Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “shutdown”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

AVESTAR Center for Operational Excellence of Electricity Generation Plants

To address industry challenges in attaining operational excellence for electricity generation plants, the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) has launched a world-class facility for Advanced Virtual Energy Simulation Training and Research (AVESTARTM). This presentation will highlight the AVESTARTM Center simulators, facilities, and comprehensive training, education, and research programs focused on the operation and control of high-efficiency, near-zero-emission electricity generation plants. The AVESTAR Center brings together state-of-the-art, real-time, high-fidelity dynamic simulators with full-scope operator training systems (OTSs) and 3D virtual immersive training systems (ITSs) into an integrated energy plant and control room environment. AVESTAR’s initial offering combines--for the first time--a “gasification with CO2 capture” process simulator with a “combined-cycle” power simulator together in a single OTS/ITS solution for an integrated gasification combined cycle (IGCC) power plant with carbon dioxide (CO2) capture. IGCC systems are an attractive technology option for power generation, especially when capturing and storing CO2 is necessary to satisfy emission targets. The AVESTAR training program offers a variety of courses that merge classroom learning, simulator-based OTS learning in a control-room operations environment, and immersive learning in the interactive 3D virtual plant environment or ITS. All of the courses introduce trainees to base-load plant operation, control, startups, and shutdowns. Advanced courses require participants to become familiar with coordinated control, fuel switching, power-demand load shedding, and load following, as well as to problem solve equipment and process malfunctions. Designed to ensure work force development, training is offered for control room and plant field operators, as well as engineers and managers. Such comprehensive simulator-based instruction allows for realistic training without compromising worker, equipment, and environmental safety. It also better prepares operators and engineers to manage the plant closer to economic constraints while minimizing or avoiding the impact of any potentially harmful, wasteful, or inefficient events. The AVESTAR Center is also used to augment graduate and undergraduate engineering education in the areas of process simulation, dynamics, control, and safety. Students and researchers gain hands-on simulator-based training experience and learn how the commercial-scale power plants respond dynamically to changes in manipulated inputs, such as coal feed flow rate and power demand. Students also analyze how the regulatory control system impacts power plant performance and stability. In addition, students practice start-up, shutdown, and malfunction scenarios. The 3D virtual ITSs are used for plant familiarization, walk-through, equipment animations, and safety scenarios. To further leverage the AVESTAR facilities and simulators, NETL and its university partners are pursuing an innovative and collaborative R&D program. In the area of process control, AVESTAR researchers are developing enhanced strategies for regulatory control and coordinated plant-wide control, including gasifier and gas turbine lead, as well as advanced process control using model predictive control (MPC) techniques. Other AVESTAR R&D focus areas include high-fidelity equipment modeling using partial differential equations, dynamic reduced order modeling, optimal sensor placement, 3D virtual plant simulation, and modern grid. NETL and its partners plan to continue building the AVESTAR portfolio of dynamic simulators, immersive training systems, and advanced research capabilities to satisfy industry’s growing need for training and experience with the operation and control of clean energy plants. Future dynamic simulators under development include natural gas combined cycle (NGCC) and supercritical pulverized coal (SCPC) plants with post-combustion CO2 capture. These dynamic simulators are targeted for use in establishing a Virtual Carbon Capture Center (VCCC), similar in concept to the DOE’s National Carbon Capture Center for slipstream testing. The VCCC will enable developers of CO2 capture technologies to integrate, test, and optimize the operation of their dynamic capture models within the context of baseline power plant dynamic models. The objective is to provide hands-on, simulator-based “learn-by-operating” test platforms to accelerate the scale-up and deployment of CO2 capture technologies. Future AVESTAR plans also include pursuing R&D on the dynamics, operation, and control of integrated electricity generation and storage systems for the modern grid era. Special emphasis will be given to combining load-following energy plants with renewable and distributed generating supplies and fast-ramping energy storage systems to provide near constant baseload power.

97 MATHEMATICS AND COMPUTING↗

Simultaneously firing two cylinders of an even firing camless engine

A valve control system includes an engine speed control module that determines an engine speed and a desired engine stop position. A piston position module determines a desired stopping position of a first piston based on the desired engine stop position. A valve control module receives the desired stopping position, commands a set of valves to close at the desired stopping position if the engine speed is less than a predetermined shutdown threshold, and commands the set of valves to reduce the engine speed if the engine speed is greater than the predetermined shutdown threshold.

