Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “federal procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enhancing Performance Contracts with Monitoring-Based Commissioning (MBCx)

Integrating monitoring-based commissioning (MBCx) software tools into performance contracts is a timely topic given recent developments in MBCx software offerings and the growing number of MBCx deployments nationwide. Many commercial building owners have started to install MBCx software tools that tie in advanced metering infrastructure, building automation systems, and local weather data to enable ongoing commissioning and identify energy conservation measures. To support federal and commercial building owners in understanding, procuring, and implementing MBCx software tools, this report provides an overview of their capabilities, the MBCx process, and how MBCx can be integrated into - and benefit - each phase of a performance contract. This report is intended to spur increased use of MBCx in performance contracts, whether an agency has previously installed or is considering adding MBCx at the time of their project. Additionally, case studies illustrate successful experiences using MBCx within performance contracts at a university campus and across a large number of buildings managed by the General Services Administration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enhancing Performance Contracts with Monitoring-Based Commissioning (MBCx)

To support federal and commercial building owners in understanding, procuring, and implementing monitoring-based commissioning (MBCx) software tools, this report provides an overview of their capabilities, the MBCx process, and how MBCx can be integrated into—and benefit—each phase of a performance contract. This report is intended to spur increased use of MBCx in performance contracts, whether an agency has previously installed or is considering adding MBCx at the time of their project. Additionally, case studies illustrate successful experiences using MBCx within performance contracts at a university campus and across a large number of buildings managed by the General Services Administration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Securing the Modern Grid: Federal Investments, Digitization, and Supply Chain Strategy

Across the United States (U.S.) grid expansion and modernization is underway, paving the way for accelerated load growth and intelligent resource management. Digitization of the grid is supported by several state and federal programs, providing support for utilities installing advanced metering infrastructure (AMI), AI-powered analytics systems, battery energy storage systems (BESS), and distributed energy resource management systems (DERMS) to transform the grid from a one-way power delivery system into an intelligent, responsive network that will enable faster load growth and power expansion of data centers for advanced artificial intelligence (AI) applications. The digital transformation of America's grid presents opportunity for increased efficiency and resiliency but also introduces new digital risks that require careful management. Digital equipment often contains several vulnerabilities such as unencrypted communication protocols, and persistent remote access capabilities that could be exploited to manipulate device settings, coordinate service disruptions, or inject false data into grid operations. These digital risks become particularly important as the grid must rapidly scale to support AI-driven data centers, which the administration has identified as essential for maintaining U.S. technological leadership and economic competitiveness. These vulnerabilities are compounded by supply chain realities: Chinese manufacturers currently produce 70-90% of essential grid components including inverters, batteries, and control systems, with the U.S. lacking domestic manufacturing capacity for critical assets like extra-high voltage transformers. Recent federal legislation has established Foreign Entity of Concern (FEOC) restrictions to address these risks, requiring projects to achieve escalating thresholds of non-FEOC content to receive tax credits while utilities work to expand sourcing channels for their supply chains and strengthen security measures. These restrictions arrive precisely when utilities face unprecedented electricity demand growth driven by the rapid growth in data centers, creating a considerable challenge: rapidly expanding infrastructure while navigating complex compliance requirements while lacking viable alternatives for many critical components. Idaho National Laboratory (INL) and its partners have developed practical approaches to help utilities navigate these intersecting challenges as they leverage federal investment to strengthen and grow the grid. These solutions include Cyber-Informed Engineering (CIE) principles that build resilience directly into systems, the Cirrus tool for secure cloud migration, and enhanced procurement guidance that embeds security requirements throughout equipment lifecycles. Federal initiatives, such as the Technical Assistance for Digital Assurance (TADA) project, provide direct support to utilities implementing these approaches while facilitating knowledge sharing across the industry. While these tools and frameworks cannot eliminate all risks inherent in foreign supply chain dependencies, they offer pragmatic pathways for strengthening security posture without sacrificing the deployment momentum essential to meeting surging electricity demand. Ultimately, securing America's digital energy infrastructure demands dedicated coordination across multiple fronts: building domestic supply chains, implementing robust digital assurance practices, and maintaining the aggressive modernization timeline necessary for reliability, resilience, and energy independence.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Federal Water Management Planning Manual

This Federal Water Management Resource Guide provides direction to Federal agencies on how optimize water use at Federal facilities, use water balance analysis methods, identify design elements and procurement best practices, and expand use of alternative water. It provides best practices for managing water to be considered when developing or improving an effective facility water management program. PNNL developed this guide for the Federal Energy Management Program (FEMP). FEMP was directed by the Council on Environmental Quality (CEQ) to develop a Federal Water Management Resource Guide per the Implementing Instructions for Executive Order (E.O.) 13834, Efficient Federal Operations. This document serves to satisfy this requirement in order to provide best water management practices within the Federal Government.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Federal Water Management Planning Manual

