Waste Treatment Technology Process Development Plan For Hanford Waste Treatment Plant Low Activity Waste Recycle

The purpose of this Process Development Plan is to summarize the objectives and plans for the technology development activities for an alternative path for disposition of the recycle stream that will be generated in the Hanford Waste Treatment Plant Low Activity Waste (LAW) vitrification facility (LAW Recycle). This plan covers the first phase of the development activities. The baseline plan for disposition of this stream is to recycle it to the WTP Pretreatment Facility, where it will be concentrated by evaporation and returned to the LAW vitrification facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SELECTION OF SURPLUS PLUTONIUM MATERIALS FOR DISPOSITION TO WIPP

The U.S. Department of Energy (DOE) is preparing a Surplus Plutonium Disposition (SPD) Supplemental Environmental Impact Statement (SEIS). Included in the evaluation are up to 6 metric tons (MT) of plutonium in the form of impure oxides and metals for which a disposition plan has not been decided, among options that include preparation as feed for the Mixed Oxide Fuel Fabrication Facility; disposing to high-level waste through the Savannah River Site (SRS) HB Line and H Canyon; can-in-canister disposal using the SRS Defense Waste Processing Facility; and preparation for disposal at the Waste Isolation Pilot Plant (WIPP). DOE and SRS have identified at least 0.5 MT of plutonium that, because of high levels of chemical and isotopic impurities, is impractical for disposition by methods other than the WIPP pathway. Characteristics of these items and the disposition strategy are discussed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Improving PCM Waste Management Through New Approaches to Screening for LLW Treatment and Disposal - 20145

A major step forward in the management of Plutonium Contaminated Material (PCM) Waste has been taken at the Sellafield site with the introduction of new capabilities to enable wastes previously conservatively designated as PCM Intermediate Level Waste (ILW) to be re-classified for treatment as Low Level Waste (LLW). The Sellafield site, located in the North West of England, within the United Kingdom (UK), has operated plutonium processing plants and waste facilities for almost 70 years. During this time management of the raw PCM waste produced has presented a variety of challenges. The waste is currently processed by high force waste compaction in the Waste Treatment Complex (WTC). The WTC converts 200 litre drums of raw PCM waste into a compacted, grout encapsulated monolith form within stainless steel containment, ready for emplacement within the UK's Geological Disposal Facility (GDF) when it becomes available. To help progress some of the wastes waiting for treatment, recent improvements have been made with the introduction of new waste assay instrumentation which enables the identification of a 'candidate' waste potentially suitable for disposal via the LLW treatment route. Opening a new LLW route for previously designated PCM has been a major advance in PCM waste management policy. It has required a range of technical assessment arrangements to be developed, tested and commissioned and involved the engagement of a wide range of stakeholders. In particular, very detailed technical analysis methods have been developed to ensure that there is a robust and conservative approach to the final sentencing of waste. Following completion of commissioning tests, the first 86 m{sup 3} of previously designated PCM waste was successfully treated through the LLW route and consigned to LLW disposal in June 2019. The direct benefit of sentencing waste to the correct waste route (LLW) is the significant cost savings across the complete range of waste management activities. This work is also strategically important for demonstrating to a range of stakeholders including workforce and regulators, that waste previously designated as PCM can be re-classified in a systematic and justifiable way without increasing risk to personnel or the wider environment. By ensuring that waste is being managed appropriately it will be possible to carry out more remediation work safely, in less time, and at a lower cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The completion of the construction and commissioning of the liquid radwaste treatment plant at ChNPP - 15685

Since a beginning of ChNPP operation, and after a tragedy in 1986, a few thousands m{sup 3} of LRW have been collected in a storage tanks. In 2004 ChNPP started the new project on creation of LRW treatment plant (LRWTP) financed from EBRD fund. But it was stopped in 2008 because of financial and contract problems. In 2010, FSUE RADON jointly with Ukrainian partners has won a tender on completion of LRWTP, in particular I and C system. The purpose of LRTP is to process liquid rad-wastes from SSE 'Chernobyl NPP' site and those liquids stored in the LRWS and SLRWS tanks as well as the would-be wastes after ChNPP Power Units 1, 2 and 3 decommissioning. The LRTP design lifetime - 20 years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bioregenerative life support systems for long-term space habitation: a conceptual approach

Life support systems represent one of the most critical aspects of human space exploration. Future long-term missions such as the establishment of human-tended Lunar and Martian bases require closed life support systems. A conceptual approach to an Engineered Closed/Controlled EcoSystem incorporating bioregenerative capabilities by integrating humans, plants, and waste management processes is presented. The integration of physical/chemical and biological waste treatment processes is suitable for supporting plant growth through hydroponics and materially closing the human and plant metabolic loops. This conceptual design separates wastes into individual loops for treatment according to the specific metabolic needs of humans and plants. The means through which an integrated Engineered Closed/Controlled EcoSystem meets the life support objectives of long-term space habitation are summarized.

