Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “standard review plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A unified approach for composite cost reporting and prediction in the ACT program

The Structures Technology Program Office (STPO) at NASA Langley Research Center has held two workshops with representatives from the commercial airframe companies to establish a plan for development of a standard cost reporting format and a cost prediction tool for conceptual and preliminary designers. This paper reviews the findings of the workshop representatives with a plan for implementation of their recommendations. The recommendations of the cost tracking and reporting committee will be implemented by reinstituting the collection of composite part fabrication data in a format similar to the DoD/NASA Structural Composites Fabrication Guide. The process of data collection will be automated by taking advantage of current technology with user friendly computer interfaces and electronic data transmission. Development of a conceptual and preliminary designers' cost prediction model will be initiated. The model will provide a technically sound method for evaluating the relative cost of different composite structural designs, fabrication processes, and assembly methods that can be compared to equivalent metallic parts or assemblies. The feasibility of developing cost prediction software in a modular form for interfacing with state of the art preliminary design tools and computer aided design (CAD) programs is assessed.

Freeman, W. Tom↗

Progress on the Development of Future Airport Surface Wireless Communications Network

Continuing advances in airport surface management and improvements in airport surface safety are required to enable future growth in air traffic throughout the airspace, as airport arrival and departure delays create a major system bottleneck. These airport management and safety advances will be built upon improved communications, navigation, surveillance, and weather sensing, creating an information environment supporting system automation. The efficient movement of the digital data generated from these systems requires an underlying communications network infrastructure to connect data sources with the intended users with the required quality of service. Current airport surface communications consists primarily of buried copper or fiber cable. Safety related communications with mobile airport surface assets occurs over 25 kHz VHF voice and data channels. The available VHF spectrum, already congested in many areas, will be insufficient to support future data traffic requirements. Therefore, a broadband wireless airport surface communications network is considered a requirement for the future airport component of the air transportation system. Progress has been made on defining the technology and frequency spectrum for the airport surface wireless communications network. The development of a test and demonstration facility and the definition of required testing and standards development are now underway. This paper will review the progress and planned future work.

Kerczewski, Robert J.↗

The Forward Physics Facility at the High-Luminosity LHC

High energy collisions at the High-Luminosity Large Hadron Collider (LHC) produce a large number of particles along the beam collision axis, outside of the acceptance of existing LHC experiments. The proposed Forward Physics Facility (FPF), to be located several hundred meters from the ATLAS interaction point and shielded by concrete and rock, will host a suite of experiments to probe standard model (SM) processes and search for physics beyond the standard model (BSM). In this report, we review the status of the civil engineering plans and the experiments to explore the diverse physics signals that can be uniquely probed in the forward region. FPF experiments will be sensitive to a broad range of BSM physics through searches for new particle scattering or decay signatures and deviations from SM expectations in high statistics analyses with TeV neutrinos in this low-background environment. High statistics neutrino detection will also provide valuable data for fundamental topics in perturbative and non-perturbative QCD and in weak interactions. Experiments at the FPF will enable synergies between forward particle production at the LHC and astroparticle physics to be exploited. We report here on these physics topics, on infrastructure, detector, and simulation studies, and on future directions to realize the FPF’s physics potential.

47 OTHER INSTRUMENTATION↗

Laser Pyro System Standardization and Man Rating

This viewgraph presentation reviews an X-38 laser pyro system standardization system designed for a new manned rated program. The plans to approve this laser initiation system and preliminary ideas for this system are also provided.

