Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “educational program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Natural Resources Assessment for the SNS Second Target Station, Oak Ridge, Tennessee

The US Department of Energy’s Oak Ridge National Laboratory (ORNL) is a leading institution in advanced materials, supercomputing, neutrons, and nuclear science. As a research laboratory managed by UT-Battelle, LLC for DOE, ORNL has national priorities in energy, security, and scientific discovery that necessitate facility improvements and expansions. DOE is also committed to environmental stewardship. The laboratory is located on the ~32,000-acre Oak Ridge Reservation (ORR), much of which is categorized as a National Environmental Research Park and a state Wildlife Management Area. DOE works with the Tennessee Wildlife Resources Agency (TWRA), Tennessee Department of Environment and Conservation (TDEC), US Fish and Wildlife Service (USFWS), US Department of Agriculture, and other agencies to serve as an effective steward of the ORR. Accordingly, project managers must conform to environmental regulations, agreements, and policies at the federal, state, and institutional levels. Per 40 CFR (Code of Federal Regulations) 1508.14, potential effects on research and science education on the National Environmental Research Park represent potential impacts of federal actions. Moreover, federal actions that affect the quantity and quality of hunting opportunities and deer reduction harvest on the Oak Ridge Wildlife Management Area must be considered whenever other aspects of the human environment (as defined by NEPA) are affected. The Spallation Neutron Source (SNS) is a premiere facility at ORNL that provides advanced capabilities in neutron scattering to promote new discoveries and research opportunities in material sciences, physics, chemistry, biological sciences, and others. A conceptual design for a Second Target Station (STS) has been in consideration for several years. The STS is intended to complement and enhance existing ORNL capabilities, notably research and exploration of complex materials. The proposed STS will involve development of existing natural areas on the ORR, which might contain sensitive resources that require mitigation or avoidance in accordance with existing policies and regulation. This report summarizes current knowledge of natural and cultural resources within the STS project area. At the time of this report, the proposed STS project consisted of an operations area comprising 55.4 acres (22.4 ha) and a total review area for potential construction comprising ~224 acres (90.6 ha). The review area is located primarily within forested natural areas of the ORR with minor development in the form of power-line rights-of-way and secondary/graveled roads (Figure 1). The primary goal was to evaluate potential effects on sensitive resources that might result from development of the STS. In addition to onthe-ground surveys during summer 2009 and fall 2019 to summer 2020 by ORNL Natural Resources Management Program and Aquatic Ecology Group staff, this report makes use of historical (pre-1995) and contemporary (1995 to present) data from additional confirmed sources (e.g., TDEC). Likewise, forest conditions were compiled primarily from a 2013 forest inventory effort for Forest Management Compartment 17 and supplemented with limited ground observations in 2019. The individuals who obtained and compiled the data that are presented here are familiar with and routinely assess sensitive resources on the ORR.

54 ENVIRONMENTAL SCIENCES↗

Review of Particle Physics

The Review summarizes much of particle physics and cosmology. Using data from previous editions, plus 3,200 new measurements from 903 papers, we list, evaluate, and average measured properties of gauge bosons and the recently discovered Higgs boson, leptons, quarks, mesons, and baryons. We summarize searches for hypothetical particles such as supersymmetric particles, heavy bosons, axions, dark photons, etc. Particle properties and search limits are listed in Summary Tables. We give numerous tables, figures, formulae, and reviews of topics such as Higgs Boson Physics, Supersymmetry, Grand Unified Theories, Neutrino Mixing, Dark Energy, Dark Matter, Cosmology, Particle Detectors, Colliders, Probability and Statistics. Most of the 118 reviews are updated, including many that are heavily revised.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Wafer-Free Crystalline Silicon Solar Cells (CRADA Final Report)

