Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program managers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Needs for integrated risk assessment to support optimal environmental management decisions - 15455

Cleaning up legacy waste from 50 years of nuclear weapons production and energy research still remains a challenge for the U.S. Department of Energy (DOE). The DOE environmental management program is currently forecasted to run through at least late 2060's with an estimated liability of $204 billion. Risks to human health of workers and the public, the ecological system, and nuclear safety of cleanup activities continue to drive the cost of DOE's cleanup programs. Currently, these risks are generally assessed and managed independently of each other. Except for DOE self-regulated on-site disposal activities of low-level radioactive waste, risks to human health and the environment are generally under the purview of U.S. Environmental Protection Agency and State regulatory agencies, while nuclear safety risks are regulated by DOE with oversight from the U.S. Nuclear Regulatory Commission and the Defense Nuclear Facilities Safety Board where appropriate. When managing health and environmental risks, the individual regulatory authorities often use an area-by-area (or unit-by-unit), contaminant-by-contaminant (chemical-by-chemical or radionuclide-by-radionuclide) approach, focusing on a single medium (soil, water, or air), a single source (e.g., a burial ground or a processing facility), and a single receptor (e.g, a groundwater well or a creek). This level of segregation in risk evaluations by risk category, geographical location, and operational unit, as well as the corresponding separation of regulatory authorities poses a significant challenge to reaching an optimal decision in prioritizing and managing cleanup activities. This management challenge adds another layer of complexity to large-scale cleanup effort at complex sites such as the Hanford site in eastern Washington. Therefore, to support a scientifically sound, operationally robust decision making process, there is a need for an integrated, holistic approach to risk assessment that addresses the combined effects of all major contributing factors. Previous studies have pointed out the need for integrated risk assessments that address multi-contaminant, multimedia, multi-pathway exposures, for the purposes of evaluating risks to human health and the environment. We believe that a comprehensive risk assessment should also take into nuclear safety risks that are associated with handling of nuclear material either retrieved from burial sites or to be decommissioned from nuclear facilities. Recent efforts, such as the Consortium for Risk Evaluation with Stakeholder Participation (CRESP)-led Hanford site-wide independent risk review that will categorize all types of risks at the Hanford site and the DOE complex-wide risk review mandated by the Fiscal Year 2014 Consolidated Appropriations Act ('Omnibus bill'), are beginning to more comprehensively address this need. This paper provides a categorization of various types of risks present at typical DOE sites, reviews the current risk assessment and management practices, and discusses the needs for integrating nuclear safety into performance and risk assessments for optimal cleanup decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived from the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of habitat‐specific competition for oral rabies vaccine baits between raccoons and opossums

Abstract Throughout the eastern United States, the National Rabies Management Program (NRMP) distributes oral rabies vaccine (ORV) baits to manage rabies virus circulation in raccoon ( Procyon lotor ) populations. The consumption of vaccine baits by non‐target species including Virginia opossums ( Didelphis virginiana ) may reduce the effectiveness of ORV programs, but competition for baits remains poorly quantified in many areas of the southeastern United States. We distributed placebo ORV baits injected with a biomarker across 4 land cover types (bottomland hardwood, upland pine, riparian, isolated wetland) on the Savannah River Site in South Carolina, USA, 2017–2019. We then trapped and collected whiskers from 247 raccoons and 78 opossums to assess biomarker presence using fluorescent microscopy. Our data revealed greater bait uptake probability by raccoons (estimated x̅ = 0.30, 95% CI = 0.19–0.44) compared to opossums (estimated x̅ = 0.11, 95% CI = 0.05–0.23) across all cover types surveyed. Probability of bait consumption was not affected by cover type or the abundance of raccoons or opossums. Among raccoons, males were more likely to consume baits than females (estimated x̅ = 0.28, 95% CI = 0.17–0.44 for males and 0.14, 95% CI = 0.05–0.31 for females) and probability of consumption increased by 0.08 with each additional day trapped during the 10‐day trapping session. Uptake rates for raccoons were relatively low compared to other studies and not influenced by competition with opossums. These low consumption rates indicate that additional research addressing the roles of baiting season, bait density, and resource selection will be important to maximize ORV bait uptake by target species in these southeastern landscapes.

