Engineering PapersโŒ• Search

NASA NTRS ยท 20050131681

James Webb Space Telescope Status

Abstract

The James Webb Space Telescope (JWST) is the first deployable infrared to millimeter wave space telescopes. We will describe the progress on JWST and introduce other speakers in the session. The JWST will operate at the Sun-Earth Lagrange point L2, where radiative cooling lowers the telescope and instrument temperatures to about 35 K. It will have an 18-segment beryllium primary mirror with a 25 m2 area fitting inside a 6.6m circumscribed circle, and will provide spectroscopy and imaging over the wavelength range from 0.6 to 28 microns. It is planned for launch in 2011 on an Ariane 5 rocket. The project is a partnership of NASA, ESA, and CSA, and the prime contractor is Northrop Grumman. See http://www.jwst.nasa.gov for more details on JWST.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Mather, John C.. 2005-01-01. James Webb Space Telescope Status. https://ntrs.nasa.gov/citations/20050131681

Cite the original work for its findings. Save a collection to share your selection of sources.