Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Resource Allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Experimental Results of LightSAR Mision Planning Using a Market-Based System

The allocation of scarce spacecraft resources to multiple users has always been a difficult process. This difficulty arises from the fact that there are never enough resources to meet the stated requirements of the scientific investigators who compete to acquire their desired data sets.

LightSAR Mission Planning Market-based systems↗

Colonel Blotto Games and Lancaster's Equations: A Novel Military Modeling Combination

Military strategists face a difficult task when engaged in a battle against an adversarial force. They have to predict both what tactics their opponent will employ and the outcomes of any resultant conflicts in order to make the best decision about their actions. Game theory has been the dominant technique used by analysts to investigate the possible actions that an enemy will employ. Traditional game theory can be augmented by use of Lanchester equations, a set of differential equations used to determine the outcome of a conflict. This paper demonstrates a novel combination of game theory and Lanchester equations using Colonel Blotto games. Colonel Blotto games, which are one of the oldest applications of game theory to the military domain, look at the allocation of troops and resources when fighting across multiple areas of operation. This paper demonstrates that employing Lanchester equations within a game overcomes some of practical problems faced when applying game theory.

Collins, Andrew J.↗

Evidence Report: Risk of Inadequate Human-Computer Interaction

Human-computer interaction (HCI) encompasses all the methods by which humans and computer-based systems communicate, share information, and accomplish tasks. When HCI is poorly designed, crews have difficulty entering, navigating, accessing, and understanding information. HCI has rarely been studied in an operational spaceflight context, and detailed performance data that would support evaluation of HCI have not been collected; thus, we draw much of our evidence from post-spaceflight crew comments, and from other safety-critical domains like ground-based power plants, and aviation. Additionally, there is a concern that any potential or real issues to date may have been masked by the fact that crews have near constant access to ground controllers, who monitor for errors, correct mistakes, and provide additional information needed to complete tasks. We do not know what types of HCI issues might arise without this "safety net". Exploration missions will test this concern, as crews may be operating autonomously due to communication delays and blackouts. Crew survival will be heavily dependent on available electronic information for just-in-time training, procedure execution, and vehicle or system maintenance; hence, the criticality of the Risk of Inadequate HCI. Future work must focus on identifying the most important contributing risk factors, evaluating their contribution to the overall risk, and developing appropriate mitigations. The Risk of Inadequate HCI includes eight core contributing factors based on the Human Factors Analysis and Classification System (HFACS): (1) Requirements, policies, and design processes, (2) Information resources and support, (3) Allocation of attention, (4) Cognitive overload, (5) Environmentally induced perceptual changes, (6) Misperception and misinterpretation of displayed information, (7) Spatial disorientation, and (8) Displays and controls.

Kritina Holden↗

NASA's Role in Gas Turbine Technology Development: Accelerating Technical Progress via Collaboration Between Academia, Industry, and Government Agencies

Given the maturity of the gas turbine engine since its invention and also considering the limited and flattened level of resources expected to be allocated for NASA aeronautics research and development, we ask the question are NASA technology investments still needed to enable future turbine engine-based propulsion systems? If so, what is NASA’s unique role to justify NASA’s investment? To address this topic, we will first review the accomplishments and the impact that NASA Glenn Research Center has made on turbine engine technologies over the last 78 years. Specifically, this paper discusses NASA’s role and contributions to turbine engine development, specific to both 1) NASA’s role in conducting experiments to understand flow physics and provide relevant benchmark validation experiments for Computational Fluid Dynamics (CFD) code development, validation, and assessment; and 2) the impact of technologies resulting from NASA collaborations with industry, academia, and other government agencies. Note that the scope of the discussion is limited to the NASA technology contributions with which the author was intimately associated, and does not represent the entirety of the NASA contributions to turbine engine technology. The specific research, development, and demonstrations discussed herein were selected to both 1) provide a comprehensive review and reference list of the technology and its impact, and 2) identify NASA’s unique role and highlight how NASA’s involvement resulted in additional benefit to the gas turbine engine community. Secondly, we will discuss current NASA collaborations that are in progress and provide a status of the results. Finally, we discuss the challenges anticipated for future turbine engine-based propulsion systems for civil aviation and identify potential opportunities for collaboration where NASA involvement would be beneficial. Ultimately, the gas turbine engine community will decide if NASA involvement is needed to contribute to the development of the design and analysis tools, databases, and technology demonstration programs to meet these challenges for future turbine engine-based propulsion systems.

Suder, Kenneth L.↗

Space Station Freedom restructure impacts on technology experiment accommodation

This is a follow up to NASA Technical Memorandum (TM) 102766; it provides an overview of the Office of Aeronautics and Space Technology (OAST) Space Station Freedom (SSF) Technology Development Payload Program, reviews the OAST SSF resource requirements, and contrasts the requirements with the resources that are available to OAST since the restructure of SSF. A discussion of the issues as well as conclusions and recommendations, is provided. It is concluded that, even after adjustments to the OAST traffic model to reflect restructure, some resources will be inadequate even at the 20 percent allocation level. It is also concluded that bartering resources among U.S. users and international partners, and increasing the level of automation may be viable solutions to the resource constraint problem. The final conclusion is that, to facilitate the performance of technology experiments on SSF, OAST should fund SSF experiments and update its traffic model as soon as possible, and should provide technical and programmatic assistance to technology experiment developers.

