Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Test Pilots”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Ceramic Membrane Solar Desal: Pilot System Design and Full-Scale System Techno-Economic Analysis (CRADA Final Report)

This work is conducted in support of the American Made Challenges Solar Prize. The current scope addresses the Design portion of the overall prize competition. This team, led by the University of Connecticut, will design a solar powered, pilot scale, ceramic-based membrane distillation system that can operate on high salinity waters and propose that design for construction in the Test phase of the Prize competition.

14 SOLAR ENERGY↗

A search for cosmogenic neutrinos with the ARIANNA test bed using 4.5 years of data

The primary mission of the ARIANNA ultra-high energy neutrino telescope is to uncover astrophysical sources of neutrinos with energies greater than 10 16 eV. A pilot array, consisting of seven ARIANNA stations located on the surface of the Ross Ice Shelf in Antarctica, was commissioned in November 2014. We report on the search for astrophysical neutrinos using data collected between November 2014 and February 2019. A straight-forward template matching analysis yielded no neutrino candidates, with a signal efficiency of 79%. We find a 90% confidence upper limit on the diffuse neutrino flux of E 2 Φ=1.7× 10 -6 GeV cm -2 s -1 sr -1 for a decade wide logarithmic bin centered at a neutrino energy of 1018,eV, which is an order of magnitude improvement compared to the previous limit reported by the ARIANNA collaboration. The ARIANNA stations, including purpose built cosmic-ray stations at the Moore's Bay site and demonstrator stations at the South Pole, have operated reliably. Sustained operation at two distinct sites confirms that the flexible and adaptable architecture can be deployed in any deep ice, radio quiet environment. We show that the scientific capabilities, technical innovations, and logistical requirements of ARIANNA are sufficiently well understood to serve as the basis for large area radio-based neutrino telescope with a wide field-of-view.

79 ASTRONOMY AND ASTROPHYSICS↗

Modeling and Analysis of the Transport and Disposal of Beryllium Moderator Blocks and Greater than Class C (GTCC) Waste

Radioactive waste in the United states is categorized based on its source, radioactivity, and security risk. The categorization method employed by the Nuclear Regulatory Committee (NRC) for low-level radioactive waste is not currently applied to any waste generated by the Department of Energy (DOE) or disposed of in DOE facilities. As a result, there is a large volume of DOE-generated waste with characteristics similar to the NRC’s “Greater than Class C” (GTCC) waste category which presently do not have a path for long-term disposal. Much of this waste cannot undergo the standard commercial disposition process due to it being categorized as Transuranic (TRU) waste under DOE guidelines, due to elevated concentrations of key fission products. Possible solutions to this dilemma are explored in the Environmental Impact Statement for the “Disposal of Greater-Than-Class-C Low Level Radioactive Wave” (EIS-0375). This paper analyzes several EIS possible paths for disposal for this “orphaned” waste. One example that highlights this categorization issue is the spent beryllium cladding that has been extracted from the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) throughout its operational lifetime. These beryllium blocks surround the reactor’s main chambers and components and serve as neutron moderators. This paper will use this particular waste form to analyze the economic and technological viability of transporting and storing this material under the storage and transportation criteria of the Waste isolation Pilot Plant (WIPP), which was deemed the most feasible disposition path according to the EIS. The example of this waste form used in this paper that highlights this categorization issue is the spent beryllium cladding extracted from Idaho National Laboratory’s (INL) Advanced Test Reactor (ATR). These beryllium blocks surround the reactor’s components and serve as neutron moderators, and thus have accumulated high concentration of high-activity transuranic isotopes. This paper analyzed the viability of transporting and storing this material under the storage and transportation criteria of the five primary disposition paths covered in EIS-0375. An array of calculations was carried out to assess the viability of the various disposition paths for the beryllium shipments as well as other waste shipments that fall within the GTCC category. Modeling with MCNP 6.2 was conducted to determine whether the beryllium blocks could be safely stored and transported within a 72-B cask; the standard shipping container for remote-handled, transuranic waste, while also meeting regulatory limits at various disposition paths. A cost analysis of the transportation and long-term disposal paths mentioned in the EIS was also carried out using available data and information from similar waste shipments. Lastly, a geochemical analysis of the various geological repository discussed in the EIS was also carried out using the Geochemists Workbench Release 14. Long-term disposal of the beryllium blocks at the Waste Isolation Pilot Plant (WIPP) proved to be the most cost-effective long-term disposition option of the ones considered in the EIS. A dose rate calculation at both contact and remote-handling distances indicate that the analyzed beryllium shipments should not exceed the exposure limits at any of the considered locations. Greater-than-class-C waste has been left in a regulatory state of limbo for years, resulting in backlogs of inventory across several research sites in the United States. Due to its high activity and presence of transuranic isotopes, it is imperative to ensure that it remains inaccessible and sequestered both in its short-term interim as well as a long-term geologic time scale. The information and assessments done in the paper could potentially serve as a reference for any future shipments of this waste form at the WIPP facility as well as other disposition paths that may be considered in the future.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Avista’s Shared Energy Economy Model Pilot: A Techno-economic Assessment

