Tools and Methods for Optimization of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plants (NPP) operating cycle. Refueling outages are extremely costly for a NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities in a duration of around 30 days on average. Outage staff begin working on the schedule more than a year ahead of the outage start and make every effort to build a robust schedule. Despite the robust and detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjusting. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. The Optimization of Outage Activities project under the Risk-Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program focuses on developing tools and methods to support nuclear power plants with optimization of outage schedules. The goal of the outage optimization is the completion of all planned and emergent outage activities as fast as possible while maintaining highest level of safety. This report describes the initial development of tools to support outage management that leverage computational and machine learning methods developed in other RISA and LWRS projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Methods and Tools To Assess Robustness of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plant (NPP) operating cycle. Refueling outages are extremely costly for an NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities within 30 days on average. Despite detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjustment. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but are often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. This paper focuses on developing tools and methods to support NPPs with outage schedule optimization and it describes the initial development of tools to support outage management that leverage computational and machine learning methods.

97 - MATHEMATICS AND COMPUTING↗

A Scalable Approach to Minimize Charging Costs for Electric Bus Fleets

Incorporating battery electric buses into bus fleets faces three primary challenges: a BEB’s extended refuel time, the cost of charging, both by the consumer and the power provider, and large compute demands for planning methods. When BEBs charge, the additional demands on the grid may exceed hardware limitations, so power providers divide a consumer’s energy needs into separate meters even though doing so is expensive for both power providers and consumers. Prior work has developed a number of strategies for computing charge schedules for bus fleets; however, prior work has not worked to reduce costs by aggregating meters. Additionally, because many works use mixed integer linear programs, their compute needs make planning for commercial-sized bus fleets intractable. This work presents a multi-program approach to computing charge plans for electric bus fleets. The proposed method solves a series of subproblems where the solution to the charge problem becomes more refined with each problem, moving closer to the optimal schedule. The results demonstrate how runtimes are reduced by using intermediate subproblems to refine the bus charge solution so that the proposed method can be applied to large bus fleets of 100+ buses. Not only will we demonstrate that runtimes scale linearly with the number of buses but we will also show how the proposed method scales to large bus fleets of over 100 buses while managing the monthly cost of energy.

Mortensen, Daniel (ORCID:0000000276494452)↗

Co-optimization of nuclear reactor flexible power operation and maintenance scheduling

As flexible power operation of nuclear power plants becomes more attractive due to the reduction in fossil-fueled dispatchable generation on energy grids, finding optimal power production strategies that balance revenue generation with operational concerns becomes more complex. This article presents a general framework to aid operators in designing economically optimal long term dispatch strategies for nuclear power plants. The principal novelty is the linking of estimated system remaining useable life (RUL) to strategic operational decisions. It is shown that, depending on the relationship between the fixed costs from maintenance and the associated lost revenue from an outage, it can be economically optimal in the long term to delay a maintenance outage and not perform this alongside refueling. For a given relationship between power ramping and degradation, optimal strategies were found that discouraged load following in some situations while minimizing unnecessary maintenance. It is shown that heavy load following can cause maintenance and refueling outages to diverge due to their inverse relationships with respect to load following, potentially leading to a significant loss in capacity factor. As a result, this general framework can be applied to specific reactor dispatch allowing operators to adapt operational strategies as future grid conditions change.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Robotic technologies of the Flight Telerobotic Servicer (FTS) including fault tolerance

The original FTS concept for Space Station Freedom (SSF) was to provide telerobotic assistance to enhance crew activity and safety and to reduce crew EVA (Extra Vehicular Activity) activity. The first flight of the FTS manipulator systems would demonstrate several candidate tasks and would verify manipulator performance parameters. These first flight tasks included unlocking a SSF Truss Joint, mating/demating a fluid coupling, contact following of a contour board, demonstrating peg-in-hole assembly, and grasping and moving a mass. Future tasks foreseen for the FTS system included ORU (Orbit Replaceable Unit) change-out, Hubble Space Telescope Servicing, Gamma Ray Observatory refueling, and several in-situ SSF servicing and maintenance tasks. Operation of the FTS was planned to evolve from teleoperation to fully autonomous execution of many tasks. This wide range of mission tasks combined with the desire to evolve toward fully autonomy forced several requirements which may seen extremely demanding to the telerobotics community. The FTS requirements appear to have been created to accommodate the open-ended evolution plan such that operational evolution would not be impeded by function limitations. A recommendation arising from the FTS program to remedy the possible impacts from such ambitious requirements is to analyze candidate robotic tasks. Based on these task analyses, operational impacts against development impacts were weighed prior to requirements definition. Many of the FTS requirements discussed in the following sections greatly influenced the development cost and schedule of the FTS manipulator. The FTS manipulator has been assembled at Martin Marietta and is currently in testing. Successful component tests indicate a manipulator which achieves unprecedented performance specifications.

Chladek, John T.↗

Concepts to Automate Fluid Transfer Capability of Low Impact Docking System (LIDS)

The capability to transfer mass between spacecraft is necessary for many mission scenarios. Docking and berthing operations have enabled fluid, electrical, crew and equipment transfers to some degree on all manned space operations since the Gemini program. The Apollo program performed some sophisticated docking maneuvers to land men on the moon and return them safely to Earth. These programs primarily transferred crew, equipment, and pressurized atmosphere between docked spacecraft. The International Space Station (ISS) U.S. modules are connected by Common Berthing Mechanism (CBM) portals. They provide many feed-through ports for electrical, and fluid transfer between modules, as well as a large diameter crew and equipment tunnel. Fluid and electrical jumpers are manually installed after the CBM sealing surfaces have been securely mated to maintain the pressurized cabin environment. CBM berthing and subsequent fluid transfer capability requires a lengthy manual process involving an active interface that mates with a passive half. The Androgynous Peripheral Attach System (MAS) a Russian technology that docked the Russian Zarya module to Unity, or Node 1, is a more complex system that also is capable of fuel transfer, enabling refueling of the Russian re-boost engines on ISS. For several years, a Low Impact Docking System (LIDS) has been under development at Johnson Space Center (JSC). This docking technology has a requirement to be androgynous in order to allow the fabrication of a single configuration that can dock with all other LIDS units. It is desired to make electrical and fluid coupling mating an automated process to enable routine docking and undocking operations to support future exploration missions. It is envisioned that modular design and vehicle assembly will require an efficient LIDS for fuel, electrical, crew, and equipment transfer. Marshall Space Flight Center (MSFC) has joined the LIDS development effort and plans to employ fluid transfer concepts and technology from previous development programs, such as the Automated Fluid Interface System (AFIS) and the Ohital Fluid Transfer System (OFTS) that were developed and tested by MSFC. Orbital Expressderived robotic satellite servicing technology is scheduled to fly soon to demonstrate fluid transfer technology developed for the Air Force. This paper will compare known technology against possible fluid transfer requirements for LIDS to develop design strategies for automated fluid transfer.

Miernik, Janie H.↗