Brown, Christopher W.↗

Approach to Quality Assurance for Complex Environmental Modeling - 20407

A strong Quality Assurance (QA) program for complex environmental modeling is essential for regulatory and public acceptance and trust, but it does not have to be onerous. Neptune and Company, Inc. (Neptune) has developed a strong QA program that improves transparency, traceability, reproducibility, and therefore, defensibility and trust. Neptune's QA program has evolved over the past 27 years, transitioning from an ad hoc QA program, to a program that is currently Nuclear Quality Assurance-1 (NQA-1) compliant, and will soon be NQA-1/DOE approved for DOE EM modeling work. In addition, Neptune is a qualified laboratory assessor and qualified auditor for reference materials, a proficiency testing provider, and fully complies with the Environmental Protection Agency (EPA) QA program. Neptune's President and CEO, Kelly Black, was recently named the Chairperson of the International Organization for Standardization (ISO) Technical Committee 69, Application of Statistical Methods. A strong QA program has been developed for Neptune's radiological performance assessment (PA) program. Although pieces of their QA program are currently in development, their current program includes document control using Subversion, issue tracking and work flow tracking using JIRA, and transparency and traceability via a system of 'calc sheets' for documentation of all data analysis and modeling combined with 'check print' documentation of QA checking, and rigorous model testing and configuration control. All work is reviewed by an independent subject matter expert who is not associated with the collection and assembly of information, for an internal peer review. The program is enforced with a handful of Standard Operation Procedures (SOPs), Work Instructions, QA Project Plans (QAPPs), and Quality Management Plans (QMPs) that are updated frequently, with required annual training and acknowledgment. In addition, effective communication of modeling approaches and results to clients and stakeholders are integral to their QA program. Many of their models are built using the GoldSim modeling platform, for which their models are well-known for their level of transparency, documentation, and QA traceability. This level of QA is also applied to their process-level models. Neptune has taken some lessons learned from the extremely rigorous QA program required for the Yucca Mountain Project (YMP), and imposed the YMP requirements of complete traceability, transparency, and reproducibility, but avoided the inflexibility of a QA program that likely contributed to the suspect e-mails in 2005 that resulted in loss of trust in the YMP, and in nuclear waste disposal (and nuclear power) in general. There are far too many examples of loss of public trust due to poor QA that could have been easily avoided with a simple and straight-forward QA program combined with stakeholder engagement. The purpose of this paper is to share features of Neptune's Radiological Performance Assessment program QA program, and some of their QA related lessons learned over the past 27 years of QA for complex environmental modeling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Setting Spacecraft Maximum Allowable Concentrations for 1 hour or 24 hour contingency exposures to airborne chemicals

Since the early years of the manned space program, NASA has developed and used exposure limits called Spacecraft Maximum Allowable Concentrations (SMACs) to help protect astronauts from airborne toxicants. Most of these SMACS are based on an exposure duration of 7 days, since this is the duration of a 'typical' mission. A set of 'contingency SMACs' is also being developed for scenarios involving brief (1-hour or 24- hour) exposures to relatively high levels of airborne toxicants from event-related 'contingency' releases of contaminants. The emergency nature of contingency exposures dictates the use of different criteria for setting exposure limits. The NASA JSC Toxicology Group recently began a program to document the rationales used to set new SMACs and plans to review the older, 7-day SMACs. In cooperation with the National Research Council's Committee on Toxicology, a standard procedure has been developed for researching, setting, and documenting SMAC values.

Garcia, Hector D.↗

NASA Specialized Center for Research and Training (NSCORT) in space environmental health

Activities of the Center for Space Environmental Health (CSEH), one of several NSCORTs supported by NASA in order to advance knowledge in environmental health in space habitats, are reviewed. Research in environmental health will define the standards or requirements needed to protect human health. This information will affect mission plans and the design of space habitats. This reseach will study unique contaminant stresses and lead to risk models for human health and performance.