This CRADA project, based on the DOE Solar Energy Technologies Office (SETO) Solar Prize Voucher program, helped Leap Photovoltaics to develop methodologies to immobilize Si particles by permanently attaching them to an Al-coated substrate and thereby forming carrier-selective electrical contacts to the Si particles. The bigger goal was to help Leap Photovoltaics develop these immobilized and contacted particle arrays into relatively efficient, inexpensive, and industrially relevant solar cells. By using Si particles instead of wafers in a solar cell absorber layer, one can avoid costs associated with growing monocrystalline Si ingots, then diamond-sawing them into wafers, then processing wafers into cells – a mainstream practice in today's high-efficiency Si cell and module technology. Monocrystalline or polycrystalline Si particles can be obtained in various ways: for example, Si kerf from wafer sawing is monocrystalline; recycled Si cell wafers can be ball-milled into particles; particles can be grown using various gas-phase techniques (mostly from SiH4). These Si particles can be assembled onto a substrate and serve as an absorber layer for the solar cell, absorbing photons to generate photocarriers. The challenge with this technique is to collect photocarriers from individual Si particles, with separation of photogenerated electrons to the negative cell’s electrode and positive photogenerated holes to the positive electrode. Therefore, each particle must have two isolated, carrier-selective contacts: one for electrons and one for holes. Plus, particles need to be immobilized onto a solid substrate. The goal of this work was focused on the immobilization of Si particles and creating hole-selective contact to them at the same time, using industrially relevant Si photovoltaic (PV) cell technology: screen printing of Al back-surface field electrodes. This is used in the mainstream Propane Education and Research Council (PERC) technology for hole-collecting contacts at the back of the cell. The work performed at NREL consisted of screen printing of Al metal paste on substrates, spreading Si particles onto it, and thermally processing the structures to form hole-collecting contacts. The final structures were investigated by scanning electron microscopy (SEM) after focused ion beam (FIB) cross-sectioning and polishing. The work was done jointly by NREL staff and Leap Photovoltaics (Leap PV) employees stationed at NREL. The samples were then taken to Leap PV for further processing. Training the Leap PV employee on various NREL techniques (laser cutting, screen printing, thermal processing, characterization) was part of the scope.

14 SOLAR ENERGY↗

Precision Measurement of Net-Proton-Number Fluctuations in Au + Au Collisions at RHIC

We report precision measurements on cumulants (𝐶 𝑛 ) and factorial cumulants (𝜅 𝑛 ) of (net) proton number distributions up to fourth order in Au + Au collisions over center-of-mass energies $\sqrt{s_{NN}}$ = 7.7–27 GeV from phase II of the Beam Energy Scan program at RHIC. (Anti)protons are selected at midrapidity (|𝑦| < 0.5) within a transverse momentum range of 0.4 < 𝑝 𝑇 < 2.0 GeV/𝑐. Relative to various noncritical-point model calculations and peripheral collision 70%–80% data, the net proton 𝐶 4 /𝐶 2 measurement in 0%–5% collisions shows a minimum around 19.6 GeV for significance of deviation at ∼2–5⁢𝜎. A minimum in 𝐶 4 /𝐶 2 with respect to a noncritical baseline is expected to be a characteristic feature of the signature associated with a critical point in the QCD phase diagram. In addition, deviations from noncritical baselines around the same collision energy region are also seen in proton factorial cumulant ratios, especially in 𝜅 2 /𝜅 1 and 𝜅 3 /𝜅 1 . As a result, dynamical model calculations including a critical point are called for in order to understand these precision measurements.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

1. Physical Security Engineering by Design for Nuclear Facilities; 2. Nuclear Power Plant Site Security Management – A Security Strategy; 3. The UAE Women in Nuclear Energy Security

