Engineering PapersSearch

SEARCH · Engineering Papers

Results for “mission analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

General Mission Analysis Tool (GMAT) Mathematical Specifications

The General Mission Analysis Tool (GMAT) is a space trajectory optimization and mission analysis system developed by NASA and private industry in the spirit of the NASA Mission. GMAT contains new technology and is a testbed for future technology development.

Hughes, Steve

Preparing General Mission Analysis Tool for Operational Maneuver Planning of the Advanced Composition Explorer Mission

The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

mission design

Mission analysis for design of a SEP multi-mission spacecraft.

Study of the multimission capability of a solar electric propulsion spacecraft. The study includes such factors as spacecraft constraints, payload variations with launch opportunity, propellant on-loading and off-loading requirements, and limitations in thrusting time, throttling range and steering. The study determined that a single spacecraft design, with P sub zero = 12 kW and I sub s = 3000 sec launched by a Titan IIIC or Titan IIID/Centaur can be used to conduct at least five diverse missions: Eros rendezvous, 1 AU out-of-ecliptic, Mercury orbiter, Jupiter flyby/probe, and Jupiter orbiter. Flight time and injection velocity vary as needed to achieve the desired payload capability. The mission analysis approach and results are presented.

Driver, J. M.

General Mission Analysis Tool (GMAT) User's Guide (Draft)

4The General Mission Analysis Tool (GMAT) is a space trajectory optimization and mission analysis system. This document is a draft of the users guide for the tool. Included in the guide is information about Configuring Objects/Resources, Object Fields: Quick Look-up Tables, and Commands and Events.

Hughes, Steven P.

The General Mission Analysis Tool (GMAT): Current Features And Adding Custom Functionality

The General Mission Analysis Tool (GMAT) is a software system for trajectory optimization, mission analysis, trajectory estimation, and prediction developed by NASA, the Air Force Research Lab, and private industry. GMAT's design and implementation are based on four basic principles: open source visibility for both the source code and design documentation; platform independence; modular design; and user extensibility. The system, released under the NASA Open Source Agreement, runs on Windows, Mac and Linux. User extensions, loaded at run time, have been built for optimization, trajectory visualization, force model extension, and estimation, by parties outside of GMAT's development group. The system has been used to optimize maneuvers for the Lunar Crater Observation and Sensing Satellite (LCROSS) and ARTEMIS missions and is being used for formation design and analysis for the Magnetospheric Multiscale Mission (MMS).

Conway, Darrel J.

Advanced mission analysis programs

Computer programs provide preliminary trajectory and guidance information required for feasibility studies in space mission analysis. The advanced mission analysis computer programs include programs for approximate solutions, programs for targeting and output, and programs for Monte Carlo and linear guidance analysis.

Bjorkman, W. S.

Methods of Performing Large Scale, Multidimensional Parametric Studies for Space Launch System Mission Analysis

Optimizing a large number of trajectories over a wide range of parameters is a difficult and computationally intensive, particularly when the parametric space has a large number of dimensions. Solving parametric studies like these require good initial conditions for each optimization case, which results in a significant amount of manual interaction and human judgment and can be time consuming. The Space Launch System (SLS) uses POST2 (Program to Optimize Simulated Trajectories II) to simulate different ascent trajectories and perform mission analysis. SLS mission analysis currently uses two types of large scale, multidimensional parameter spaces. The qualifying factor between these spaces is the grid density, which determines the set of applicable solution methodologies. One type has a relatively low number of dimensions (2-3), but a large number of grid coordinates (2000- 4000), whereas the second type has a relatively low number of grid coordinates (150-350), but a higher number of dimensions (7-10).

Stein, W. B.

Study 2.6 operations analysis mission characterization

An analysis of the current operations concepts of NASA and DoD is presented to determine if alternatives exist which may improve the utilization of resources. The final product is intended to show how sensitive these ground rules and design approaches are relative to the total cost of doing business. The results are comparative in nature, and assess one concept against another as opposed to establishing an absolute cost value for program requirements. An assessment of the mission characteristics is explained to clarify the intent, scope, and direction of this effort to improve the understanding of what is to be accomplished. The characterization of missions is oriented toward grouping missions which may offer potential economic benefits by reducing overall program costs. Program costs include design, development, testing, and engineering, recurring unit costs for logistic vehicles, payload costs. and direct operating costs.

Wolfe, R. R.

