated Circuit) multiplexer/address chips for 2-dimensional addressing, twenty capacitors, two temperature sensors, numbers of resistors and all necessary interconnects, as shown in Figure 8. Complete MSA quadrant assemblies have been successfully manufactured and fully functionally tested. The assemblies have passed a series of critical reviews required by JWST in satisfying all the design specifications. The qualification tests cover programmable 2-D addressing, life tests, optical contrast tests, and environmental tests including radiation, vibration, and acoustic tests. A 2-D addressing pattern with 'ESA' letters programmed in a MSA is shown in Figure 9. The MSAs passed 1 million cycle life tests and achieved high optical contrast over 10,000. MSA teams are now making progress in final fabrication, testing and assembly (Figure 10). The delivery of flight-format MSA system is scheduled at the end of 2008 for being integrated to the focal plane of the NIRSpec detectors.

Li, Mary J.↗

The Scientific Capabilities of the James Webb Space Telescope

The scientific capabilities of the James Webb Space Telescope fall into four themes. The End of the Dark Ages: First Light and Reionization theme seeks to identify the first luminous sources to form and to determine the ionization history of the universe. The Assembly of Galaxies theme seeks to determine how galaxies and dark matter, gas, stars, metals morphological structures, and active nuclei within them evolved from the epoch of reionization to the present. The Birth of Stars and Protoplanetary Systems and the Origins of Life theme seeks to determine the physical and chemical properties of planetary systems around nearby stars and of our own, and investigate the potential for life in those systems. A comprehensive, top-level review of JWST sciences was published in the journal Space Science Reviews (Gardner et al. 2006, SSR, 123, 485). That paper gives details of the 4 JWST science themes, and describes the design of the observatory and ground system. Since that paper was published, the JWST Science Working Group, working with members of the astronomical community, has continued to develop the science case for JWST, giving more details in a series of white papers. In this poster, the main science themes and white papers are reviewed.

Gardner, Jonathan P.↗

On-Orbit Multi-Field Wavefront Control with a Kalman Filter

A document describes a multi-field wavefront control (WFC) procedure for the James Webb Space Telescope (JWST) on-orbit optical telescope element (OTE) fine-phasing using wavefront measurements at the NIRCam pupil. The control is applied to JWST primary mirror (PM) segments and secondary mirror (SM) simultaneously with a carefully selected ordering. Through computer simulations, the multi-field WFC procedure shows that it can reduce the initial system wavefront error (WFE), as caused by random initial system misalignments within the JWST fine-phasing error budget, from a few dozen micrometers to below 50 nm across the entire NIRCam Field of View, and the WFC procedure is also computationally stable as the Monte-Carlo simulations indicate. With the incorporation of a Kalman Filter (KF) as an optical state estimator into the WFC process, the robustness of the JWST OTE alignment process can be further improved. In the presence of some large optical misalignments, the Kalman state estimator can provide a reasonable estimate of the optical state, especially for those degrees of freedom that have a significant impact on the system WFE. The state estimate allows for a few corrections to the optical state to push the system towards its nominal state, and the result is that a large part of the WFE can be eliminated in this step. When the multi-field WFC procedure is applied after Kalman state estimate and correction, the stability of fine-phasing control is much more certain. Kalman Filter has been successfully applied to diverse applications as a robust and optimal state estimator. In the context of space-based optical system alignment based on wavefront measurements, a KF state estimator can combine all available wavefront measurements, past and present, as well as measurement and actuation error statistics to generate a Maximum-Likelihood optimal state estimator. The strength and flexibility of the KF algorithm make it attractive for use in real-time optical system alignment when WFC alone cannot effectively align the system.

Lou, John↗