33 ADVANCED PROPULSION SYSTEMS↗

BEAM EXTRACTION FROM THE RECYCLER RING TO P1 LINE AT FERMILAB

The transfer line for beam extraction from the Recycler ring to P1 line provides a way to deliver 8 GeV kinetic energy protons from the Booster to the Delivery ring, via the Recycler, using existing beam transport lines, and without the need for new civil construction. It was designed in 2012. The kicker magnets at RR520 and the lambertson magnet at RR522 in the RR were installed in 2014 Summer Shutdown, the elements of RR to P1 Stub (permanent quads, trim quads, correctors, BPMs, the toroid at 703 and vertical bending dipole at V703 (ADCW) were installed in 2015 Summer Shutdown. On Tuesday, June 21, 2016, beam line from the Recycler Ring to P1 line was commissioned. The detailed results will be presented in this report.

43 PARTICLE ACCELERATORS↗

Effects of fuel thickness on thermal and mechanical performance of U10-Mo monolithic fuel plates

Monolithic fuels are being considered for conversion of high performance research and test reactors. These plate-type fuels are comprised of a low enrichment, high density U-Mo alloy fuels within an aluminum cladding. Although the plates have demonstrated satisfactory performance; still, use of a high density fuel in a foil form retains technical challenges that could affect the overall performance. To understand performance of this new design during fabrication and irradiation, the plates have been evaluated for various geometrical and operational variables. As a part of these set of parametric sensitivity studies, effects of foil thickness on performance were studied. Because high performance research reactors will utilize different fuel thicknesses, it is necessary to evaluate possible effects for a range of thicknesses that are being considered for various designs. Based on the preliminary design specifications, the fuel thicknesses were varied between the limiting cases. The bounding fuel thicknesses were 0.203 mm as minimum that is projected for ATR, and 0.635 mm as maximum that is projected for MITR. To study possible effects, a behavioral model was developed for a selected plate from RERTR-12 experiments and the plate was simulated with as run irradiation history. The simulations were repeated for a range of fuel thicknesses, while keeping the cladding thickness and the operational parameters the same. The results have indicated that the plates with thicker fuels would have higher temperatures, deformations and shutdown stresses. To investigate the effects of fuel thickness exclusively, operational parameters were scaled. In particular, a second set of simulations with prorated volumetric heat generation rates were performed. The results indicated that the fabrication stresses in the fuel foil decrease with an increasing fuel thickness. On contrary, irradiation stresses of the fuel at shutdown are higher for the plates with thicker fuels. Greater peak deformations occurred in plates with thicker fuels.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Assessment of failure modes of monolithic fuel plates

Monolithic fuel is a fuel form that is considered for the conversion of high performance research reactors. In order to qualify this new fuel system, the fuel plates should meet the safety standards and perform well in reactor. The fuel system must maintain its mechanical integrity, sustain a geometric stability and should have stable and predictable irradiation behavior. The requirement to maintain mechanical integrity under normal operating conditions is primarily demonstrated by a successful testing of fuel plates up to the limiting conditions defined by the fuel performance envelope, including an adequate margin. Although large number of plates have been tested with satisfactory thermo-mechanical performance, post-irradiation examination of plates from previous RERTR-12 experiments have revealed that pillowing occurred in several plates, rendering performance of these plates unacceptable. To address such failures, efforts are underway to define the mechanisms responsible for the in-reactor pillowing, and suggest improvements to the fuel plate design and operational envelope. For this purpose, selected plates from previous experiments were simulated to understand the thermo-mechanical response of the plates to the fission density and thermally induced stresses. Simulation results were then comparatively evaluated with post-irradiation examinations of selected plates. The simulation results and experimental observations established a possible correlation between failure by plate pillowing, high porosity and a presence of tensile stress state. The study has implied that porosity leading to degradation of material properties, accompanied by a sufficiently large tensile stress state can lead to a pillowing-type failure at reactor shutdown. This paper presents these findings, discusses such failure modes, and the influence of fuel burn-up and power on the magnitude of the shutdown-induced tensile stresses.