Non-NASA Center↗

AVANTech's Liquid Radwaste (LRW) Processing System Upgrade at the Farley Nuclear Plant - 20328

This paper looks at the Liquid Radioactive Waste (LRW) processing system configuration at Joseph M. Farley Nuclear Plant (Plant Farley). A combination of factors led the staff at Plant Farley to seek a better way to manage and process liquid waste. These factors were: - Reduce effluent activity; - Reduce waste volume; - Improve cost efficiency. The LRW processing system changes made at Plant Farley are identified and discussed. The information and technologies cited in this paper are directly applicable to other nuclear power plants who might contemplate an upgrade of LRW processing systems or of individual system components. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applying lean management to aging infrastructure - 15416

Currently the Savannah River Site liquid waste system consists of 51 waste tanks, two operating evaporators, a salt processing pilot plant, the DWPF vitrification facility, the salt-stone Processing Facility and an Effluent Treatment Plant. Six of the waste tanks have been grouted and closed and the full scale Salt Waste Processing Facility (SWPF) is under construction. Some of the waste tanks and associated infrastructure were placed into operation as early as 1954 and DWPF went into operation in 1996. Due to this long history of operation, the SRS liquid waste system is being challenged by aging infrastructure issues and the stored radioactive liquid waste has been identified by regulators as the highest environmental risk in the state. Much of the DOE complex faces similar infrastructure issues. Remedies that can mitigate the impact of those issues are needed all across the complex. At SRS, Lean Management has been adopted as a business process to help address some of the impacts. Lean Management got its start decades ago in the manufacturing sector and has its roots in the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health care, and now the DOE complex. Lean Management has a 'secret sauce' that must be correct to avoid becoming the 'flavor of the month'. The easy part is the talking. The hard part is the doing. The payoff is in the doing. Obviously as facilities and equipment age, more and more funds are needed to maintain, refurbish, and replace them. Funding of course is tight for all our sites. Lean management generates work efficiency so a given set of resources can produce more. It must be noted that this isn't by working harder but rather by focusing scarce resources on the few activities that truly add value. A positive aspect for companies that have been on this journey is employees feel less stress and higher motivation. The work they do matters and they have fewer outside impediments to distract and sap their energy. SRR has used the Lean process to streamline both work planning and control and the supply chain to improve maintenance efficiency and reduce the Corrective Maintenance backlog. This paper explains how this was done, the challenges encountered, and how organizations can use this methodology for their own improvements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ecological risk assessment software for radioactive waste management facilities - 15464

