Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power system simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

RAPID

Parallel computer code for the simulator for dynamics of power systems which has the capability to initiate the system and create different faults for the dynamic analysis. The code is based on time-parallel method (Parareal) with Adaptive Method Reduction (AMR). The coarse solvers for the Parareal algorithm include several Semi Analytical Solution methods. Also, Integrated simulation of coupled transmission and distribution systems can be studied.

Simunovic, Srdjan [Oak Ridge National Lab. (ORNL),↗

Evaluating Interconnection Queue Impacts Using Hosting Capacity Analysis

The interconnection queue has been identified as a bottleneck in the efforts to shift the nations generation resources towards renewable sources and meet various state and federal goals. Efforts such as the interconnection innovation e-Xchange (i2X) are therefore trying to come up with ways in which the queue could be altered to make interconnection faster, cheaper, and fairer. This paper proposes using hosting capacity analysis methods to simulate the evolution of a power system as new resources are added. Modeling the interconnection process in this way enables simulation based study of various policy decisions for queue management and cost allocation. Sample results are presented to illustrate how some queue modifications might play out both in distribution and transmission systems.

Distributed Energy Resources, Interconnection↗

Electrical substation grid testbed for DLT applications of electrical fault detection, power quality monitoring, DERs use cases and cyber-events

Electrical utilities continue to deploy more intelligent electronic devices (IEDs) inside and outside electrical substation, and are associated with customer-owned distributed energy resources (DERs). The integrity and confidentiality of data from these IEDs, like power meters and protective relays, is crucial. Blockchain technology could improve the resilience of microgrids by improving the security of data sharing. The penetration of customer-owned DERs (renewable energy sources) and the increasing deployment of IEDs can lead to integrate power system applications with Distributed Ledger Technology (DLT). In this study, we implemented the electrical faulted phase detection and power quality monitoring algorithms with a Cyber Grid Guard (CGG) system using DLT. In addition, the DERs (wind turbine farms) use case and protective relay cyber-event tests were assessed, by using the CGG system with DLT. In the experimental model, the testbed was created by using a real-time simulator and CGG system with power meters/ protective relays in-the-loop. The data collected from the CGG system and IEDs were compared with the same time stamp source. These results had shown the successful assessment of protection, control and monitoring applications using a CGG system with DLT. In the future, the ESGT with DERs and the CGG system will be used in other power system applications, based on implementing smart contracts between electrical utilities with customer-owned DERs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrical Fault and Power Quality Detection Algorithms and Customer-Owned DERs Monitoring with a Cyber Grid Guard System and DLT

In this study, the electrical fault and power quality detection algorithms and customer-owned DERs monitoring use cases were implemented, with a Cyber Grid Guard system and DLT. Electrical utilities continue to deploy more intelligent electronic devices (IEDs) inside and outside electrical substations, and are associated with customer-owned distributed energy resources (DERs). Data from these IEDs, such as power meters and protection relays, must be kept confidential and of high integrity. Blockchain technology has the potential to increase microgrid resilience by enhancing data sharing security. The growing use of IEDs and customer-owned renewable energy sources (DERs) may make it necessary to connect Distributed Ledger Technology (DLT) with power system applications. We implemented the electrical faulted phase detection and power quality monitoring algorithms with a Cyber Grid Guard (CGG) system using DLT. In addition, the DERs (wind turbine farms) use case and protective relay cyber-event tests were assessed, by using the CGG system with DLT. In the experimental model, the testbed was created by using a real-time simulator and CGG system with power meters/ protective relays in the loop. The data collected from the CGG system and IEDs were compared with the same time stamp source. These results showed the successful assessment of protection, control and monitoring applications using a CGG system with DLT. In the future, power system applications for the ESGT with DERs and the CGG system will be based on executing smart contracts between electrical utilities and customer-owned DERs.