59 BASIC BIOLOGICAL SCIENCES↗

Expanding the Pool of Federal Policy Options to Promote Industrial Energy Efficiency

Improving the energy efficiency of industry is essential for maintaining the viability of domestic manufacturing, especially in a world economy where production is shifting to low-cost, less regulated developing countries. Numerous studies have shown the potential for significant cost-effective energy-savings in U.S. industries, but the realization of this potential is hindered by regulatory, information, workforce, and financial obstacles. This report evaluates seven federal policy options aimed at improving the energy efficiency of industry, grounded in an understanding of industrial decision-making and the barriers to efficiency improvements. Detailed analysis employs the Georgia Institute of Technology's version of the National Energy Modeling System and spreadsheet calculations, generating a series of benefit/cost metrics spanning private and public costs and energy bill savings, as well as air pollution benefits and the social cost of carbon. Two of the policies would address regulatory hurdles (Output-Based Emissions Standards and a federal Energy Portfolio Standard with Combined Heat and Power); three would help to fill information gaps and workforce training needs (the Superior Energy Performance program, Implementation Support Services, and a Small Firm Energy Management program); and two would tackle financial barriers (Tax Lien Financing and Energy-Efficient Industrial Motor Rebates). The social benefit-cost ratios of these policies appear to be highly favorable based on a range of plausible assumptions. Each of the seven policy options has an appropriate federal role, broad applicability across industries, utilizes readily available technologies, and all are administratively feasible.

54 ENVIRONMENTAL SCIENCES↗

Making Industry Part of the Climate Solution

Improving the energy efficiency of industry is essential for maintaining the viability of domestic manufacturing, especially in a world economy where production is shifting to low-cost, less regulated developing countries. Numerous studies have shown the potential for significant cost-effective energy-savings in U.S. industries, but the realization of this potential is hindered by regulatory, information, workforce, and financial obstacles. This report evaluates seven federal policy options aimed at improving the energy efficiency of industry, grounded in an understanding of industrial decision-making and the barriers to efficiency improvements. Detailed analysis employs the Georgia Institute of Technology's version of the National Energy Modeling System and spreadsheet calculations, generating a series of benefit/cost metrics spanning private and public costs and energy bill savings, as well as air pollution benefits and the social cost of carbon. Two of the policies would address regulatory hurdles (Output-Based Emissions Standards and a federal Energy Portfolio Standard with Combined Heat and Power); three would help to fill information gaps and workforce training needs (the Superior Energy Performance program, Implementation Support Services, and a Small Firm Energy Management program); and two would tackle financial barriers (Tax Lien Financing and Energy-Efficient Industrial Motor Rebates). The social benefit-cost ratios of these policies appear to be highly favorable based on a range of plausible assumptions. Each of the seven policy options has an appropriate federal role, broad applicability across industries, utilizes readily available technologies, and all are administratively feasible.

54 ENVIRONMENTAL SCIENCES↗

Federal Utility Partnerships & Clean Production of Natural Gas

Karen Thomas from NREL will discuss utility partnership programs with the federal government under the Federal Energy Management Program (FEMP) of the Department of Energy (DOE). These programs offer a way for a utility to partner with federal agencies. She will describe the federal government's ability to work directly with their serving natural gas utility to implement successful energy efficiency projects. Also, Jill Engel-Cox from NREL's Joint Institute for Strategic Energy Analysis will briefly share their analysis to identify opportunities to reduce emissions and increase efficiency of the production and delivery of natural gas.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Thinking Tools for Successful Collaborative Initiatives - 13351

