Results for “EXPENDITURES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Telematics and Data Science: Informing Energy-Efficient Mobility

Fleets exploring the possibility of adding electric vehicles (EVs), battery electric vehicles (BEVs), and plug-in hybrid electric vehicles (PHEVs) seek an efficient, data-driven means to justify both expenditures for vehicle and charging infrastructure and the appropriate placement of them to help ensure the cost-effective adoption of these technologies. Exploring data collection and analytic methodologies across different telematics providers offers the opportunity to better understand the strengths, weaknesses, and possibilities for employing different methods of data collection, including smartphone-based telematics and more traditional telematics with hardware installed on a vehicle's onboard diagnostics port. This report presents results of five pilot programs that collected data from the operation of conventional light-duty fleet vehicles to generate recommendations for transitioning these fleet vehicles to EVs, implementing adequate charging infrastructure, and establishing management practices to maximize the benefits of these new fleet technologies.

33 ADVANCED PROPULSION SYSTEMS↗

Unpacking the Disconnect Between Wholesale and Retail Electric Rates [PowerPoint]

The 2017 DOE Staff Report to the Secretary on Electricity Markets and Reliability noted a disconnect between falling wholesale electricity prices and flat or rising retail investor-owned utility (IOU) electricity prices between 2008 and 2016. This analysis sought to assess recent trends in utility costs, retail sales, and/or retail rates vis-à-vis wholesale market prices in order to help explain this disconnect. Using FERC Form 1 and ICE Power Indices data, Berkeley Lab researchers developed key annual metrics between 2007 and 2016 at a regional level for five of the seven NERC regions: Midwest Reliability Organization (MRO), Northeast Power Coordinating Council (NPCC), ReliabilityFirst Corporation (RFC), SERC Reliability Corporation (SERC), and Western Electricity Coordinating Council (WECC). The analyses of these metrics enabled Berkeley Lab researchers to arrive at the following conclusions: Retail and wholesale rates were increasingly disconnected across all included NERC regions; Reductions in wholesale electricity market prices happened concurrently with reductions in IOU fuel and purchased power (FPP) costs, but sizable regional differences in the degree of FPP cost reductions existed; Reductions in IOU FPP costs were offset in part by increases in non-fuel operations and maintenance (O&M) costs, but modest regional differences in the degree of these cost impacts existed; Reductions in IOU FPP costs were also offset in part by increases in capital expenditures, but regional differences in the magnitude and type of investments existed; and, Reductions in retail sales tended to mitigate the effect on retail rates from reductions in total utility costs, but regional differences existed that were sometimes counterintuitive and suggest the value in a more detailed analysis of utility costs vis-à-vis general rate case filings and decisions to better understand retail rate changes over time.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Benchmarking Anticipated Wind Project Lifetimes: Results from a Survey of U.S. Wind Industry Professionals

This paper draws on a survey of wind industry professionals to clarify trends in the expected useful life of land-based wind power plants in the United States. The expected useful life of a project affects expectations about its profitability, the timing of possible decommissioning or repowering, and its levelized costs. We find that most wind project developers, sponsors and long-term owners have increased project-life assumptions over time, from a typical term of ~20 years in the early 2000s to ~25 years by the mid-2010s and ~30 years more recently. Current assumptions range from 25 to 40 years, with an average of 29.6 years. The estimated average levelized cost of energy (LCOE) for new wind projects built in 2018 is $\$ $40.4/MWh (real 2018$\$ $), assuming a 20-year project life. With a 25-year useful life and no change in assumed operations and maintenance (O&M) expenditures or wind plant performance over time, LCOE declines by 10%, to $\$ $36.2/MWh, because capital costs are recovered over five additional years of production. At the now-common 30-year assumed life, levelized costs decrease another 7%, to $\$ $33.5/MWh (under the same unaltered assumptions about O&M and performance). Even longer assumed lifetimes lead to further (but diminishing) LCOE reductions—e.g., to $\$ $31.7/MWh and $\$ $30.3/MWh for 35- and 40-year lives, respectively. The data and trends presented here may inform assumptions used by electric system planners, modelers and analysts. The results may also provide useful benchmarks to the wind industry, helping developers and assets owners to compare their expectations with those of their peers.