Environmental Risk Assessment (ERA) is a systematic process which can be used to identify, quantify and characterize the risk posed by contaminants and physical stressors in the environment on biological receptors, including human and non-human biota. Human receptors can be addressed through a Human Health Risk Assessment and non-human biota can be addressed through an Ecological Risk Assessment (EcoRA). In 2012 the Canadian Standards Association (CSA) issued a CSA standard N288.6 Environmental Risk Assessment at Class I Nuclear Facilities and Uranium Mines and Mills. The standard applies to radioactive waste management facilities, as well as nuclear power plants. The ERA can also be used retrospectively, to estimate the effect that a contaminant or stressor has already had on the environment; and can be used to assist in determining possible remedial or risk management options to return the quality of the affected environment to a predetermined state. While industry-standard tools for estimating radiological doses to humans are readily available, there is a need for a tool to implement the CSA N288.6 standard for Ecological Risk Assessment. To address this need, AMEC developed a computer code called -Assessment of Impact of Contaminants on Ecological Receptors (AICER)-. The code was developed to be consistent with the CSA standard N288.6, by assessing the impact of radiological contamination on non-human biota for normal operations. The code can also be used to screen for the potential effects of conventional contamination on the environment. In addition, the code is also applicable for abnormal events and accidents with the appropriate modification of some parameters used in the code. The AICER code was qualified in accordance with the requirements of the Canadian quality standard CSA N286.7 -Quality Assurance of Analytical, Scientific, and Design Computer Programs for Nuclear Power Plants-. The functionality of the code is illustrated with screen shots in the paper, following the introduction of the theoretical model for the dose calculation. An inter-comparison with RESRAD-BIOTA and ERICA Assessment tool at the conceptual level was conducted. In addition, the practical application of the code for the assessment of the impacts related to an existing radioactive waste management facility is provided. In particular, analysis was conducted to evaluate radiological doses to non-human biota resulting from a fire accident scenario involving an existing waste storage and processing facility. Analysis included all feasible waterborne and airborne exposure pathways. Doses were evaluated for a range of species representing valued ecological components at various trophic levels and compared with benchmark values for indicator species. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the process demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the Savannah River Site. It is not expected that the exact equipment used during this testing will be used during the waste feed qualification testing for WTP, but functionally similar equipment will be used such that the techniques demonstrated would be applicable. For example, the mixing apparatus could use any suitable mixer capable of being remoted and achieving similar mixing speeds to those tested.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operations research modeling in support of the Hanford direct feed low activity waste program - 15538

Operations Research (OR) modeling is a supplemental system planning tool for the Hanford Tank Farm Contractor. OR models are designed to quantify the impact of equipment failures and other constraints on mission duration; to determine overall system performance; and to identify any potential bottleneck areas and identify any potential improvement areas. OR models are being developed to provide critical insights into the expected operational performance of current and planned facilities and to help identify any operational risks which impact performance of plant and equipment. This information is used to aid decision making on facility design and operations. A new OR model is being developed in support of the Direct Feed Low Activity Waste (DFLAW) Program and will be a valuable tool in the development of overall operational and management strategies as well as providing input to facility design. The OR model will identify predicted system availability, process bottlenecks, and key equipment influencing system performance. The OR model will also test proposed solutions to improve system availability by resolving process bottlenecks and provide this information to the design agent for incorporation into the DFLAW process design. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental cleanup of the East Tennessee Technology Park - Year three - A status report - 15522

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (Reservation) in Tennessee. Under the contract, the base period scope of work to be completed by 2016 includes demolition of both the K-25 and K-31 gaseous diffusion buildings and all demolition waste dispositioned, initiation of demolition on the remaining K-27 gaseous diffusion building, safe storage of transuranic (TRU) waste for eventual transfer to the Transuranic Waste Processing Center, previously designated -No-Path-To-Disposition Waste- dispositioned to the extent possible, and completion of design and engineering of a mercury treatment system to be installed at the Y-12 National Security Complex (Y-12). UCOR will have also managed DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and Y-12 in a safe and cost-effective manner. Since assuming responsibilities as the ETTP and Oak Ridge Reservation cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; completed the deactivation and demolition (D and D) of the 44-acre K-25 gaseous diffusion building; removed and disposed of a contaminated underground storage tank (Tank W-1A) at ORNL; dispositioned mercury-contaminated storage tanks at Y-12; completed closure of the Toxic Substances Control Act Incinerator; disposed of more than 158,000 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF); and conducted operations, surveillance, and maintenance activities at 180 DOE EM facilities at ETTP, ORNL, and Y-12 in a safe and cost-effective manner. In 2014, UCOR completed the removal and disposal of all of the K-25 demolition debris; completed the removal of asbestos-laden transite siding on the K-31 gaseous diffusion building and began demolition of that 17-acre building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2015; advanced the design and engineering of a Mercury Treatment Facility to be located at Y-12; continued the cost-effective and safe disposition of all cleanup wastes; and readied ETTP for Voluntary Protection Program Star Status Assessment in 2015. Project performance as of December 31, 2014, continued to be excellent: - Cost Performance Index - 1.12 - Schedule Performance Index - 1.02 At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its excellent project performance. Through calendar year 2014, UCOR's recordable injury rate was 1.04 occurrences per 200,000 work hours, and the lost workday case rate was 0.52. This performance continues to be due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key enablers included: - Selected and deployed experienced staff in key leadership positions throughout the organization, continually re-energizing the organization with new leaders - Implemented previously successful safety programs and initiatives from other DOE sites, such as DOE's Voluntary Protection Program - Brought fresh thinking and innovation to tackling tough project issues, such as the deactivation of the Technetium-99-contaminated areas of K-27, applying lessons learned from the D and D of K-25; and implementing a -waste factory- approach to cleanup - Maintained continuing alignment between UCOR's contract with DOE and its Performance Measurement Baseline - rapidly addressing contract changes when they arose - Maintained a readiness both from a process as well as experienced personnel perspective to support DOE OREM in performing other significant Oak Ridge Reservation cleanup activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Authorization to proceed with production engineering for the waste treatment and immobilization plant's high-level waste facility - 15595