42 ENGINEERING↗

Decay Heat Surrogate Modeling for High Temperature Reactors

The accuracy of the safety analysis of Nuclear Power Plants, in general, and the High Temperature Reactors, in particular, is driven by several factors, among which the accuracy of decay heat curves or calculation. This paper is aimed to present a methodology based on the usage of the RAVEN code for the construction of a multi-dimensional decay heat curve for High Temperature Reactors, via calculations performed by ORIGEN. The main goal of this activity has been the identification of a model able to surrogate the phenomenology of the decay heat after shutdown, satisfying the following requirements: 1) Reasonable prediction accuracy till 1 month after the shutdown, 2) Ability to capture the main deviation effects determined by field conditions (e.g. burn-up, fuel temperature, fissile enrichment, etc.), 3) As easy as possible formalism in order to possibly allow the implementation of the curve into system codes (e.g. RELAP5-3D) inputs exploiting, for example, control variable capabilities. Three surrogate models (also known as decay heat curves in the safety analysis nomenclature) have been identified: 1) Spline Exponential surrogate model, 2) A Support Vector Regression model and, 3) A Dynamic Mode Decomposition model. The aim of this paper is to present the mathematical background of the identified surrogate models and their performance in the prediction of decay heat evolution for High Temperature Reactors. A preliminary comparison of the surrogate model performances is finally reported.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Considerations for Safeguards Implementation in the Post-Operational Facility Life Cycle

Hundreds of facilities around the world under International Atomic Energy Agency (IAEA) safeguards are currently permanently shutdown or undergoing decommissioning. For facilities in States with a comprehensive safeguards agreement (CSA) in force, safeguards obligations under the CSA extend until the IAEA has determined for safeguards purposes that a facility has been decommissioned (i.e., the IAEA has verified that the nuclear material has been removed and residual structures and equipment essential for its use have been removed or rendered inoperable). The IAEA Department of Safeguards recently issued a report providing high-level guidance to States on IAEA safeguards implementation throughout the post-operational life cycle phases of facilities and locations outside facilities. These phases include permanent shutdown, closed-down, and decommissioned for safeguards purposes. Additional consideration is needed for how post-operational facilities might be consistently evaluated when developing State-level safeguards approaches. This work presents ideas about how the IAEA might implement the State-level concept and associated elements (e.g., State-specific factors) throughout the post-operational life cycle, focusing on maintaining effectiveness and gaining efficiencies where appropriate. Considerations include whether State-specific factors should influence facility status, how a change in a facility’s post-operational status might impact a State’s acquisition path analysis, and how rendering inoperable/removal of essential equipment could affect resources expended on safeguards implementation.

Hogue, Karen↗

Long Term Storage with Surveillance of Canadian Prototype Nuclear Power Reactors

Atomic Energy of Canada (AECL) was originally formed by the government of Canada in 1952 to perform research in radiation and nuclear areas. In the mid 1950's Canada decided to limit itself to peaceful uses of nuclear energy and AECL embarked on several research and development programs, one of them being the development of nuclear power plants. This led to the development of the CANDU{sup TM} design of heavy water power reactors, of which there are now 29 operating around the world. This presentation discusses the present state of the first two CANDU{sup TM} prototype reactors and a prototype boiling light water reactor and lessons learnt after being in a long-term storage with surveillance state for more than 20 years. AECL facilities undergo decommissioning by either a prompt or a deferred removal approach. Both approaches are initiated after an operating facility has been declared redundant and gone through final operational shutdown. For the deferred approach, initial decommissioning activities are performed to put the facility into a sustainable, safe, shutdown state to minimize the hazards and costs of the ensuing extended storage with surveillance (SWS) or Safestor phase. At the appropriate time, the facility is dismantled and removed, or put into a suitable condition for re-use. AECL has a number of facilities that were built during its history, and some of these are now redundant or will become redundant in the near future. The deferred removal approach is part of AECL's decommissioning strategy for several reasons: 1. Reduction in radiation doses to workers during the final dismantling, 2. No facilities are available yet in Canada for the management of quantity of wastes arising from decommissioning, 3. Financial constraints presented by the number of facilities that will undergo decommissioning, compared to the availability of funds to carry out the work. This has led to the development of a comprehensive decommissioning plan that includes all of AECL's redundant and presently operating facilities. Several significant issues have arisen over the decades these reactors have been in the SWS phase. With the long time frames encompassed by this approach to decommissioning, the storage and maintenance of facility information for future decommissioning, and the knowledge and training of successive generations of staff to perform facility inspections and maintenance are major issues. Complacency of both staff and management is a potential issue. The problem arises primarily because these facilities have been put into a comparatively low hazard state, are remotely located, and not much changes over time and changes are slow. During the period that these facilities have been in this state, regulatory scrutiny and expectations have increased. This along with continuing changes in regulatory staff requires a continuous education and communication activity with the regulator. Because of the long time frames involved, the building structures continue to deteriorate slowly, and repairs and maintenance are required upon occasion. The costs can be significant, for example, to replace a roof. When these occasions arise, the balance of cost and benefit is always questioned, i.e., 'Wouldn't it be better to spend the money on dismantling rather than fixing?'. One positive note is that ancillary buildings that either have very low radiation hazards or were decontaminated during the initial decommissioning activities have been used for several alternate uses. This has helped to defray costs, and also keeps an interest in maintaining the building structures and systems in good condition during the SWS phase. Over the past few years, the lessons learnt from these and other facilities in SWS, have been addressed in a holistic manner by moving from a short-term, project-oriented approach to a comprehensive, long term stewardship approach. Key to this approach was the development of an integrated plan to decommission all of AECL's facilities. One of the prime results of the implementation of this plan was the development of an organizational structure that addressed the lessons learnt to date including information management, quality assurance, training, waste management, funding, etc. that are required to successfully maintain these prototype reactors until they can be fully decommissioned.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Comparison of Candidate Sites for installation of Landfill facility at Ignalina NPP Site Using Fuzzy Logic Approach

