Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “refueling schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Meta-RaPS Algorithm for the Aerial Refueling Scheduling Problem

The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for each fighter aircraft (job) on multiple tankers (machines). ARSP assumes that jobs have different release times and due dates, The total weighted tardiness is used to evaluate schedule's quality. Therefore, ARSP can be modeled as a parallel machine scheduling with release limes and due dates to minimize the total weighted tardiness. Since ARSP is NP-hard, it will be more appropriate to develop a ppro~imate or heuristic algorithm to obtain solutions in reasonable computation limes. In this paper, Meta-Raps-ATC algorithm is implemented to create high quality solutions. Meta-RaPS (Meta-heuristic for Randomized Priority Search) is a recent and promising meta heuristic that is applied by introducing randomness to a construction heuristic. The Apparent Tardiness Rule (ATC), which is a good rule for scheduling problems with tardiness objective, is used to construct initial solutions which are improved by an exchanging operation. Results are presented for generated instances.

Kaplan, Sezgin↗

Aerial Refueling Process Rescheduling Under Job Related Disruptions

The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for each fighter aircraft (job) on the multiple tankers (machines) to minimize the total weighted tardiness. ARSP assumes that the jobs have different release times and due dates. The ARSP is dynamic environment and unexpected events may occur. In this paper, rescheduling in the aerial refueling process with a time set of jobs will be studied to deal with job related disruptions such as the arrival of new jobs, the departure of an existing job, high deviations in the release times and changes in job priorities. In order to keep the stability and to avoid excessive computation, partial schedule repair algorithm is developed and its preliminary results are presented.

Kaplan, Sezgin↗

Energy Transitions Initiative Partnership Project: Alaska Longline Fishermen’s Association Alternative Fuels Review

This report provides information about additional options in electrifying the Alaska Longline Fishermen’s Association (ALFA) fishing fleet. Currently, the Energy Transitions Initiative Partnership Project is prioritizing electric hybrid and battery electric options for retrofit of select fishing vessels in the fleet. However, there are other options for reducing carbon emissions among the fleet, namely hydrogen, ammonia, and biofuels. The use of these alternative fuels may be an option for the fleet in the future as ALFA addresses its vulnerabilities. A literature review of available resources on these fuels was conducted to provide information on several topics associated with implementation of these technologies, including current applications, commercially available power modules, necessary components, infrastructure, and safety codes and standards. An additional aspect that this report investigates is general sizing and refueling schedule based on operating records of multiple ships in the fleet.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Transitions Initiative Partnership Project: Alaska Longline Fishermen’s Association Alternative Fuels Review

This report provides information about additional options in electrifying the Alaska Longline Fishermen’s Association (ALFA) fishing fleet. Currently, the Energy Transitions Initiative Partnership Project is prioritizing electric hybrid and battery electric options for retrofit of select fishing vessels in the fleet. However, there are other options for reducing carbon emissions among the fleet, namely hydrogen, ammonia, and biofuels. The use of these alternative fuels may be an option for the fleet in the future as ALFA addresses its vulnerabilities. A literature review of available resources on these fuels was conducted to provide information on several topics associated with implementation of these technologies, including current applications, commercially available power modules, necessary components, infrastructure, and safety codes and standards. An additional aspect that this report investigates is general sizing and refueling schedule based on operating records of multiple ships in the fleet.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Tools And Methods to Analyze Plant Outage Schedule and Assist Schedulers in Improving Outage Resilience

Refueling outages of nuclear power plants (NPPs) are considered one of the most critical phases throughout the plant lifetime. In such instances, tens of thousands of activities (e.g., maintenance, surveillance) are performed in a short amount of time (typically 2-3 weeks unless major backfitting or modernization projects are carried out) by a large number of crews (e.g., electricians, mechanics) that are hired as contractors. As a consequence, a plant outage can be expensive not only in terms of costs (e.g., contractor labor, material), but also in terms of loss generation since the plant is taken off the grid during the full outage duration (an indicative metric is about 1.2M$/day of loss of revenue). Thus, there is a continuous need to decrease the economic impact of outages on plant finances. This can be done by: decreasing the frequency of plant outages (e.g., from 18 to 24 months), reducing the time to complete the outage, and reducing the risk of outage delays. The Optimization of Outage Activities project under the Risk Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program focuses on developing tools and methods to support NPPs with outage schedule optimization. The developed tools and methods are designed to analyze plant outage schedule with the goal of identify critical elements in the schedule that might pose a high risk of delays. These methods and tools can be considered resource-centric in the sense that they address outage challenges as a resource optimization problem. In this context, resources are either time and crews; outage delays occurs when either (or both) resources are insufficient to complete the set of tasks assigned at a specific time instant of the outage. This report provides details on how plant resources (time and crews) can be allocated in such a way that delays are minimized. In this respect, two classes of methods have been developed: the first one focuses on the time resource and how variability of the time to complete outage tasks may impact outage delays. The second one integrates available resources to assess when dailies activities should be performed such that the risk of outage delays are minimized.

