Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Why Don't They Just Give Us Money? Project Cost Estimating and Cost Reporting

Successful projects require an integrated approach to managing cost, schedule, and risk. This is especially true for complex, multi-year projects involving multiple organizations. To explore solutions and leverage valuable lessons learned, NASA's Virtual Project Management Challenge will kick off a three-part series examining some of the challenges faced by project and program managers when it comes to managing these important elements. In this first session of the series, we will look at cost management, with an emphasis on the critical roles of cost estimating and cost reporting. By taking a proactive approach to both of these activities, project managers can better control life cycle costs, maintain stakeholder confidence, and protect other current and future projects in the organization's portfolio. Speakers will be Doug Comstock, Director of NASA's Cost Analysis Division, Kristin Van Wychen, Senior Analyst in the GAO Acquisition and Sourcing Management Team, and Mary Beth Zimmerman, Branch Chief for NASA's Portfolio Analysis Branch, Strategic Investments Division. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

Comstock, Douglas A.↗

An Application of the Phosphorus Consistent Rule for Environmentally Acceptable Cost-Efficient Management of Broiler Litter in Crop Production

We calculated the profitability of using broiler litter as a source of plant nutrients using the phosphorus consistent litter application rule. The cost saving by using litter is 37% over the use of chemical fertilizer-only option to meet the nutrient needs of major crops grown in Alabama. In the optimal solution, only a few routes of all the possible routes developed were used for inter- and intra- county litter hauling. If litter is not adopted as the sole source of crop nutrients, the best environmental policy may be to pair the phosphorus consistent rule with taxes, marketable permits, and subsidies.flaws

Paudel, Krishna P.↗

Depot Charging Schedule Optimization for Medium- and Heavy-Duty Battery-Electric Trucks

Charge management, which lowers charging costs for fleets and prevents straining the electrical grid, is critical to the successful deployment of medium- and heavy-duty battery-electric trucks (MHD BETs). This study introduces an energy demand and cost management framework that optimizes depot charging for MHD BETs by combining an energy consumption machine learning model and a linear program optimization model. The framework considers key factors impacting real-world MHD BET operations, including vehicle and charger configurations, duty cycles, use cases, geographic and climate conditions, operation schedules, and utilities’ time-of-use (TOU) rates and demand charges. The framework was applied to a hypothetical fleet of 100 MHD BETs in California under three different utilities for 365 days, with results compared to unmanaged charging. The optimized charging solution avoided more than 90% of on-peak charging, reduced fleet charging peak load by 64–75%, and lowered fleet energy variable costs by 54–64%. This study concluded that the proposed charge management framework significantly reduces energy costs and peak loads for MHD BET fleets while making recommendations for fleet electrification infrastructure planning and the design of utility TOU rates and demand charges.

Song, Shuhan↗

Reducing costs of managing and accessing navigation and ancillary data by relying on the extensive capabilities of NASA's spice system

The SPICE system of navigation and ancillary data possesses a number of traits that make its use in modern space missions of all types highly cost efficient. The core of the system is a software library providing API interfaces for storing and retrieving such data as trajectories, orientations, time conversions, and instrument geometry parameters. Applications used at any stage of a mission life cycle can call SPICE APIs to access this data and compute geometric quantities required for observation planning, engineering assessment and science data analysis. SPICE is implemented in three different languages, supported on 20+ computer environments, and distributed with complete source code and documentation. It includes capabilities that are extensively tested by everyday use in many active projects and are applicable to all types of space missions - flyby, orbiters, observatories, landers and rovers. While a customer's initial SPICE adaptation for the first mission or experiment requires a modest effort, this initial effort pays off because adaptation for subsequent missions/experiments is just a small fraction of the initial investment, with the majority of tools based on SPICE requiring no or very minor changes.

ancillary data↗

Hydrocarbon-based membranes cost-effectively manage species transport and increase performance in thermally regenerative batteries