As part of the second round of the Washington Clean Energy Fund, Avista Corp received a $3.5 million matching grant in support of a shared energy economy project to test the integration of energy assets–from rooftop solar and battery storage to building energy management systems–that can be shared and used for multiple purposes. The goal of this project is to demonstrate how both the customer and the utility can benefit from this shared energy economy model and demonstrate that the electric grid can become more reliable, efficient, resilient, and flexible. Pacific Northwest National Laboratory was engaged by the U.S. Department of Energy and the Washington State Department of Commerce to work with Avista in assessing the benefits of the shared energy economy model. This report documents the techno-economic assessment of the shared energy economy model, including the definition of use cases and applications, collection and preparation of data and input parameters, development of modeling and optimization methods, and case studies and analysis results.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of Magnesium Oxysulfate Formulation for SRPPF Aqueous Recovery Liquid Solidification

The liquid effluent from the Savannah River Plutonium Processing Facility (SRPPF) Aqueous Recovery Processes will be solidified into a stable form that is acceptable by Waste Isolation Pilot Plant (WIPP) for disposal. The current Aqueous Recovery flow sheet proposes to solidify the liquid effluent using a grout formula that was developed and tested for the former Waste Solidification Building process. This Portland cement based mixture results in a high pH (~13) leachate from the solidified waste form which is not acceptable to WIPP in the large quantities expected from production at SRPPF. Various cementitious materials were previously evaluated as alternative grout formulations to Portland cement and a MgO-based mix was identified as a promising alternative. A magnesium oxysulfate (MOS) cement formulation comprised of reactive magnesium oxide (MgO), anhydrous magnesium sulfate (MgSO 4 ), and sand, as a non-reactive heat sink provided good mixability, similar density to the original Portland-cement based mix, and a leachate pH of 9.4, within the assumed WIPP brine pH range. However, the MOS formulation exhibited an appreciable amount of heat generation, which resulted in premature setting of a large-scale test.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Topical Report – Findings on Subtask 2.7 – Wet ESP and Aerosol Testing at Coal Creek Station