Large Space Telescope Mission analysis

The total mission scenario from Shuttle/LST (Large Space Telescope) integration to ground return is described. The LST is to contain near-diffraction-limited, 2.4-m optics and a variety of instruments that will allow it to make observations from the ultraviolet to the infrared regions. Particular attention is given to the most important aspect of the LST development planning, which consists in the design for change in both configuration and operation. The discussion covers mission objectives, planning for scientific observation, and support operations. The inherent characteristics of the periodic Space Shuttle revisits and earth return capability provide the LST with a capability for growth that should be incorporated into every phase of its development.

Friedlaender, F. M.

International Ultraviolet Explorer (IUE) satellite mission analysis

The results are presented of the mission analysis performed by Computer Sciences Corporation (CSC) in support of the International Ultraviolet Explorer (IUE) satellite. The launch window is open for three separate periods (for a total time of 7 months) during the year extending from July 20, 1977, to July 20, 1978. The synchronous orbit shadow constraint limits the launch window to approximately 88 minutes per day. Apogee boost motor fuel was computed to be 455 pounds (206 kilograms) and on-station weight was 931 pounds (422 kilograms). The target orbit is elliptical synchronous, with eccentricity 0.272 and 24 hour period.

Cook, R. A.

Mission Analysis for LEO Microwave Power-Beaming Station in Orbital Launch of Microwave Lightcraft

A detailed mission analysis study has been performed for a 1 km diameter, rechargeable satellite solar power station (SPS) designed to boost 20m diameter, 2400 kg Micr,oWave Lightcraft (MWLC) into low earth orbit (LEO) Positioned in a 476 km daily-repeating oi.bit, the 35 GHz microwave power station is configured like a spinning, thin-film bicycle wheel covered by 30% efficient sola cells on one side and billions of solid state microwave transmitter elements on the other, At the rim of this wheel are two superconducting magnets that can stor,e 2000 G.J of energy from the 320 MW, solar array over a period of several orbits. In preparation for launch, the entire station rotates to coarsely point at the Lightcraft, and then phases up using fine-pointing information sent from a beacon on-board the Lightcraft. Upon demand, the station transmits a 10 gigawatt microwave beam to lift the MWLC from the earth surface into LEO in a flight of several minutes duration. The mission analysis study was comprised of two parts: a) Power station assessment; and b) Analysis of MWLC dynamics during the ascent to orbit including the power-beaming relationships. The power station portion addressed eight critical issues: 1) Drag force vs. station orbital altitude; 2) Solar pressure force on the station; 3) Station orbital lifetime; 4) Feasibility of geo-magnetic re-boost; 5) Beta angle (i..e., sola1 alignment) and power station effective area relationship; 6) Power station percent time in sun vs, mission elapsed time; 7) Station beta angle vs.. charge time; 8) Stresses in station structures.. The launch dynamics portion examined four issues: 1) Ascent mission/trajecto1y profile; 2) MWLC/power-station mission geometry; 3) MWLC thrust angle vs. time; 4) Power station pitch rate during power beaming. Results indicate that approximately 0 58 N of drag force acts upon the station when rotated edge-on to project the minimum frontal area of 5000 sq m. An ion engine or perhaps an electrodynamic thruster (i.e., geomagnetic re-boost) station-keeping system can maintain the orbit altitude. The rate at which the power station s superconducting magnetic energy storage system (SMES) is 'charged' directly relates to the beta angle since the station is operating in the edge-on attitude. The maximum charge rate occurs when the beta angle is at its maximum because time in the sun and projected area of the station are, too, at their maximums For the maximum charge of 2000 G.J with a maximum beta angle of 52 degrees, approximately 3 hours (2 orbital revolutions) are required to reach the full charge, while about 16 hours (10.3 revolutions) are required when the beta angle is 10 degrees. Overall, the LEO station concept appears to be a viable candidate fo1 the formidable power-beaming infrastructure needed to boost MWLC into low earth orbit.

Myrabo, L. N.

Mariner 10 mission analysis - Application of a black art

A major accomplishment of the mission analysis performed for Mariner 10 was the selection of a trajectory which optimized science return from the mission. The analysis utilized simple, unweighted 'science value functions' which allowed the relative values of each candidate trajectory, for each of the seven science experiments, to be calculated. A total relative value for each trajectory was determined by a simple averaging process and sensitivities were revealed by multiplying individual values. This showed a clear scientific preference for launching in early November and was used to support deferral of the launch from early October to November 3, 1973.

Shirley, D. L.