Low-temperature heat (T<130°C) can be utilized by thermally regenerative batteries (TRBs) for power production, allowing the thermal energy to be converted to storable chemical potential energy. However, TRBs suffer from high ohmic losses and ammonia crossover, which has slowed their development. In this study, we examined how the use of six different membranes influenced TRB performance, determined the most influential membrane parameters, and identified promising membrane candidates that cost-effectively increase TRB performance. Of the six membranes examined, an inexpensive, hydrocarbon CEM (Selemion CMVN) had low ammonia crossover without compromising resistance, resulting in good performance across all metrics studied. A thin anion exchange membrane (Sustainion, 50 microns) showed a high peak power density of 82 mW cm –2 due to low resistance, but the average power density and energy density were low due to high ammonia flux. Full discharge curves using Selemion CMVN provided an average power density of 26 ± 7 mW cm –2 with an energy density of 2.9 Wh L –1 , which were large improvements on previous TRBs. A techno-economic analysis showed that Selemion CMVN had the lowest levelized cost of storage ($410 per MWh) at an applied current density of 50 mA cm –2 .

25 ENERGY STORAGE↗

Managing Insurance Cost and Business Risk

This fact sheet explores the role insurance and re-insurance industries play in mitigating resilience risk and offers best practices for building owners to work effectively with insurers. It also reviews the types of insurance coverages relevant to resilience as well as efforts by the insurance industry to respond to increased risk.

Commercial, Resilience, Resiliency, Financing, Ins↗

Infusing Stretch Goal Requirements into the Constellation Program

In 2004, the Vision for Space Exploration (VSE) was announced by the United States President's Administration in an effort to explore space and to extend a human presence across our solar system. Subsequently, the National Aeronautics and Space Administration (NASA) established the Exploration Systems Mission Directorate (ESMD) to develop a constellation of new capabilities, supporting technologies, and foundational research that allows for the sustained and affordable exploration of space. Then, ESMD specified the primary mission for the Constellation Program to carry out a series of human expeditions, ranging from Low Earth Orbit (LEO) to the surface of Moon, Mars, and beyond for the purposes of conducting human exploration of space. Thus, the Constellation Program was established at the Lyndon B. Johnson Space Center (JSC) to manage the development of the flight and ground infrastructure and systems that can enable continued and extended human access to space. Constellation Program's "Design Objectives" call for an early attention to the program's life cycle costs management through the Program's Need, Goals, and Objectives (NGO) document, which provides the vision, scope, and key areas of focus for the Program. One general policy of the Constellation Program, found in the Constellation Architecture Requirements Document (CARD), states: "A sustainable program hinges on how effectively total life cycle costs are managed. Developmental costs are a key consideration, but total life cycle costs related to the production, processing, and operation of the entire architecture must be accounted for in design decisions sufficiently to ensure future resources are available for ever more ambitious missions into the solar system....It is the intent of the Constellation Program to aggressively manage this aspect of the program using the design policies and simplicity." To respond to the Program's strong desire to manage the program life cycle costs, special efforts were established to identify operability requirements to influence flight vehicle and ground infrastructure design in order to impact the life cycle operations costs, and stretch goal requirements were introduced to the Program. This paper will describe how these stretch goal requirements were identified, developed, refined, matured, approved, and infused into the CARD. The paper will also document several challenges encountered when infusing the stretch goal requirements into the Constellation Program.

Operability↗

Why Costing is Important on HBCU Grants

This paper explains why cost is important on Historically Black College and University (HBCU) Grants. The topics of discussion include: 1) Forward Funding; 2) Good and bad cost management; and 3) Recommendations for cost performance.

Source record↗

Government conceptual estimating for contracting and management

The use of the Aerospace Price Book, a cost index, and conceptual cost estimating for cost-effective design and construction of space facilities is discussed. The price book consists of over 200 commonly used conceptual elements and 100 systems summaries of projects such as launch pads, processing facilities, and air locks. The cost index is composed of three divisions: (1) bid summaries of major Shuttle projects, (2) budget cost data sheets, and (3) cost management summaries; each of these divisions is described. Conceptual estimates of facilities and ground support equipment are required to provide the most probable project cost for budget, funding, and project approval purposes. Similar buildings, systems, and elements already designed are located in the cost index in order to make the best rough order of magnitude conceptual estimates for development of Space Shuttle facilities. An example displaying the applicability of the conceptual cost estimating procedure for the development of the KSC facilities is presented.