97 MATHEMATICS AND COMPUTING↗

Economic Dispatch Optimization of Multi-Unit SMR Site

With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Hydrogen and Electric Charging Infrastructure for Heavy-Duty Trucks: A Nationally Scalable Megaregion Assessment

Decarbonizing regional and long-haul freight is challenging due to the limitations of battery-electric commercial vehicles and infrastructure constraints. Hydrogen fuel cell medium- and heavy-duty vehicles (MHDVs) offer a viable alternative, aligning with the decarbonization goals of the Department of Energy and commercial entities. Historically, alternative fuels like compressed natural gas and liquefied propane gas have faced slow adoption due to barriers like infrastructure availability. To avoid similar issues, effective planning and deploying zero-emission hydrogen fueling infrastructure is crucial. This research develops deployment plans for affordable, accessible, and sustainable hydrogen refueling stations, supporting stakeholders in the decarbonized commercial vehicle freight system. It aims to benefit underserved and rural energy-stressed communities by improving air quality, reducing noise pollution, and enhancing energy resiliency. This research also provides a blueprint for replacing diesel in over-the-road Class 8 freight truck applications with hydrogen fueling solutions. The study focuses on the Texas Triangle Megaregion (I-45, I-35, and I-10), the I-10 corridor between San Antonio, TX, and Los Angeles, CA, and the I-5/CA-99 corridors between Los Angeles, CA, and San Francisco, CA. This area represents a significant portion of U.S. heavy-duty freight movement, carrying ~8.5% of the national freight volume. Using the OR-AGENT (Optimal Regional Architecture Generation for Efficient National Transport) modeling framework, the study conducts an advanced assessment of commercial vehicles, road and freight networks, and energy systems. The framework integrates data on freight mobility, traffic, weather, and energy pathways to deliver a region-specific, optimized vehicles powertrain architectures, infrastructure deployment solutions, operational logistics, and energy pathways. By considering all vehicle origin-destination pairs utilizing these corridors and all feasible fueling station location options, the framework's genetic algorithm identifies the minimum number and optimal locations of hydrogen refueling stations, ensuring no vehicle is stranded. It also determines fuel schedules and quantities at each station. A roadmap for station deployment based on multiple adoption trajectories ensures a strategic rollout of hydrogen refueling infrastructure.

Sujan, Vivek [ORNL] (ORCID:0000000269882342)↗

SLS Payload Launch Loads Analysis Using the NTRC Method

Norton-Thevenin Receptance Coupling (NTRC), as described in several NASA Engineering and Safety Center (NESC) papers shows promise in enabling loads development for payloads with less computational cost and analyst time as compared to a full integrated vehicle coupled loads analysis (CLA). NTRC allows the free vehicle responses and impedance (accelerance) at the payload to vehicle interface (derived from integrated vehicle CLA) to be used with a payload model in a payload CLA. Due to the NTRC damping differing from the full integrated vehicle damping, results are slightly different, so coverage factors were developed to ensure NTRC results enveloped results from a traditional CLA. NTRC results with coverage factors were very close to full CLA results. The Space Launch System (SLS) coupled loads team has developed an implementation of the NTRC method to enable support of co-manifested payloads with analysis needs that do not fit the primary SLS load cycle schedule. The NTRC method was successfully used to support the European System Providing Refueling, Infrastructure, and Communications (ESPRIT) module for Gateway planned to fly on Artemis V and has been adopted as the SLS approach for supporting payload CLA requests that do not align with vehicle load cycles.