1. Security by design, or SeBD, is a comprehensive approach that integrates the physical protection system of a nuclear plant into every stage of its existence. This includes planning, designing, constructing, commissioning, and operating the facility, using a combination of analytical, physical, technological, and procedural measures. Essentially, SeBD involves intentionally applying and incorporating security into all aspects of design and operation throughout the entire lifecycle of a facility. By implementing this methodology throughout various phases such as program development, process implementation, staff training and procedures management in conjunction with plant equipment, facilities can be optimized to minimize security risks without compromising functional design requirements. This ultimately improves the overall security posture of the site and reduces the need for costly modifications or additional security resources post-design. 2. A site security strategy is a living document that is revised on a periodic or event-driven basis, ensuring that site security operations and corresponding procedures provide long-term, effective protection for the entire nuclear power plant (NPP) site. A site security strategy aims to mitigate threats across the entire NPP site via in-depth defense approaches and mutual support; therefore, if a layer is omitted or altered, then the effect across all layers must be re-evaluated. Therefore, the aim of the site security strategy is to provide an appropriate, scalable security regime that deters, denies, delays, and detects incidents and, equally importantly, reassures legitimate users and the regulator that due diligence and regulatory compliance have been achieved, ensuring that the site is safe and secure. Robust access control for vehicles and pedestrians is at the heart of the strategy. Vehicle and pedestrian searching and screening are seen as the strongest mitigation methods against vehicle- and pedestrian-borne attacks. The security strategy must also be supported through comprehensive staff training and the development of robust processes, procedures, and planning. If all these measures are to be effective, then training must be implemented during each phase of construction, partial operation/commissioning, and full operation. No single element of site security is completely isolated from the influence of other elements. Ideally, consideration of all key elements will result in a security strategy that is integrated and proportional to the threat and that does not over specify individual security solutions through the application of isolated measures but rather applies a holistic, all-encompassing approach. 3. When women enter the labor force, numerous positive outcomes emerge, including increased GDP, educational gains, and decreased maternal mortality. Despite these benefits, women's employment rates and equality vary significantly worldwide as does support for women in the workforce. This paper will explore the multifaceted benefits of women's employment, the factors influencing labor force participation rates, and the urgency to achieve gender equality as outlined in the 2015 United Nations Sustainable Development Goals (SDGs). It will then examine the emerging presence of women in the traditionally male-dominated nuclear field, specifically within the United Arab Emirates (UAE) as a testament to their resilience and determination to break social norms and advance gender equality.

Zineddin, Dr. Z.↗

Mortality among workers at the Rocky Flats Plant, 1951–2017

The Rocky Flats (RFs) Plant operated from 1951–1989 as part of the U.S. Department of Energy (DOE) nuclear complex. Its primary mission was weapons component fabrication, whereby workers were potentially exposed to radioactive and non-radioactive hazards. RF worker mortality was compared to the general population, and dose-response relationships between mortality and radiation organ doses were examined. RF workers first employed between 1951 and 1979 for ⩾30 d were identified (n = 9397). Vital status was determined using national and state death records up to 2017. Organ doses from external photons and neutrons irritation and internalised plutonium (Pu), americium (Am), and uranium (U) were modelled as cumulative lagged total doses per year. Beryllium exposure was evaluated as an effect modifier using data from the DOE Nationwide Beryllium Medical Program. Statistical analyses included standardised mortality ratios (SMRs), Cox proportional hazard models, and excess relative risk (ERR) models. Approximately 53.2% of workers were deceased by the end of the study. Nearly 90% were monitored for radiation exposure, with a mean weighted absorbed dose of 59.0 mGy for the lungs. Nearly 45% of workers had intakes of alpha-particle emitting radionuclides, and 46.7% were monitored for neutrons. Leading causes of death included ischemic heart disease (n = 999) and lung cancer (n = 361). The highest SMRs were observed for berylliosis (SMR: 176.9; 95% CI: 76.2, 348.7; n < 10) and asbestosis (SMR: 4.65; 95% CI: 2.23, 8.55; n = 10). Dose-response analyses showed no statistical increase in risk from low-dose radiation including lung cancer (ERR per 100 mGy: −0.02; 95% CI: −0.11, 0.08; n = 361) and Parkinson’s disease (ERR per 100 mGy: 0.13; 95% CI: −0.26, 0.31; n = 57). Approximately 45% of workers were monitored for beryllium, with a weak non-significant indication of effect modification for lung cancer risk. The RF cohort showed no evidence of a statistically significant increase in mortality from occupational radiation exposure. However, this study was limited by low statistical power, which inhibits the ability to detect effects. Future pooling of Million Person Study (MPS) cohorts will provide further insights, particularly regarding Pu as a carcinogen.