17 WIND ENERGY↗

NREL's Balance-of-System Cost Model for Land-Based Wind

NREL's Land-based Balance of System Systems Engineering (LandBOSSE) model is a tool for modeling the balance of system (BOS) costs of land-based wind plants. BOS costs currently account for approximately 30% of the capital expenditures needed to install a land-based wind plant and include all costs associated with installing a wind plant, such as permitting, labor, material, and equipment costs associated with site preparation, foundation construction, electrical infrastructure, and tower installation. NREL developed LandBOSSE after identifying a need for a hybrid of process-based and empirically derived model that can provide flexibility for assessing wind plant BOS costs at a system level. NREL's prior BOS models have relied on empirical fits of legacy industry data, which limit their predictive ability. LandBOSSE, however, was designed to help users explore tradeoffs between innovative design scenarios while balancing the level of detail and speed required for model execution. The model was developed using a hybrid of process-based and empirically derived methods to create a modular model design that will allow for updates as wind energy technology evolves. The goal of LandBOSSE is to allow researchers, analysts, wind power developers, government agencies, and the public to explore how BOS may vary for different wind plant designs.

17 WIND ENERGY↗

Initial DOE SNF Standardized Canister Storage Configuration Alternatives Study

This study looks at storage configuration alternatives for United States Department of Energy (DOE) Spent Nuclear Fuel (SNF) Standardized Canisters loaded with DOE-owned SNF. The focus of the study is for the DOE SNF Standardized Canisters that would be packaged in the Idaho Nuclear Technology and Engineering Center (INTEC) area at Idaho National Laboratory (INL), but its general findings are useful across the DOE Complex. The study considered storage in existing facilities, modified existing facilities, new facilities, and new modular systems. The existing INTEC facilities considered in the study include the CPP-603 Irradiated Fuel Storage Facility (IFSF), the CPP-749 Underground Fuel Storage Facility (UFSF), the CPP-666 SNF Wet Storage Basin Facility, CPP-1774 Three Mile Island (TMI) Independent Spent Fuel Storage Facility (ISFSF), and the CPP-2707 Cask Pad Facility. The new facilities considered in the study include the Foster Wheeler designed Idaho Spent Fuel (ISF) Independent Spent Fuel Storage Installation (ISFSI) and some conceptual designs. The new modular systems considered in the study include Holtec International’s HI-STAR/HI-STORM, NAC International’s MAGNASTOR/UMS/MPC and Orano TN’s MATRIX/NUHOMS. Based on considerations of various factors, including but not limited to capacity, impact to facility operations, capital costs, expenditure rate, licensing issues, agreements with the State of Idaho, and road ready conditions, new modular storage systems from commercial vendors may have clear advantages over other storage alternatives. This is further supported by recent experience with West Valley Demonstration Project (WVDP) storage project for High Level Waste Glass canisters.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Catalytic Bio-crude Production in a Novel, Short-Contact Time Reactor

RTI has developed a catalytic fast pyrolysis (CFP) process to produce biomass-based hydrocarbon replacement fuels. From a technology perspective, this advanced biofuels process produces liquid transportation fuels that can leverage capital expenditures in the existing petroleum distribution infrastructure. From a business perspective, this technology does not face potential market limitations caused by oxygenate blend limitations for light duty vehicle applications. A promising catalyst has been developed with excellent potential for deoxygenation to produce a hydrocarbon-rich biocrude that is more suitable for upgrading with traditional hydroprocessing technology. The role of the catalyst is to control the chemistry during biomass pyrolysis to produce a biocrude in a single step that has lower oxygen content and is more thermally stable than conventional biomass fast pyrolysis oil. Catalyst properties are optimized to minimize gas and coke production and improve catalytic deoxygenation and biocrude yields. Results from this project have demonstrated that biocrudes from catalytic fast pyrolysis contain <20 wt% oxygen, with the organic fraction as low as 12% oxygen. These oxygen numbers are > 50% lower compared to traditional fast pyrolysis oils. The biocrude produced from our CFP process can be upgraded to gasoline range hydrocarbons. A very conservative approach for upgrading included a preliminary stabilization step followed by a hydroprocessing step. The oxygen content in the upgraded product was decreased by 97% (to less than 3wt %) from the oxygen content of the biocrude sample. Additionally, the acid content was reduced by 99% from the acid content of the biocrude sample. In an optimized integrated process, the CFP step and the hydroprocessing (upgrading) step need to be carefully balanced to maximize the input biomass energy that is recovered in the finished biofuels. Hydrogen utilization and carbon recovery during both catalytic biomass pyrolysis and biocrude upgrading need to be optimized to maximize energy recovery in the finished biofuel. A nominal 1 ton per day (TPD) catalytic biomass pyrolysis system was designed based on the laboratory experimental data. The system was designed to achieve the short residence times (0.5–2 sec) and high heat transfer rates required for maximum liquid biocrude yields while optimizing process integration to maintain catalyst activity by continuous regeneration. The catalytic biomass pyrolysis reactor is a continuously circulating single-loop transport reactor design that is flexible enough to allow sensitivity studies around temperature, residence time, biomass feed rate, and catalyst-to-biomass ratio (i.e., catalyst circulation rate) for process optimization. For a nominal 100 lb/hr feed rate of dry biomass, the products include ~25 lb/hr char and coke, ~20 lb/hr permanent gases, and ~55 lb/hr condensable vapors. Pyrolysis temperatures are 350–600°C, and the system is operated close to ambient pressure. Production of the catalyst developed within the project was scaled up to provide enough material (200kg) for bench-scale testing. The 1TPD bench-scale unit was fabricated, installed and commissioned with this project. Biocrude samples from wood were produced in this unit with the CFP catalyst with material balance > 90%. The intermediate biocrude yields and chemical composition compare well with previous laboratory results and a hydroprocessing strategy for upgrading the resulting biocrude was developed. The experimental results obtained within this project were used to develop a process model for a 2000 TPD commercial facility. Detailed flow sheets were developed for all major unit operations in the process and provided a basis for an economic analysis to develop capital and operating costs. Estimates of the biofuel production costs were used to develop internal rates of return for the yields and compositions measured for the current state of technology at the end of this project and for the yields anticipated for an optimized (nth plant) scenario as additional process improvements are made.