Clarkson, Thomas W.↗

Next Steps in Planetary Protection for Human Spaceflight

Planetary protection is defined as: a) the prevention of contamination of extraterrestrial bodies by terrestrial microorganisms, and b) biohazard containment of returned samples from bodies in the Solar System that could harbor life.1 While the majority of interplanetary missions to date have involved robotic exploration, future missions will include human explorers. Current planetary protection requirements do not address the unique challenges associated with human exploration. The purpose of this abstract is to review planetary protection efforts for crewed missions and provide a forward plan for implementing them at the systems level. Article IX of the UN Outer Space Treaty of 1967 provides the definition of planetary protection, outlined above.1 COSPAR holds the international standard in line with this treaty2, while NASA's Planetary Protection Policy (NPD 8020.7G) outlines the U.S. implementation of the COSPAR standard. 3;4 NPI 8020.7 groups future human spaceflight planetary protection studies as follows: 1) microbial monitoring, 2) contamination mitigation and control, and 3) environmental effects. Additionally, a NPI 8020.7 outlines a five-step plan for forward work: 1) a literature review, 2) community inputs, 3) completion of recommended studies, 4) developing a draft NPR, and 5) implementation with NASA teams. The literature review was published in 2016.5 Inputs from the community were gathered at the Planetary Protection Knowledge Gaps for Human Extraterrestrial Missions, held in 2015.6 Johnson and Race (2016) outlined notional requirements and prioritized studies needed before final requirements can be produced. This prior work sets the stage for completing the necessary studies and finalizing planetary protection requirements for human spaceflight. We propose a continuation of the systems engineering approach adopted thus far. The challenges associated with the implementation of notional requirements will be quantified in detailed discussions with internal stakeholders. The status and results of high-priority studies that have been completed since 2016 or are ongoing will be incorporated into discussions with stakeholders. In this way, we plan to bridge the gap between the science behind planetary protection and the engineering development that will implement it, allowing finalized planetary protection requirements to be developed for future human space missions.

Mitchell, Julie↗

State Insights On The Water-Energy Nexus And Policy Ideas To Achieve Greater Savings

Governors, state policymakers, utilities and other stakeholders across the country are increasingly aware of the connection between energy and water production and use, and the need to conserve both resources to meet economic and environmental goals. It requires substantial amounts of water to produce energy and considerable amounts of energy to treat and deliver water. The critical interdependence between energy and water was clearly illustrated during the recent winter storm in Texas and other parts of the South in February 2021. Initial power outages contributed to a longer-term water crisis. Power outages led to water pump failures while water demand increased from frozen water pipes that burst. This caused low water pressure that can lead to harmful bacteria growth in the water. The power outages also prevented water treatment plants from properly treating the water for several days, thereby leaving many residents without clean drinking water and worsening the storm’s impacts. The National Governors Association has been working with states on this connection between water and energy and strategies for conserving those resources for several years. NGA held a Water-Energy Nexus Learning Lab in September 2020. This event invited two leading states in the water-energy nexus space, Arizona and Wisconsin, to showcase some of their model policies and programs to other states, Maryland, Nevada, North Carolina, North Dakota, and Washington, looking for greater savings opportunities. This paper provides an overview of challenges that states are facing in developing integrated water and energy conservation policies; provides background on Arizona and Wisconsin’s innovative water-energy policies and programs; and summarizes action items the participating state teams identified for their respective states. The main categories of policy solutions identified by states at NGA’s Water-Energy Nexus Learning Lab were: Funding & Financing – providing financial incentives for water efficiency modeled after established energy efficiency programs, and an emphasis on financial support for small water and energy utilities. Education & Technical Assistance – providing more education and training opportunities about ways to achieve cost-effective energy and water savings, and the needs of resource-constrained small and medium utilities for training and other assistance. Structural Changes to Encourage Conservation – developing ways to incentivize agricultural conservation such as through water allocation strategies; adopting water reuse or water loss standards; and requiring electric utilities to consider water impacts as part of their integrated resource planning process. Communications & Data – conducting energy audits, reviewing water data provided to state agencies, and developing data benchmarking tools to measure and better manage energy and water use. Climate Strategy – establishing a multi-agency working group or other collaborative approach to determine ways to integrate energy and water savings in state policies and help meet the state climate objectives.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Solar Automated Permit Processing Software for Distributed PV (Cooperative Research and Development Final Report, CRADA Number CRD-19-00825)

NREL and its project partners built and commercialized the novel Solar Automated Permitting Processing Plus (SolarAPP+) software platform that delivers instant residential rooftop solar permits. The tool provides installers with a standard portal for entering permit information for residential solar systems across all Authorities Having Jurisdiction (AHJs) using SolarAPP+, thereby providing a streamlined plan review form, transparency into permitting timelines, and required specifications. The project has proven to reduce permitting timelines from as many as 20 business days to zero, delivering solar projects faster in the four participating AHJs using the platform. Streamlining permitting timelines, all else equal, results in consumers installing their systems and reducing their electricity bills faster. The continued expansion of SolarAPP+ features and adoption nationwide will expand the benefits of the SolarAPP+ beyond the current user base.