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion carbon capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery. The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the unique components present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants by contributing to aerosol formation. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and flue gas particulate provides nucleation sites where amine vapors can condense as aerosols. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, particulate components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to fully characterize aerosol behavior with various control technologies installed to better optimize aerosol mitigation technology for CO 2 capture. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on mitigating formation of problematic aerosols at Great River Energy’s Coal Creek Station, upstream of the PCCC system. Determine the effectiveness of the Mitsubishi Heavy Industries (MHI) proprietary amine emission reduction unit (AERU) as a postcapture solvent recovery system for reducing aerosol emissions and extending solvent life downstream of the PCCC system. Determine the impact of aerosols on the efficiency and degradation products of both commercial and advanced solvents within the PCCC system. Work was conducted at Coal Creek Station Unit 1 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then optionally routed through a WESP before passing to the CO 2 absorber columns. The MHI solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . Flue gas exiting the absorber column was routed to MHI’s proprietary AERU to recover entrained solvent. The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Particulate was measured, collected, and analyzed from multiple locations throughout the pilot-scale system. Unlike the performance observed in prior work, the inlet FGD and DCC did not remove significant particulate matter from the flue gas. This appears to be due to a difference in the nature of the particulate. The DCC seemed to increase particulate size and count, most likely owing to water condensing onto the surfaces of fly ash particles. When the WESP was operated, it achieved >95% particulate capture. Very little particulate matter or indications of solvent were detected at the AERU outlet. When operating with advanced KS 21 solvent, the particulate material at the AERU outlet was even further decreased. Solvent analysis showed that some species derived from flue gas and ash were slowly concentrating in the solvent over the duration of the test. The levels observed were reported to be within expected ranges and were not of concern to MHI. A high-level techno-economic assessment of installing CO 2 capture at Coal Creek Station suggested that, when using a standard monoethanolamine (MEA)-based solution with simple heat integration, the energy penalty to net generation would be 34%. The bulk of this was due to steam losses for regenerating solvent, followed by parasitic electrical demand for CO 2 compression and then by increased parasitic load for pushing flue gas through the absorber column. These demands could be decreased with a more advanced solvent that exhibits lower heat of regeneration and lower pressure drop than does a simple MEA solution. Further energy could be saved with more thorough heat integration to recover useful energy from the steam used for solvent regeneration. Installing a WESP was predicted to increase the cost of electricity by nearly $5/MWh. This would become cost-effective if solvent losses were roughly 10 times the baseline estimate when not using a WESP but could be returned to baseline by installing the WESP. Piping CO 2 for storage in more favorable geology could help with carbon capture and storage economics. Although storing off-site would necessitate construction of a CO 2 transport pipeline, the cost of this pipeline might be more than offset by reducing the number of wells required, the depths of the wells required, and the electrical demand for the CO 2 compressor. Additional factors that favor off-site storage costs include smaller expected CO 2 plume sizes, which translates to less monitoring and fewer landowner agreements. More detailed assessment of the specific geology in the region under and around Coal Creek Station would be needed to accurately assess the costs and benefits of different storage site options. This subtask was cofunded through the Energy & Environmental Research Center–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission.