09 BIOMASS FUELS↗

2020 Annual Report of Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPR's ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of available drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns. The process involves an initial assessment of the pillar-to-diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the structural integrity with more detail using geomechanical models. Finite-element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent "red flags" for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the cavern's drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report includes an update to the baseline drawdowns for each cavern, and provides an initial assessment of the evolution of drawdown expenditure for several caverns

02 PETROLEUM↗

ION Engineering Commercial Carbon Capture Design & Costing (C3DC) (Final Report)

ION Engineering LLC (ION) has coupled its proven, solvent-based CO 2 capture technology with an exceptionally qualified design and engineering team to complete a pre FEED for a 300-megawatt equivalent commercial-scale CO 2 capture plant for Gerald Gentleman Station’s (GGS) Generation Unit 2 (GGS2). The remarkable team was comprised of ION, Nebraska Public Power District (NPPD), Sargent & Lundy (S&L) with continued support from Koch Modular Process Systems (KMPS), and Siemens. The overall objective of the project was to provide the engineering design and cost estimate at an American Association of Cost Engineers (AACE) Class 3 estimate, resulting in accuracy ranges of -20 to +30% for the capital cost estimate. The project team was successful in completing this objective and was able to overcome the challenges that were presented during the process. A conservative interest rate of 7.0% with a financing term of 20 years was used based on interest rates utilized by S&L for this level of study. The resulting annualization factor is multiplied by the total EPC cost to calculate an annualized capital expenditure. It is estimated that the carbon capture facility treating a 300 MWe slipstream will capture 1.9 million tonnes per year of CO 2 at a capacity factor of 85%. The resulting cost of capture for the CO 2 island was determined to be $\$$36.55/tonne. Utilizing an interest rate of 4.5%, supported by historical rates for previous large capital projects in the power industry, reduces the cost of capture to $32.52/tonne. These cost of capture numbers continue to further ION’s case for commercial deployment of ION’s solvent technology.