The U.S. Department of Energy restricted certain engineering, procurement, and construction work on the Waste Treatment and Immobilization Plant's (WTP) Pretreatment Facility, and to a lesser degree the High-Level Waste (HLW) Facility in 2012 and early 2013 because of the impact of unresolved technical issues on the facility design, and a misalignment between the facility design and nuclear safety basis. The U.S. Department of Energy, Office of River Protection (ORP) needed a way to minimize project management risk, while continuing limited critical path construction work for the HLW Facility and resolving the technical and safety basis issues. ORP developed a process to systematically address and resolve the technical, management, and quality issues that led DOE to restrict HLW Facility production activities in 2012 and 2013. This process provided for a phased resumption of HLW engineering, procurement, and construction activities on an incremental basis and a final decision for release to full production. In August 2014, ORP provided authorization for the WTP contractor to resume all engineering work necessary to finalize the HLW Facility design. The decision to proceed with production engineering in the HLW Facility, representing the first of two decision points, was based on significant progress in resolving HLW technical issues and improving work processes to align the HLW design and safety basis. Full release for HLW equipment procurements and construction is forthcoming based on conditions that must be fully satisfied and demonstrated during a transition period expected to continue for the next few years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Study of an unrefined humate solution as a possible remediation method for groundwater contamination - 15698

Savannah River Site (SRS) was one of the major nuclear processing facilities in the U.S. where plutonium was produced during the Cold War. Approximately 1.8 billion gallons of low level acidic waste solution containing radionuclides and dissolved metals were discharged to a series of unlined seepage basins at the F/H Area. Uranium is a key contaminant of concern in the basin's groundwater. It is migrating into the groundwater creating an acidic plume with a pH between 3-5.5. Groundwater Actions: The pump-and-treat water treatment unit was designed and built in 1997 to remove metals and radionuclides. In 2004 a hybrid funnel-and-gate system was constructed to create a treatment zone in which the acidic nature of the contaminated sediments could be reversed. Huma-K is an organic fertilizer that comes from the alkaline extraction of leonardite (a low-rank coal). Huma-K has a high content of humic substances which consist of complex organic compounds formed by the decomposition of plant and animal tissue. The objective of this study is to determine if a low cost unrefined humate solution (Huma-K) can be used to facilitate uranium adsorption to control its mobility in acidic groundwater. This study can assist in evaluating whether Huma-K can be used as an in situ amendment for the remediation of groundwater contaminated with uranium. Sediments from FAW-1 70-90 ft were used in this experiment. Sediments were disaggregated and sieved to a particle size of . 2 mm. Concentrations in the range 10-500 ppm were tested. Once all the components were added, pH was adjusted to 4. Samples were vortex mixed and placed on a shaker table at 100 RPM for a period of 24 hours in order to reach the adsorption equilibrium. Once the adsorption equilibrate was reached, samples were centrifuged at 2700 RPM to separate the liquid and the solid phase. The liquid fraction was analyzed using a Thermo Scientific Genesys 10S UV-Vis spectrophotometer. The same experimental design was used as explained above. A known concentration of Huma-K was used to study the pH effect on the sorption process. pH values were measured at the beginning and at the end of the experiment. Spectra of Huma-K show a featureless character. Absorbance of light increases as the wavelength is decreased. Measurements were done at 254 nm due to the presence of aromatic rings. Apparently there are two sorption processes. The first one follows the same trend as the Langmuir isotherm up to 250 ppm. The second sorption process occurs after all the binding sites in the sediments have been occupied. Precipitation decreases as the pH is increased. Based on the sorption isotherm, humic substances apparently bind first to the binding sites of the sediments particles. Once all the binding sites have been occupied, other sorption processes may start to dominate. Sorption is affected by pH. Higher sorption is seen at low pH values. Increased precipitation at low pH values is probably due to the neutralization of surface charges of humic molecules making them agglomerate.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress updates for the Hanford waste treatment and immobilization plant project - 15593