Successful collaboration requires effective communication and collective problem solving. Regardless of the subject area --- environmental remediation, waste management, program planning and budgeting --- those involved must focus their efforts in an orderly and cooperative manner. A thinking tool is a technique used to get individuals to focus on specific components of the task at the same time and to eliminate the 'noise' that accompanies communications among individuals with different objectives and different styles of communicating. For example, one of these thinking tools is a technique which enables a working group to delineate its roles, responsibilities and communication protocols so that it can deliver the right information to the right people at the right time. Another enables a group to objectively and collectively evaluate and improve a policy, plan, or program. A third technique enables a group to clarify its purpose and direction while generating interest and buy-in. A fourth technique makes it possible for a group with polarized opinions to acknowledge their differences as well as what they have in common. A fifth technique enables a group to consider a subject of importance from all perspectives so as to produce a more comprehensive and sustainable solution. These thinking tools make effective communication and collective problem solving possible in radioactive waste management and remediation. They can be used by a wide spectrum of professionals including policy specialists, program administrators, program and project managers, and technical specialists. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Federal Home-to-Work Electric Vehicle Program Guide

This document serves as a comprehensive resource for Federal agencies in developing their own program resources that promote the efficient and effective use of electric vehicles (EVs) for home-to-work travel while ensuring compliance with Federal regulations and sustainability objectives. One mission of the U.S. Department of Energy's Federal Energy Management Program (FEMP) Fleet program is to help federal fleet managers meet or exceed statutory requirements related to energy and environmental performance while improving overall fleet efficiency, reducing costs, and meeting mission requirements. To further this mission, FEMP provides resources to support Federal agencies with increasing alternative fuel vehicle (AFV) acquisitions and reducing petroleum use. EVs are AFVs and help agencies meet federal fleet requirements. Federal fleets include government-owned EVs used for home-to-work travel. The purpose of this document is to serve as a guide for Federal agencies in developing their own internal program documents to manage government-owned EVs used for home-to-work travel. Federal agencies should consult their counsel and consider their own policies and authorities in the implementation of any policies or best practices regarding government-owned EVs used for home-to-work travel. The guide provides key considerations for agencies, including launching a pilot program to fine-tune best practices, conducting a cost-benefit analysis to compare home versus public charging, and exploring cost-effective solutions, such as installing standard outlets instead of dedicated charging stations. The guide underscores the importance of legal and financial considerations, such as verifying agency authority to install home charging infrastructure at an employee's home, ensuring the availability and appropriateness of using agency funds for home charging infrastructure, and understanding the tax implications of reimbursements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Special Report on the "Department of Energy's Efforts to Meet Accountability and Performance Reporting Objectives of the American Recovery and Reinvestment Act"