There is only one nuclear power plant in Lithuania - Ignalina NPP (Nuclear Power Plant). Two similar units with installed capacity of 1500 MW (each) were commissioned in 1983 and 1987 respectively. But the first Unit of Ignalina NPP was finally shutdown December 31, 2004, and second Unit is planned to be shutdown before 2010. Operational radioactive waste of different activities is generated at Ignalina NPP. After closure of INPP a waste from decommissioning should be managed also. According to Lithuanian regulatory requirements (1) the waste depending on the activity must be managed in different ways. In compliance with this Regulation very low-level radioactive waste (VLLW) could be disposed of in a Landfill facility. In such case very simple engineered barriers are required. A cap on the top of the repository is necessary from long-term safety point of view. Experience has shown that the effective and safe isolation of waste depends on the performance of the overall disposal system, which is formed by three major components: the site, the disposal facility and the waste form. The basic objective of the siting process is to select a suitable site for disposal and demonstrate that this site has characteristics which provide adequate isolation of radionuclides from the biosphere for desired periods of time. The methodology and results on evaluation and comparison of two candidate sites intended for construction of Landfill facility at Ignalina NPP site are presented in the paper. Criteria for comparison are based on the IAEA (International Atomic Energy Agency) recommendations (2). Modeling of the radionuclide releases has been performed using ISAM (Improving of Safety Assessment Methodologies for Near Surface Disposal facilities) methodology (3). For generalization of the information and elaboration of the recommendations Fuzzy Logic approach was used (4). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feasibility Study on the Enlargement of the Surface Repository for LILW at Mochovce, Slovak Republic

In the Slovak Republic the sources of radioactive waste include the operation of the Mochovce and Bohunice nuclear power plants, decommissioning activities currently carried out and/or planned at Bohunice and elsewhere, as well as the use of radioactive sources in research, industry, and medicine. Pursuant to the Slovak policy low and intermediate level radioactive waste (LILW) containing predominantly short-lived radionuclides (LILW-SL), which is amenable for surface disposal, shall be disposed of at the National Radioactive Waste Repository (NRR) at Mochovce, which was designed to take all Slovak LILW-SL and which currently is in routine operation. The NRR site covers approximately 11 ha, currently only some 20 % of this area is used with two double rows of 20 reinforced concrete vaults each. The dimensions of a vault are 17.4 x 5.4 x 5.5 m, with an effective volume of 510 m{sup 3}. The total capacity of the two existing double rows (80 vaults) is enough to accommodate a net volume of radioactive waste of 22,320 m{sup 3}. Until the end of 2006 some 17 % of that capacity had already been used up. The NRR can receive in addition to the waste resulting from decommissioning the Bohunice A1 NPP pilot power reactor (under decommissioning since 1979) all the routinely produced Slovak waste until approximately 2020. However, the early shutdown of the Bohunice V1 Unit 1 end of 2006 and the planned shutdown of Unit 2 in 2008 with their following decommissioning will require additional disposal capacity well ahead of the initial time schedule. In this context it appears meaningful, to analyze anew the regulatory boundary conditions, existing disposal options and the corresponding waste categories. The main purpose of the feasibility study is to analyze alternatives for optimization of LILW management in the Slovak Republic as well as for the enlargement of the NRR at Mochovce, which will allow to dispose of the waste generated by the decommissioning of the nuclear power plants Bohunice A1 and V1 as well as waste arising from the operation of the Mochovce and Bohunice V2 NPPs and institutional waste. This paper describes the situation in the field of waste disposal in the Slovak Republic, the reasons leading to the decision of enlarging the NRR, the approach developed to select the optimum solution out of eight different enlargement variants, and first proposals and concepts for the enlargement of the NRR developed in the course of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of MERCI decay heat measurement for PWR UO{sub 2} fuel rod