Piesciorovsky, Emilio↗

Transmission Operator Workflows for Real-Time Reliability Studies: A Review of Control Room Practices and Naturalistic Decision Making

This report provides an overview of real-time reliability study tools and their use by power system operators in the control room environment. After introducing some of the nuances of the control room environment and the differences in perspectives between power system engineers and operators, the roles and responsibilities of key entities involved in RTCA workflows are introduced. These are specifically the transmission system operator (TOP) and reliability coordinator (RC), which are required to run tools such as real-time contingency analysis (RTCA) as part of a real-time reliability assessment every 30 minutes, as dictated by a series of standards issued by the North American Electric Reliability Corporation (NERC). The process by which power systems operators operate the grid is discussed in terms of naturalistic decision making (NDM) and the recognition-primed decision-making (RPD) model. This cognitive model describe how experts working in high-risk, high-stress environments make safety-critical decisions under uncertainty and time pressure. For power system operators, the mental simulations involved in the traditional RPD model are supplemented by physics-based simulations using numerical tools, such as RTCA, to improve situational awareness and effectiveness of control actions. Next, a generic workflow is introduced to describe operator decision making for running RTCA tools and responding to system violations on a pre-contingent basis. The types of analysis performed and control actions chosen by power system operators are described in detail. The overall high-level workflow is then expanded in subsequent sections, with special attention given to high-voltage violations, low-voltage violations, and thermal overloads. Each type of violation is described in detail, with explanations of common causes, impacts on equipment and customers, and mitigation strategies. An additional workflow diagram is provided for each type of violation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SINFAC simulation of a high-power hybrid CPL

The systems improved numerical fluids analysis code (SINFAC) was used to model a high-power hybrid capillary-pumped loop. A comparison was made between the simulation results and actual experimental test data for the mechanical-pump-assist mode of operation. The hybrid capillary-pumped loop consisted of a capillary-pumped loop with a mechanical pump in the liquid return line with a bypass value so that the system could be operated either as a capillary-only loop or a series hybrid loop. Excellent agreement was obtained between numerical and experimental data.

Benner, Steve M.↗

Power electronic applications for Space Station Freedom

NASA plans to orbit a permanently manned space station in the late 1990s, which requires development and assembly of a photovoltaic (PV) power source system to supply up to 75 kW of electrical power average during the orbital period. The electrical power requirements are to be met by a combination of PV source, storage, and control elements for the sun and eclipse periods. The authors discuss the application of power electronics and controls to manage the generation, storage, and distribution of power to meet the station loads, as well as the computer models used for analysis and simulation of the PV power system. The requirements for power source integrated controls to adjust storage charge power during the insolation period current limiting, breaker interrupt current values, and the electrical fault protection approach are defined. Based on these requirements, operating concepts have been defined which then become drivers for specific system and element design.

Pickrell, Roy L.↗

A real-time, dual processor simulation of the rotor system research aircraft

A real-time, man-in-the loop, simulation of the rotor system research aircraft (RSRA) was conducted. The unique feature of this simulation was that two digital computers were used in parallel to solve the equations of the RSRA mathematical model. The design, development, and implementation of the simulation are documented. Program validation was discussed, and examples of data recordings are given. This simulation provided an important research tool for the RSRA project in terms of safe and cost-effective design analysis. In addition, valuable knowledge concerning parallel processing and a powerful simulation hardware and software system was gained.

Mackie, D. B.↗

Analytical Models of Frequency and Voltage in Large-Scale All-Inverter Power Systems

Low-order frequency response models for power systems have a decades-long history in optimization and control problems such as unit commitment, economic dispatch, and wide-area control. With a few exceptions, these models are built upon the Newtonian mechanics of synchronous generators, assuming that the frequency dynamics across a system are approximately homogeneous, and assume the dynamics of nodal voltages for most operating conditions are negligible, and thus are not directly computed at all buses. As a result, the use of system frequency models results in the systematic underestimation of frequency minimum nadir and maximum RoCoF, and provides no insight into the reactive power-voltage dynamics. This paper proposes a low-order model of both frequency and voltage response in grid-forming inverter-dominated power systems. The proposed model accounts for spatial-temporal variations in frequency and voltage behavior across a system and as a result, demonstrates the heterogeneity of frequency response in future renewable power systems. Electromagnetic transient (EMT) simulations are used to validate the utility, accuracy, and computational efficiency of these models, setting the basis for them to serve as fast, scalable alternatives to EMT simulation, especially when dealing with very large-scale systems, for both planning and operational studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stabilizing Inverter-Based Transmission Systems: Power Hardware-in-the-Loop Experiments with a Megawatt-Scale Grid-Forming Inverter