The purpose of the American Recovery and Reinvestment Act of 2009 (Recovery Act) was to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in health and science, and invest in the Nation's energy future. The Department of Energy will receive an unprecedented $38 billion in Recovery Act funding to support a variety of science, energy, and environmental initiatives. The Recovery Act requires transparency and accountability over these funds. To this end, the Office of Management and Budget (OMB) issued guidance requiring the Department to compile and report a wide variety of funding, accounting, and performance information. The Department plans to leverage existing information systems to develop accounting and performance information that will be used by program managers and ultimately reported to Recovery.gov, the government-wide source of Recovery Act information, and to OMB. The Department's iManage iPortal, a system that aggregates information from a number of corporate systems, will serve as the main reporting gateway for accounting information. In addition, the Department plans to implement a methodology or system that will permit it to monitor information reported directly to OMB by prime funding recipients. Furthermore, performance measures or metrics that outline expected outcomes are being developed, with results ultimately to be reported in a recently developed Department-wide system. Because of the significance of funds provided and their importance to strengthening the Nation's economy, we initiated this review to determine whether the Department had taken the steps necessary to ensure that Recovery Act funds can be appropriately tracked and are transparent to the public, and whether the benefits of the expenditures can be properly measured and reported clearly, accurately, and in a timely manner. Although not yet fully mature, we found that the Department's efforts to develop, refine, and apply the control structure needed to ensure accurate, timely, and reliable reporting to be both proactive and positive. We did, however, identify certain issues relating to Recovery Act performance management, accounting and reporting accuracy, and timeliness that should be addressed and resolved. In particular, at the time of our review: (1) Program officials had not yet determined whether existing information systems will be able to process anticipated transaction increases associated with the Recovery Act; (2) System modifications made to the Department's performance management system to accommodate Recovery Act performance measures had not yet been fully tested and verified; (3) The ability of prime and sub-recipients to properly segregate and report both accounting and performance information had not been determined; (4) There was a lack of coordination between Headquarters organizations related to aspects of Recovery Act reporting. For example, we observed that the Offices of Fossil Energy and Program, Analysis and Evaluation were both involved in developing job creation estimates that could yield significantly different results; and, (5) A significant portion (91 of 142, or 64 percent) of the performance measures developed for the Recovery Act activities were not quantifiable. In some instances, Project Operating Plans had not been finalized and we were not able to verify that all needed performance measures had been developed. Furthermore, the Department had not developed specific metrics to measure federal and contractor jobs creation and retention, an essential Recovery Act objective. The Department had devoted a great deal of time and resources to identifying and mitigating Recovery Act-related risks. For example, the Department developed a risk assessment tool that is intended to assist programs in identifying risks that can prevent its Recovery Act projects from meeting their intended goals. We also found that program staff and management officials at multiple levels were actively engaged in designing Recovery Act-related control and accountability programs. These efforts ranged from updating existing information systems to developing matrices designed to ensure that all required reporting and performance elements were addressed. Each of these activities required substantial effort and was accomplished within a relatively short period. Further, we noted that the Office of the Chief Financial Officer had been instrumental in helping impacted program elements identify issues that could adversely affect the Department's ability to execute its accounting, reporting, and performance monitoring responsibilities. While much has been done, additional work is necessary if the Department is to successfully manage Recovery Act-related risks. For example, as previously noted, OMB has issued guidance establishing Recovery Act monitoring and reporting requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Identification and prioritization of high risk deteriorating support infrastructure - 15475

Identification and prioritization for the re-capitalization of deteriorating waste processing and storage support infrastructure and information technology (IT) is essential for a safe, cost effective, and sustainable waste management program. Funding restraints have limited programs to performing only maintenance on aging infrastructure support systems whose operational costs, technological obsolescence, and reliability risks continue to grow without a disciplined and balanced re-capitalization program. Savannah River Site (SRS) comprises both Department of Energy Environmental Management and NNSA missions, and includes a lab, Savannah River National Laboratory. SRS has developed a crosscutting identification and prioritization tool and process that provides integration of all Site mission support infrastructure re-capitalization requirements and prioritizes into a single database that can be readily accessed for infrastructure investment decisions. This database, referred to as the SRS Critical Integrated Infrastructure Priority List (CIIPL) captures risk data that includes impacts toward safety, regulatory compliance, mission, and cost for inclusion in its prioritization process. Further, the CIIPL provides a status of each entered project's readiness for execution that includes funding source, reliability of current cost estimate, and an out year budget profile. The SRS CIIPL, created in 2009, was initially comprised of re-capitalization projects for the Site's common infrastructure (i.e. shared roads and utilities) that supported all Site missions and activities. As mission program funding became constrained, the value for a Site wide integrated prioritization tool became more apparent and the CIIPL grew to include all Site mission and tenant activities which included safeguards and security requirements. The SRS CIIPL has become a highly effective tool for achieving senior management situational awareness of the Site's most pressing support infrastructure and IT needs. The mission programs have used the CIIPL to prioritize and fund high risk projects within their own program budgets. This past year, the CIIPL was used as a budgeting and decision making tool to allocate funding for two common infrastructures high risk projects for the FY16 Site budget submission and has received laudatory comments from DOE headquarters review teams. The SRS CIIPL and its process can be a benefit to other waste management organizations by demonstrating a proven approach toward the integration of support infrastructure and IT re-capitalization requirements across diverse mission and tenant boundaries. The SRS CIIPL can provide senior management with an objective decision making tool that delivers a balanced evaluation of project requirements in terms of multiple risk criteria; safety, regulatory, mission, and cost impacts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Los Alamos National Laboratory Nuclear Material Management and Storage Program: Storage Health Metrics