Strege, Joshua↗

Destructive PIE and Safety Testing of Six AGR-2 UO 2 Capsule 3 Compacts

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program’s second irradiation experiment (AGR-2) was irradiated in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) from June 2010 to October 2013 (Collin 2014). The fuel compacts in this experiment held either tristructural isotropic (TRISO)-coated spherical kernels of uranium oxide (UO2) or TRISO-coated kernels containing both uranium carbide and uranium oxide phases (UCO). There were six separately monitored and controlled capsules in the AGR-2 test train. Capsule 3 held twelve compacts containing UO2-TRISO particles fabricated by BWX Technologies Nuclear Operations Group. The AGR-2 TRISO particles were fabricated in a pilot-scale fluidized-bed chemical vapor deposition (FB-CVD) furnace with a coating chamber inner diameter of 150 mm (Phillips, Barnes, and Hunn 2010), which was a change from the first irradiation experiment (AGR-1) particles that had been coated in a lab-scale FB-CVD coating system with a chamber inner diameter of 50 mm (Lowden 2006). The TRISO particles were overcoated with resinated graphite flake at Oak Ridge National Laboratory (ORNL), and the overcoated particles were pressed into one-inch-long, half-inch-diameter cylinders (Hunn, Montgomery, and Pappano 2010). Each cylindrical compact held an average of 1,543 TRISO particles with 9.6% enriched UO2 kernels that had a nominal diameter of 500 μm (Hunn, Savage, and Silva 2012). Capsule 3 compacts were irradiated to average calculated burnups of 9.01–10.69% fissions per initial metal atom (FIMA), and the average calculated fluences of fast neutrons with energies E n > 0.18 MeV were 3.05–3.53×10 25 n/m 2 (Sterbentz 2014). The calculated time-average, volume-average Capsule 3 compact temperatures were 996–1,062°C. However, Capsule 3 compact temperatures varied several hundred degrees across each compact, and the timeaverage minimum (TA min ) and time-average maximum (TA max ) temperatures were between 889–999°C and 1,072–1,105°C, respectively (Hawkes 2014). After irradiation, the AGR-2 test train was transferred from ATR to the INL Materials and Fuels Complex for inspection and disassembly (Ploger, Demkowicz, and Harp 2015). The initial inspection included dimensional metrology of the compacts and graphite fuel holders. Like all the AGR-2 compacts, the compacts in Capsule 3 shrank slightly during irradiation, as expected, with an average length reduction of 1.07–1.24% and an average diameter reduction of 0.13–0.41%. Post-irradiation examination (PIE) of the capsule components was completed to measure select fission products ( 90 Sr, 110m Ag, 134 Cs, 137 Cs, 144 Ce, and 154 Eu) outside the compacts (Stempien and Demkowicz 2020). This involved gamma counting of the graphite and graphoil spacers at the top and bottom of each capsule, acid leaching for radiochemical analysis of fission products on the metallic capsule components, and burn-leach analysis of the graphite holders. The total amount of 110mAg measured on the Capsule 3 components was 13% of the calculated capsule inventory. This was significantly lower than the amount of 110m Ag measured on the three UCO capsule components, which ranged from 32–70%. The lower 110m Ag release in Capsule 3 was likely due to lower peak temperatures compared with the UCO fuel capsules (Hawkes 2014). Measured inventories of the other select fission products were also lower in Capsule 3.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Conceptual design of HTS magnets for fusion nuclear science facility

Second-generation high temperature superconductors (HTS) are available for producing >20 T at the magnet bore compared to 13–16 T for lower temperature superconducting (LTS) toroidal field magnets proposed in recent fusion energy systems studies (FESS) of Fusion Nuclear Science Facility (FNSF). HTS may enable higher fusion power density and smaller device size. High current density cables of multi-layered REBCO tapes have achieved >10 kA at 4–20 K operation in short sample tests for fusion. High current density cables are required for engineering design of FNSF to allow space for interior plasma components. High current density HTS magnets are particularly attractive in reducing the size of a fusion device, beneficial for compact tokamaks, due to their space constraints. Successful HTS magnet development may enable the design of smaller and cheaper fusion pilot plants with a mission of demonstrating net electricity. It may also offer significant cost and performance advantages in non-fusion applicants such as nuclear magnetic resonance (NMR) and magnetic resonance imaging (MRI). Furthermore, we developed HTS magnet design concepts for a compact FNSF radial build in order to define the coil size, winding pack mechanical loading and engineering requirements. Partnering with vendors in the US, PPPL is also testing high current cable prototypes aiming at enabling low cost cable technology toward 100 A/mm 2 engineering current density over the winding pack desired in high field model coil development for compact fusion pilot plants.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Temperature response and brine availability to heated boreholes in bedded salt