20 FOSSIL-FUELED POWER PLANTS↗

Production of Biocrude in an Advanced Photobioreactor-Based Biorefinery

Algenol Biotech, the National Renewable Energy Laboratory (NREL), Georgia Institute of Technology, Arizona State University, and Reliance Industries formed a team to advance the state of the art in algal biomass production and downstream processing technologies, with the end goal of a sustainable, economically viable biofuel intermediate (BFI, biocrude) product. The project included examination of high value co-product production as a market entry strategy and for enhancing the economics of a biorefinery for BFI production. The project targeted innovations in biology, operations, and engineering. The goals of the project were: BFI productivity greater than 4,000 gal-BFI/acre-yr on an annualized basis; energy efficient innovations in downstream operations resulting in an energy expenditure less than 10% of the BFI energy content and a carbon footprint reduction of more than 60% compared to fossil alternatives; and a comprehensive Techno-Economic Analysis (TEA) that identifies limiting factors for commercial viability of a photobioreactor (PBR)-based biofuel product. The project achieved the overall objectives. Strain development efforts led to the identification of a strain (Cyanobacterium sp. AB1166) that, relative to the previous best strain (Cyanobacterium sp. AB1), exhibited a ~10% increase in productivity under commercially-relevant cultivation conditions and also resulted in cultures with a >50% reduction in viscosity such that harvesting efficiency was improved; these results represent achievement of key project milestones. Progress was also made at NREL in altering the biochemical composition of algal biomass to improve the yield of BFI produced via HTL. These strain enhancements coupled with improved outdoor cultivation practices, including semi-continuous operation, increased areal biomass productivity by nearly 80% over the established baseline productivity. The annualized productivity achieved (26.8 g/m2-d), paired with HTL conversion yields realized at NREL and RIL (38% ± 2% BFI), translates to 4,100 gal-BFI/acre-yr, exceeding the FY20 BETO goal of 3,700 gal-BFI/acre-yr. Significant progress was also demonstrated in large scale PBR-based production system design, operability, and cost reduction. A 24,000-L production module comprised of 240 interlinked PBRs was constructed and successfully operated outdoors for over one year in Fort Myers, Florida. Aided by a state-of-the-art productivity model, the productivities achieved convincingly demonstrated scalability of laboratory results determined at the mL to L scale to large-scale outdoor operations exceeding 20,000 L. The system was used to cultivate Arthrospira platensis (Spirulina), an industrially-relevant cyanobacterium and source for phycocyanin, an approved blue food colorant that Algenol is developing as a risk reduction strategy for future biofuel projects and as a potential business opportunity. A key project milestone to develop phycocyanin extraction and purification technologies was achieved ahead of schedule, and product samples received positive feedback from potential customers. The production and downstream operations data generated in this project were used to conduct and refine Techno-Economic and Life Cycle Assessments to provide research guidance for reducing the costs and environmental footprint of algal biofuel and co-product manufacturing plants. Several CO 2 supply scenarios for an algal biorefinery were identified as being capable of providing a large (>60%) reduction in carbon footprint in comparison to gasoline. The TEA assessments incorporated detailed comparisons of PBR versus open pond production systems, yielding a 3-fold higher areal productivity for PBRs and suggesting overall production cost parity for the two systems. The progress in this ABY2 project addressed many of the the barriers identified for the Advanced Algal Systems R&D Program and are directly relevant to achieving the established BETO goals associated with large scale biofuel production and cost reduction.

09 BIOMASS FUELS↗

Current Challenges, Constraints and Recommendations for Reducing Cost of Physical Security at US Commercial Nuclear Power Plants

Economic or financial causes have led to closure or announced early retirement of several US nuclear reactors in the last five years. The published report "Economic and Market Challenges Facing the U.S. Nuclear Commercial Fleet – Cost and Revenue Study" by Idaho National Laboratory identified 63 of the 79 studied nuclear power plants (NPPs) lost money in the year 2016. The revenue gap analysis performed in the study also concluded that additional revenue is required to return most of these nuclear power units to profitable operations. This can be achieved by reducing operation and maintenance (O&M) costs that accounts for about 70% of total operating expenditures for an NPP. The Light Water Reactor Sustainability (LWRS) Program conducts research and development, sponsored by the US Department of Energy, that provides a technical foundation for licensing and managing the long-term safe and economical operation of current nuclear power plants, utilizing the unique capabilities of the national laboratory system. Reduction in O&M costs aligns with the LWRS program’s mission of providing science-based solutions to the nuclear industry to implement technologies and methodologies for safe, efficient, economical, and long-term operation.

97 MATHEMATICS AND COMPUTING↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗

An Overview of Behind-the-Meter Solar-Plus-Storage Program Design: With Considerations for India

Indian consumers have been deploying behind-the-meter generation (predominantly diesel backup, and, more recently, photovoltaic) and storage systems (predominantly lead-acid and other kinds of batteries as uninterrupted power supplies) by the millions for decades) to address reliability issues within the Indian power system. The same energy storage systems could provide additional services to the consumer and distribution companies if properly regulated and designed from the outset to be grid interactive. Grid-connected distributed solar PV (DPV), or rooftop solar, has also seen wide deployment in India and features prominently in the Government of India’s plans for a transition to clean, reliable, and affordable energy for all. At the same time, many utilities and state governments, as well as the central government in India are currently funding-constrained for both operational and future capital expenditures in the power sector, and some perceive customer-sited resources as exacerbating existing financial challenges. In that context, behind-the-meter energy storage systems paired with distributed photovoltaic (DPV) - with the capability to act as both generation and load - represent a potentially unique and disruptive power sector technology capable of providing a range of important services to customers, utilities, and the broader power system in India. This report aims to offer a comprehensive, evidence-based approach to designing customer programs based on experience in the United States that can help regulators, utilities, and policymakers in India manage the range of challenges and opportunities that increased behind-the-meter energy storage deployment will bring to the power system, in particular when these systems are paired with DPV.