61 RADIATION PROTECTION AND DOSIMETRY↗

Sensitive Resources Assessment and Forest Analysis for the Proposed Versatile Test Reactor, Oak Ridge, Tennessee

The US Department of Energy’s (DOE’s) Oak Ridge National Laboratory (ORNL) is a leading institution in advanced materials, supercomputing, neutrons, and nuclear science. As a research laboratory managed by UT-Battelle, LLC for DOE, ORNL has national priorities in energy, security, and scientific discovery that necessitate facility improvements and expansions. DOE is also committed to environmental stewardship. The laboratory is located on the ~32,000-acre (~13,000-ha) Oak Ridge Reservation (ORR), much of which is categorized as a National Environmental Research Park (NERP) and a state Wildlife Management Area. DOE works with the Tennessee Wildlife Resources Agency (TWRA), Tennessee Department of Environment and Conservation (TDEC), US Fish and Wildlife Service (USFWS), US Department of Agriculture, and other agencies to serve as an effective steward of the ORR. Accordingly, project managers must conform to environmental regulations, agreements, and policies at the federal, state, and institutional levels. Per 40 CFR (Code of Federal Regulations) 1508.14, potential effects on research and science education also represent potential effects of federal actions on the NERP, and impacts on, e.g., deer harvest, must be considered on the Oak Ridge Wildlife Management Area when other aspects of the human environment are affected. The United States currently has no fast neutron testing capability to support advanced nuclear research and development. The proposed Versatile Test Reactor (VTR) will take advantage of current investments by the US government and private industry in nuclear reactors to expedite the design and construction process, using proven technology to create a world-class scientific infrastructure. The VTR will take advantage of fast neutrons provided by this proven technology, along with a capability to rapidly insert, conduct, and remove state-of-the-art experiments. An advantage of the VTR is that it can support future innovations in experimental capabilities without modifying the facility. The VTR will support progress in a variety of science and technology areas, including testing and qualification of advanced reactor fuels; testing and qualification of innovative structural materials; testing of innovative components and instruments; validation of advanced modeling and simulation tools; and versatility for future technical missions. Through proven technology, the VTR can take advantage of existing reactor designs and operating experience to reduce the risk, cost, and time for design and construction. The top available resources of DOE laboratories, industry, and universities will be used to expedite reactor design and construction toward developing the scientific infrastructure that affords a strong testing capability that can be sustained over many years. This report summarizes current knowledge of natural and cultural resources primarily within the VTR construction area. At the time of this report, the proposed VTR site design includes a construction area of ~150.4 acres (~69.9 ha), which contains an ~51.3-acre (~20.8-ha) operations area, located within forested natural areas of the ORR. The primary goal of the work presented here was to evaluate potential effects on sensitive resources that might result from development and construction activities associated with VTR. In addition to on-the-ground surveys during spring and summer 2020 by the ORNL Natural Resources Management Program and Aquatic Ecology Group staff, this report makes use of historical (pre-1995) and contemporary (1995 to present) data from additional confirmed sources (e.g., TDEC). Likewise, forest conditions were compiled from a 2011 forest inventory and supplemented with limited ground observations in 2020. The individuals who obtained and compiled the data presented here are familiar with and routinely assess sensitive resources on the ORR. Anyone who references this report must consider that the timing of surveys did not permit a complete delineation of the resources that will be affected. If the VTR project proceeds, additional surveys will be required to account for the seasonal patterns of various threatened and endangered species. Data deficiencies and potential resources that likely went undetected are indicated where possible. Accordingly, this report should facilitate more environmentally sound decisions during planning and 2 development of the VTR site, provide a foundation for further assessment of sensitive and cultural resources, and help project managers better address regulatory guidance and DOE policies on sustainable development in compliance with, for example, the US Endangered Species Act (ESA), Migratory Bird Treaty Act (MBTA), Tennessee Rare Plant Protection and Conservation Act of 1985, Tennessee Nongame and Endangered or Threatened Wildlife Species Conservation Act of 1974, several federal and state regulations regarding aquatic resource protection, and site-specific policies as outlined in various ORR management plans developed by ORNL and TWRA for DOE.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Measurement of fifth- and sixth-order fluctuations of (net-)proton number in Au + Au collisions from phase II of the beam energy scan program at RHIC

