Engineering PapersSearch

SEARCH · Engineering Papers

Results for “federal procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

American Made Energy Infrastructure - Evolution of Federal Incentives and Requirements

This presentation, "Evolution of Federal Incentives and Requirements," explores the development and impact of federal cybersecurity regulations, tax credits, and domestic content requirements on the energy sector. It covers key legislation such as the ARRA of 2009, IIJA, and IRA, and their implications for grid modernization, manufacturing, and deployment of energy technologies. The presentation also addresses definitions and restrictions related to Foreign Entities of Concern (FEOC) and their impact on federal procurement. Additionally, it introduces the DOE's cybersecurity framework for energy supply chains and practical actions for compliance planning.

25 - ENERGY STORAGE

Microgrid Procurement Checklist Training: Part 1

Learn how to navigate the Microgrid Procurement Checklist, a key resource for federal agencies developing microgrid projects. This first session will provide a step-by-step walkthrough of the checklist, helping participants understand its structure, key tasks, and how to apply it in project planning.

25 ENERGY STORAGE

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs) are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and enhance mission resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report (for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Analysis of Supply Chain Challenges in the U.S. Solar Industry: Focus on Build America, Buy America Act and Inverter Supply Issues

The United States (U.S.) solar industry has been undergoing significant transformation, driven largely by meeting U.S. climate goals while simultaneously maintaining national security. At the forefront of this movement is the Inflation Reduction Act (IRA) and the Build America, Buy America (BABA) Act. The IRA has driven investment in clean energy generation deployments while the BABA Act, enacted under Division G, Title IX of the Infrastructure Investment and Jobs Act (IIJA) establishes domestic content procurement preference for all federal financial assistance obligated for infrastructure projects. While these pieces of legislation aim to reduce reliance on foreign-made solar components and increase domestic production, the sector continues to face notable supply chain challenges. These are particularly pronounced with inverters, a critical component in solar photovoltaic (PV) systems. This report explores the current state of these supply chain challenges, with a specific focus on the impact of the BABA requirements and the associated complexities in inverter manufacturing and supply.

14 SOLAR ENERGY

Manufacturing Full-Scale High Gradient Copper Accelerators: Electron Beam Welding and Allied Processes

This DOE ARDAP-funded study examines the technical and business feasibility of manufacturing high-gradient normal conducting RF (NCRF) copper accelerating structures using electron beam welding (EBW) instead of conventional high-temperature brazing. The core motivation is material performance: brazing softens copper significantly, while hard copper alloys have demonstrated ~75% higher operational gradients in SLAC tests, making cold-joining techniques highly attractive. EBW, applied to split-cell (half or quadrant) structure designs, preserves copper hardness away from the weld joint and simplifies machining — but industrial process optimization remains immature and a substantial learning curve is expected. The business case was modeled for two scenarios: a greenfield EBW linac company (> $10M upfront costs, viable above ~30 units/year) and an EBW division added to an existing accelerator firm to reduce risk and upfront costs, at the expense of being less optimal structure for the higher volume production. The study concludes that without a significant increase in demand, private investment alone cannot sustain this capability, and recommends federal support through R&D grants, procurement incentives, and CAPEX cost-sharing to incubate domestic EBW-NCRF manufacturing — with the existing-company model.

43 PARTICLE ACCELERATORS

Securing the Modern Grid: Federal Investments, Digitization, and Supply Chain Strategy