Decay heat measurements, called the MERCI experiment, were conducted at Commissariat a l'Energie Atomique (CEA)/Saclay to characterize accurately residual power at short cooling time and verify its prediction by decay code and nuclear data. The MOSAIC calorimeter, developed and patented by CEA/Grenoble (DTN/SE2T), enables measurement of the decay heat released by a pressurized water reactor (PWR) fuel rod sample between 200 and 4 W within a precision of 1%. The MERCI experiment included three phases. At first, a UO{sub 2} fuel rod sample was irradiated in the CEA/Saclay experimental reactor OSIRIS. The burnup achieved at the end of irradiation was similar to 3.5 GWd/tonne. The second phase was the transfer of the fuel rod sample from its irradiation location to a hot cell, to be inserted inside the MOSAIC calorimeter. It took 26 min to carry out the transfer. Finally, decay heat released by the PWR sample was measured from 27 min to 42 days after shutdown. Post irradiation examinations were performed to measure concentrations of some heavy nuclei (U, Pu) and fission products (Cs, Nd). The decay heat was predicted using a calculation scheme based on the PEPIN2 depletion code, the TRIPOLI-4 Monte Carlo code, and the JEFF3.1.1 nuclear data file. The MERCI experiment analysis shows that the discrepancy between the calculated and the experimental decay heat values is included between -10% at 27 min and +6% at 12 h, 30 min otter shutdown. From 4 up to 42 days of cooling time, the difference between calculation and measurement is about ± 1%, i.e., experimental uncertainty. The MERCI experiment represents a significant contribution for code validation; the time range above 10{sup 5} s has not been validated previously. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

To Decommission or Not To Decommission? That is the Question... Revisited

Major Highlights Comparing 1998 to 2014: Favoring Plant Shutdown: Electric utility deregulation has created greater competition; Markets have been disrupted by cheap natural gas; Despite high availability, cost of electric power from natural gas still below break-even cost of nuclear generation; Emerging ISO acceptance of fluctuating renewable energy on the grid. Favoring DECON: D and D technologies have matured; Reactor Vessel and Internals segmentation methods still being refined; Nuclear workforce is 16 years older and leaving the nuclear industry (Impact on D and D TBD); Avoiding risk of more restrictive regulation and higher LLW disposal costs. Favoring SAFSTOR: Full funding of NDT still major driver for deferring immediate dismantlement. SAFSTOR vs. near term D and D influenced by: Status of and confidence in decommissioning fund (NDT) and cost estimate; Local and state politics; Public pressure. Most early shutdown plants tend to have under-funded decommissioning funds and opt for SAFSTOR. SAFSTOR allows for fund growth through interest compounding, but must assume that cost increase is less than fund growth: May not be true across the board, Much uncertainty/risk in waste disposal costs, regulatory requirements, etc. when projected out several decades. Once initiated SAFSTOR decision is not easily changed to DECON: Plant infrastructure equipment and components not readily available, RCS chemical decontamination can be very challenging, Key/knowledgeable plant personnel are gone. Consideration for phased approach to DECON: Remove >95% of the radiological source term under today's known regulations and cost by full System Decontamination of the primary circuit systems, and removal of NSSS and decontamination of the Containment Building; Improves risk profile in those areas most vulnerable to excessive cost growth; Able to defer D and D of the remainder of the plant to allow for the NDT to grow with interest.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The High Capacity Type B Waste Transport Cask to Serve Dismantling Project - 18344