SLS↗

Application of Norton-Thevenin Receptance Coupling (NTRC) to Space Launch System (SLS) Payload Coupled Loads Analysis (CLA)

Norton-Thevenin Receptance Coupling (NTRC), as described in several NASA Engineering and Safety Center (NESC) papers shows promise in enabling loads development for payloads with less computational cost and analyst time as compared to a full integrated vehicle coupled loads analysis (CLA). NTRC allows the free vehicle responses and impedance (accelerance) at the payload to vehicle interface (derived from integrated vehicle CLA) to be used with a payload model in a payload CLA. Due to the NTRC damping differing from the full integrated vehicle damping, results are slightly different, so coverage factors were developed to ensure NTRC results enveloped results from a traditional CLA. NTRC results with coverage factors were very close to full CLA results. The Space Launch System (SLS) coupled loads team has developed an implementation of the NTRC method to enable support of co-manifested payloads with analysis needs that do not fit the primary SLS load cycle schedule. The NTRC method was successfully used to support the European System Providing Refueling, Infrastructure, and Communications (ESPRIT) module for Gateway planned to fly on Artemis V and has been adopted as the SLS approach for supporting payload CLA requests that do not align with vehicle load cycles.

SLS↗

NASA's Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress 2020

National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.

Propellant transfer, satellite servicing↗

Solar power satellite. System definition study. Part 1, volume 3: Construction, transportation and cost analyses

Concepts developed for both LEO and GEO construction of photovoltaic and thermal engine satellites are analyzed. Topics discussed include: satellite construction; crew scheduling; crew jobs and organizations; operator productivity rating; constructability rating; transportation systems for cargo launch, refueling operations, personnel transport, and orbit transfer; collision analysis, cost analysis, and radiation evironment and effects.

Source record↗

Servicing of spacecraft in the geostationary arc

The possibility of servicing geosynchronous spacecraft in connection with the development of the Space Station and its associated infrastructure is discussed. The proposed servicing infrastructure is presented as well as the design of a serviceable spacecraft, and a servicing scenario for a geostationary earth observation platform. The scenario employs the space based OTV, OMV, remote servicer and remote refueling system. It is shown that servicing geostationary spacecraft provides the largest economic benefit when performed on a scheduled basis.

Russell, Paul K.↗

Development of medical electronic devices in the APL space department

Several electronic devices for automatically correcting specific defects in a body's physiologic regulation and allowing approximately normal functioning are described. A self-injurious behavior inhibiting system (SIBIS) is fastened to the arm of a person with chronic self-injurious behavior patterns. An electric shock is delivered into the arm whenever the device senses above-threshold acceleration of the head such as occur with head-bangers. Sounding a buzzer tone with the shock eventually allows transference of the aversive stimulus to the buzzer so shocks are no longer necessary. A programmable implantable medication system features a solenoid pump placed beneath the skin and refueled by hypodermic needle. The pump functions are programmable and can deliver insulin, chemotherapy mixes and/or pain killers according to a preset schedule or on patient demand. Finally, an automatic implantible defibrillator has four electrodes attached directly to the heart for sensing electrical impulses or emitting them in response to cardiac fibrillation.

Newman, A. L.↗

Final Report for ARPA-E LOCOMOTIVES Advanced Locomotive Technology and Rail Infrastructure Optimization System (ALTRIOS) Project

The Advanced Locomotive Technology and Rail Infrastructure Optimization System (ALTRIOS) is a unique, fully integrated, open-source software tool used to evaluate strategies for cost-effectively deploying advanced locomotive technologies and associated infrastructure. ALTRIOS simulates freight-demand-driven train scheduling, mainline meet-pass planning, locomotive dynamics, train dynamics, energy conversion efficiencies, and energy storage dynamics of line-haul train operations. Because new locomotives represent a significant long-term capital investment and new technologies must be thoroughly demonstrated before deployment, this tool provides guidance on the risk/reward trade-offs and operation integration of different technology rollout strategies. An open, integrated simulation tool is valuable for identifying future research needs and making decisions on technology development, routes, and train selection. This final report details the ALTRIOS software architecture, major modules and components, and data validation process. It demonstrates the software's utility through a 30-year rollout case study targeting high penetration of advanced powertrain technologies by 2050 for two BNSF Railway routes: loaded taconite ore trains from Hibbing, Minnesota, to Superior, Wisconsin, and mixed-freight trains from Superior to Minneapolis, Minnesota.