We report high-statistics measurements of fifth- and sixth-order factorial cumulants and cumulant ratios of (net-)proton multiplicity distributions in Au+Au collisions at $\sqrt{s_{NN}}$ = 7.7–27GeV, using data from the STAR experiment collected during the Beam Energy Scan Phase II at RHIC. Protons and antiprotons are identified at midrapidity (|𝑦| < 0.5) with transverse momentum 0.4 < 𝑝 𝑇 < 2.0GeV/𝑐. The proton factorial cumulants 𝜅 4 , 𝜅 5 , and 𝜅 6 increase with order but exhibit no sign alternation within current uncertainties, offering no evidence for a two-component structure in the proton multiplicity distribution, as might be expected near a first-order phase transition. The cumulant ratios 𝐶 5 /𝐶 1 and 𝐶 6 /𝐶 2 fluctuate around zero in collisions at 0–40% centrality. The results are consistent with both the negative predictions from lattice QCD and the positive trends obtained from the ultrarelativistic quantum molecular dynamics (UrQMD) model. At $\sqrt{s_{NN}}$ ≳ 27GeV, the 𝐶 4 /𝐶 2 and 𝐶 5 /𝐶 1 results are compatible with predictions from lattice QCD, functional renormalization group (FRG), and hadron resonance gas (HRG) models, while UrQMD describes the data better at lower energies. Here, these measurements place constraints on baryon number fluctuations and offer valuable insights into the QCD phase structure.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

Comprehensive Land Use and Environmental Stewardship

Comprehensive Land Use and Environmental Stewardship (CLUES) Report serves as a summary document of the land use and environmental stewardship activities occurring on the Idaho National Laboratory (INL) Site (Desert) and the Research and Education Campus (REC) within Idaho Falls. Land and facility use planning and decisions at the INL Site are guided by a comprehensive planning process in accordance with the United States (U.S.) Department of Energy (DOE) Order 430.1C, “Real Property Asset Management,” which states "Establish a data-driven, risk-informed, performance-based approach to the life-cycle management of real property assets that aligns the real property portfolio with DOE mission needs; acquire, manage, positively account for, and dispose of real property assets in a safe, secure, cost-effective, and sustainable manner; and ensure the real property portfolio is appropriately sized, aligned, and in the proper condition to support efficient mission execution." Land use planning, like Campus Master Planning and 5-Year Facility Planning, provides a means for better, more sustainable use of the INL Site in a coordinated effort to ensure current and future mission needs are met, including acquisition, recapitalization, maintenance, disposition, real property utilization and long-term stewardship. This document and all functions of INL are guided by the DOE Vision for INL and the INL Mission and builds on the baseline established in the FY 2015 CLUES Report. However, it delivers a revised structure with focus on new resource management zones, which provide organization of key management considerations and access restrictions to optimize land use and environmental stewardship. A new set of thematic Guiding Principles presented in this report provide the intent and sustainable management direction to protect the INL Site natural environment. They demonstrate that the mission and vision of DOE and INL can be realized with inclusion of first of a kind technology, private sector development, and globally recognized testing and demonstration. This CLUES Report encourages comprehensive management decision-making with additional resource discussions for sustainability, the built environment, and the ecological landscape at the INL Site. Enhanced resource considerations and trends emphasize the importance of air, land use, environmental, subsurface, and cultural resources. The INL Site supports exceptional and interdependent resources. A diversity of bat species are accommodated by culturally significant caves distributed around the Site. Big game species like elk, deer, and moose seek vegetation communities which are protected by long-term stewardship and monitoring programs.