This article presents what the authors believe to be the first experimental verification of the ability of grid-forming (GFM) inverters to stabilize a transmission electric power system that is otherwise unstable. The experiments described here were performed using power hardware-in-the-loop (PHIL) simulation to connect a megawatt-scale battery inverter to a real-time electromagnetic transient (EMT) simulation of the near-future Maui power system. This allows the dynamic interactions between the inverter and the power system to be observed without putting the real power system at risk. The ability to use the actual inverter hardware removes the need to rely on a computer model approximation of the inverter's behavior.

electromagnetic transient simulations↗

The importance of capturing power system operational details in resource adequacy assessments

Traditional methods for assessing the resource adequacy (RA) of a power system are becoming obsolete due to emerging trends such as the increasing deployment of variable renewable energy and storage. Consequently, analysts are recommending that RA be assessed using a Monte Carlo simulation approach that models chronological power system operations over many instances of possible operating conditions. However, this approach is necessarily more complex and computationally demanding, which is an obstacle to real-world implementation. Here, in this study, we investigate which operational details of power systems are important to capture in order to accurately evaluate a system's RA, versus details that add complexity but do not meaningfully affect RA results. To do so, we develop a probabilistic RA assessment framework by adapting an existing production cost model and apply it to a case study based on the IEEE Reliability Test System. Our results indicate that multi-year data, storage dispatch, and transmission limits are key details to incorporate. Accurate RA results can be obtained using non-economic dispatch strategies as long as they are coordinated with detailed operational strategies. We also demonstrate how popular expectation-based RA metrics can mask important differences in the characteristics of loss of load events.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Aquarius's Instrument Science Data System (ISDS) Automated to Acquire, Process, Trend Data and Produce Radiometric System Assessment Reports

The Aquarius Radiometer, a subsystem of the Aquarius Instrument required a data acquisition ground system to support calibration and radiometer performance assessment. To support calibration and compose performance assessments, we developed an automated system which uploaded raw data to a ftp server and saved raw and processed data to a database. This paper details the overall functionalities of the Aquarius Instrument Science Data System (ISDS) and the individual electrical ground support equipment (EGSE) which produced data files that were infused into the ISDS. Real time EGSEs include an ICDS Simulator, Calibration GSE, Labview controlled power supply, and a chamber data acquisition system. ICDS Simulator serves as a test conductor primary workstation, collecting radiometer housekeeping (HK) and science data and passing commands and HK telemetry collection request to the radiometer. Calibration GSE (Radiometer Active Test Source) provides source choice from multiple targets for the radiometer external calibration. Power Supply GSE, controlled by labview, provides real time voltage and current monitoring of the radiometer. And finally the chamber data acquisition system produces data reflecting chamber vacuum pressure, thermistor temperatures, AVG and watts. Each GSE system produce text based data files every two to six minutes and automatically copies the data files to the Central Archiver PC. The Archiver PC stores the data files, schedules automated uploads of these files to an external FTP server, and accepts request to copy all data files to the ISDS for offline data processing and analysis. Aquarius Radiometer ISDS contains PHP and MATLab programs to parse, process and save all data to a MySQL database. Analysis tools (MATLab programs) in the ISDS system are capable of displaying radiometer science, telemetry and auxiliary data in near real time as well as performing data analysis and producing automated performance assessment reports of the Aquarius Radiometer.

Source record↗

A Multi-Function AAA Algorithm Applied to Frequency Dependent Line Modeling

Modeling of power distribution system components that are valid for a wide range of frequencies are crucial for highly accurate modeling of electromagnetic transient (EMT) events. This has recently become of interest due to the improvements needed for the resilient operation of distribution systems. Vector fitting (VF) is a very popular and commonly used algorithm for wide band representations of power system components in EMT simulations. In this research, we present a new multi-input rational approximation algorithm (MIAAA) and illustrate its advantages with respect to VF using examples of approximations of admittance matrices discussed in the literature. We show that MIAAA not only outperforms VF in terms of achieving better accuracy using lesser number of poles, but also has no numerical issues achieving convergence. In contrast to VF, MIAAA is not sensitive to the location of input sample points and it does not require good estimates for the location of the desired approximation poles. The novelty of this research work is the use of recent mathematical results to solve existing challenges in distribution system modeling and to develop rational approximations for power system models that intend to be optimal in terms of accuracy and performance.

