Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “resource planning optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Efficiency Management in Spaceflight Systems

Efficiency in spaceflight is often approached as “faster, better, cheaper – pick two”. The high levels of performance and reliability required for each mission suggest that planners can only control for two of the three. True efficiency comes by optimizing a system across all three parameters. The functional processes of spaceflight become technical requirements on three operational groups during mission planning: payload, vehicle, and launch operations. Given the interrelationships among the functions performed by the operational groups, optimizing function resources from one operational group to the others affects the efficiency of those groups and therefore the mission overall. This paper helps outline this framework and creates a context in which to understand the effects of resource trades on the overall system, improving the efficiency of the operational groups and the mission as a whole. This allows insight into and optimization of the controlling factors earlier in the mission planning stage.

Murphy, Karen↗

Efficiency Management in Spaceflight Systems

Efficiency in spaceflight is often approached as "faster, better, cheaper - pick two". The high levels of performance and reliability required for each mission suggest that planners can only control for two of the three. True efficiency comes by optimizing a system across all three parameters. The functional processes of spaceflight become technical requirements on three operational groups during mission planning: payload, vehicle, and launch operations. Given the interrelationships among the functions performed by the operational groups, optimizing function resources from one operational group to the others affects the efficiency of those groups and therefore the mission overall. This paper helps outline this framework and creates a context in which to understand the effects of resource trades on the overall system, improving the efficiency of the operational groups and the mission as a whole. This allows insight into and optimization of the controlling factors earlier in the mission planning stage.

Murphy, Karen↗

Controlling Distributed Planning

A system of software implements an extended version of an approach, denoted shared activity coordination (SHAC), to the interleaving of planning and the exchange of plan information among organizations devoted to different missions that normally communicate infrequently except that they need to collaborate on joint activities and/or the use of shared resources. SHAC enables the planning and scheduling systems of the organizations to coordinate by resolving conflicts while optimizing local planning solutions. The present software provides a framework for modeling and executing communication protocols for SHAC. Shared activities are represented in each interacting planning system to establish consensus on joint activities or to inform the other systems of consumption of a common resource or a change in a shared state. The representations of shared activities are extended to include information on (1) the role(s) of each participant, (2) permissions (defined as specifications of which participant controls what aspects of shared activities and scheduling thereof), and (3) constraints on the parameters of shared activities. Also defined in the software are protocols for changing roles, permissions, and constraints during the course of coordination and execution.

Clement, Bradley↗

Converging on the optimal attainment of requirements

Planning for the optimal attainment of requirements is an important early lifecycle activity. However, such planning is difficult when dealing with competing requirements, limited resources, and the incompleteness of information available at requirements time.

requirements optimization summarization tradeoffs↗

The Integrated Medical Model - Optimizing In-flight Space Medical Systems to Reduce Crew Health Risk and Mission Impacts

The Integrated Medical Model (IMM) is a decision support tool used by medical system planners and designers as they prepare for exploration planning activities of the Constellation program (CxP). IMM provides an evidence-based approach to help optimize the allocation of in-flight medical resources for a specified level of risk within spacecraft operational constraints. Eighty medical conditions and associated resources are represented in IMM. Nine conditions are due to Space Adaptation Syndrome. The IMM helps answer fundamental medical mission planning questions such as What medical conditions can be expected? What type and quantity of medical resources are most likely to be used?", and "What is the probability of crew death or evacuation due to medical events?" For a specified mission and crew profile, the IMM effectively characterizes the sequence of events that could potentially occur should a medical condition happen. The mathematical relationships among mission and crew attributes, medical conditions and incidence data, in-flight medical resources, potential clinical and crew health end states are established to generate end state probabilities. A Monte Carlo computational method is used to determine the probable outcomes and requires up to 25,000 mission trials to reach convergence. For each mission trial, the pharmaceuticals and supplies required to diagnose and treat prevalent medical conditions are tracked and decremented. The uncertainty of patient response to treatment is bounded via a best-case, worst-case, untreated case algorithm. A Crew Health Index (CHI) metric, developed to account for functional impairment due to a medical condition, provides a quantified measure of risk and enables risk comparisons across mission scenarios. The use of historical in-flight medical data, terrestrial surrogate data as appropriate, and space medicine subject matter expertise has enabled the development of a probabilistic, stochastic decision support tool capable of optimizing in-flight medical systems based on crew and mission parameters. This presentation will illustrate how to apply quantitative risk assessment methods to optimize the mass and volume of space-based medical systems for a space flight mission given the level of crew health and mission risk.