Abstract There is a growing need for disposal of high‐level nuclear waste. To reduce uncertainty associated with brine availability to repository excavations in salt formations, a collaboration between Sandia, Los Alamos, and Lawrence Berkeley National Laboratories is performing a series of borehole‐scale coupled process tests. Here, we report on the first round of the Brine Availability Test in Salt (BATS) project, a “shakedown” experiment called Phase 1s. Experimental testing included placing a resistive heater, a 260‐W radiative heater, and a 750‐W radiative heater within previously drilled horizontal boreholes at the Waste Isolation Pilot Plant (WIPP) while monitoring temperature and water inflow. The experiments successfully achieved the targeted temperature of 120 °C when using the 750‐W radiative heater. Simulations using FEHM (Finite Element Heat and Mass transfer code) and TOUGH‐FLAC (Transport Of Unsaturated Groundwater and Heat–Fast Lagrangian Analysis of Continua) were able to accurately predict the coupled thermo–hydro–mechanical–chemical response of salt, matching the observed temperature and brine production. Due to the extremely low permeability of salt, these systems take many years to reach steady state when perturbed by mining activities. Long‐term numerical simulations are used to develop the initial pressure and saturation conditions. The inclusion of a damaged rock zone with higher permeability around the borehole also affects the saturation and pressure distributions and plays an important role in dissipating the potential for thermal pressurization. Knowledge gained from this round of experimentation and simulation will be used to conduct the next BATS project experiment in new boreholes at WIPP.

58 GEOSCIENCES↗

Distribution of rare earth elements in the pilot-scale processing of fly ashes derived from eastern Kentucky coals: Comparisons of the feed and processed ashes

Beneficiated fly ash from the combustion of Central Appalachian high volatile bituminous coals was extracted with HNO 3 in a pilot-scale processing plant. Several major oxides (notably CaO and SO 3 , but also including Fe 2 O 3 , MgO, K 2 O, and P 2 O 5 ) and minor elements (Mn, As, Sr, Ba, and Pb) are depleted in the post-HNO 3 -extraction spent ash. The total lanthanides, Y, and Sc concentration is reduced by about 20% in the spent ash, with Gd showing the greatest decrease. Along with Gd, Nd and Dy are also well differentiated between the feed and spent ashes, with La and Sm showing minimal partitioning. The Gd decrease is correlated with the depletion of Fe 2 O 3 . The heavy rare earth elements (REE heavier than Eu) and Y are disproportionately concentrated in the HNO 3 -leachate compared to the light REE. For the ashes studied, Sc did not partition between the feed and spent ashes. Pozzolanicity tests show that the compressive strength and strength activity indices of the spent ash + ordinary Portland cement (OPC) mixes are comparable to 100% OPC, indicating that the spent ashes produced in the pilot-scale runs have the potential to be sold as a Class F fly ash. Finally, the beneficiated ash chemistry influences the chemistry of the post-HNO 3 -extraction spent ash and the HNO 3 -leachate. A 500-ppm-REE fly ash will presumably be a more economically favorable feedstock than an ash with a significantly lesser concentration.

01 COAL, LIGNITE, AND PEAT↗

Cyber-Physical System: Design for Sustainability and Resilience

When considering the design tools needed in the transition from numeric models to pilot plant, cyber-physical systems (CPS) come to the forefront as a method to model complex integrated energy systems. CPS approach has proven to be valuable to identify opportunities for economically viable early adoption of integrated energy technologies. This tutorial will introduce the concepts and the roles of CPS in co-design to minimize risks for pilot plant and technology deployment. This tutorial will also layout basic requirements for the CPS development, which requires a highly interdisciplinary effort with expertise in sensors, hardware testing, real-time modeling, controls, and system integration.

Harun, Nor Farida↗

Bench-Scale Development of Promoted High-Capacity Structured Sorbents (Final Technical Report)