99 GENERAL AND MISCELLANEOUS↗

Williston Basin CORE-CM Initiative Final Report

The University of North Dakota Energy & Environmental Research Center (EERC) is leading the Williston Basin Carbon Ore, Rare Earth, and Critical Minerals (CORE-CM) Initiative to drive the expansion and transformation of coal and coal-based resource usage within the Williston Basin to produce rare-earth elements (REEs), CMs, and nonfuel carbon-based products (CBPs). This project is the first phase in a long-term program and set the stage for future work by assessing resource, market, technology, and infrastructure knowledge; identifying knowledge gaps; developing a series of plans to be carried out in future work; and initiating stakeholder engagement. Composed of several tasks, the project sought to identify, characterize, and assess several necessary aspects vital to make this future work a reality. The project’s fundamental task was to characterize the Williston Basin CORE-CM resources. Over 2500 samples from multiple sources were utilized to begin the assessment. Several locations were identified in western North Dakota where sample analysis identified the total REE (TREE) concentration as being over 500 parts per million (ppm), which is at a concentration level that would be suitable to consider for mining and extraction. Current operating coal mines have sufficient concentrations of TREEs for consideration. However, the current data across the basin are still not adequate to fully characterize REE and CM content nor give reliable estimates of the total resource potential. Waste stream reuse was also considered, and several streams were identified which ranged from potential energy sources to chemicals to material wastes. This includes streams that result from oil and gas production. These streams are not fully characterized, and further data are needed before they can be accurately assessed. Infrastructure within the Williston Basin is suitable for expansion of a new industry to mine, extract, and concentrate REEs and CMs. The development of this industry will not only preserve many existing jobs in the coal-mining industry but produce many new jobs. The supply chain for REEs and CMs is currently controlled outside of the United States in nations such as China, but the potential to develop the supply chain within the basin is considered possible. Processing of the mined materials for REEs and CMs needs further research. The technology and knowhow exist outside of the United States, and within the country much of the knowledge has been lost and must be regained. To develop the supply chain and regain lost processing technology, the creation of technology innovation centers (TICs) is crucial. The Williston Basin contains several similar centers and entrepreneurial assistance for other industries that can be applied in the development of REE and CM innovation centers. Education to develop the new skill sets required is also needed. Outreach is important for the development of the REE and CM industry within the basin. Understanding throughout federal and state governments, state agencies, industry, and resource end users is vital for the industry to form and grow. Through this project these groups have been contacted through bulletins, presentations, webinars, and annual symposiums. The report is a summary of the work conducted and throughout refers to a series of appendixes which contain more thorough and specific information about each section.

01 COAL, LIGNITE, AND PEAT↗

Solar Resource and Infrastructure Assessment for the Town of Westhampton

This report is a solar resource and infrastructure assessment for the town of Westhampton, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Westhampton. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Westhampton are oversaturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. Future upgrades could potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Final Technical Report

The capture of CO2 and its simultaneously conversion to useful chemical fuels driven by solar energy represents one of the best solutions to resolve our growing energy and environmental concerns. The most critical challenge to this endeavor is the rational design of a photocatalytic architecture that can effectively couple a given photosensitizer (PS) with an appropriate catalyst, thereby enabling efficient photosensitization of a multi-electron reduction catalysis. This research program aims to address this challenge using an interdisciplinary approach that combines innovative material design and synthesis, fundamental mechanistic studies, and photocatalytic performance evaluation. The strategies include 1) constructing and investigating a novel class of 2D COF hybrid photocatalysts with an effective photoactive organic building block as PS and a precisely incorporated CO2 reduction molecular catalyst (MC); and 2) mechanistic origins of CO2 photoreduction using a set of complementary time-resolved and in situ spectroscopic techniques. The novelty of the proposed hybrid system lies in the unprecedented combination of the unique advantage of porous crystalline COF PS with the precise catalytic function of MC for photocatalytic CO2 reduction. In the periods of the support (09/01/2019-12/31/2022), we have made research progress in four projects: 1) Exploring 2D COFs with incorporated Mn complex for light driven CO2 reduction; 2) The dependence of excited state and charge transfer dynamics on monomer structure of 2D COFs; and 3) Control over Charge Separation by Imine Structural Isomerization in Covalent Organic Frameworks with Implications on CO2 Photoreduction; and 4) The impact of monomer structure on the photoluminescence properties of COFs. We found that both monomer structure and linker chemistry can effectively impact the excited state dynamics, charge transfer properties, and photoluminescence quantum yields, the important properties that dictate their applications in photocatalysis. In addition, we found that the direction of imine linker determines charge transfer direction and thus controls the types of catalytic reactions (e.g. water oxidation or CO2 reduction reactions). The result from these fundamental studies provides important information for correlating the structure of the COF photocatalysts with their photophysical properties and catalytic functions, paving the way for their novel application in photocatalysis. We expect that our findings will contribute to addressing current shortcomings of semiconductor- and molecular-based photocatalytic systems that suffer from inefficient light harvesting and charge separation and poor adsorption and activation of reactants. In turn, this research will contribute towards the development of novel photocatalytic systems for CO2 reduction to generate renewable chemical fuels and simultaneously address the problem of mitigating climate change due to CO2 accumulation. In addition, the experimental approaches employed in this research can be easily transferred to other energy technologies and are expected to broadly impact fields involving photocatalysis, optoelectronic devices, and solar energy conversion. The proposed research has also been integrated with educational activities and serve as a basis to raise awareness around the critical issues of global energy production and consumption, and to develop the next generation of solar energy scientists.