Across the United States (U.S.) grid expansion and modernization is underway, paving the way for accelerated load growth and intelligent resource management. Digitization of the grid is supported by several state and federal programs, providing support for utilities installing advanced metering infrastructure (AMI), AI-powered analytics systems, battery energy storage systems (BESS), and distributed energy resource management systems (DERMS) to transform the grid from a one-way power delivery system into an intelligent, responsive network that will enable faster load growth and power expansion of data centers for advanced artificial intelligence (AI) applications. The digital transformation of America's grid presents opportunity for increased efficiency and resiliency but also introduces new digital risks that require careful management. Digital equipment often contains several vulnerabilities such as unencrypted communication protocols, and persistent remote access capabilities that could be exploited to manipulate device settings, coordinate service disruptions, or inject false data into grid operations. These digital risks become particularly important as the grid must rapidly scale to support AI-driven data centers, which the administration has identified as essential for maintaining U.S. technological leadership and economic competitiveness. These vulnerabilities are compounded by supply chain realities: Chinese manufacturers currently produce 70-90% of essential grid components including inverters, batteries, and control systems, with the U.S. lacking domestic manufacturing capacity for critical assets like extra-high voltage transformers. Recent federal legislation has established Foreign Entity of Concern (FEOC) restrictions to address these risks, requiring projects to achieve escalating thresholds of non-FEOC content to receive tax credits while utilities work to expand sourcing channels for their supply chains and strengthen security measures. These restrictions arrive precisely when utilities face unprecedented electricity demand growth driven by the rapid growth in data centers, creating a considerable challenge: rapidly expanding infrastructure while navigating complex compliance requirements while lacking viable alternatives for many critical components. Idaho National Laboratory (INL) and its partners have developed practical approaches to help utilities navigate these intersecting challenges as they leverage federal investment to strengthen and grow the grid. These solutions include Cyber-Informed Engineering (CIE) principles that build resilience directly into systems, the Cirrus tool for secure cloud migration, and enhanced procurement guidance that embeds security requirements throughout equipment lifecycles. Federal initiatives, such as the Technical Assistance for Digital Assurance (TADA) project, provide direct support to utilities implementing these approaches while facilitating knowledge sharing across the industry. While these tools and frameworks cannot eliminate all risks inherent in foreign supply chain dependencies, they offer pragmatic pathways for strengthening security posture without sacrificing the deployment momentum essential to meeting surging electricity demand. Ultimately, securing America's digital energy infrastructure demands dedicated coordination across multiple fronts: building domestic supply chains, implementing robust digital assurance practices, and maintaining the aggressive modernization timeline necessary for reliability, resilience, and energy independence.

24 POWER TRANSMISSION AND DISTRIBUTION

Navigating United States Standards and Regulation for Digital Energy Systems

This report provides an analysis of the U.S. standards and regulatory landscape for digital energy systems, focusing on cybersecurity, safety, and reliability requirements. It examines the interplay between federal mandates, state regulations, voluntary industry standards, and utility-specific policies, highlighting critical gaps between compliance and real-world risk mitigation. While NERC CIP standards enforce cybersecurity for Bulk Electric System assets, distribution-level infrastructure and emerging technologies often fall outside mandatory oversight, creating vulnerabilities. The report identifies systemic challenges such as reliance on self-attestation, uneven state adoption of safety codes, and lagging standards for advanced technologies like battery energy storage and inverter-based resources. Through a detailed gap analysis, it underscores the urgency of proactive risk-based approaches, independent verification, and strategic engagement with state and federal entities. Recommendations include adopting tiered security frameworks, strengthening procurement practices, and addressing emerging technology risks to ensure resilient and secure digital energy infrastructure. This guidance is intended for utilities, regulators, and stakeholders navigating compliance obligations and seeking to enhance cybersecurity and safety beyond minimum standards.

24 - POWER TRANSMISSION AND DISTRIBUTION

A review of United States energy-only generator interconnection service policy and considerations for reform