14 SOLAR ENERGY↗

Current and future federal and state sampling guidance for per- and polyfluoroalkyl substances in environmental matrices

Per- and polyfluoroalkyl substances (PFAS) are a class of emerging contaminants composed of an estimated 5000 to 10,000 human-made, fluorinated, organic chemicals. Due to the complexity of PFAS, the need for multiple environmental matrix considerations and the absence of a promulgated federal standard for environmental sampling and analysis, U.S. states have begun developing health-based regulatory and/or guidance values for a limited number of PFAS in environmental matrices. As there is a growing body of science to inform PFAS sampling guidance standard development, it is important to understand which U.S. states are implementing sampling guidelines and how they plan to handle emerging PFAS. This critical review discusses the current and impending federal and state sampling guidelines for PFAS in environmental matrices, the data gaps surrounding PFAS sampling guidance in U.S. states, and the future impacts of impending guidance documents and regulations. Ten federal guidance documents are available for PFAS sampling guidance and analysis. The maximum number of PFAS covered in these guidance documents is 25 analytes spanning across 8 unique media. While the EPA has developed several different sampling and analytical guidelines for PFAS, there is no formal regulation of PFAS or requirements of states to enforce these guidelines. Consequently, only 31 states have informally adopted sampling guidelines, while the other 19 states have no guidance documentation in place for PFAS. The introduction of new PFAS sampling guidelines by the EPA, as well as updated analytical guidelines that target more PFAS or total organofluoride, is expected to continuously shift the landscape of federal and state guidance for PFAS sampling moving forward.

54 ENVIRONMENTAL SCIENCES↗

Update of Erosion Conditions and Assessment of Mitigation Options for the L-Bar Site

The L-Bar former uranium milling site was remediated and closed per regulations and is now under the long-term stewardship of the U.S. Department of Energy, Office of Legacy Management (DOE/LM). Since assuming stewardship in 2004, DOE/LM has observed erosion and sedimentation processes at the L-Bar Site that will challenge meeting the design closure criteria in the long term, and therefore erosion control structures were installed in several areas. Portions of these structures were subsequently damaged by summer convective storm events and they are being redesigned. At the request of DOE/LM, Desert Research Institute (DRI) reviewed the proposed redesign plans of the erosion control structures. The purpose of this review is to support DOE/LM decisions regarding mitigation of ongoing erosion processes, including assessing possible repair of the existing erosion control structures, as well as plan for effective long-term site management. This design review is performed in reference to the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards contained in 40 CFR 192.02 that require containment of residual radioactive material be effective for up to 1,000 years (if achievable, but certainly for 200 years), limit radon release, protect groundwater, and minimize future maintenance. The erosion control structures under review are not subject to the UMTRCA standard directly, but they contribute to the performance of the overall containment system by virtue of their relationship with the large diversion channels bounding the disposal cell. The 11 design drawings included in “Erosion Control Alternatives Analysis, L-Bar, New Mexico, Disposal Site, LTS-111-0043-08-002,” dated January 11, 2019, and listed in Appendix A, and supporting calculations in Weston (2019) are the focus of the review. Additionally, DOE/LM provided supporting data such as a 2018 photogrammetry-based digital elevation model of the site, precipitation records collected from an on-site weather station, and sedimentation records collected at an on-site basin. This assessment includes review of the proposed design to mitigate current site conditions but also addresses site changes between the initial erosion assessment report (Miller et al., 2012) and current conditions. The analysis is at a predesign engineering level and does not include development of hydraulic or sediment transport models. Site precipitation data are included in Miller et al. (2012). The natural conditions of the site, the design of site diversion systems, observed erosion at the site, and predesign engineering analysis are used to develop a holistic view of the challenges to L-Bar Site stability and possible responsive actions.

