Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “interconnection policies”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Engaging with Utilities and Key Stakeholders [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation overviews the interconnection process for distributed energy resources and how to engage well with utilities. The workshop will be held on March 25, 2026.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2025 Large Load Literature Review

This literature review catalogs more than 90 publications focused on large loads, and groups the documents and resources thematically into 12 categories, (listed below). The 2026 Large Load Literature Review and Data Sources summary reports are available here: https://emp.lbl.gov/publications/2026-large-load-literature-review -Load forecasting -Data sources -Reliability and resource adequacy -Large load interconnection -Demand flexibility -Generation -Co-location -Data center location/infrastructure -Large load tariffs -Policy options -Maps and tools -Design and operations

97 MATHEMATICS AND COMPUTING↗

Providencia Island White Papers: Stakeholder Engagement & Coordination in Interconnection Rulemaking

The starting point of engineering interconnection rules involves determining the technological and socioeconomic contexts that drive potential challenges and opportunities for renewable energy adoption and integration. This paper discusses the importance of understanding the viewpoints, expectations, and needs of the range of stakeholders when developing an interconnection rule. Approaches to ensure a result that aligns with various goals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Providencia Island White Papers: Overview of Technical Requirements for Interconnection

This issue brief provides an overview of key technical requirements for inverter-based resources - including distributed energy resources (DERs) - to support the reliable and safe operation of the Providencia Island electrical grid, and other island or isolated area mini-grid applications. With the planned increase in inverter-based resources and the introduction of energy storage, adopting Institute of Electrical and Electronics Engineers (IEEE) Std 1547-2018, including the more advanced performance capabilities for voltage and frequency ride-through, will simplify interconnection as well as help to maintain a safe, reliable grid on Providencia Island.

24 POWER TRANSMISSION AND DISTRIBUTION↗

GMLC Technical Assistance to States: DER Interconnection Workshop #2 [Slides]

NREL hosted this workshops to help state public utility commissions (PUCs) understand the materials and support available to assist in distributed energy resource (DER) interconnection activities. This workshop focused on "Modern DER Capabilities and Deployment Concerns" and included four speakers, whose material will be posted at https://www.nrel.gov/grid/ieee-standard-1547/workshops.html. The slides in this deck were for the facilitator to provide context to the attendees, as well as additional resources on the topics discussed.

1547↗

Evaluating Interconnection Queue Impacts Using Hosting Capacity Analysis

The interconnection queue has been identified as a bottleneck in the efforts to shift the nations generation resources towards renewable sources and meet various state and federal goals. Efforts such as the interconnection innovation e-Xchange (i2X) are therefore trying to come up with ways in which the queue could be altered to make interconnection faster, cheaper, and fairer. This paper proposes using hosting capacity analysis methods to simulate the evolution of a power system as new resources are added. Modeling the interconnection process in this way enables simulation based study of various policy decisions for queue management and cost allocation. Sample results are presented to illustrate how some queue modifications might play out both in distribution and transmission systems.

Distributed Energy Resources, Interconnection↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Conceptual Framework

This report explores one integrated technical and process concept designed to manage interconnection costs and streamline interconnection timelines to support near-term renewable energy deployment. We describe a new agreement between renewable energy developers and utilities, informed by the technical analysis. The agreement defines the operational parameters for a renewable energy system, with the goal of reducing risk and cost to all parties. This work provides a foundation upon which other states and utilities may build proof of concept. This report is supported by a technical analysis that is detailed in a companion report, "Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis" (McLaren et al. 2022).

14 SOLAR ENERGY↗

On Distributed Model-Free Reinforcement Learning Control with Stability Guarantee

Distributed learning can enable scalable and effective decision making in numerous complex cyber-physical systems such as smart transportation, robotics swarm, power systems, etc. However, the stability of the system is usually not guaranteed in most existing learning paradigms; and this limitation can hinder the wide deployment of machine learning in decision making of safety-critical systems. This paper presents a stability guaranteed distributed reinforcement learning (SGDRL) framework for interconnected linear subsystems, without knowing the subsystem models. While the learning process requires data from a peer-to-peer (p2p) communication architecture, the control implementation of each subsystem is only based on its local state. The stability of the interconnected subsystems will be ensured by a diagonally dominant eigenvalue condition, which will then be used in a model-free RL algorithm to learn the feedback control gains. The RL algorithm structure follows an off-policy iterative framework, with interleaved policy evaluation and policy update steps. We numerically validate our theoretical results by performing simulations on four interconnected sub-systems.