The project objective was to develop high-capacity structured sorbent capable of achieving low CO 2 removal from air. The sorbent framework consists of an amine-functionalized onto hydrophobic polymer backbone with an added promoter. The functionalized amine provides high CO 2 capacity and adsorption rates and the polymer backbone to reduce water uptake. For the sorbent development, multiple functionalized amines and promoters were assessed to select a candidate that achieved high CO 2 capacity, high adsorption rate, and high stability. A sorbent-coated filter design was selected as the structured sorbent, which provides high sorbent loading capacity and contains an electrically conductive nonwoven filter substrate that can be Joule-heated to provide efficient utilization of available electricity for sorbent regeneration. A commercial partner operated a pilot filter manufacturing line to produce the filter panels coated with the developed sorbent. A 1 kg CO 2 /day bench unit was designed and fabricated to test the structured filter sorbent. The key achievements from the structured sorbent development activity were demonstrating that existing filter industrial-scale processes can be used for manufacturing Susteon’s structured sorbent and completing a proof-of-concept demonstration of the commercially manufactured structured sorbent filters for CO 2 capture from air with direct, Joule-heated regeneration. A techno-economic assessment with sensitivity analysis was conducted on a 100,000 TPY facility with 85% operating capacity. Through sorbent optimization and process design improvements, it is estimated that the cost of capture was reduced from $\$$349/tCO 2 to $\$$241/tCO 2 . The TEA projects further reductions to $165/tCO 2 through enhancements in CO 2 adsorption rate and sorbent capacity and reducing manufacturing and scale up risks. A life cycle analysis was conducted on the same 100,000 TPY facility and confirmed that the facility’s electricity demand drives its greenhouse gas impact. It was determined that electricity supplied through the current grid mix would result in net-positive CO 2 emissions and that achieving net-negative emissions is only possible by powering the system with renewable electricity or fossil fuel sources equipped with carbon capture and sequestration.

36 MATERIALS SCIENCE↗

Raman Microscopy Analysis of Wyoming CarbonSAFE Pilot Well Thin Sections for Mineralogy and Organic Matter Characterization

Scanning confocal Raman microspectroscopy (RMS) was used to analyze thin sections for inorganic mineral content and for evaluation of organic material (OM). Thin sections were selected from a stratigraphic test well core in the Powder River Basin, Wyoming under the Wyoming CarbonSAFE project. The well was analyzed with a variety of rock and fluid characterization techniques to determine the feasibility of a commercial-scale CO2 storage site. RMS complements other analyses, including traditional petrography, SEM, porosity and permeability, and XRD For this aspect of the study, RMS is especially important in the evaluation of OM in sealing lithologies. At prospective geologic CO2 storage sites, it is imperative to assess the unconventional oil and gas potential of seals to ensure that any future development would not compromise the integrity of the seals. Whole-slide mineralogical surveys were performed on thin sections from various shale and sandstone formations. Surveys were analyzed with Direct Classical Least Squares to identify and quantify minerals. The location and concentration of minerals was color-coded and overlaid on optical images for visualization of the distribution of minerals. Dense hyperspectral Raman mapping of OM was performed on five thin sections. Eleven spectral parameters diagnostic of organic type and thermal maturity were used to train a Partial Least Squares (PLS) calibration against a set of artificially matured samples spanning the pre- to mid-oil window. The PLS was applied to the study set and a post-mature set. Additionally, the PLS was applied to each point in hyperspectral maps for visualization of trends in maturity across sample sets and discrimination of organic matter types within a given map. In inorganic surveys on thin sections, a total of 14 unique inorganic minerals were identified in Raman spectra including quartz, dolomite, calcite, hematite and anhydrite. Shale thin sections tended to be dominated by organic material. OM was often observed mixed with inorganic minerals. Sand- and mudstones were dominated by inorganic minerals. The PLS extrapolated the post-mature set to reflectances >1.2%. The study set ranged from very immature to postmature in the median of map fit-peak parameters. However, point maturity maps indicate that matrix OM in all study samples is immature and that discreet organic particles selected for mapping, which may be inertinites, bias medians towards more-mature. The work demonstrates the capabilities of RMS to perform both whole-slide mineralogy and OM analysis with applications to formation evaluation in oil & gas, carbon sequestration and mining. Here, analysis of sealing formations in the well indicates high levels of immature organic matter that would not be a viable target for future oil production that could compromise the CO2 storage site. The work brings together diverse disciplines from geology and petrography to analytical chemistry, big data and microscopy.