Grid interconnection has emerged as a significant obstacle to the development of new electricity resources. There is growing interest in energy-only interconnection, which is an interconnection service option meant to allow the interconnection of new generators without ensuring their energy deliverability during all hours through the transmission system to customers. This approach potentially avoids upfront congestion-related transmission upgrades but could increase curtailment risk. Interest in energy-only interconnection is shaped by incomplete understanding of how interconnection policy functions in different jurisdictions, a knowledge gap that makes it difficult to determine how energy-only interconnection might be better used or re-designed. In this paper, we provide a regulatory review of energy-only interconnection in U.S. interconnection policy and practice, identifying jurisdictions in which rules are close to -or farther from-the theoretical concept of energy-only interconnection service. We find substantial jurisdictional differences in how energy-only interconnection is implemented, driven by differences in resource adequacy frameworks, real-time transmission operations, and state-level procurement practices. U.S. regulators have preferred local jurisdictional flexibility over federal prescription of interconnection study methods and procedures, which also contributes to differences among regions. Such findings raise fundamental questions about whether competition policies in electricity markets should extend beyond spot energy markets and into more prescriptive guidelines around interconnection rules and market entry. This paper sheds light on tensions that energy-only interconnection raises in allowing generators to access the transmission system on an as available basis and discusses how controlling thresholds for congestion-related network upgrades may be a barrier to electricity market entry.

Gorman, Will

Federal Water Management Planning Manual

FEMP developed this Federal Water Management Planning Manual to provide a resource for designing a comprehensive water management program. The manual describes strategies to optimize water use at federal facilities, use water balance analysis methods, identify design elements and procurement best practices, and expand use of alternative water.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Procurement Analysis Tool (PAT)

This a poster on PAT for the CESA National Energy Summit for States: Navigating Energy Trends and Federal Programs Conference.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Stationary diesel engines for use with generators to supply electric power

The procurement of stationary diesel engines for on-site generation of electric power deals with technical criteria and policy relating to federal agency, not electrical components of diesel-generator sets or for the design of electric-power generating plants or their air-pollution or noise control equipment.

Source record

American Made Infrastructure: Evolution of Federal Incentives and Requirements

Foreign Entity of Concern (FEOC) restrictions in the One Big Beautiful Bill Act (OBBB) represent the latest evolution of a multi-year legislative trajectory responding to national security concerns about foreign control – and particularly FEOC control – of energy infrastructure. Beginning with Executive Order 14017 (February 2021), which initiated comprehensive federal review of critical supply chain vulnerabilities in semiconductors, battery energy storage systems, and critical minerals, policymakers have progressively expanded restrictions on foreign participation. The National Defense Authorization Act (NDAA) 2019 established precedent for component-level prohibitions on foreign information and communications technology procurement, while NDAA 2024 extended these restrictions to six major People’s Republic of China (PRC) battery manufacturers. Complementary measures such as the Build America, Buy America (BABA) Act and the Infrastructure Investment and Jobs Act (IIJA) introduced domestic content thresholds and FEOC eligibility criteria for federal funding programs. The Inflation Reduction Act (IRA) 2022 further operationalized FEOC restrictions through electric vehicle tax credit requirements, creating a scalable framework for excluding foreign-controlled components. Recent executive actions and state-level policies have reinforced this trajectory, reflecting sustained alignment across federal and state governments. Collectively, these developments demonstrate a bipartisan policy approach that pairs incentives for advanced energy deployment with safeguards designed to prevent subsidizing adversaries or entities that present foreign-sourcing risk.

99 - GENERAL AND MISCELLANEOUS

Photovoltaics in the U.S.A. - A progress report

The Federal Photovoltaics Program is reviewed with reference to price goals, program organization, technical developments, and various applications. The immediate goals of the program are: (1) to develop the Federal market by encouraging Government agencies to incorporate photovoltaic systems, and (2) to provide marketing support to commercial solar cell and system manufacturers whose growth is crucial to the ultimate success of the photovoltaic program. The program will initially provide for procurement of the smaller remote types of systems and will be broadened to include residential and intermediate load systems.

Forney, R. G.

The changing tide: Federal support of civilian-sector R and D

The involvement of the Federal government in civilian sector research and development is discussed. Relevant policies are put in an historical perspective. The roles played by industrial research and public funding are reveiwed. Government support of basic an generic research, clientele-oriented applied research, and research with commercial ends is studied. Procurement, anti-trust, and patent policies, all of which affect the climate for private research and development, are examined.

Fusfeld, H. I.

Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

Source record