Engineering PapersSearch

SEARCH · Engineering Papers

Results for “technical management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Implementation of Human Systems Integration Technical and Management Process for the Lunar Gateway Program

NASA recognizes Human Systems Integration (HSI) as part of the overall systems engineering and acquisition strategy for space systems. The Lunar Gateway Program is implementing HSI technical and management process across the lifecycle of the mission, as required by NPR 7123.1C NASA Systems Engineering Processes and Requirements, and led by the Gateway HSI team as required by NPR 8705.2C Human-Rating Requirements for Space Systems, now HEOMD-003 Crewed Deep Space Systems Human Rating Certification Requirements and Standards for NASA Missions. NASA has been using HSI principles for many years and has applied them to many of its previous human spaceflight Programs. As NASA returns to the Moon in a more sustainable manner, the Gateway Program is maturing the application of HSI by implementing it more visibly as part of Artemis, with guidance from the NASA/SP-20210010952 NASA HSI Handbook. This paper discusses how HSI is being implemented in the Gateway Program, challenges faced with its implementation during the development phase, and strategies/approaches used to overcome those. The paper also covers HSI implementation for flight systems, vehicle processing, and interfaces across the six identified NASA HSI Domains: human factors engineering, operations, safety, training, maintainability and supportability, habitability and environment. The goal is to provide an overview of the implementation process of HSI in the Gateway Program as an example for other Programs/Projects/Missionsthat are looking to implement HSI.

Jackelynne Silva-Martinez

Technical and Management Information System (TMIS)

The TMIS goals developed to support the Space Station Program (SSP) mission requirements are outlined. The TMIS will provide common capabilities to all SSP centers and facilitate the flow of technical and management information throughout the program as well as SSP decision-making processes. A summary is presented of the various TMIS phases.

Rau, Timothy R.

Technical and management information system: The tool for professional productivity on the space station program

The Space Station Program is highly complex not only in its technological goals and requirements but also in its organizational structure. Eight Contractor teams supporting four NASA centers plus Headquarters must depend on effective exchange of information--the lifeblood of the program. The Technical and Management Information System (TMIS) is the means by which this exchange can take place. Value of the TMIS in increasing productivity comes primarily from its ability to make the right information available to whomever needs it when it is needed. Productivity of the aerospace professional and how it can be enhanced by the use of specifically recommended techniques and procedures for information management using the TMIS are discussed.

Montoya, G.

Space Station Freedom - Technical and management challenges

The development of the Space Station is reviewed, focusing on the technical and managerial aspects of the program. The optimization of the Space Station configuration, utilization impacts on design, technical aspects of the distribution systems, and the problems of designing for a lifetime of 30 years or more are discussed. In addition, cost reduction studies, testing and verification, determining the assembly sequence, and operational communications and support systems are examined. Managerial aspects of the program include organization, program control, management tools and processes, and the integration of elements from the international partners.

Moser, Thomas L.

The NASA Air Traffic Management Ontology: Technical Documentation

This document is intended to serve as comprehensive documentation for the NASA Air Traffic Management (ATM) Ontology. The ATM Ontology is a conceptual model that defines key classes of entities and relationships pertaining to the US National Airspace System (NAS) and the management of air traffic through that system. A wide variety of classes are represented in the ATM Ontology, including classes corresponding to flights, aircraft, manufacturers, airports, airlines, air routes, NAS facilities, air traffic control advisories, weather phenomena, and many others. The Ontology can be useful in the context of a variety of information management tasks relevant to NAS, including information exchange, data query and search, information organization, information integration, and terminology standardization.

information management

Human Spaceflight Safety for the Next Generation on Orbital Space Systems

The National Aeronautics and Space Administration (NASA) Commercial Crew Program (CCP) has been chartered to facilitate the development of a United States (U.S.) commercial crew space transportation capability with the goal of achieving safe, reliable, and cost effective access to and from low Earth orbit (LEO) and the International Space Station (ISS) as soon as possible. Once the capability is matured and is available to the Government and other customers, NASA expects to purchase commercial services to meet its ISS crew rotation and emergency return objectives. The primary role of the CCP is to enable and ensure safe human spaceflight and processes for the next generation of earth orbital space systems. The architecture of the Program delineates the process for investment performance in safe orbital systems, Crew Transportation System (CTS) certification, and CTS Flight Readiness. A series of six technical documents build up the architecture to address the top-level CTS requirements and standards. They include Design Reference Missions, with the near term focus on ISS crew services, Certification and Service Requirements, Technical Management Processes, and Technical and Operations Standards Evaluation Processes.