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to clean up radioactive waste at the Hanford Site in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 211 983 m{sup 3} (56 million gallons) of radioactive waste stored in 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. In recent years, the project has encountered issues that affected project design completion, especially in the Pretreatment and High-Level Waste Facilities. These included technical issues, changes in requirements, changes in funding, weaknesses in the nuclear supply chain, identification of new hazards, and new information about the tank waste. The combination of these issues led to a suspension of construction of the Pretreatment Facility and a partial suspension of construction of the High-Level Waste Facility in mid-2012. Since then, the WTP Project has made significant progress in establishing and implementing a strategy for resolving these issues. This strategy focuses on resuming full production work in a sequence that fully supports the DOE plan for a phased approach for starting treatment of the Hanford tank waste, beginning with the low-activity waste streams. Concurrent with the technical and programmatic issues, the DOE Office of River Protection has made numerous changes in the processes it uses to manage and oversee the WTP Project. These changes have had a beneficial impact on the progress the project has made in establishing a path forward for resuming production activities, and on planning for the necessary contract and baseline changes needed to complete the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. department of energy safety design strategy review and approval beyond critical decision 3 for the high-level waste facility - 15525

The Waste Treatment and Immobilization Plant (WTP) in Hanford, Washington, is the nation's largest environmental remediation construction project. In 2012, at the WTP's High-Level Waste (HLW) Facility, the U.S. Department of Energy (DOE), Office of River Protection (ORP) restricted construction work at the Hazard Category 2 nuclear facility because of unresolved technical issues associated with the facility and of misalignment of the design and nuclear safety basis. By 2013, as additional issues were discovered, ORP limited HLW design and procurement activities. Addressing the technical issues and the misalignment of the design basis with the Preliminary Documented Safety Analysis (PDSA) is a priority for ORP. A proposal was developed to use the concept of a safety design strategy (SDS), as documented in DOE-STD-1189-2008, Integration of Safety into the Design Process, as a planning mechanism to support facility design and PDSA alignment. The standard provides the processes to develop an SDS that will ensure safety is integrated into design early in the project, by the start of preliminary design. Ultimately, as design progresses, an SDS is intended to support development of the project's PDSA. However, in this unique case, the HLW Facility design and construction phase has progressed beyond Critical Decision 3 and DOE-STD-1189-2008 was issued in 2008; 6 years after ORP approved the first WTP PDSA. In July 2013, ORP and the contractor recognized that the unresolved technical issues and design - safety basis misalignment should be addressed through a renewed look at nuclear safety requirements, and agreed that developing an SDS tailored to the criteria in DOE-STD-1189-2008 provided the best path forward to better integrate design and safety. Development of the SDS for the HLW Facility was one of many goals ORP established in a plan that describes how ORP will determine whether, and under what conditions, the contractor should be authorized to proceed with production engineering, procurement, and construction activities for the HLW Facility. Over the next several months, the contractor developed the draft SDS, identifying design basis accidents and control strategies for those accidents. ORP monitored progress and, when appropriate, provided recommendations. In April 2014, the contractor provided a draft SDS to ORP for initial review by an independent DOE Review Team. The Review Team was comprised of representatives from nuclear safety, criticality safety, engineering, fire protection, the Office of Environmental Management, the Assistant Manager WTP, and the DOE Chief of Nuclear Safety. A unique draft document review and interactive review process, facilitated through work sessions and continuous communication with the contractor, culminated in the development of 147 technical comments on topics varying from SDS implementation to hydrogen deflagration in vessels. Comment resolution sought to improve project clarity, delineation of control strategies, and, holistically, facilitate integration of safety into design in the SDS, as it will guide the restart of the HLW Facility production engineering and limited procurement and construction activities. All comments were resolved in support of a contractor submission of the final SDS to ORP at the end of June 2014. Successful resolution of these comments was achieved by continuing the real-time response and incorporation interaction with the contractor to ensure that mutual objectives were satisfied. The response times were facilitated through telephone, E-mail, and a shared file server accessible to contractor and DOE reviewers across the DOE complex. As a measure of success of this process, the Safety Basis Approval Authority (ORP Manager) and the WTP Federal Project Director approved the SDS on August 1, 2014, with no conditions of approval. DOE and the contractor recognized that it would be difficult to implement the SDS without changes to the existing contractor's engineering and nuclear safety processes. Accordingly, the contractor developed or revised a significant number of engineering and nuclear safety plans and procedures to implement the SDS into the design process. Over the coming year, the contractor will conduct a gap analysis between the SDS and the presently approved PDSA to incorporate the design basis accidents and preferred control strategies developed from the SDS into the PDSA. In addition, ORP will conduct an assessment of the contractor's implementation of the SDS into the design process at the appropriate stage of implementation, within 6 to 12 months of approval. Although the SDS was developed late in the HLW project timeline, the document will facilitate alignment of design and the safety basis, and is a key step in the return to full production engineering for the HLW Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges when performing economic optimization of waste treatment: A review