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Wendell

This report is a solar resource and infrastructure assessment for the town of Wendell, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Wendell. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Wendell are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. It appears that National Grid is planning an upgrade to the Wendell Depot substation, which might then allow in-process projects are to proceed, and potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

KENO-VI Primer: Performing Calculations using SCALE’s Criticality Safety Analysis Sequence (CSAS6) with Fulcrum

The SCALE code system developed at Oak Ridge National Laboratory is widely used and accepted around the world for criticality safety analysis. The well-known KENO-VI three-dimensional Monte Carlo criticality computer code is one of the primary criticality safety analysis tools in SCALE. The KENO-VI primer is designed to help a new user understand and use the SCALE/KENO-VI Monte Carlo code for nuclear criticality safety analysis. It assumes that the user has a college education in a technical field. There is no assumption of familiarity with Monte Carlo codes in general or with SCALE/KENO-VI in particular. The primer is designed to teach by example, with each example illustrating two or three features of SCALE/KENO-VI that are useful in criticality analysis. The primer is based on SCALE 6.2 and 6.3, which includes the Fulcrum graphical user interface. Each example uses Fulcrum to provide the framework for preparing input data and viewing output results. Starting with a Quickstart section, the primer gives an overview of the basic requirements for SCALE/KENO-VI input and allows the user to quickly run a simple criticality problem with SCALE/KENO-VI. Each following section begins with a list of basic objectives identifying the goal of the section and the individual SCALE/KENO-VI features covered in detail in the section’s sample problems. Upon completion of the primer, a new user should be comfortable using Fulcrum to set up criticality problems in SCALE/KENO-VI. The primer provides a starting point for the criticality safety analyst who uses SCALE/KENO-VI. Complete descriptions are provided in the SCALE/KENO-VI manual. Although the primer is self-contained, it is intended as a companion volume to the SCALE/KENO-VI training and documentation. The SCALE manual and training schedule are available at https://scale.ornl.gov. The primer provides specific examples of using SCALE/KENO-VI for criticality analysis; the SCALE/KENO-VI manual provides information on the use of SCALE/KENO-VI and all its modules. The primer also contains an appendix with sample input files. In addition, this primer, its errata, and sample inputs are also available at https://code.ornl.gov/scale/primers/kenovi/.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Solar Resource and Infrastructure Assessment for the Town of Blandford

This report is a solar resource and infrastructure assessment for the town of Blandford, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Blandford. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, most distribution lines providing electricity to Blandford are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. We can expect significant upgrades to these circuits, if any of the in-process projects are to proceed, which might then free up additional capacity for new projects. There is one circuit which serves a section of North Blandford Road that is not over-saturated; for the immediate future, this is the most cost-effective location for new large-scale projects to be sited. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in preferred locations. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

KENO V.a Primer: Performing Calculations using SCALE’s Criticality Safety Analysis Sequence (CSAS5) with Fulcrum

The SCALE code system developed at Oak Ridge National Laboratory is widely used and accepted around the world for criticality safety analyses. The well-known KENO V.a three-dimensional Monte Carlo criticality computer code is one of the primary criticality safety analysis tools in SCALE. The KENO V.a primer is designed to help a new user understand and use the SCALE/KENO V.a Monte Carlo code for nuclear criticality safety analyses. It assumes that the user has a college education in a technical field. There is no assumption of familiarity with Monte Carlo codes in general or with SCALE/KENO V.a in particular. The primer is designed to teach by example, with each example illustrating two or three features of SCALE/KENO V.a that are useful in criticality analyses. The primer is based on SCALE 6.2 and 6.3, which includes the Fulcrum graphical user interface (GUI). Each example uses Fulcrum to provide the framework for preparing input data and viewing output results. Starting with a Quickstart section, the primer gives an overview of the basic requirements for SCALE/KENO V.a input and allows the user to quickly run a simple criticality problem with SCALE/KENO V.a. The sections that follow Quickstart include a list of basic objectives at the beginning that identifies the goal of the section and the individual SCALE/KENO V.a features that are covered in detail in the sample problems in that section. Upon completion of the primer, a new user should be comfortable using Fulcrum to set up criticality problems in SCALE/KENO V.a. The primer provides a starting point for the criticality safety analyst who uses SCALE/KENO V.a. Complete descriptions are provided in the SCALE/KENO V.a manual. Although the primer is self-contained, it is intended as a companion volume to the SCALE/KENO V.a training and documentation. The SCALE manual and training schedule are available at https://scale.ornl.gov. The primer provides specific examples of using SCALE/KENO V.a for criticality analyses; the SCALE/KENO V.a manual provides information on the use of SCALE/KENO V.a and all its modules. The primer also contains an appendix with sample input files. In addition, this primer, its errata and sample inputs are also available at https://code.ornl.gov/scale/primers/kenova.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Incentivizing Cold-Climate Efficiency in Juneau (Final Report)