This Federal Water Management Resource Guide provides direction to Federal agencies on how optimize water use at Federal facilities, use water balance analysis methods, identify design elements and procurement best practices, and expand use of alternative water. It provides best practices for managing water to be considered when developing or improving an effective facility water management program. PNNL developed this guide for the Federal Energy Management Program (FEMP). FEMP was directed by the Council on Environmental Quality (CEQ) to develop a Federal Water Management Resource Guide per the Implementing Instructions for Executive Order (E.O.) 13834, Efficient Federal Operations. This document serves to satisfy this requirement in order to provide best water management practices within the Federal Government.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Navigating United States Standards and Regulation for Digital Energy Systems

This report provides an analysis of the U.S. standards and regulatory landscape for digital energy systems, focusing on cybersecurity, safety, and reliability requirements. It examines the interplay between federal mandates, state regulations, voluntary industry standards, and utility-specific policies, highlighting critical gaps between compliance and real-world risk mitigation. While NERC CIP standards enforce cybersecurity for Bulk Electric System assets, distribution-level infrastructure and emerging technologies often fall outside mandatory oversight, creating vulnerabilities. The report identifies systemic challenges such as reliance on self-attestation, uneven state adoption of safety codes, and lagging standards for advanced technologies like battery energy storage and inverter-based resources. Through a detailed gap analysis, it underscores the urgency of proactive risk-based approaches, independent verification, and strategic engagement with state and federal entities. Recommendations include adopting tiered security frameworks, strengthening procurement practices, and addressing emerging technology risks to ensure resilient and secure digital energy infrastructure. This guidance is intended for utilities, regulators, and stakeholders navigating compliance obligations and seeking to enhance cybersecurity and safety beyond minimum standards.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Session 059 - Panel: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Sites (R1.7)

This panel session focused on small business procurement and contracting opportunities within the DOE Complex and USACE FUSRAP Sites. The federal government encourages prime contractors to obtain goods and services from small and disadvantaged businesses (Tier 2) and often tie these goals to contract award fee. Goods and services being considered for these procurements include decontamination and decommissioning, remediation, transportation and disposal of radioactive waste, health physics, emergency response planning and training, lab services, R and D products, waste treatment, maintenance, A/E and professional consulting. Panelists with presentations: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Program (Aaron Deckard; Subcontracting Opportunities with the DOE Primes (William Badger); Bechtel National, Inc. Small Business Opportunities (Lisa Tribuce-Leoung Tat); Small Business Procurement and Contracting Opportunities (Gina Joiner); Small Business Procurement and Contracting Opportunities - Flour (Katy Burnau); Environmental WORK, Formerly Utilized Sites Remedial Action Program (FUSRAP) (John Busse)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ePROJECT BUILDER: PROMOTING WIDER ADOPTION OF ENERGY SAVINGS PERFORMANCE CONTRACTS THROUGH STANDARDIZATION AND TRANSPARENCY

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Earni, Shankar↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

A review of United States energy-only generator interconnection service policy and considerations for reform

Grid interconnection has emerged as a significant obstacle to the development of new electricity resources. There is growing interest in energy-only interconnection, which is an interconnection service option meant to allow the interconnection of new generators without ensuring their energy deliverability during all hours through the transmission system to customers. This approach potentially avoids upfront congestion-related transmission upgrades but could increase curtailment risk. Interest in energy-only interconnection is shaped by incomplete understanding of how interconnection policy functions in different jurisdictions, a knowledge gap that makes it difficult to determine how energy-only interconnection might be better used or re-designed. In this paper, we provide a regulatory review of energy-only interconnection in U.S. interconnection policy and practice, identifying jurisdictions in which rules are close to -or farther from-the theoretical concept of energy-only interconnection service. We find substantial jurisdictional differences in how energy-only interconnection is implemented, driven by differences in resource adequacy frameworks, real-time transmission operations, and state-level procurement practices. U.S. regulators have preferred local jurisdictional flexibility over federal prescription of interconnection study methods and procedures, which also contributes to differences among regions. Such findings raise fundamental questions about whether competition policies in electricity markets should extend beyond spot energy markets and into more prescriptive guidelines around interconnection rules and market entry. This paper sheds light on tensions that energy-only interconnection raises in allowing generators to access the transmission system on an as available basis and discusses how controlling thresholds for congestion-related network upgrades may be a barrier to electricity market entry.

Gorman, Will↗

Flate-plate photovoltaic power systems handbook for Federal agencies

The primary purpose is to provide a tool for personnel in Federal agencies to evaluate the viability of potential photovoltaic applications. A second objective is to provide descriptions of various photovoltaic systems installed by different Federal agencies under the Federal Photovoltaic Utilization Program so that other agencies may consider similar applications. A third objective is to share lessons learned to enable more effective procurement, design, installation, and operation of future photovoltaic systems. The intent is not to provide a complete handbook, but rather to provide a guide for Federal agency personnel with additional information incorporated by references. The steps to be followed in selecting, procuring, and installing a photovoltaic application are given.