Avery, Don E.↗

High Speed Networking and Large-scale Simulation in Geodynamics

Large-scale numerical simulation has been one of the most important approaches for understanding global geodynamical processes. In this approach, peta-scale floating point operations (pflops) are often required to carry out a single physically-meaningful numerical experiment. For example, to model convective flow in the Earth's core and generation of the geomagnetic field (geodynamo), simulation for one magnetic free-decay time (approximately 15000 years) with a modest resolution of 150 in three spatial dimensions would require approximately 0.2 pflops. If such a numerical model is used to predict geomagnetic secular variation over decades and longer, with e.g. an ensemble Kalman filter assimilation approach, approximately 30 (and perhaps more) independent simulations of similar scales would be needed for one data assimilation analysis. Obviously, such a simulation would require an enormous computing resource that exceeds the capacity of a single facility currently available at our disposal. One solution is to utilize a very fast network (e.g. 10Gb optical networks) and available middleware (e.g. Globus Toolkit) to allocate available but often heterogeneous resources for such large-scale computing efforts. At NASA GSFC, we are experimenting with such an approach by networking several clusters for geomagnetic data assimilation research. We shall present our initial testing results in the meeting.

Kuang, Weijia↗

Galileo mission planning for Low Gain Antenna based operations

The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.

Gershman, R.↗

A two-phase methodology for technology selection and system design

A two-phase methodology that can be used to guide R&D managers in the evaluation and selection of competing technologies is presented. Deterministic multiattribute utility theory is used in the first phase to rank the technological alternatives; the example presented involves the evaluation of electric and hybrid passenger vehicles. In all, 39 individuals from eight automotive firms were interviewed to assess their risk preferences and attitudes toward the vehicle design. In the second phase, the decision-maker must allocate a fixed amount of resources to different projects for the technology selected, some of which may be undertaken in parallel, to maximize a given measure of performance. When parallel funding is pursued the best outcome is chosen. The problem is formulated as a probabilistic network and solved heuristically using Monte Carlo simulation. Results are presented for two decision-makers and three budget options. In each case, the heuristic finds the optimal allocation of funds.

Bard, Jonathan F.↗

Research on the applications of space technology

Communication satellites and technology transfer are discussed in seven individual reports. Topics cover: (1) NASA'S technological alternatives assuming that the orbit-spectrum resource will continue to be allocated to communication satellite service providers at zero price; (2) the economic aspects of orbit-spectrum allocation; (3) the cost structure of local distribution systems for satellite communication; (4) the economic basis for national science and technology policy; (5) the economics of the household economy; (6) government patent policy; and (7) screening and evaluation in information dissemination.

Source record↗

Dynamic decisions and work load in multitask supervisory control

A paradigm is developed for the problem of allocating in time a single resource to multiple simultaneous task demands which appear randomly, last for various periods, and offer varying rewards for service. Based upon a dynamic optimizing algorithm plus an estimator, and including response time and future discounting constraints, a model of the human decisionmaker is compared to experimental results for human subjects performing such a task at a computer-graphics terminal. Results indicate a reasonable fit, under various model parameters and task conditions, and suggest interesting hypotheses about the nature of human 'planning ahead' and mental work load.

Tulga, M. K.↗

Overview of SERI's high efficiency solar cell research

The bulk of the research efforts supported by the Solar Energy Research Institute (SERI) High Efficiency Concepts area has been directed towards establishing the feasibility of achieving very high efficiencies, 30% for concentrator and more than 20% for thin film flat plate, in solar cell designs which could possibly be produced competitively. The research has accomplished a great deal during the past two years. Even though the desired performance levels have not yet been demonstrated, based on the recent progress, a greater portion of the terrestrial photovoltaics community believes that these efficiencies are attainable. The program will now allocate a larger portion of resources to low cost, large area deposition technology. The program is currently shifting greater emphasis on to the study of crystal growth in order to provide the understanding and tools needed to design a large area process.

Benner, J. P.↗

Simulation Of Research And Development Projects

Measures of preference for alternative project plans calculated. Simulation of Research and Development Projects (SIMRAND) program aids in optimal allocation of research and development resources needed to achieve project goals. Models system subsets or project tasks as various network paths to final goal. Each path described in terms of such task variables as cost per hour, cost per unit, and availability of resources. Uncertainty incorporated by treating task variables as probabilistic random variables. Written in Microsoft FORTRAN 77.

