Engineering PapersSearch

SEARCH · Engineering Papers

Results for “dispatch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Decomposing a renewable energy design and dispatch model

We address a mixed-integer linear programming model which selects a cost-minimizing set of available technologies with which to design a renewable energy system and prescribe their associated dispatch decisions. Realistically sized instances of such models pose computational challenges. To this end, we develop a Lagrangian heuristic based on a decomposition methodology which partitions the model into blocks and optimizes these more manageable, smaller subproblems. It also provides a lower bound to assess solution quality. In conclusion, we apply this methodology to the National Renewable Energy Laboratory's Renewable Energy Integration and Optimization (REopt TM ) model to generate near-optimal solutions to realistic instances containing, on average, approximately 300,000 variables and at least as many constraints, with a mean 30% optimality gap improvement using a five-minute solution time limit, compared to directly solving the original monolith.

97 MATHEMATICS AND COMPUTING

A Distributionally Robust Optimization Framework for Stochastic Assessment of Power System Flexibility in Economic Dispatch

Given the complexity of power systems, particularly the high-dimensional variability of net loads, accurately depicting the entire operational range of net loads poses a challenge. To address this, recent methodologies have sought to gauge the maximum range of net load uncertainty across all buses. In this paper, we consider the stochastic nature of the net load and introduce a distributionally robust optimization framework that assesses system flexibility stochastically, accommodating a minimal extent of system violations. We verify the proposed method by solving the flexibility of the economic dispatch problem on four distinct IEEE standard test systems. Compared to traditional deterministic flexibility evaluations, our approach consistently yields less conservative flexibility outcomes.

distributionally robust optimization

A Reduced-Order Model of a Nuclear Power Plant with Thermal Power Dispatch

This paper presents reduced-order modeling of thermal power dispatch (TPD) from a pressurized water reactor (PWR) for providing heat to nearby heat consuming industrial processes that seek to take advantage of nuclear heat to reduce carbon emissions. The reactor model includes the neutronics of the reactor core, thermal–hydraulics of the primary coolant cycle, and a three-lump model of the steam generator (SG). The secondary coolant cycle is represented with quasi-steady state mass and energy balance equations. The secondary cycle consists of a steam extraction system, high-pressure and low-pressure turbines, moisture separator and reheater, high-pressure and low-pressure feedwater heaters, deaerator, feedwater and condensate pumps, and a condenser. The steam produced by the SG is distributed between the turbines and the extraction steam line (XSL) that delivers steam to nearby industrial processes, such as production of clean hydrogen. The reduced-order simulator is verified by comparing predictions with results from separate validated steady-state and transient full-scope PWR simulators for TPD levels between 0% and 70% of the rated reactor power. All simulators indicate that the flow rate of steam in the main steam line and turbine systems decrease with increasing TPD, which causes a reduction in PWR electric power generation. The results are analyzed to assess the impact of TPD on system efficiency and feedwater flow control. Due to the simplicity of the proposed reduced-order model, it can be scaled to represent a PWR of any size with a few parametric changes. In the future, the proposed reduced-order model will be integrated into a power system model in a digital real-time simulator (DRTS) and physical hardware-in-the-loop simulations.

08 HYDROGEN

Dynamic security assessment of systems powered only by grid-forming power plants with uncertain dispatch using polynomial vectors

A modern challenge in power engineering is to perform the dynamic security assessment (DSA) of grids that are 100% powered by inverter-based resources (IBRs). Addressing this challenge is difficult because: (i) the dispatch of IBRs can be uncertain as a result of the variability of renewable resources and (ii) they have hard current control limits that cannot be neglected, contrasting synchronous machines. To address this problem, this paper sets forth a framework to conduct DSA of bulk power systems that are 100% powered by grid-forming IBRs. Furthermore, the framework considers that IBR operational conditions are unknown but bounded by a zonotope which is also expressed as a polynomial vector for uncertainty propagation via Dormand–Prince integration. The framework is applied to modified versions of the WSCC 9-bus and IEEE 39-bus grids.