Kerstman, Eric↗

A vehicle scheduling algorithm using non-serial discrete dynamic programming with space shuttle applications

Description of the development and operation of a vehicle-scheduling algorithm which has applications to the NASA problem of assigning payloads to space delivery vehicles. The algorithm is based on a discrete, integer-valued, nonserial, dynamic-programming solution to the classical problem of developing resource utilization plans with limited resources. The algorithm places special emphasis on incorporating interpayload (precedence) relationships; maintaining optimal alternate schedule definitions (a unique feature of dynamic programming) in the event of contingencies (namely, resource inventory changes) without problem resolution; and, by using a special information storage technique, reducing the computational complexity of solving realistic problems.

Dupnick, E.↗

IMPACTing Medical System Design with a Risk Analysis Tool [“IMPACT” sur la Conception du Système Médical avec un Outil d'Analyse des Risques]

Background: Following the success of Artemis I, NASA is preparing for human extended duration missions. Ongoing efforts are focused on mitigating mission-related risks, including those affecting crew health and performance. Communication latency, logistics of resupply and time frame of medical evacuation are barriers to provision of healthcare for these missions, especially with respect to constraints in mass, volume, and crew training. An in-depth assessment of medical risks, capabilities and resources for a specific mission design is necessary to determine an optimal balance that maximizes likelihood of mission success. Overview: IMPACT (Informed Mission Planning via Analysis of Complex Tradespaces) is a dynamic tool designed to estimate medical risk and outcomes for a specific mission design. In its current iteration, a list of medical conditions selected based on likelihood of occurrence and/or consequence was linked to a set of clinical capabilities and resources necessary for diagnosis and management. A probabilistic risk analysis tool was then used to identify and estimate the likelihood and consequence of risks through the following outcome metrics: loss of crew life (inflight mortality due to medical conditions), need for medical evacuation (return to definitive care), and crew disability (task time affected based on how medical conditions influence the ability to perform specific exploration mission crew tasks). Finally, the model’s optimization algorithm provides recommendations for medical capabilities that maximize risk mitigation relative to mass and volume constraints. In the Spring of 2023, IMPACT was utilized to estimate outcome metrics for a design reference mission that would be representative of an extended duration Artemis mission. Notional data generated were then used to determine a recommended set of medical capabilities and resources relative to user-defined mass and volume constraints. A multidisciplinary team has also been updating IMPACT to strengthen the model’s fidelity. Figure 1 shows how updates to outcome metric inputs for the conditions resulted in different capability and resource allocation recommendations. Discussion: This presentation will discuss the IMPACT tool and share the latest data generated for a representative extended duration Artemis mission. Efforts to improve the fidelity of data generated by the model’s algorithm will also be discussed.

