Engineering Papers⌕ Search

DOE OSTI · 1891636

FORCE-DISPATCHES Integration - Initial Demonstration

Abstract

Integrated energy systems (IES) combine, in mutually beneficial ways, power from variable renewable energy sources and nuclear power plants (NPP) to improve economic viability under uncertain market and weather conditions. The open-source Framework for Optimization of Resources and Economics (FORCE) tool suite, developed at Idaho National Laboratory (INL), has enabled comprehensive modeling and simulation of IES. The capabilities within FORCE include grid portfolio optimization through the Holistic Energy Resource Optimization Network (HERON) and the transient process model analysis library HYBRID, among others. Continuous efforts and investments from the IES programs have been made to expand and improve the versatility of the FORCE toolset in fiscal year 2022. Code-coupling and cross-tool communication have been important methods for improving this versatility. This report focuses on an additional workflow in the HERON tool for capacity and dispatch stochastic optimization through integration with the external tool Design Integration and Synthesis Platform to Advance Tightly Coupled Hybrid Energy Systems (DISPATCHES). DISPATCHES was primarily developed by the National Energy Technology Laboratory, in collaboration with other national laboratories, which included INL, universities, and industry partners. It is coupled to a library of algebraic models for specific plant components, and to a framework for stochastic optimization different from that provided in the current Risk Analysis Virtual Environment (RAVEN)-running-RAVEN algorithm in HERON. HERON currently conducts stochastic optimization via an outer-inner loop: it optimizes over variable capacity on the outer loop, and at each step within the capacity parameter space, conducts an inner optimization over scenarios (of market signals, demand, and/or weather patterns) and hourly dispatch throughout a user-specified number of years. On the other hand, DISPATCHES conducts stochastic optimization via an “all-at-once” strategy in which capacity variables are optimized at the same level as dispatch variables, as all scenarios are considered at once. The latter method works especially well for projects of limited size and project length, as the necessary computational power and memory increases with the number of variables and scenarios. The new capability to use the DISPATCHES workflow in HERON enhances standalone simulations by leveraging FORCE tools—namely, the economic metrics from the Tool for Economic Analysis (TEAL) and reduced-order model (ROM) sampling from RAVEN. The initial demonstration of the DISPATCHES workflow simulates an existing nuclear-case flowsheet within the DISPATCHES repository—this models a NPP with a secondary revenue stream for hydrogen production. Electrical output from the plant is converted to hydrogen via a proton-exchange membrane (PEM) electrolyzer, hydrogen tanks are used for storage, and an additional turbine is added for hydrogen combustion. Continued work regarding this FORCE-DISPATCHES integration will include automatic generation of DISPATCHES models from HERON inputs, offering analysts the option of using either the RAVEN-runsRAVEN or DISPATCHES workflow to solve technoeconomic optimization problems.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Soto Gonzalez, Gabriel Jose, Talbot, Paul W.. 2022-09-21. FORCE-DISPATCHES Integration - Initial Demonstration. https://doi.org/10.2172/1891636

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

From zonal to nodal capacity expansion planning: Spatial aggregation impacts on a realistic test-case

Solving power system capacity expansion planning (CEP) problems at realistic spatial resolutions is computationally challenging. Thus, a common practice is to solve CEP over zonal models with low spatial resolution rather than over full-scale nodal power networks. Due to improvements in solving large-scale stochastic mixed integer programs, these computational limitations are becoming less relevant, and the assumption that zonal models are realistic and useful approximations of nodal CEP is worth revisiting. Here, this work is the first to conduct a systematic computational study on the assumption that spatial aggregation can reasonably be used for ISO-scale CEP. By considering a realistic, large-scale test network based on the state of California with over 8000 buses, we find that well-designed small spatial aggregations can yield good approximations but that coarser zonal models may result in large distortions of investment decisions, e.g., capacity under-investment of up to 41% for the lowest resolution model considered.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-facility analysis using metered power data to quantify MRI energy use and utility bill costs across scanner operating modes

This study quantifies the energy consumption of magnetic resonance imaging (MRI) scanners across discrete operating modes during routine clinical workflows, based solely on electrical power measurements. Although previous studies have investigated MRI energy consumption within single hospitals or specific clinical settings, this research provides a broader and more systematic analysis. Researchers analyzed electrical power data and applied a previously developed semi-automatic method for identifying MRI operating modes using load duration curves for 20 MRI scanners across four different U.S. healthcare facilities, encompassing outpatient, inpatient, and mixed-use clinical settings. A key innovation is the inclusion of localized hourly utility rates to estimate costs, a parameter absent in prior literature. Key findings indicate significant variability in energy and cost profiles between weekdays and weekends. Scanner characteristics, including magnet strength, manufacturer, vintage, location, and clinical setting, influenced average daily energy consumption and power thresholds for operating modes. Notably, the clinical setting of a scanner predominantly determines its energy use. For example, the scanners in outpatient facilities consumed more energy. The breakdown of energy usage and costs by operating modes showed scanners spend between 61% and 93% of their time in nonproductive modes, with one outlier spending 34%. Average daily energy use for the scanners in the study ranged from 160 to 1069 kWh, with energy costs ranging from $\$$9 to $\$$149. This study uses an existing framework to quantify MRI energy behavior, leading to insights that can enable improved performance and cost savings across different healthcare environments.

24 POWER TRANSMISSION AND DISTRIBUTION↗