54 ENVIRONMENTAL SCIENCES↗

Federal Communications Commission (FCC) Transponder Loading Data Conversion Software. User's guide and software maintenance manual, version 1.2

This volume contains the complete software system documentation for the Federal Communications Commission (FCC) Transponder Loading Data Conversion Software (FIX-FCC). This software was written to facilitate the formatting and conversion of FCC Transponder Occupancy (Loading) Data before it is loaded into the NASA Geosynchronous Satellite Orbital Statistics Database System (GSOSTATS). The information that FCC supplies NASA is in report form and must be converted into a form readable by the database management software used in the GSOSTATS application. Both the User's Guide and Software Maintenance Manual are contained in this document. This volume of documentation passed an independent quality assurance review and certification by the Product Assurance and Security Office of the Planning Research Corporation (PRC). The manuals were reviewed for format, content, and readability. The Software Management and Assurance Program (SMAP) life cycle and documentation standards were used in the development of this document. Accordingly, these standards were used in the review. Refer to the System/Software Test/Product Assurance Report for the Geosynchronous Satellite Orbital Statistics Database System (GSOSTATS) for additional information.

Mallasch, Paul G.↗

Europa Clipper Payload Verification and Validation: Avionics-Instrument Interface Test Campaign

NASA's Europa Clipper mission will investigate Jupiter's icy moon Europa using a payload suite consisting of nine instruments to address a range of scientific objectives concerning Europa's habitability. As the project proceeds past its Critical Design Review, confidence is being built in the system's ability to achieve mission objectives through the implementation of a rigorous payload verification and validation (V&V) program. As part of this payload V&V program, instrument box-level testing was performed by the payload team to verify select instrument-avionics interface requirements. This testing was performed at JPL using the avionics testbed's Bulk Data Storage Emulator (BDSEM) with visiting instrument Test Models. This paper summarizes the Data Link test campaign involving roughly four days of functional testing per instrument, including planning, testing methods, types of issues found, and the requirement closure process. Detail is also provided on the development, deployment, and validation of a standardized analysis tool used in data reviews. This testing verified requirements related to commanding rates, loss of link, packet format, clock counters, loopback test capability, and SpaceWire jitter and skew margins. Additional risk reduction testing of basic commanding, counter behavior, science data collection and transfer, and interface swapping was also performed. Because the BDSEM venue was not originally designed to be a run for record venue, the process of characterizing venue fidelity and establishing suitability for requirement closure using data collected in this venue will also be addressed.In order to close requirements, an extensible tool was developed to post-process instrument command and telemetry data from their original binary to a human-readable format and give visibility to errors detected within the data, such as packets with Cyclic Redundancy Check errors. This tool, called payload-packet-parser, is a Python 3.9 command line tool built using a variety of open-source Python libraries. Payload-packet-parser was designed to support parsing command and telemetry packets for all Europa Clipper instruments and additional analysis tools were developed for verification of specific information interface requirements. This test campaign, including post-processing using a single parsing and verification toolset, allowed for early interface testing, alleviating testing burdens on instrument teams and buying down risk on the instrument-avionics interface by finding hardware and software issues and idiosyncrasies prior to integration with system test venues. Over twenty issues were discovered across the payload, resulting in software updates and instrument rework well in advance of any system impacts. This paper concludes with an assessment of benefits and costs of this type of testing and lessons learned.

Montanez, Leticia↗

Space information systems in the Space Station era; Proceedings of the AIAA/NASA International Symposium on Space Information Systems, Washington, DC and Greenbelt, MD, June 22, 23, 1987

Technological and planning issues for data management, processing, and communication on Space Station Freedom are discussed in reviews and reports by U.S., European, and Japanese experts. The space-information-system strategies of NASA, ESA, and NASDA are discussed; customer needs are analyzed; and particular attention is given to communication and data systems, standards and protocols, integrated system architectures, software and automation, and plans and approaches being developed on the basis of experience from past programs. Also included are the reports from workshop sessions on design to meet customer needs, the accommodation of growth and new technologies, and system interoperability.