Mukherjee, Sayak↗

Distributed Energy Resource Integration

This webinar focuses on the subject of DER integration, outlining the current industry state of the art and status of DER adoption in the US, a holistic view and roadmap of DER integration, DER interconnection standards, interconnection screening and study processes, interconnection automation, DER hosting capacity, AMI analytics, and non-wires alternatives.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Retrospective Analysis of Distributed Solar Interconnection Timelines and Related State Mandates

Most distributed residential photovoltaic (PV) systems must secure an interconnection agreement prior to operation that ensures the local electrical system will operate safely within the broader electrical grid. PV installers generally submit an interconnection application to the local utility that provides all the necessary details the utility needs to evaluate the proposed system. To encourage timely execution of this process, many states’ utility commissions have established mandates that limit the maximum number of days allowed for utility review and approval of interconnection for certain small, often residential applications. In this paper, we derive the median and range of cycle times for the pre-installation approval phase of the interconnection process (i.e., from application submission to approval by the utility) across 24 U.S. states, using a data set of approximately 170,000 projects. We evaluate the percentage of projects that are approved within respective state-mandated timelines from 2017– 2019. We further evaluate how timelines have evolved since 2012 for a subset of five states: Arizona, California, Colorado, New Jersey, and New York. The analyses are divided into two size ranges: systems that are ≤10 kilowatts (kW), and systems that are 11–50 kW.

14 SOLAR ENERGY↗

DuraMAT Technology Scouting Report: Assessing Module Reliability Risks Associated with Projected Technological Changes

Maintaining the reliability of photovoltaic (PV) modules in the face of rapidly changing technology is critical to maximizing solar energy's contribution to global decarbonization. Our presentation describes expected changes in PV technology and their impacts on performance and reliability. We leverage PV market reports, interviews with PV researchers and other industry stakeholders, and peer-reviewed literature to narrow the multitude of possible changes into a manageable set of 11 impactful trends likely to be incorporated in near-term crystalline-silicon module designs. We group the trends into four categories (module architecture, interconnect technologies, bifacial modules, and cell technology) and explore the drivers behind the changes, their interactions, and associated reliability risks and benefits. Our analysis identifies specific areas that would benefit from accelerating the PV reliability learning cycle, to assess emerging module products and designs more accurately. We recommend that researchers continue tracking module technologies and their reliability implications so efforts can be focused on the most impactful trends. As the rapid technological turnover continues, it is also critical to incorporate fundamental knowledge into models that can predict module reliability. Predictive capabilities complete the PV reliability learning cycle-reducing the time required to assess new designs and mitigating the risks associated with large-scale deployment of new products.

bifacial↗

SEIN: Breaking Barriers Resilient Energy System Analysis [Slides]

The Solar Energy Innovation Network (SEIN) is a collaborative research program that supports multi-stakeholder teams in researching and sharing solutions to real-world challenges associated with solar energy adoption. The Breaking Barriers project was selected to participate in the Solar Energy Innovation Network, Round 2, and was led by Groundswell, a D.C.-based clean energy project developer. The Breaking Barriers team included Partnership for Southern Equity, Atlanta University Center campus facility managers and professors, the City of Atlanta's Neighborhood Planning Unit T, and Georgia Power Company. The project aimed to design and construct innovative urban energy resiliency hubs integrating microgrid technology, solar generation, and energy storage in Atlanta colleges and communities. The hubs will help these historically Black colleges and universities (HBCUs) and the energy-burdened broader community in West Atlanta be more resilient, in addition to informing new course curricula at Atlanta University Center campuses. With many possible options for the system's battery size, the Breaking Barriers team needed insight into the relationships between BESS size, economic performance, and resilience at Spelman College's Manley Center. These insights are crucial for entering procurement negotiations with project developers, establishing resilience capabilities that the HBCU campuses can plan around, and guiding the team's fundraising targets. This analysis includes estimates of PV and battery performance, costs, savings, and resilience for multiple battery sizes. In order to provide power during a grid outage, the resilient energy system also needs to be connected to the Manley Center in a safe and island-able manner (electrically isolated from the grid). Analysis of potential electrical configurations and estimated setup costs is key to successfully entering a required interconnection agreement with Georgia Power, as well as informing requests for engineering firms to construct the system. This analysis includes conceptual options and rough order of magnitude cost estimates for electrically interconnecting the resilient energy system to the Manley Center and the grid. The Breaking Barriers team used this analysis to select preferred system characteristics and design for the resilient energy system.