Myers, Grant↗

Pilot Development Progress to Demonstrate Electric Thermal Energy Storage (ETES) Using Low-Cost Particles

The rapid growth of future energy demand increases the need to economically store electrical energy over durations up to several days in long-duration energy storage (LDES) applications. LDES can reduce the grid stress for improving the resilience of the grid. The integration of renewable power and storage has several significant and positive impacts including expanding the renewable energy portion of electricity generation, meeting peak-load demand, and coordinating supply and demand. Several energy storage approaches including mechanical, chemical and electrochemical methods are currently deployed or under development. However, LDES requirements pose unique challenges for scalability, energy capacity, and cost. Thermal energy storage (TES) has the ability to store a large capacity of energy with improved site flexibility compared to incumbent LDES technologies (i.e., pumped hydro) and has attracted significant interest. Our development in TES technology using solid particles as the storage medium has shown feasibility and potential in serving LDES purposes. Particle TES has various advantages over commercialized molten nitrate salt TES and has emerged as a promising storage technology originating from Generation 3 concentrating solar power (CSP) development. Stable, inexpensive silica sand produced in the Midwestern U.S. was identified as a suitable storage medium and has been validated through lab heating and cycling tests. We have successfully developed particle TES for bidirectional electric energy storage to broaden the applications for TES beyond CSP technologies and into standalone electric-thermal energy storage (ETES) systems. Key component designs and performance were verified with prototype testing and model simulations. The ETES system uses high-temperature, low-cost particle thermal energy storage coupled with a unique pressurized fluidized bed heat exchanger that supports a high-efficiency, air-Brayton combined power cycle. At times of low energy demand or high renewable production, an electric particle heater heats large quantities of solid particles to high temperatures in excess of 1100 degrees C. The particles are stored in internally insulated silos. At times of high electricity demand, the hot particles are gravity-fed through the heat exchanger where stored thermal energy is transferred to the power cycle working fluid to drive the gas turbine power generation system, thereby converting the thermal energy back into electricity for the grid. The cold particles leaving the heat exchanger are returned to the storage silos by a well-insulated particle conveyor. This ETES technology using particle TES can be sited anywhere and is predicted to be economic and efficient. Moreover, this ETES technology could be co-located with a retired coal or gas plant to leverage existing power generation and grid infrastructure. Our work has focused on the development of each of the key components (e.g., the electric particle heater, particle storage silos, and the particle-to-gas pressurized fluidized bed heat exchanger) through conceptual designs, prototype testing, and computational modeling. These developments demonstrate technological feasibility and are an important step towards the next phase of development of this promising LDES technology. This presentation will show the progress in developing a pilot demonstration of the ETES system on a commercially relevant scale.

25 ENERGY STORAGE↗

Novel Transformational Membranes and Process for CO 2 Capture from Flue Gas (FE0031731)

The objectives of this project are to develop a cost-effective design and fabrication process for a novel transformational membrane and its membrane modules that capture CO 2 from flue gas. Optimization of the novel transformational membrane, scale-up of the membrane to a prototype size of about 20" wide in continuous roll-to-roll fabrication, and construction and testing of a skid for the integrated membrane process will be performed. For the design of this membrane, we use a cost-effective polymer support and coat a thin top layer of the membrane. The simplicity of this membrane design offers a low cost for the membrane element in commercial spiral-wound (SW) configuration (<$2.00/ft 2 or $21.5/m 2 ). The prototype membrane will be used to fabricate 6 pilot-size membrane modules (each about 20" length, 3 modules each at the commercial-size diameter of 8 inches with 35 m 2 membrane area for Stage 1 and 3 modules each at 5-inch diameter with 12 m 2 membrane area for Stage 2) for testing with simulated flue gas at OSU and with actual flue gas at the National Carbon Capture Center, Wilsonville, AL using the skid to capture the CO 2 (at 60 – 90%) with at least 95% CO 2 purity. The prototype membrane modules will be in commercial SW configuration with a minimal pressure drop (<0.103 bar/meter (1.5 psi/meter)). These objectives have been achieved successfully.