41 EE - Solar Energy Technologies Office (EE-4S)↗

A MIMO AAA Agorithm for Frequency Dependent Line Modeling

Modeling of power distribution system components that are valid for a wide range of frequencies are crucial for highly accurate modeling of electromagnetic transient (EMT) events. This has recently become of interest due to the improvements needed for the resilient operation of distribution systems. Vector fitting (VF) is a very popular and commonly used algorithm for wide band representations of power system components in EMT simulations. In this research, we present a new multi-input rational approximation algorithm (MIAAA) and illustrate its advantages with respect to VF using examples of approximations of admittance matrices discussed in the literature. We show that MIAAA not only outperforms VF in terms of achieving better accuracy using lesser number of poles, but also has no numerical issues achieving convergence. In contrast to VF, MIAAA is not sensitive to the location of input sample points and it does not require good estimates for the location of the desired approximation poles. The novelty of this research work is the use of recent mathematical results to solve existing challenges in distribution system modeling and to develop rational approximations for power system models that intend to be optimal in terms of accuracy and performance.

AAA algorithm↗

Thermal Simulator Development: Non-Nuclear Testing of Space Fission Systems

Non-nuclear testing can be a valuable tool in the development of a space nuclear power system. At the NASA MSFC Early Flight Fission Test Facility (EFF-TF), highly designed electric heaters are used to simulate the heat from nuclear fuel to test space fission power and propulsion systems. To allow early utilization, nuclear system designs must be relatively simple, easy to fabricate, and easy to test using non-nuclear heaters to closely mimic heat from fission. In this test strategy, highly designed electric heaters are used to simulate the heat from nuclear fuel, allowing one to develop a significant understanding of individual components and integrated system operation without the cost, time and safety concerns associated with nuclear testing.

Bragg-Sitton, Shannon M.↗

Power systems testing

The Space Station Freedom (SSF) will give the U.S. a permanent manned presence in space in 1999. The SSF underwent its final design concept in 1991. Launches of hardware will begin in late 1995, and the SSF will become operational in the man tended configuration in 1997. Additional Space Shuttle flights between 1997 and 1999 will complete the SSF. Along with international partners, a crew of four astronauts will conduct long-term experimentation in the microgravity environment of the orbiting spacecraft. Lewis Research Center, along with its prime contractor, will provide the electrical power system (EPS) for SSF. Two major testing facilities at the Lewis Research Center will support the Lewis EPS. The Power Systems Facility provides test beds for life testing the station batteries and the power management distribution system testbed. This testbed simulates two channels of the EPS. The Space Power Facility at the Lewis Plum Brook Station is the largest vacuum chamber in the world. Within this chamber, a simulated space environment, testing of full-size EPS components will occur.

Source record↗

Acquire and Test IDAES Framework Components

The cooperation under the Grid Modernization Initiative and the Applied Energy Tri-Laboratory umbrellas requires mutual understanding of capabilities and a common effort to identify gaps existing in the available computational modeling and analysis tools. In this work, we report acquisition and testing of the National Energy Technology Laboratory’s Institute for the Design of Advanced Energy Systems (IDAES) framework, particularly including both electric power systems production cost model simulator Prescient as well as system optimization IDAES itself. Further, we consider the methods in which developments in Prescient and IDAES for grid-energy simulation and optimization may be included in the Framework for Optimization of ResourCes and Economics (FORCE) ecosystem that has been under collaborative development by Idaho National Laboratory, Argonne National Laboratory, and Oak Ridge National Laboratory. We propose two integration methods to introduce Prescient and IDAES into existing FORCE automated workflows. One integration involves using Prescient as a market reduced-order model and IDAES models similar to how existing Modelica models are used. The other integration involves wrapping the Prescient-IDAES dispatch optimization process with the stochastic capacity optimization workflow in FORCE.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SPS large array simulation

Three types of computer simulations were developed to study the SPS microwave power transmission system (MPTS). The radially symmetric array simulation is low cost and is utilized to investigate general overall characteristics of the spacetenna at the array level only. "Tiltmain", a subarray level simulation program, is used to study the effects of system errors which modify the far-field pattern. The most recently designed program, "Modmain," takes the detail of simulation down to the RF module level and so to date is the closest numerical model of the reference design.

Rathjen, S.↗