K A Shair↗

IMPACTing Medical System Design with a Risk Analysis Tool

Background: Following the success of Artemis I, NASA is preparing for human extended duration missions. Ongoing efforts are focused on mitigating mission-related risks, including those affecting crew health and performance. Communication latency, logistics of resupply and time frame of medical evacuation are barriers to provision of healthcare for these missions, especially with respect to constraints in mass, volume, and crew training. An in-depth assessment of medical risks, capabilities and resources for a specific mission design is necessary to determine an optimal balance that maximizes likelihood of mission success. Overview: IMPACT (Informed Mission Planning via Analysis of Complex Tradespaces) is a dynamic tool designed to estimate medical risk and outcomes for a specific mission design. In its current iteration, a list of medical conditions selected based on likelihood of occurrence and/or consequence was linked to a set of clinical capabilities and resources necessary for diagnosis and management. A probabilistic risk analysis tool was then used to identify and estimate the likelihood and consequence of risks through the following outcome metrics: loss of crew life (inflight mortality due to medical conditions), need for medical evacuation (return to definitive care), and crew disability (task time affected based on how medical conditions influence the ability to perform specific exploration mission crew tasks). Finally, the model’s optimization algorithm provides recommendations for medical capabilities that maximize risk mitigation relative to mass and volume constraints. In the Spring of 2023, IMPACT was utilized to estimate outcome metrics for a design reference mission that would be representative of an extended duration Artemis mission. Notional data generated were then used to determine a recommended set of medical capabilities and resources relative to user-defined mass and volume constraints. A multidisciplinary team has also been updating IMPACT to strengthen the model’s fidelity. Figure 1 shows how updates to outcome metric inputs for the conditions resulted in different capability and resource allocation recommendations. Discussion: This presentation will discuss the IMPACT tool and share the latest data generated for a representative extended duration Artemis mission. Efforts to improve the fidelity of data generated by the model’s algorithm will also be discussed.

K A Shair↗

Celestial Mapping System and Digital Lunar Library Initiative

We are preparing to create an interactive, global 3D lunar environment with integrated dataset and AI/ML tools to provide unique value to mission planners, scientists and the entire lunar community. This lunar environment will be based on NASA Ames Celestial Mapping System (CMS) [1] and Digital Lunar Library (DLL) Initiative. CMS provides a 3D virtual Lunar Globe with extensive user friendly tool sets, that include high resolution terrain visualization, elevation profiles, measurement kits, slope analysis, path optimization, line of sight analysis, equipment planning and placement tools and many other functionalities [1]. It has a thick client with less overhead to access hardware resources. This allows features such as terrain profiling and distance calculations to be performed on the client and on the fly. The application is developed to provide situational and domain awareness on the Lunar surface, planning capabilities for equipment placements and traverse path optimization. As data becomes available, CMS has the capabilities to integrate data sets that change dynamically in real-time, which will be useful for monitoring satellites and remotely-sensed data on the Lunar surface. CMS supports importing synthetic features in a variety of 3D, 2D, vector and raster formats. In the future, these capabilities will be enhanced by incorporating AI/ML tools and a plug-in architecture to enable customization by the user groups. With the help of DLL we will be able to : 1) Amplify the value of lunar information with AI-powered data enhancements 2) Acquire and integrate lunar data with AI-assisted georectification and homogenization 3) Analyze lunar data with advanced 3D visualization, intelligent search-by-example 4) Apply lunar data insights to specific use cases with an open plug-in architecture. The CMS-DLL initiative will have several potential use cases for NASA and the lunar community in general, including subsurface lava tube visualization and analysis, soil analysis, in-situ lunar resource visualization and representation on 3D globe, and data analytics for utilization. REFERENCES: [1] https://celestial.arc.nasa.gov/

3D Globe↗

Runway Operations Planning: A Two-Stage Solution Methodology

The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. Thus, Runway Operations Planning (ROP) is a critical component of airport operations planning in general and surface operations planning in particular. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, may be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. Generating optimal runway operations plans was approached in with a 'one-stage' optimization routine that considered all the desired objectives and constraints, and the characteristics of each aircraft (weight class, destination, Air Traffic Control (ATC) constraints) at the same time. Since, however, at any given point in time, there is less uncertainty in the predicted demand for departure resources in terms of weight class than in terms of specific aircraft, the ROP problem can be parsed into two stages. In the context of the Departure Planner (OP) research project, this paper introduces Runway Operations Planning (ROP) as part of the wider Surface Operations Optimization (SOO) and describes a proposed 'two stage' heuristic algorithm for solving the Runway Operations Planning (ROP) problem. Focus is specifically given on including runway crossings in the planning process of runway operations. In the first stage, sequences of departure class slots and runwy crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program. Preliminary results from the algorithm implementation on real-world traffic data are included.