This is the final technical report for the DOE EERE BTO project Incentivizing Cold-Climate Efficiency in Juneau. The project implemented a community energy campaign to deploy heat pumps and efficiency for residents of Juneau, in Southeast Alaska. The project helped Juneau make progress towards its renewable energy goal of reaching 80% renewable energy for space heating by 2045. The Incentivizing Cold-Climate Efficiency in Juneau (ICE-Juneau) project began in 2020 and concluded three years later in 2023. During that time, a group of implementation partners and a research advisory team instituted a beneficial electrification campaign to promote energy savings and carbon reduction in residences of Juneau, Alaska. The campaign, Thermalize Juneau, focused on the installation of single head ductless mini-split heat pumps along with other efficiency upgrades. Thermalize Juneau was the first campaign of its kind in Alaska. After several months of planning, registration opened to the public in early 2021, and over the course of six months 164 participants enrolled. Campaign staff provided education to homeowners on heat pumps and efficiency, and each participant received a one-on-one heat pump assessment using a custom Microsoft Excel-based calculator that estimated energy savings for their residence based on building characteristics and past utility bills. Participants could also obtain a free energy audit from one of the two local energy auditors to further inform their decision. A heat pump installer, electrician, and builder were selected via a competitive RFP process. Participants who felt ready to install a heat pump or other efficiency upgrades received a site visit and custom quote from each of these contractors free of charge, and if they still felt energy upgrades were right for them, could move forward with an individual contract. Participants received a $400 heat pump installation rebate, offered by the installer if 40 heat pump installations occurred through the campaign. Overall, the campaign facilitated 75 heat pump installations (including participants that went with another contractor or heat pump model) and 30 efficiency upgrades (including participants that went with another builder or did DIY upgrades). The campaign created 3 new jobs as the heat pump installer hired an administrative assistant and two apprentices over the course of the campaign. It also helped Juneau work toward achieving its renewable energy goal of 80% renewable energy for space heating by 2045 by upgrading houses from fuel oil to heat pumps powered by the hydropower electric grid. Researchers conducted four surveys to inform Thermalize Juneau and future energy campaigns. The first surveyed existing and prospective heat pump owners in Juneau to identify barriers the campaign could address and inform recruitment efforts. Entry and exit surveys provided information on participant demographics, goals, outcomes, and suggestions for improving future campaigns. And a final survey of community members who had not participated in Thermalize Juneau gave insight on ways future campaigns could include a greater diversity of participants so they could realize similar benefits. Researchers also used pre-campaign energy modeling to predict energy savings, which was then compared to the savings estimated through aggregation of heat pump assessments and energy audits, and later to actual energy savings of 10 participants who installed a heat pump and were able to provide complete energy use data sets. In addition to energy savings, and to assist the electric utility in future planning efforts, researchers analyzed the overall change in electric use across participants with energy data and heat pump installations. They also completed a life cycle cost analysis, showing positive net present values for those displacing a fuel oil appliance, and a more mixed case for those switching from electric baseboard. This project proved the feasibility of energy campaigns, with a goal of beneficial electrification, in cold, remote locations. The Thermalize Juneau team compiled a Guidebook to Thermalize Campaigns, available online. In addition to documenting what occurred in Alaska’s first thermalize campaign, it provides tips and resources for other communities wishing to implement a similar program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