Mango, Edward J.

Earned Value Management (EVM): Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects.

Control Account Manager

Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report

Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

Source record

Midcourse Space Experiment Data Certification and Technology Transfer

The University of Alabama in Huntsville contributes to the Technical Management of the Midcourse Space Experiment Program, to the Certification of the Level 2 data produced by the Midcourse Space Experiment's suite of in-orbit imaging radiometers, imaging spectra-radiometers and an interferometer and to the Transfer of the Midcourse Space Experiment Technology to other Government Programs. The Technical Management of the Midcourse Space Experiment Program is expected to continue through out the spacecraft's useful life time, 5 years after its 1996 launch. The Transfer of Midcourse Space Experiment Technology to other government elements is expected to be on a demand basis by the United States Government and other organizations. The University of Alabama Huntsville' contribution specifically supports the nine Ultraviolet Visible Imagers and Spectrographic Imagers (UVISI) and the Pointing and Alignment of all eleven of the science instruments. The science instruments effectively cover the 0.1 to 28 micron spectral region. The Midcourse Space Experiment spacecraft, launched April 24, 1996, is expected to have a 5 year useful lifetime with a 12 month lifetime for the cryogenically cooled IR sensor. A pre-launch, ground based calibration of the instruments provided a basis for the pre-launch certification of the Level 2 data base these instruments produce. With the spacecraft in-orbit the certification of the instruments' Level 2 data base is being extended to the in-orbit environment.

Pollock, David B.

Midcourse Space Experiment Data Certification and Technology Transfer

The University of Alabama in Huntsville contributes to the Technical Management of the Midcourse Space Experiment Program, to the Certification of the Level 2 data produced by the Midcourse Space Experiment's suite of in-orbit imaging radiometers, imaging spectro-radiometers and an interferometer and to the Transfer of the Midcourse Space Experiment Technology to other Government Programs. The Technical Management of the Midcourse Space Experiment Program is expected to continue through out the spacecraft's useful life time. The Transfer of Midcourse Space Experiment Technology to other government elements is expected to be on a demand basis by the United States Government and other organizations. The University, of Alabama Huntsville' contribution specifically supports the Principal Investigator's Executive Committee, the Deputy Principal Investigator for Data Certification and Technology Transfer team, the nine Ultraviolet Visible Imagers and Spectrographic Imagers (UVISI) and the Pointing and Alignment of all eleven of the science instruments. The science instruments effectively cover the 0.1 to 28 micron spectral region. The Midcourse Space Experiment spacecraft, launched April 24, 1996, is expected to have a 5 year useful lifetime. The cryogenically cooled IR sensor, SPIRIT III, performed through February, 1997 when its cryogen expired. A pre-launch, ground based calibration of the instruments provided a basis for the pre-launch certification of the Level 2 data base these instruments produce. With the spacecraft in-orbit the certification of the instrument's Level 2 data base was extended to the in-orbit environment.

Pollock, David B.

Unique strategies for technical information management at Johnson Space Center

In addition to the current NASA manned programs, the maturation of Space Station and the introduction of the Space Exploration programs are anticipated to add substantially to the number and variety of data and documentation at NASA Johnson Space Center (JSC). This growth in the next decade has been estimated at five to ten fold compared to the current numbers. There will be an increased requirement for the tracking and currency of space program data and documents with National pressures to realize economic benefits from the research and technological developments of space programs. From a global perspective the demand for NASA's technical data and documentation is anticipated to increase at local, national, and international levels. The primary users will be government, industry, and academia. In our present national strategy, NASA's research and technology will assume a great role in the revitalization of the economy and gaining international competitiveness. Thus, greater demand will be placed on NASA's data and documentation resources. In this paper the strategies and procedures developed by DDMS, Inc., to accommodate the present and future information utilization needs are presented. The DDMS, Inc., strategies and procedures rely on understanding user requirements, library management issues, and technological applications for acquiring, searching, storing, and retrieving specific information accurately and quickly. The proposed approach responds to changing customer requirements and product deliveries. The unique features of the proposed strategy include: (1) To establish customer driven data and documentation management through an innovative and unique methods to identify needs and requirements. (2) To implement a structured process which responds to user needs, aimed at minimizing costs and maximizing services, resulting in increased productivity. (3) To provide a process of standardization of services and procedures. This standardization is the central theme of the strategic approach. It will allow Division level Data and Documentation Libraries (DDL's) to function independently and optimize efficiency at the Directorate level. This process also facilitates interconnectivity between Division level DDL's and makes them transparent to the users. (4) To implement the process of 'cost savings', and at the same time the objective is to gain substantial improvement in the organization, categorization, and preservation of JSC-generated data and documentation, and (5) To find, locate, retrace, restore, and preserve the Center-generated crucial scientific and technical information that has been and is being provided by the engineers and scientists of JSC. This is important to the preservation of 'lessons learned'. Preliminary estimates of the possible cost savings which will result from the implementation of this process will also be discussed in this paper.