Anagnostakis, Ioannis↗

Mission planning for the Lidar in Space Technology Experiment

Developing a mission planning system for a Space Shuttle mission is a complex procedure. Several months of preparation are required to develop a plan that optimizes science return during the short operations time frame. Further complicating the scenario is the necessity to schedule around crew activities and other payloads which share Orbiter resources. SpaceTec, Inc. developed the mission planning system for the Lidar In Space Technology Experiment, or LITE, which flew on Space Shuttle mission STS-64 in September of 1994. SpaceTec used a combination of off-th-shelf and in-house developed software to analyze various mission scenarios both premission and real-time during the flight. From this analysis, SpaceTec developed a comprehensive mission plan that met the mission objectives.

Redifer, Matthew E.↗

Methodologies for optimal resource allocation to the national space program and new space utilizations. Volume 1: Technical description

The optimal allocation of resources to the national space program over an extended time period requires the solution of a large combinatorial problem in which the program elements are interdependent. The computer model uses an accelerated search technique to solve this problem. The model contains a large number of options selectable by the user to provide flexible input and a broad range of output for use in sensitivity analyses of all entering elements. Examples of these options are budget smoothing under varied appropriation levels, entry of inflation and discount effects, and probabilistic output which provides quantified degrees of certainty that program costs will remain within planned budget. Criteria and related analytic procedures were established for identifying potential new space program directions. Used in combination with the optimal resource allocation model, new space applications can be analyzed in realistic perspective, including the advantage gain from existing space program plant and on-going programs such as the space transportation system.

Source record↗

Autonomous path-planning for formation flying-applications

The paper presents a solution to the optimal formation path-planning problem where the formation reconfigurations are required subject to collision avoidance and resource limitation contraints.

formation flying collision-avoidance path-planning↗

The Application of Lean Thinking Principles and Kaizen Practices for the Successful Development and Implementation of the Ares I-X Flight Test Rocket and Mission

On October 28, 2009 the Ares I-X flight test rocket launched from Kennedy Space Center and flew its suborbital trajectory as designed. The mission was successfully completed as data from the test, and associated development activities were analyzed, transferred to stakeholders, and well documented. Positive lessons learned from Ares I-X were that the application of lean thinking principles and kaizen practices are effective in streamlining development activities. Ares I-X, like other historical rocket development projects, was hampered by technical, cost, and schedule challenges and if not addressed boldly could have resulted in cancellation of the test. The mission management team conducted nine major meetings, referred to as lean events, across its elements to assess plans, procedures, processes, requirements, controls, culture, organization, use of resources, and anything that could be changed to optimize schedule or reduce risk. The preeminent aspect of the lean events was the focus on value added activities and the removal or at least reduction in non-value activities. Trained Lean Six Sigma facilitators assisted the Ares I-X developers in conducting the lean events. They indirectly helped formulate the mission s own unique methodology for assessing schedule. A core team was selected to lead the events and report to the mission manager. Each activity leveraged specialized participants to analyze the subject matter and its related processes and then recommended alternatives and solutions. Stakeholders were the event champions. They empowered and encouraged the team to succeed. The keys to success were thorough preparation, honest dialog, small groups, adherence to the Ares I-X ground rules, and accountability through disciplined reporting and tracking of actions. This lean event formula was game-changing as demonstrated by the success of Ares I-X. It is highly recommended as a management tool to help develop other complex systems efficiently. The key benefits for Ares I-X were obtaining unambiguous schedule margin, defining enabling options for risk reduction, and most importantly a stronger more unified team.

Askins, B. R.↗

The Application of Lean Thinking Principles and Kaizen Practices for the Successful Development and Implementation of the Ares I-X Flight Test Rocket and Mission