Highlights: • Review of main optimization tools in the field of waste management. • Different optimization methods are applied. • Different fractions are analyzed. • There is focus on different parameters in different geographical regions. • More research is needed which encompasses both recycling and energy solutions. - Abstract: Strategic and operational decisions in waste management, in particular with respect to investments in new treatment facilities, are needed due to a number of factors, including continuously increasing amounts of waste, political demands for efficient utilization of waste resources, and the decommissioning of existing waste treatment facilities. Optimization models can assist in ensuring that these investment strategies are economically feasible. Various economic optimization models for waste treatment have been developed which focus on different parameters. Models focusing on transport are one example, but models focusing on energy production have also been developed, as well as models which take into account a plant’s economies of scale, environmental impact, material recovery and social costs. Finally, models combining different criteria for the selection of waste treatment methods in multi-criteria analysis have been developed. A thorough updated review of the existing models is presented, and the main challenges and crucial parameters that need to be taken into account when assessing the economic performance of waste treatment alternatives are identified. The review article will assist both policy-makers and model-developers involved in assessing the economic performance of waste treatment alternatives.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Erosion and corrosion analysis of waste transfer components in the POR104 valve box at Hanford - 15715

At the United States Department of Energy Hanford Site in Richland, Washington, waste is being transferred to storage tanks in preparation for treatment at the Waste Treatment and Immobilization Plant. Regulatory committees have concerns regarding the structural integrity of the waste transfer components being used. Washington River Protection Solutions (WRPS) has employed a Fitness-for-Service program, which is a multi-disciplinary engineering approach that is used to determine if equipment is fit to remain in operation for a specified projected period. An approach to monitor aging equipment is to take thickness measurements of components when feasible, to evaluate if there is any appreciable degradation in the integrity of the components. The thickness measurements can be used to determine if erosion or corrosion is occurring and predict the remaining lifespan of the components. These predictions can also be used to develop design modifications for new piping and pipe jumpers. Analysis of thickness measurements have been conducted on four floor nozzles in the POR104 valve box located in the C-Tank Farm at Hanford. The data for the floor nozzles of the valve box does not show signs of wear, but there are variations in thicknesses which are likely due to manufacturing processes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determining the biomass fraction of mixed waste fuels: A comparison of existing industry and {sup 14}C-based methodologies

Highlights: • Compares industry standard and {sup 14}C methods for determining bioenergy content of MSW. • Differences quantified through study at an operational energy from waste plant. • Manual sort and selective dissolution are unreliable measures of feedstock bioenergy. • {sup 14}C methods (esp. AMS) improve precision and reliability of bioenergy determination. • Implications for electricity generators and regulators for award of bio-incentives. - Abstract: {sup 14}C analysis of flue gas by accelerator mass spectrometry (AMS) and liquid scintillation counting (LSC) were used to determine the biomass fraction of mixed waste at an operational energy-from-waste (EfW) plant. Results were converted to bioenergy (% total) using mathematical algorithms and assessed against existing industry methodologies which involve manual sorting and selective dissolution (SD) of feedstock. Simultaneous determinations using flue gas showed excellent agreement: 44.8 ± 2.7% for AMS and 44.6 ± 12.3% for LSC. Comparable bioenergy results were obtained using a feedstock manual sort procedure (41.4%), whilst a procedure based on selective dissolution of representative waste material is reported as 75.5% (no errors quoted). {sup 14}C techniques present significant advantages in data acquisition, precision and reliability for both electricity generator and industry regulator.