Brown, J. A.↗

Enabling Assurance in the MBSE Environment

A number of specific benefits that fit within the hallmarks of effective development are realized with implementation of model-based approaches to systems and assurance. Model Based Systems Engineering (MBSE) enabled by standardized modeling languages (e.g., SysML®) is at the core. These benefits in the context of spaceflight system challenges can include [1]: • Improved management of complex development • Reduced risk in the development process • Improved cost management • Improved design decisions With appropriate modeling techniques the assurance community also can improve early oversight and insight into project development. NASA has shown the basic constructs of SysML in an MBSE environment offer several key advantages, within a Model Based Mission Assurance (MBMA) initiative [2, 3]. These include the following: • Model viewpoints that promote rapid and systematic assessment of requirements coverage, hazard tagging and risk management • Embedded safety assessments for launch vehicles • Deployment of model assisted development of reliability products - Failure Modes and Effects Analyses (FMEAs) and Fault Trees • Test Planning • Validation and Verification of complex functions • Support of Assurance Case development for complex systems In addition, while there are benefits to be harvested, there is a realization that these do not come without effort and cost. Enabling model-based approaches requires structure, not only in an organizational context, but in a modeling context as well. There can be a steep learning curve and costs associated to train skilled modelers. But, on the other hand, not all of the assurance community need to be modelers. Models themselves must conform to ontologies that enable assurance. This places constraints upon the models and modelers. Optimums have yet to be developed where resources and constraints on modeling must be traded off in the organization and modeling efforts for projects. A number of barriers need to be overcome, as well, which pose challenges to the developers of the software that supports MBSE/MBMA. Information and data must be made to flow seamlessly through the life cycle. Because there is a wide variety of tools used in the community, to avoid the problems of the past of silos, delays, and diverging interests, information should flow among these tools to support the “single source of truth” paradigm of MBSE. This will greatly facilitate MBMA and advancement of assurance functions.

Evans, John W.↗

Enabling Assurance in the MBSE Environment

A number of specific benefits that fit within the hallmarks of effective development are realized with implementation of model-based approaches to systems and assurance. Model Based Systems Engineering (MBSE) enabled by standardized modeling languages (e.g., SysML®) is at the core. These benefits in the context of spaceflight system challenges can include: Improved management of complex development, Reduced risk in the development process, Improved cost management, Improved design decisions. With appropriate modeling techniques the assurance community can improve early oversight and insight into project development. NASA has shown the basic constructs of SysML in an MBSE environment offer several key advantages, within a Model Based Mission Assurance (MBMA) initiative.

Evans, John W.↗

A Model-Driven Architecture Approach for Modeling, Specifying and Deploying Policies in Autonomous and Autonomic Systems

Autonomic Computing (AC), self-management based on high level guidance from humans, is increasingly gaining momentum as the way forward in designing reliable systems that hide complexity and conquer IT management costs. Effectively, AC may be viewed as Policy-Based Self-Management. The Model Driven Architecture (MDA) approach focuses on building models that can be transformed into code in an automatic manner. In this paper, we look at ways to implement Policy-Based Self-Management by means of models that can be converted to code using transformations that follow the MDA philosophy. We propose a set of UML-based models to specify autonomic and autonomous features along with the necessary procedures, based on modification and composition of models, to deploy a policy as an executing system.

Pena, Joaquin↗

The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

Schedule↗

Cost as a technology driver

Cost managment as a guiding factor in optimum development of technology, and proper timing of cost-saving programs in the development of a system or technology with payoffs in development and operational advances are discussed and illustrated. Advances enhancing the performance of hardware or software advances raising productivity or reducing cost, are outlined, with examples drawn from: thermochemical thrust maximization, development of cryogenic storage tanks, improvements in fuel cells for Space Shuttle, design of a spacecraft pyrotechnic initiator, cost cutting by reduction in the number of parts to be joined, and cost cutting by dramatic reductions in circuit component number with small-scale double-diffused integrated circuitry. Program-focused supporting research and technology models are devised to aid judicious timing of cost-conscious research programs.

Fitzgerald, P. E., Jr.↗