14 SOLAR ENERGY

iDDS: intelligent distributed dispatch and scheduling for workflow orchestration

The intelligent distributed dispatch and scheduling (iDDS) service is a versatile workflow orchestration system designed for large-scale, distributed scientific computing. iDDS extends traditional workload and data management by integrating data-aware execution, conditional logic, and programmable workflows, enabling automation of complex and dynamic processing pipelines. Originally developed for the ATLAS experiment at the large hadron collider, iDDS has evolved into an experiment-agnostic platform that supports both template-driven workflows and a Function-as-a-Task model for Python-based orchestration. This paper presents the architecture and core components of iDDS, highlighting its scalability, modular message-driven design, and integration with systems such as PanDA and Rucio. We demonstrate its versatility through real-world use cases: fine-grained tape resource optimization for ATLAS, orchestration of large Directed Acyclic Graph (DAG) workflows for the Rubin Observatory, distributed hyperparameter optimization for machine learning applications, active learning for physics analyses, and AI-assisted detector design at the electron–ion collider. By unifying workload scheduling, data movement, and adaptive decision-making, iDDS reduces operational overhead and enables reproducible, high-throughput workflows across heterogeneous infrastructures. We conclude with current challenges and future directions, including interactive, cloud-native, and serverless workflow support.

97 MATHEMATICS AND COMPUTING

Early-stage Testing of Thermal Power Dispatch Simulator for Subjective Mental Workload and Evolution Time

The excess thermal energy produced by nuclear power plants (NPPs) during low electricity demands can be utilized in industrial processes, such as hydrogen production, through a thermal power dispatch (TPD) system. Initial testing of the first iteration of a single-train TPD design with a manual control mode at the Idaho National Lab (INL) revealed a high operator workload and degraded control capability. The current study evaluated the impact of an enhanced dual-train TPD design on operators’ subjective mental workload and evolution task-time while completing two operating scenarios in manual and automatic control modes. The results showed no statistically significant difference between participants’ mental workload using both control modes. Evolution time in automatic control mode took a shorter time than in manual control, with participants completing all evolutions in less than the 10-min set as the design specification limit. The shorter evolution time is discussed within the context of plant safety and operational efficiency.

Gideon, Olugbenga

A Tale of Two Simulators—A Comparative Human-in-the-Loop Nuclear Power Plant Operations Study on Thermal Power Dispatch for Hydrogen Production

A study was designed for a reconfigurable, full-scale, full-scope nuclear power plant control room simulator to compare two different thermal power dispatch systems, on separate simulator platforms, demonstrating a TPD concept of operation. A TPD system can provide a desirable alternative revenue source for utilities but requires addressing new and unique operational issues. The selection of representative scenarios and the scenario-based experimental design are presented as key elements to capture evidence for validating the developed TPD concept of operations overcome these operational issues.

Ulrich, Thomas A.

FervoFlex: Long duration in-reservoir energy storage and load-following, dispatchable geothermal generation

Fervo recently achieved a groundbreaking milestone with the successful completion of its pioneering commercial geothermal project in Northern Nevada. This project is partially supported by the ARPA-E OPEN grant, FervoFlex™ technology—a long-duration in-reservoir energy storage and load-following, dispatchable geothermal generation system. Notably, this project marks a significant stride in commercial viability, delivering uninterrupted, 24/7 clean energy to Google data centers in Nevada (Terrell, Michael 2023)

15 GEOTHERMAL ENERGY

Design of a SMART Valve Testbed for Nuclear Thermal Dispatch

By the year 2050, the United States aims to achieve net-zero carbon emissions. To achieve this target, the licensing of the Light Water Reactor (LWR) fleet has been extended for 20 more years. To stay economically competitive with other power sources such as renewable and fossil-fuel power plants, the U.S. Department of Energy has introduced a plan to modernize the existing LWR fleet and diversify the revenue stream. One of the plans is to dispatch thermal energy to endothermic industrial processes. SMART valves will play an important role in this initiative by efficiently balancing the load by regulating valves in a coordinated manner while monitoring the thermal-hydraulic systems to enhance safety and maintain the integrity of the power plant. This research aims to develop a facility to test the coordinated control algorithm and produce various test results for training the monitoring system. The constructed facility is capable of simulating various operational and accidental scenarios by coordinating all the valves (positions) and pump (flowrate). The facility is developed with an Internet of Things (IoT)-based custom system and a python-based valve position control and coordination mechanism. It has achieved stable sensor outputs, pump control, and coordinated valve regulation in all three valves with minimum obstruction in the system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS

Techno-Economic Viability of Flexible Dispatch of Unconventional Geothermal Systems