The United States have already announced around 20 reactor shutdown and many more in the next 10 year. Financial constraints on plant operators and the low cost of fossil energy contribute to accelerate the shutdown of additional reactors. The industry has been gaining experience with reactor dismantling and is continuously trying to improve the cost efficiency of the upcoming projects. To do so, larger and more capacitive transport casks are needed to transport increasing volume of Low Level Waste (LLW) at a more attractive cost. Waste disposal is also a major cost element in a dismantling project. Consequently, the capacity to segment, package and transport the waste in the most optimized configuration will result in significant cost savings. While for LLW, the constraints for package requirements are limited, activated waste resulting mainly from reactor vessel and vessel internals segmentation require additional shielding to meet disposal and transportation regulations. The key element to succeed is the availability on the market of a licensed type B transport package with a larger payload that allows at the same time an optimization of the waste segmentation. AREVA TN has designed and licensed versatile high capacity type B casks for the transport of spent fuel canisters as part of the NUHOMS{sup R} system that can also be used to transport radioactive waste. While it will take a few more years to transport spent fuel to a consolidated interim storage facility and even more to a repository, the type B casks can be used to transport activated LLW from dismantled reactors to disposal sites. A first of a kind project will be performed with AREVA's partner NorthStar at Vermont Yankee Nuclear Power Plant. AREVA's team will perform the reactor segmentation and package the material into an AREVA's large capacity type B cask. This unmatched cask capacity is expected to significantly decrease the LLW disposal costs, as well as the onsite operations costs, while optimizing the schedule. The package will be transported by rail to waste disposal facilities. This paper will present the main characteristics of the package, provide an update of the overall schedule, and explain the innovations that contribute to simpler and more cost effective transport and operation. Finally, it will emphasize the benefits of using larger type B casks for immediate and future transportation needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of an Accident Tolerant Fuel Leak in the Advanced Test Reactor

Accident Tolerant Fuels (ATF), which are nuclear fuel sources designed to withstand operational irregularities and incidents, have been a topic of interest in the nuclear industry for several decades. Interest in ATF technology surged following the 2011 accident at Fukushima Daiichi in Japan. At the Advanced Test Reactor (ATR), one of Idaho National Laboratory’s (INL) four operating nuclear reactors, the ATF program is a collaborative effort between the national laboratory and various stakeholders within the nuclear industry. This program focuses on the research and development of novel fuel compositions, cladding, and component materials with enhanced accident-resistant properties. During one of ATR’s 60-day operating cycles in 2024, the reactor experienced five unplanned shutdowns. Following the fifth shutdown, radiation monitors detected an increase in radiation levels coming from the loop piping. Subsequent water samples confirmed the cause was a leak of fission products from the ATF experiment, designated as ATF-2C. The source of the leak was identified as the instrumented section of the test train. The primary discussions in this paper are 1) the design of the ATF test train, 2) the operating parameters leading up to and following the detection of the leak, and 3) the quantification and characterization of the released fission products.

Accident Tolerant Fuels↗

Evaluation of an Accident Tolerant Fuel Leak in the Advanced Test Reactor

Accident Tolerant Fuels (ATF), which are nuclear fuel sources designed to withstand operational irregularities and incidents, have been a topic of interest in the nuclear industry for several decades. Interest in ATF technology surged following the 2011 accident at Fukushima Daiichi in Japan. At the Advanced Test Reactor (ATR), one of Idaho National Laboratory’s (INL) four operating nuclear reactors, the ATF program is a collaborative effort between the national laboratory and various stakeholders within the nuclear industry. This program focuses on the research and development of novel fuel compositions, cladding, and component materials with enhanced accident-resistant properties. During one of ATR’s 60-day operating cycles in 2024, the reactor experienced five unplanned shutdowns. Following the fifth shutdown, radiation monitors detected an increase in radiation levels coming from the loop piping. Subsequent water samples confirmed the cause was a leak of fission products from the ATF experiment, designated as ATF-2C. The source of the leak was identified as the instrumented section of the test train. The primary discussions in this presentation are 1) the design of the ATF test train, 2) the operating parameters leading up to and following the detection of the leak, and 3) the quantification and characterization of the released fission products.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Immersive Scientific Visualization of Molten-Salt Reactor Waste Characteristics Using Virtual Reality