Cochrane, E. H.↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since.Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter for a given ECM taken in the performance period. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the estimated (and guaranteed) savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

Evolution of Energy Efficiency Programs Over Time: The Case of Standby Power

Issued in 2001, Presidential Executive Order 13221 directed federal agencies to purchase products with low standby power, with the goal of 1) reducing energy consumption in federal facilities, and 2) drawing attention to the problem of high standby power consumption, with guidance provided by the Federal Energy Management Program (FEMP). At that time, standby power was newly recognized as an increasing building energy load. Since then, procurement of products with low standby power have been set in place in acquisition processes, and the purchasing power of the federal government continues to influence manufacturers’ design decisions related to standby power. In recent years, FEMP has shifted effort from direct manufacturer outreach for data collection, to integrating low standby requirement into broader acquisition programs including Energy Star and Electronic Product Environmental Assessment Tool (EPEAT). Another milestone has been the labeling of low standby products on the GSA Advantage website to simplify and enhance compliance. Looking forward into the program’s future, this question arises “How do we design programs over time to reflect market and technology changes, by adjusting programmatic requirements while maintaining effectiveness?” This paper discusses that question for the case of standby power, which transitioned from covering a single to multiple environmental attributes, both in the context of the program’s past and future.

Payne, CT↗

Federal Water Management Planning Manual

FEMP developed this Federal Water Management Planning Manual to provide a resource for designing a comprehensive water management program. The manual describes strategies to optimize water use at federal facilities, use water balance analysis methods, identify design elements and procurement best practices, and expand use of alternative water.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Procurement Analysis Tool (PAT)

This a poster on PAT for the CESA National Energy Summit for States: Navigating Energy Trends and Federal Programs Conference.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Office of Inspector General (OIG)

The NASA Office of Inspector General is the Federal Law Enforcement Agency at NASA which conducts criminal and regulatory investigations in which NASA is a victim. The OIG prevents and detects crime, fiaud, waste and abuse and assists NASA management in promoting economy, efficiency, and effectiveness in its programs and operations. Investigations (OI) and the Office of Audits (OA). The investigations side deals with criminal Investigations, administrative investigations, and civil investigations. The Audits side deals with inspections and assessments as well as the Auditing of NASA Programs and Activities. Our mission at the OIG is to conduct and supervise independent and objective audits and investigations relating to agency programs and operations; to promote economy, effectiveness and efficiency within the agency; to prevent and detect crime, fraud, waste and abuse in agency programs and operations; to review and make recommendations regarding existing and proposed legislation and regulations relating to agency programs and operations. We are also responsible for keeping the agency head and the Congress fully and currently informed of problems in agency programs and operations. deal with False Claims, False Statements, Conspiracy, Theft, Computer Crime, Mail Fraud, the Procurement Integrity Act, the Anti-Kickback Act, as well as noncompliance with NASA Management Instructions, the Federal Acquisition Regulations (FAR), and the Code of Federal Regulations (CFR). Most of the casework that is dealt with in our office is generated through gum shoe work or cases that we generate on our own. These cases can come from Law Enforcement Referrals, GIDEP Reports, EPlMS (NASA Quality System), Defense Contract Audit Agency, Newspaper Articles, and Confidential Information. In many cases, confidentiality is the biggest factor to informants coming forward. We are able to maintain confidentiality because the 01 is independent of NASA Management and doesn t report to the Center Directors, therefore the informant s mangers and supervisors are unaware of the informants actions. The only time when an informant s confidentiality may be compromised is when it is needed in a Court of Law and is released through a Judicial Court Order. During my tenure here at the NASA OIG/OI at Glenn Research Center, I have been involved in many different tasks. They have ranged from updating Suspected Unapproved Parts case files to independently interviewing NASA employees to turn up general background information. The 01 has the duty of informing NASA aeronautical safety managers of potential Nonconforming products. My mission is to compile a database of Nonconformance reports for distribution. The background information that I turn up from my interviews is then used to determine NASA s susceptibility to acceptance of unapproved parts. The IG organization is divided up into two separate disciplines, the Office of 01 investigations primarily focus on violations of Federal laws. Some of these violations

Macisco, Christopher A.↗

Open system environment procurement

Relationships between the request for procurement (RFP) process and open system environment (OSE) standards are described. A guide was prepared to help Federal agency personnel overcome problems in writing an adequate statement of work and developing realistic evaluation criteria when transitioning to an OSE. The guide contains appropriate decision points and transition strategies for developing applications that are affordable, scalable and interoperable across a broad range of computing environments. While useful, the guide does not eliminate the requirement that agencies posses in-depth expertise in software development, communications, and database technology in order to evaluate open systems.

Fisher, Gary↗