Flexible geothermal operations could boost project returns through the allocation of improved power purchase agreements and/or exploitation of power price arbitrage opportunities. In this study, we investigated the techno-economic feasibility of variable flow rate control and time-of-day pricing in closed-loop geothermal systems. We considered U-shaped multilateral system configurations and modeled a variety of technical system parameters. These designs were simulated using a slender-body theory (SBT) model for transient heat transfer and fluid flow. This subsurface model was integrated into the flexible geothermal economic model (FGEM) tool to evaluate the overall flexible geothermal system techno-economics. Future hourly ambient temperature conditions were based on the Sup3rCC dataset. Published datasets were used for future hourly wholesale electricity prices. We analyzed four operating strategies: 1) baseload operation, 2) seasonal dispatch (high flow rate during summer and nominal flow rate during the rest of the year), 3) net generation maximization by varying flow rate to maximize net power output, and 4) revenue maximization by varying flow rate to maximize revenue. We ran all four scenarios for a multiloop configuration with 12 lateral passes, 7-km vertical depth and 87-km total drilling length. Furthermore, we assumed a 60 degrees C/km geothermal gradient and ambient temperature and wholesale electricity prices for New Mexico as a typical state location. The nominal flow rate was set to 80 kg/s. When considering drilling costs of $1,000/m and a discount rate of 7%, the generation maximization scenario resulted in the lowest levelized cost of electricity (LCOE) of ~$150/MWh. When considering project return on investment (ROI), defined as lifetime net income divided by upfront capital costs, all flexible operation scenarios performed better than the base case scenario. The highest ROI of 80% was obtained with the revenue maximization scenario. With drilling costs of $200/m and a discount rate of 5%, the generation maximization scenario resulted in LCOE of $49/MWh.

flexible geothermal

Simulation Results of a Thermal Power Dispatch System from a Generic Pressurized Water Reactor in Normal and Abnormal Operating Conditions

Amid economic pressures in the U.S. electricity market, nuclear utilities are exploring new revenue streams, including hydrogen production. A generic pressurized water reactor simulator was modified to incorporate a novel design for a TPD system coupled to a hydrogen production plant. Standard malfunctions were included in the simulation design, including steam line breaks at various system locations and flow interruptions in the hydrogen plant due to multiple faults, reflecting anticipated operational challenges. It is imperative that the TPD system operation has a minimal effect on the reactor power, primary coolant system, and turbine system operation and performance. Due to the specific design and application of this TPD system, with the proposed turbine control system changes, the overall impact on the existing plant systems is low. Normal TPD operating scenarios resulted in minor effects on the existing plant systems: reactor power changes by at most 0.2%, and gross generator output changes by 20.5 MWe from 100 MWt of TPD. The most severe malfunction analyzed in this work is a full TPD steam line break downstream of the extraction location, which results in an increase in reactor power of about 0.5%. The gross generator output decreases by 36 MWe, a total decrease of 60 MWe from the full power steady state (FPSS) condition. These results indicate that an industrial hydrogen production plant could be coupled thermally to a nuclear power plant with limited effects on the existing system operation and safety.

08 HYDROGEN

Data-Driven Mean-Corrected Recursive Estimation-Based Optimal DER Dispatch for Distribution System Voltage Control

Recent advances in smart inverters offer opportunities to mitigate adverse grid impacts caused by high penetrations of distributed photovoltaics (PV) in distribution grids, such as voltage violations. Here, this paper proposes a novel measurement-driven optimal power flow (OPF)-based distributed energy resource management system (DERMS) voltage regulation via recursive sensitivity estimation informed coordinated control of distributed PV inverters. The proposed approach leverages available grid and controllable DER measurements, eliminating reliance on system model information while being adaptive and robust to volatile operating conditions. A mean-corrected recursive ridge regression (MCRRR) algorithm is proposed for sensitivity estimation, continuously refining the sensitivity model through a closed-form solution. It effectively manages varying grid operating conditions, such as changes in power injections and topology reconfiguration, to facilitate a time-varying update of the Load Sensitivity Factors (LSF). The proposed approach is formulated as a linear programming (LP) problem and is thus scalable to larger-scale distribution systems. Its effectiveness and efficiency are demonstrated on a realistic distribution feeder with high PV penetrations in Southern California, USA.

14 SOLAR ENERGY