Krishen, Vijay

Core Technical Capability Laboratory Management System

The Core Technical Capability Lab - oratory Management System (CTCLMS) consists of dynamically generated Web pages used to access a database containing detailed CTC lab data with the software hosted on a server that allows users to have remote access.

Shaykhian, Linda

Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P-CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P-CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects. Because NASA implements a diverse and unique portfolio of projects, those projects have traditionally created project-specific systems to manage planning and performance analysis. However, establishment and implementation of a project management system that is common across all centers and mission directorates will facilitate the adoption of best business practices. In addition, the application of timely and predictive analysis, as well as, providing all stakeholders with greater insight into project performance will enhance opportunities for project success. For more detailed information, refer to the NASA EVM System Description; Integrated Baseline Review (IBR) Handbook; EVM Implementation Handbook; Schedule Management Handbook; Work Breakdown Structure (WBS) Handbook; and other agency/industry documentation. In addition, you may contact your local center’s EVM Focal Points. All this information and more can be found at and/or the NASA Engineering Network located at https://nen.nasa.gov/web/pm.

Christopher Lewis Sadler

The role of criteria in design and management of space systems

Explicit requirements and standards arising in connection with space systems management serve as a framework for technical management and furnish legally binding control of development, verification, and operations. As a project develops, additional requirements are derived which are unique to the system in question; these are designated 'derived requirements'. The reliability and cost-effectiveness of a space system are best ensured where a balance has arisen between formal (legally binding) and informal. Attention is presently given to the development of criteria consistent with total quality management.

Blair, J. C.

Systems Engineering Awareness

The presentation will provide an overview of the fundamentals and principles of Systems Engineering (SE). This includes understanding the processes that are used to assist the engineer in a successful design, build and implementation of solutions. The context of this presentation will be to describe the involvement of SE throughout the life-cycle of a project from cradle to grave. Due to the ever growing number of complex technical problems facing our world, a Systems Engineering approach is desirable for many reasons. The interdisciplinary technical structure of current systems, technical processes representing System Design, Technical Management and Product Realization are instrumental in the development and integration of new technologies into mainstream applications. This tutorial will demonstrate the application of SE tools to these types of problems..

technical management

New Technology for the Fire Attire

Although little can be done to reduce the risks of firefighting, something can be done to curb the injuries and fatalities. This is the goal of Project FIRES, a program jointly sponsored by NASA and the Federal Emergency Management Agency's U.S. Fire Administration with technical management provided by Marshall Space Flight Center. Project FIRES (Firefighter's Integrated Response Equipment System) involves applications of advanced materials and design concepts, derived from Apollo to update existing gear which does not adequately protect against many of the hazards encountered in fire suppression activities. A major focus of the effort involves application to the FIRES ensemble of lightweight, fire-resistant, heat-protective materials originally developed for use in astronauts' space suits or in spacecraft components which require thermal protection. Data from the fourteen municipal fire departments participating in the field evaluation will form a basis for development of new nationwide protective ensemble students.

Source record

ISS Crew Transportation and Services Requirements Document

Under the guidance of processes provided by Crew Transportation Plan (CCT-PLN-1100), this document with its sister documents, Crew Transportation Technical Management Processes (CCT-PLN-1120), Crew Transportation Technical Standards and Design Evaluation Criteria (CCT-STD-1140), and Crew Transportation Operations Standards (CCT-STD-1150), and International Space Station (ISS) to Commercial Orbital Transportation Services Interface Requirements Document (SSP 50808), provides the basis for a National Aeronautics and Space Administration (NASA) certification for services to the ISS for the Commercial Provider. When NASA Crew Transportation System (CTS) certification is achieved for ISS transportation, the Commercial Provider will be eligible to provide services to and from the ISS during the services phase of the NASA Commercial Crew Program (CCP).

Commercial Crew Program