20 FOSSIL-FUELED POWER PLANTS↗

NSTX-U – A national User Facility to close the key fusion gaps

This presentation lays out how the NSTX-U Research Program will help close the science and technology gaps for moving towards a Fusion Pilot Plant (FPP) and how this work is aligned with the Bold Decadal Vision. The science gap focuses on determining whether the good confinement trends in Spherical Tokamaks extends to lower collisionalities that are comparable to those expected in FPPs. The technology gap is one of mitigating the power exhaust in FPPs, and NSTX-U is uniquely positioned to test Liquid Metal components in the highest heat flux environment of any existing tokamak, spherical or otherwise.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY↗

Wyoming CarbonSAFE: Advancing Commercialization of Low-Carbon Energy Technologies in Fossil-Rich Wyoming

Wyoming’s Powder River Basin (PRB) is the most prolific coal producer and exporter in the United States and the State of Wyoming’s largest oil-producing basin. In addition to being a leading energy producer, the PRB is the site of research programs whose aim is to develop and integrate low-carbon technologies into existing fossil fuel energy industries. Much of the PRB’s low-carbon research is focused around Dry Fork Station (DFS), which is the newest coal-fired power station in the western US. Currently, DFS hosts five carbon capture projects, including pilot-scale capture projects that utilize different capture technologies and a full front-end engineering and design (FEED) study, a commercial CO 2 pipeline for nearby CO 2 -enhanced oil recovery industry, and is also co-located with the Wyoming Integrated Test Center, which is a host facility for unconventional carbon utilization research (i.e. flue gas carbon-to-products innovations). DFS is also the host site for the Wyoming CarbonSAFE project. Wyoming CarbonSAFE, funded by the Department of Energy/National Energy Technology Laboratory, is a multi-phased program (currently in Phase II) whose core objective is developing and validating storage sites within a complex capable of storing 50 million metric tonnes of CO 2 over a 30 year project period using carbon capture, utilization and storage (CCUS). This paper will provide an overview of the project to-date, showing that CarbonSAFE goals are achievable with respect to geologic, environmental, regulatory, CO 2 source and economic conditions, and why the State of Wyoming offers one of the more favorable environments to advance the commercialization studies. In 2019, the project team designed and completed a ~10,000 foot stratigraphic test well just south of DFS. From this well, the team collected over 600 feet of core, fluid samples from target injection zones, and a full petrophysical log suite. In addition, legacy 2D seismic lines were acquired and a 3D seismic survey was acquired in the fall of 2020. The objective of these field activities has been to identify and characterize target storage reservoirs and associated caprock. This complex has several reservoirs that could meet commercial injection goals, and over 4000 feet of associated caprock. Simulations of site performance suggest that stacked injection provides the most effective storage strategy, and would necessitate several sites within the greater complex to meet final project injection goals. Other work within this project includes the development of a business-case around proximal fields with CO 2 -enhanced oil recovery potential and existing tax credits, assessment of regulatory conditions, including pore space ownership and Class VI injection well permitting requirements, implementation of a robust public outreach Electronic copy available at: https://ssrn.com/abstract=3821220 GHGT-15 McLaughlin 2 program, and surface site characterization activities that have focused on environmental factors. In the PRB and at DFS, the State of Wyoming and other entities have made carbon management a priority of its future energy industry by providing a regulatory and business framework that is favorable to advancing these technologies. These endeavors will become more realistic with the successful implementation of Wyoming CarbonSAFE, and its ability to secure and validate commercial-scale CCUS at the center of Wyoming’s premier low-carbon research efforts.

McLaughlin, Fred↗