The Strategic Materials Sustainment Program (SMSP) supports activities needed to manage the National Nuclear Security Administration’s (NNSA) inventory of strategic materials. As part of the SMSP, the Nuclear Material Management and Storage (NMM&S) program at the Los Alamos National Laboratory (LANL) is responsible for: (1) safe and secure storage of the SMSP strategic materials and others, (2) analysis, forecasting, and management of accountable nuclear materials; and (3) disposition of nuclear material through the Office of Nuclear Materials Integration (ONMI). The nuclear material management (NMM) mission is to ensure efficient nuclear material management lifecycle activities at LANL. The storage program function includes the management of storage capabilities across the site, supply chain management of nuclear materials, storage requirements integration, and nuclear container management (i.e., procurement, compliance, and safety). This report identifies key performance indicators (KPI) and describes the criteria and metrics used to assess the health of the storage component of the NMM&S program. “Health” is the ability of a process, system, facility, or program to safely and reliably accomplish its required mission. A health assessment provides timely identification of significant risks to enable mission performance. Significant risks identified are most effectively mitigated, avoided, or eliminated by evaluating and coordinating with stakeholders to specifically target, document, and often proceduralize strategies directed towards risk reduction. An effective health assessment involves status measurements of specific metrics that are tied directly to representative KPIs for a program. This document will baseline the KPI, criteria, and specific metrics that will be used to measure the “health” of the LANL Storage Program (i.e., NMM is not included).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NCS Program Health Tool

At the end of 2019, there were assessments of multiple safety management programs relied on by NCS that had significant issues identified. Discuss outliers with responders. Better definitions of categories. Expand audience. Move from Excel spreadsheet to web-based.

99 GENERAL AND MISCELLANEOUS↗

Gary Laughlin IHNS Intro to 2015 HPC Annual Report

The International, Homeland, and Nuclear Security (IHNS) Program Management Unit (PMU) oversees a broad portfolio of Sandia’s programs in areas ranging from global nuclear security to critical asset protection. We use science and technology, innovative research, and global engagement to counter threats, reduce dangers, and respond to disasters. The PMU draws on the skills of scientists and engineers from across Sandia. Our programs focus on protecting US government installations, safeguarding nuclear weapons and materials, facilitating nonproliferation activities, securing infrastructures, countering chemical and biological dangers, and reducing the risk of terrorist threats. We conduct research in risk and threat analysis, monitoring and detection, decontamination and recovery, and situational awareness. We develop technologies for verifying arms control agreements, neutralizing dangerous materials, detecting intruders, and strengthening resiliency. Our programs use Sandia’s High-Performance Computing resources for predictive modeling and simulation of interdependent systems, for modeling dynamic threats and forecasting adaptive behavior, and for enabling decision support and processing large cyber data streams. In this report, we highlight four advanced computation projects that illustrate the breadth of the IHNS mission space.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Evaluation of Nondestructive Examination Responses from Chloride-Induced Stress Corrosion Cracks: Fabrication of Base Metal Test Specimens

This report documents efforts to create actual chloride-induced stress corrosion cracks (CISCCs) in stainless-steel specimens for evaluating application of nondestructive examination (NDE) technologies for detection and sizing of CISCC in stainless-steel canisters in dry storage systems (DSSs) for spent nuclear fuel. In the United States, several DSSs for commercial spent nuclear fuel are approaching the end of their initial licensed or certified term. Many of these systems were originally licensed or certified for 20 years, after which the licensing or certification may be renewed for periods up to 40 years, according to Title 10 of the Code of Federal Regulations (10 CFR), Part 72, “Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater than Class C Waste.” Guidance for review of renewal applications is provided in NUREG-1927, Standard Review Plan for Renewal of Spent Fuel Dry Cask Storage System Licenses and Certificates of Compliance. A review of aging effects that could affect important-to-safety structures, systems, and components is required in renewal applications and applicants are required to address aging effects using either a time-limited aging analysis or an aging management program. The U.S. Nuclear Regulatory Commission (NRC) issued NUREG-2214, Managing Aging Processes In Storage (MAPS) Report, which provides guidance on the evaluation of known aging degradation mechanisms to determine if they could affect the ability of dry storage system components to fulfill their safety functions in the 20- to 60-year period of extended operation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Camp Lejeune Federal Fleet Tiger Team EVSE Site Assessment