On October 28, 2009 the Ares I-X flight test rocket launched from Kennedy Space Center and flew its suborbital trajectory as designed. The mission was successfully completed as data from the test, and associated development activities were analyzed, transferred to stakeholders, and well documented. A positive lesson learned from Ares I-X was that the application of lean thinking principles and kaizen practices was very effective in streamlining development activities. Ares I-X, like other historical rocket development projects, was hampered by technical, cost, and schedule challenges and if not addressed boldly could have resulted in cancellation of the test. The mission management team conducted nine major meetings, referred to as lean events, across its elements to assess plans, procedures, processes, requirements, controls, culture, organization, use of resources, and anything that could be changed to optimize schedule or reduce risk. The preeminent aspect of the lean events was the focus on value added activities and the removal or at least reduction in non-value added activities. Trained Lean Six Sigma facilitators assisted the Ares I-X developers in conducting the lean events. They indirectly helped formulate the mission s own unique methodology for assessing schedule. A core team was selected to lead the events and report to the mission manager. Each activity leveraged specialized participants to analyze the subject matter and its related processes and then recommended alternatives and solutions. Stakeholders were the event champions. They empowered and encouraged the team to succeed. The keys to success were thorough preparation, honest dialog, small groups, adherence to the Ares I-X ground rules, and accountability through disciplined reporting and tracking of actions. This lean event formula was game-changing as demonstrated by Ares I-X. It is highly recommended as a management tool to help develop other complex systems efficiently. The key benefits for Ares I-X were obtaining unambiguous schedule margin, defining enabling options for risk reduction, and most importantly a stronger more unified team.

Askins, B. R.↗

Simulation Of Research And Development Projects

Measures of preference for alternative project plans calculated. Simulation of Research and Development Projects (SIMRAND) program aids in optimal allocation of research and development resources needed to achieve project goals. Models system subsets or project tasks as various network paths to final goal. Each path described in terms of such task variables as cost per hour, cost per unit, and availability of resources. Uncertainty incorporated by treating task variables as probabilistic random variables. Written in Microsoft FORTRAN 77.

Miles, Ralph F.↗

Gateway Autonomy for Enabling Deep Space Exploration

The Gateway spacecraft is an important stepping-stone to exploration of the solar system, integrating commercial and international partners into a tightly coupled system, enabling cislunar activities, and implementing key technologies for missions to Mars. Autonomy is a capability area necessary to handle long communication outages where intervention from Earth is impossible, to prepare to operate with long communication delays that will be common in interplanetary travel, and to make spaceflight more affordable and accessible by reducing sustaining operations costs. The Gateway Concept of Operations states that one of Gateway’s goals is to “focus on infrastructure and systems that will allow autonomous operations aboard the Gateway with robotics, automated systems, advanced communications, and distributed computing.” Gateway’s Vehicle Systems Manager (VSM) and associated Autonomous Spacecraft Management Architecture (ASMA) are key products towards delivering autonomous capability. The primary functions of the control architecture are Mission Management and Timeline Execution, Resource Management, Fault Management, and Vehicle Control and Operation (VCO). In each of these areas, there is an initial level of capability to be delivered at launch, with plans to continue development and grow to greater capability. The initial deployment of VSM will focus on maintaining vehicle safety by focusing on full fault management capabilities and deploying only enough resource and timeline planning functionality to support that. The final deployment of VSM will add significant planning and control optimization functionality to support nominal operations for up to 21 days without ground support, even accommodating fault and failure conditions. While the VSM is the vehicle-level representation of autonomous reasoning, distributed automation is essential to provide the right scope and abstraction of information to process. Module and system support of automation and simplicity of interfaces are two important design paradigms that Gateway is focusing on to garner a systems approach to autonomy. Distribution of reasoning can increase complexity, so Gateway is also taking a strict hierarchical approach to information flow and decision making. VSM is not the only capability necessary to achieve an autonomous spacecraft. Robotics support for maintenance of the spacecraft will be essential to provide continued vehicle functionality even when crew is not present. Technical and programmatic challenges exist when implementing autonomous robotics operations. These challenges include sufficient network flexibility to support data transfer to the rest of the vehicle to coordinate module-to-module robotic walk-offs and finding the proper interfaces to allow sufficient dexterity. Communication system upgrades planned for Gateway include Delay Tolerant Networking to best utilize the complex network of relays that will be part of mature cislunar operations. Distributed computing and management will provide failure tolerance, robustness, and growth of capabilities while still allowing significant reuse of heritage software on heritage systems as well as reuse of common applications across a spacecraft to minimize new development, but this requires adherence to key standards and interfaces. The Gateway program has demonstrated significant progress towards these capabilities and has identified challenges other spacecraft developers should be aware of from the start.

Molly Anderson↗