Immersive visualization is changing how we explore, communicate, and understand complex scientific systems. In nuclear energy, an area in which data are often multidimensional, time-dependent, and difficult to interpret, virtual reality (VR) represents a powerful and intuitive informational medium. This work introduces a VR-based platform that visualizes the post-shutdown behavior and waste management lifecycle of molten-salt reactors (MSRs), a next-generation reactor type with unique operational and safety characteristics. The platform, built in Unity, is streamed on the Meta Quest 3 headset. It transforms high-fidelity simulation data into an interactive, immersive experience. Users can explore time-dependent reactor characteristics such as nuclide decay, which is a key factor for evaluating reactor waste strategies. The datasets were generated using the MOOSE (Multiphysics Object-Oriented Simulation Environment) framework and then processed through ParaView scripting for smooth integration into Unity. From a visualization standpoint, the platform emphasizes spatial storytelling, temporal exploration, and user-centered interaction. Users can navigate 3D reactor geometries, slice through volumetric data, and manipulate time to observe how physical phenomena evolve. Real-scale rendering and embodied interaction make the experience feel tangible. The interface is designed to be accessible, even to those without nuclear or simulation expertise. This lowers the barrier for stakeholders, policymakers, and the general public, while still supporting expert analysis and collaborative decision-making. This work shows how immersive visualization can function as both a scientific tool and a communication interface. By integrating simulation, processing, and visualization into a cohesive workflow, we offer a scalable framework for immersive scientific storytelling. The modular design supports future extensions to other reactor types and lifecycle stages, from shutdown to long-term storage, making the platform adaptable for both research and outreach.

99 - GENERAL AND MISCELLANEOUS↗

Ice Thermal Storage Systems for LWR Supplemental Cooling and Peak Power Shifting

Availability of enough cooling water has been one of the major issues for the nuclear power plant site selection. Cooling water issues have frequently disrupted the normal operation at some nuclear power plants during heat waves and long draught. The issues become more severe due to the new round of nuclear power expansion and global warming. During hot summer days, cooling water leaving a power plant may become too hot to threaten aquatic life so that environmental regulations may force the plant to reduce power output or even temporarily to be shutdown. For new nuclear power plants to be built at areas without enough cooling water, dry cooling can be used to remove waste heat directly into the atmosphere. However, dry cooling will result in much lower thermal efficiency when the weather is hot. One potential solution for the above mentioned issues is to use ice thermal storage systems (ITS) that reduce cooling water requirements and boost the plant’s thermal efficiency in hot hours. ITS uses cheap off-peak electricity to make ice and uses those ice for supplemental cooling during peak demand time. ITS is suitable for supplemental cooling storage due to its very high energy storage density. ITS also provides a way to shift large amount of electricity from off peak time to peak time. Some gas turbine plants already use ITS to increase thermal efficiency during peak hours in summer. ITSs have also been widely used for building cooling to save energy cost. Among three cooling methods for LWR applications: once-through, wet cooling tower, and dry cooling tower, once-through cooling plants near a large water body like an ocean or a large lake and wet cooling plants can maintain the designed turbine backpressure (or condensation temperature) during 99% of the time; therefore, adding ITS to those plants will not generate large benefits. For once-through cooling plants near a limited water body like a river or a small lake, adding ITS can bring significant economic benefits and avoid forced derating and shutdown during extremely hot weather. For the new plants using dry cooling towers, adding the ice thermal storage systems can effectively reduce the efficiency loss and water consumption during hot weather so that new LWRs could be considered in regions without enough cooling water. \ This paper presents the feasibility study of using ice thermal storage systems for LWR supplemental cooling and peak power shifting. LWR cooling issues and ITS application status will be reviewed. Two ITS application case studies will be presented and compared with alternative options: one for once-through cooling without enough cooling for short time, and the other with dry cooling. Because capital cost, especially the ice storage structure/building cost, is the major cost for ITS, two different cost estimation models are developed: one based on scaling method, and the other based on a preliminary design using Building Information Modeling (BIM), an emerging technology in Architecture/Engineering/Construction, which enables design options, performance analysis and cost estimating in the early design stage.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