The National Renewable Energy Laboratory (NREL) was contracted by the Department of Defense (DOD) Environmental Security Technology Certification Program (ESTCP) and the Department of Energy (DOE) Federal Energy Management Program (FEMP) to develop a web tool and complete pilot assessments for the installation of Electric Vehicle Supply Equipment (EVSE). NREL has deployed Tiger Teams comprising engineers and fleet experts to support DOD and DOE on several EVSE site assessments since 2015. However, the advancements developed in support of this report, including a cost-estimation tool and geospatial mapping tool, will enable a user-driven path to assess EVSE needs. This report details the site design recommendations for Camp Lejeune, North Carolina.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Advanced Microturbine Systems

In July 2000, the United Technologies Research Center (UTRC) was one of five recipients of a US Department of Energy contract under the Advanced Microturbine System (AMS) program managed by the Office of Distributed Energy (DE). The AMS program resulted from several government-industry workshops that recognized that microturbine systems could play an important role in improving customer choice and value for electrical power. That is, the group believed that electrical power could be delivered to customers more efficiently and reliably than the grid if an effective distributed energy strategy was followed. Further, the production of this distributed power would be accomplished with less undesirable pollutants of nitric oxides (NOx) unburned hydrocarbons (UHC), and carbon monoxide (CO). In 2000, the electrical grid delivered energy to US customers at a national average of approximately 32% efficiency. This value reflects a wide range of powerplants, but is dominated by older, coal burning stations that provide approximately 50% of US electrical power. The grid efficiency is also affected by transmission and distribution (T&D) line losses that can be significant during peak power usage. In some locations this loss is estimated to be 15%. Load pockets can also be so constrained that sufficient power cannot be transmitted without requiring the installation of new wires. New T&D can be very expensive and challenging as it is often required in populated regions that do not want above ground wires. While historically grid reliability has satisfied most customers, increasing electronic transactions and the computer-controlled processes of the 'digital economy' demand higher reliability. For them, power outages can be very costly because of transaction, work-in-progress, or perishable commodity losses. Powerplants that produce the grid electrical power emit significant levels of undesirable NOx, UHC, and CO pollutants. The level of emission is quoted as either a technology metric or a system-output metric. A common form for the technology metric is in the units of PPM {at} 15% O2. In this case the metric reflects the molar fraction of the pollutant in the powerplant exhaust when corrected to a standard exhaust condition as containing 15% (molar) oxygen, assuring that the PPM concentrations are not altered by subsequent air addition or dilution. Since fuel combustion consumes oxygen, the output oxygen reference is equivalent to a fuel input reference. Hence, this technology metric reflects the moles of pollutant per mole of fuel input, but not the useful output of the powerplant-i.e. the power. The system-output metric does embrace the useful output and is often termed an output-based metric. A common form for the output-based metric is in the units of lb/MWh. This is a system metric relating the pounds of pollutant to output energy (e.g., MWh) of the powerplant.

01 COAL, LIGNITE, AND PEAT↗

Best Practices for Energy Management Information Systems Metadata Schemas

The Federal Energy Management Program (FEMP) promotes best practices for impactful utilization of Energy Management Information Systems (EMIS) at federal facilities. This best practice document is part of a series of fact sheets created to help accelerate the market adoption and use of EMIS in the federal sector. The use of standard naming conventions and a metadata schema, which may be referred to as 'data tags,' improves the ability of the EMIS to consistently analyze, visualize, and derive value from operational data. To help address these issues, this fact sheet highlights best practices for use of metadata in an EMIS stack, which can significantly reduce the initial time required to deploy an EMIS.

EMIS↗