Gerard, Mireille↗

MARVEL 90% Final Design Report

This document provides documentation of the Microreactor Applications Research Validation and Evaluation Project’s (MARVEL) 90% Final Design, as required by U.S. Department of Energy (DOE) Standard-1189, “Integration of Safety into the Design Process." Per DOE-STD-1189-2016, the 90% Final Design documentation focuses on design completion, at a level capable of supporting procurement, construction, testing, and operation. At this phase, the design organization finalizes the hazards and accident analyses, Fire Hazard Analysis (FHA), security vulnerability assessments, and other supporting analyses for design completion. The objective of this report is to provide a high-level summary of the design thus far and provide references including, but not limited to, the following design deliverables: • Complete final drawings, specifications and commercial grade dedications that may be released for bid and/or construction. • Clearly defined testing plans for the safety and functionality of all subsystems. • Quality Assurance Program for Design, Testing and Procurement. • Software Quality Assurance Plan. • Code of Record (COR), applicable design requirements including codes and standards. • Final design that meets all the requirements stipulated in the COR. • Final design review, consisting of final validation of comment resolution from previous reviews, and a review of any additional developments since the last review. • Updated Safety Design Strategy. • Hazard Analysis. • Fire Hazard Analysis. • Accident analysis. • Security vulnerability assessment. • Current and detailed cost estimate. • Current construction schedule, and • Risk & Opportunities Assessment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

ANSI/AIAA S-081A, Pressure Vessel Standards Implementation Guidelines

The stress rupture specification for Composite Overwrapped Pressure Vessels (COPV) is discussed. The composite shell of the COPV shall be designed to meet the design life considering the time it is under sustained load. A Mechcanical Damage Control Plan (MDCP) shall be created and implemented that assures the COPV will not fail due to mechanical damage due to manufacturing, testing, shipping, installation, or flight. Proven processes and procedures for fabrication and repair shall be used to preclude damage or material degradation during material processing, manufacturing operations, and refurbushment.Selected NDI techniques for the liner and/or boss(es) shall be performed before overwrapping with composite. When visual inspection reveals mechanical damage or defects exceeding manufacturing specification levels (and standard repair procedures), the damaged COPV shall be submitted to a material review board (MRB) for disposition. Every COPV shall be subjected to visual and other non-destructive inspection (NDI), per the inspection plan.

Greene, Nathanael J.↗

The SSRI Knowledge Base Tool: Current Tool Functionality Review and Planned Future Enhancements

NASA’s Small Satellite Reliability Initiative (SSRI), in conjunction with NASA’s Small Spacecraft Systems Virtual Institute (S3VI), has developed the SSRI Knowledge Base to improve mission confidence for small spacecraft. The SSRI Knowledge Base provides vetted, high-quality sources of information on elements that are key to successful small spacecraft missions. These resources include SSRI working group generated documents and presentations in addition to existing guides, publications, standards, software tools, websites, and books. The Knowledge Base is fully searchable, offers downloadable content when possible, and otherwise links to or references content directly from within the tool. All 58 of the planned topic pages that comprise the SSRI Knowledge Base have been recently completed and include over 450 unique resources that are now available for review. Over the past several months significant enhancements to the tool’s capabilities have been developed and implemented. These enhancements consist of the completed baseline content; development of an Application Programming Interface (API); improved user interfaces; scalable and searchable Best Practices and Lessons Learned (BPLL) lists with ratings; and custom website analytics. The SSRI Knowledge Base is a comprehensive and searchable online tool that consolidates and organizes resources, best practices, and lessons learned from previous small spacecraft missions sponsored by NASA, other government agencies, and academia. This free, publicly available tool is available to the entire SmallSat community at: NASA SSRI Knowledge Base | Explore. This presentation will discuss the motivation for and development of the SSRI Knowledge Base, demonstrate the existing tool, share how the smallsat community can get involved and outline plans for further enhancement development. The SSRI is a collaborative activity with broad participation from civil, Department of Defense, and both national and international commercial space systems providers and stakeholders. The S3VI is jointly sponsored by NASA’s Space Technology Mission Directorate and Science Mission Directorate.

Small Spacecraft↗