33 ADVANCED PROPULSION SYSTEMS↗

Satellite Servicing's Autonomous Rendezvous and Docking Testbed on the International Space Station

The Space Servicing Capabilities Project (SSCP) at NASA's Goddard Space Flight Center (GSFC) has been tasked with developing systems for servicing space assets. Starting in 2009, the SSCP completed a study documenting potential customers and the business case for servicing, as well as defining several notional missions and required technologies. In 2010, SSCP moved to the implementation stage by completing several ground demonstrations and commencing development of two International Space Station (ISS) payloads-the Robotic Refueling Mission (RRM) and the Dextre Pointing Package (DPP)--to mitigate new technology risks for a robotic mission to service existing assets in geosynchronous orbit. This paper introduces the DPP, scheduled to fly in July of 2012 on the third operational SpaceX Dragon mission, and its Autonomous Rendezvous and Docking (AR&D) instruments. The combination of sensors and advanced avionics provide valuable on-orbit demonstrations of essential technologies for servicing existing vehicles, both cooperative and non-cooperative.

Naasz, Bo J.↗

Fluid Acquisition and Resupply Experiment (FARE-I) flight results

The Fluid Acquisition and Resupply Experiment, (FARE) is a Shuttle middeck-mounted experiment to demonstrate techniques for handling liquids in zero gravity for operations such as refueling spacecraft in orbit. The first flight took place on STS 53 launched December 2, 1992. Eight tests were performed during the mission and the experiment achieved 100 percent mission success. The second flight will be on STS 57, scheduled for launch in June 1993. The objective of FARE I was to demonstrate techniques for controlling the position of the liquid and gas within a tank during refilling and to better understand the operation of screen-type surface tension devices used to drain tanks in zero gravity. Tests were performed to demonstrate tank refilling, low gravity propellant slosh, and expulsion efficiency of the screen device. Expulsion efficiencies of 97 percent - 98 percent were demonstrated under a variety of flowrates and accelerations. Final fill levels of 60 percent to 80 percent were achieved during the vented fill tests.

Dominick, Sam M.↗

Preliminary Benchmark Uncertainties for Deimos, a HALEU-Fueled and Graphite-Moderated Advanced Reactor Testbed

Many advanced reactor concepts will make use of various uranium fuels with levels of enrichment higher than previously seen in current light water reactors. In particular, High-Assay Low Enriched Uranium (HALEU), that is uranium enriched to 235 U ≈ 20 w/o%, is planned to be used in over ten new reactor concepts. HALEU is attractive for advanced reactors as it enables longer intervals between refueling. Unfortunately, little to no experience with HALEU is available in experimental literature raising concerns for not only licensing advanced re actors but also fabrication and transportation of HALEU fuels. This is where Deimos, a Los Alamos National Laboratory internal project, comes in. Deimos is a new critical experiment scheduled for FY24 at the National Criticality Experiments Research Center (NCERC). Deimos is a graphite moderated, graphite and beryllium reflected critical experiment making use of HALEU TRi-structural ISOtropic (TRISO) fuel from the Compact Nuclear Power System (CNPS). This transaction entails a brief description of efforts to benchmark Deimos for inclusion into the International Criticality Safety

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dispatch analysis of flexible power operation with multi-unit small modular reactors

The relevance of nuclear power plant flexible power operation (FPO) is rising due to increased penetration of variable renewables. Small Modular Reactors (SMRs) such as NuScale are envisaged to have multiple units on one site. This provides opportunities for coordinating FPO between units, but also introduces challenges as common services (e.g., refueling equipment) must be shared between units and fuel loadings may be standardized. It is therefore important to quantify whether FPO with SMRs is economically beneficial. Here, this paper quantifies the economics of FPO on different timescales to analyze refueling outages of such multi-unit SMRs. A 24-h price-taker profit maximization of SMR operation is first solved considering revenues from wholesale power and ancillary service (AS) markets. The results are then used to find the most profitable operation strategy over several years for multiple units at the site accounting for the physics and materials limits on NPP operation, including refueling outages. Results show a small but appreciable participation of nuclear into AS, contributing 4% of revenues. Due to the longer fuel cycle, over a decade of operation the units’ refueling outages drifted by 3 months, ultimately leading to refueling during summer.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