14 SOLAR ENERGY↗

Institutional Framework of Variable Renewable Energy Forecasting in India

The share of variable renewable energy (VRE) in India is growing rapidly, with a national goal of reaching 50% capacity from non-fossil fuel generation by 2030. One implication of this growth is the need for improved VRE forecasting methods. For this reason, the Ministry of New and Renewable Energy (MNRE) in India commissioned this study with support from the United States Agency for International Development (USAID), the National Renewable Energy Laboratory (NREL) in the United States, and the National Institute of Wind Energy (NIWE) in India. The objective of this study was to review the existing institutional framework and suggest changes needed to support the plans for large-scale VRE integration in the country. To achieve that objective, the authors consulted local stakeholders about the status of VRE forecasting in India, reviewed existing studies, and examined VRE forecasting methods around the world to identify best practices. Based on those best practices, the study presents six potential approaches to improve the VRE forecasting framework in India. Approaches include incentivizing VRE forecast improvement and use of the most accurate VRE forecast, creating an institution that will optimize VRE forecasts while maintaining and ensuring access to necessary data for forecasting, implementing a review and certification process for VRE forecast providers, forecasting closer to dispatch time and allowing for more frequent forecast revisions, increasing the frequency of weather forecasts, and aggregating VRE forecasts at the point of interconnection.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Impact of hydropower availability on resource adequacy of the United States western interconnection

Hydropower is a key energy source in the western interconnection of the United States, comprising about 25% of the annual installed nameplate capacity in 2020. However, its generation is increasingly impacted by changing hydrological conditions, operational constraints, environmental factors, water availability, and aging dam infrastructure. Assessing hydropower availability and resource adequacy is valuable for shaping energy policies and infrastructure requirements. In this study we evaluate the sensitivity of resource adequacy in the Western Interconnection to the unavailability of hydropower plants, under a wide-ranging set of 16,384 hydropower loss scenarios derived from a combination of 14 major hydrologic regions. Although a complete loss of hydropower capacity in any region is unlikely, studying such scenarios helps in identifying hydrologic regions most critical for maintaining resource adequacy. So, we identify key hydrologic regions with disproportionately large adequacy impacts relative to their installed hydropower capacity and study compounding effects between regions using classification and regression trees. Even after controlling for total installed capacity, we find that hydropower resources in the Pacific Northwest contribute the most to interconnection-wide adequacy outcomes, with resources in Northern California and the Desert Southwest providing more moderate incremental contributions.

13 HYDRO ENERGY↗

A Functional All-Hazard Approach to Critical Infrastructure Dependency Analysis

The critical infrastructures protection landscape is a vast and varied pattern of independent, but interconnected infrastructure systems that are essential to the function of our modern society. The U.S. policy on critical infrastructure protection has been continually evolving since the “President’s Commission on Critical Infrastructure Protection” was published in 1997. In response to these policies, federal, state, and local governments, along with research institutions, have invested a substantial amount of time and effort into identifying and analyzing critical infrastructure, their functions, and dependencies/interdependencies to better understand their vulnerabilities. To date, the ability to assess vulnerabilities, resiliency, and priorities for protecting interdependent critical infrastructure systems from an all-hazards perspective remains a difficult problem. In this paper we introduce the All-Hazards Analysis (AHA) methodology, which provides an integrated functional basis across infrastructure systems, through the implementation of a common language and a scalable level of decomposition to effectively evaluate the resilience of interconnected infrastructure systems. AHA models infrastructure systems as directed multidimensional graphs, which enable the evaluation of cross-sector interdependencies prior to, during, and after disruptive events. Finally, and by design, AHA enables the cross linking of data taxonomies to enable more effective data sharing, such as the National Critical Functions (NCF) and Infrastructure Data Taxonomy (IDT).

02 PETROLEUM↗

Data Analytics for Residential PV from Permit to Interconnect (Final Technical Report)

The main objective of this research is to provide novel insights into the effects of permitting, inspection, and interconnection (PII) processes on PV system installations—and in particular, into the relationship between PII processes and adoption timelines. This research can then be used to clarify the potential effect of various process changes on reducing PII timelines, customer cancellation rates, and related costs nationwide. NREL completed this research by assembling a data set of distributed, largely residential rooftop solar systems less than 50 kilowatts in size from participating solar installers. NREL produced five publications describing the effects that PII processes can have on adoption timelines nationwide, in addition to publishing an interactive data viewer with five years of PII cycle time data. This tool can be used by stakeholders to identify potential adoption timelines by local government.

14 SOLAR ENERGY↗