Miles, Ralph F.↗

Information sciences experiment system

The rapid expansion of remote sensing capability over the last two decades will take another major leap forward with the advent of the Earth Observing System (Eos). An approach is presented that will permit experiments and demonstrations in onboard information extraction. The approach is a non-intrusive, eavesdropping mode in which a small amount of spacecraft real estate is allocated to an onboard computation resource. How such an approach allows the evaluation of advanced technology in the space environment, advanced techniques in information extraction for both Earth science and information science studies, direct to user data products, and real-time response to events, all without affecting other on-board instrumentation is discussed.

Katzberg, Stephen J.↗

Documenting the decision structure in software development

Current software development paradigms focus on the products of the development process. Much of the decision making process which produces these products is outside the scope of these paradigms. The Decision-Based Software Development (DBSD) paradigm views the design process as a series of interrelated decisions which involve the identification and articulation of problems, alternates, solutions and justifications. Decisions made by programmers and analysts are recorded in a project data base. Unresolved problems are also recorded and resources for their resolution are allocated by management according to the overall development strategy. This decision structure is linked to the products affected by the relevant decision and provides a process oriented view of the resulted system. Software maintenance uses this decision view of the system to understand the rationale behind the decisions affecting the part of the system to be modified. D-HyperCase, a prototype Decision-Based Hypermedia System is described and results of applying the DBSD approach during its development are presented.

Wild, J. Christian↗

CAD-Based Aerodynamic Design of Complex Configurations using a Cartesian Method

A modular framework for aerodynamic optimization of complex geometries is developed. By working directly with a parametric CAD system, complex-geometry models are modified nnd tessellated in an automatic fashion. The use of a component-based Cartesian method significantly reduces the demands on the CAD system, and also provides for robust and efficient flowfield analysis. The optimization is controlled using either a genetic or quasi-Newton algorithm. Parallel efficiency of the framework is maintained even when subject to limited CAD resources by dynamically re-allocating the processors of the flow solver. Overall, the resulting framework can explore designs incorporating large shape modifications and changes in topology.

Nemec, Marian↗

New challenges for Life Sciences flight project management

Scientists have conducted studies involving human spaceflight crews for over three decades. These studies have progressed from simple observations before and after each flight to sophisticated experiments during flights of several weeks up to several months. The findings from these experiments are available in the scientific literature. Management of these flight experiments has grown into a system fashioned from the Apollo Program style, focusing on budgeting, scheduling and allocation of human and material resources. While these areas remain important to the future, the International Space Station (ISS) requires that the Life Sciences spaceflight experiments expand the existing project management methodology. The use of telescience with state-the-art information technology and the multi-national crews and investigators challenges the former management processes. Actually conducting experiments on board the ISS will be an enormous undertaking and International Agreements and Working Groups will be essential in giving guidance to the flight project management Teams forged in this matrix environment must be competent to make decisions and qualified to work with the array of engineers, scientists, and the spaceflight crews. In order to undertake this complex task, data systems not previously used for these purposes must be adapted so that the investigators and the project management personnel can all share in important information as soon as it is available. The utilization of telescience and distributed experiment operations will allow the investigator to remain involved in their experiment as well as to understand the numerous issues faced by other elements of the program The complexity in formation and management of project teams will be a new kind of challenge for international science programs. Meeting that challenge is essential to assure success of the International Space Station as a laboratory in space.

NASA Discipline General Space Life Sciences↗

Orion Navigation Sensitivities to Ground Station Infrastructure for Lunar Missions

The Orion Crew Exploration Vehicle (CEV) will replace the Space Shuttle and serve as the next-generation spaceship to carry humans to the International Space Station and back to the Moon for the first time since the Apollo program. As in the Apollo and Space Shuttle programs, the Mission Control Navigation team will utilize radiometric measurements to determine the position and velocity of the CEV. In the case of lunar missions, the ground station infrastructure consisting of approximately twelve stations distributed about the Earth and known as the Apollo Manned Spaceflight Network, no longer exists. Therefore, additional tracking resources will have to be allocated or constructed to support mission operations for Orion lunar missions. This paper examines the sensitivity of Orion navigation for lunar missions to the number and distribution of tracking sites that form the ground station infrastructure.

Getchius, Joel↗

An Approach to Reasoning Service Migration in Data and Reasoning Fabric (DRF) Implementation

In this paper we consider service placement problem for Data and Reasoning Fabric (DRF) enabled airspace operations assuming a fixed cloud/edge infrastructure with allocated computing, storage and power resources, where cloud/edge servers, and communication stations are in a wired connected network, while vehicles use a wireless network for communication. The objective is to automatically select the best location for the requested service execution, which achieves minimum cost while satisfying the user quality of service (QoS) and available resources constraints. To this end, we estimate for each potential location the response time, consumed energy and total cost; formulate an optimization problem for cost minimization given the users QoS constraints and network infrastructure limitations; and solve it using nonlinear programming tools. The approach is applied to trajectory re-planning use case to handle a no-fly zone contingency in real time.

Vahram Stepanyan↗