14 SOLAR ENERGY↗

Assessment of the Dominican Republic’s Commercial and Industrial Scale Energy Efficiency Sector

In this paper the National Renewable Energy Laboratory (NREL) explores the commercial and industrial (C&I) energy efficiency market in the Dominican Republic, including the market’s current status. During NREL’s engagement with its Dominican counterparts, NREL noted market gaps, identified by both public and private sector market actors, that became the focus of this report. The intent is two-fold. First, to assist potential customers, project financing institutions, and various government agencies understand where the energy efficiency sector stands, in August 2020. Second to help them recognize the scope, scale, and opportunity for energy savings from untapped potential large reductions in energy expenditures. This research identified how savings could be captured through improvements to the enabling environment, technical capacity, and level of activity in the sector. Moreover, it determined that through taking action to catalyze energy efficiency investment, the government could make significant progress towards its self-declared NDC goals, and result in tens of millions of dollars in savings across the Dominican economy for both the private and public sectors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Background Data and Statistics on Low-Income Energy Use and Burden for the Weatherization Assistance Program: Update for Fiscal Year 2020

This report provides updated estimates of the energy consumptions, energy expenditures, and energy burdens of the population eligible to be served through the US Department of Energy (DOE) Weatherization Assistance Program (WAP) and by proxy, those clients actually served by the program. WAP continues to serve a population with an energy burden that is much greater than the rest of the county. The mean energy burden for the WAP-eligible population across the United States for FY 2020 is estimated to be 13.9% compared to 3.0% for households living above the 200% poverty threshold. The mean energy burden for households living below the 100% federal poverty line was estimated to be 30.9%. These energy burdens for the WAP-eligible population have remained steady at this high level over the last decade.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2019 Annual Report of Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPR's ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Determining the number of drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns (Sobolik et al., 2014; Sobolik 2016). The process involves an initial assessment of the pillar-to-diameter (P/D) ratio for each cavern with respect to neighboring caverns. Ideally, it is desired to keep this value greater than 1.0, which is in line with most industry design standards and should ensure cavern integrity and prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the structural integrity with more detail using geomechanical models. Finite-element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent "red flags" for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales authorized by the Congress or the President), the changes to the cavern volumes caused by these procedures must be tracked and accounted for so that an ongoing assessment of the cavern's drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report includes an update to the baseline drawdowns for each cavern, and provides an initial assessment of the evolution of drawdown expenditure for several caverns

02 PETROLEUM↗

Summary Overview of Content Guidance For Early Site Permit Applications

The Early Site Permit (ESP) process offered under Title 10 Code of Federal Regulations (CFR) Part 52, Subpart A, was promulgated by the Nuclear Regulatory Commission (NRC) in 1989 to address industry concerns with the former licensing process under 10 CFR Part 50. Previously, the licensing process required large expenditures of time and money by applicants well before key site specific environmental, safety, and emergency planning issues could be resolved. As envisioned, the ESP process is meant to resolve these issues well in advance of when a decision is made to build a nuclear power facility and before substantial capital is invested in the construction of a new nuclear facility. The ESP application is required to provide design information pertaining to structures, systems, and components along with site-specific parameters (such as meteorology, demographics, and hydrology) and address site safety, environmental protection, and emergency planning. Although an ESP applicant does not need to specify a particular nuclear plant design, as in construction permit applications, it does need to provide sufficient surrogate design information (developed to bound the nuclear plant design(s) that are being considered by the applicant) so that the NRC can make a determination on the acceptability of the site and the environmental impacts, and determine whether designs bounded by the surrogate design information provided by the applicant can be qualified for the proposed site.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Technology Innovation Pathways for Distributed Wind Balance-of-System Cost Reduction

This exploratory analysis characterizes the balance-of-system (BOS) cost reduction opportunity for small, commercial, medium, and large distributed wind systems. To do this, we used the National Renewable Energy Laboratory’s (NREL’s) Land-based Balance of System Systems Engineering (LandBOSSE) model (Eberle et al. 2019). This model calculates the capital expenditures (CapEx) associated with installation and the system components (e.g., foundation and electrical infrastructure) other than the rotor nacelle assembly and tower. Then, building on the cost reduction potential assessment, we provide a more qualitative evaluation of prospective technology innovation concepts that may enable realization of those cost reductions for distributed wind systems.

17 WIND ENERGY↗

Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve (2021 Annual Report)

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPRs ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of available drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns (Sobolik et al., 2014; Sobolik 2016). The process involves an initial assessment of the pillar - to - diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the structural integrity with more detail using geomechanical models. Finite-element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent red flags for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales , purchases, or exchanges authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the caverns drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern, and the most recent assessment of the evolution of drawdown expenditure for several caverns .

02 PETROLEUM↗