Improving the environmental sustainability of a waste processing plant

This paper describes how the level of environmental sustainability at the Solid Waste Processing plant at Research Sites Restoration Ltd (RSRL) Harwell was measured and improved. It provides reasons to improve environmental performance in an organisation, states best practice on how improvement should be conducted, and gives first-hand experience on how changes were implemented. In this paper sustainability is defined as 'meeting the needs of the present without compromising the ability of future generations to meet their own needs'. A baseline for environmental sustainability was created, by looking at multiple attributes. From this, a matrix was created to show how the baseline environmental performance compared to best practice, and a gap analysis was performed. Results from this analysis showed areas for potential systematic improvement, and actions were created. Nearly all actions were implemented within one year, and environmental sustainability improved significantly. Most improvements cost no money to implement, and the few that did had to pass criteria in a business case. Results from a company-wide survey showed that the vast majority of employees felt that environmental issues were important, and that they were willing to help improve performance. Environmental awareness training was given to everyone in the department, and individuals were given measurable improvement targets. A focus group was set up and met regularly to agree improvements and monitor results. Environmental performance was publicised regularly to highlight successes and seek further engagement and improvement. Improvement ideas were encouraged and managed in a transparent way which showed clear prioritisation and accountability. The culture of environmental improvement changed visibly and results at the end of the first year showed that electricity consumption had reduced by 12.5%, and gas consumption had reduced by 7.3%. In less than two years over UK Pound 60,000 was saved on utility bills in the Waste Processing Plant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Processing Technology for Radioactively Contaminated Water at Chernobyl Nuclear Power Plant - 19656

During the operation of the Chernobyl Nuclear Power Plant, distillation by evaporation was the main method for processing radioactively contaminated water. When the plant was decommissioned, the evaporation facility was mothballed and floor drain treatment was suspended in 2016. At present, the existing tanks with the capacity of 26,000 m{sup 3} are more than 60% full with radioactively contaminated floor drains, which requires alternative processing methods. The current process flow for radioactive waste management at State Specialized Enterprise 'Chernobyl NPP' includes processing of accumulated liquid radioactive wastes at a liquid radioactive wastes processing plant. Under the processing technology, liquid radioactive waste is immobilized at the plant by cementation and the resulting solid radioactive waste is then buried in a near-surface storage. Key factors for the selection of alternative radioactively contaminated water processing methods are the possibility to clear the processed water (no control monitoring), which requires the same degree of processing as for drinking water, and minimization of radioactive waste generation due to the lack of free space for solid waste disposal in the near-surface storage. Floor drains that require processing contain radionuclides such as {sup 137}Cs, {sup 90}Sr, {sup 60}Co and {sup 40}K. The current level of the total beta and gamma activity is about 4*105 Bq/kg. The following criteria are set for the Chernobyl NPP site for water to be disposed to the sewerage system: - Max. 37 Bq/kg for the total beta and gamma containing radionuclide activity; - Max. 0.7 Bq/kg for the total alpha containing radionuclide activity. METOIL produces inorganic sorbents for removing radionuclides from liquids and develops sorbent-based technology for a variety of applications related to liquid radioactive waste processing. In 2017-2018, experts from the Chernobyl NPP and METOIL ran several joint laboratory tests to evaluate the efficiency of inorganic sorbents made by METOIL for processing floor drains at the Chernobyl NPP. The test procedure included treatment of radioactively contaminated water in a two-stage sorption process: static sorption (sorbents are mixed in a liquid) and dynamic sorption (the liquid is filtered through a sorbent column). NIKET and MODIKS sorbents were provided for the tests. The results of the test measurements showed that the total alpha containing radionuclide activity is less than 0.026 Bq/kg and the total beta and gamma containing radionuclide activity is 9.2 Bq/kg. The physical and chemical parameters after processing also met the water disposal criteria. High sorption capacity of the sorbents used for the tests allows processing hundreds of water volumes with just one sorbent volume. At present, preparations are underway for full-scale tests at a pilot plant with a capacity of minimum 10 m{sup 3}/day. At a later stage, spent sorbents may be immobilized by inclusion into the cement matrix, which will substantially reduce the amount of radioactive waste to be buried. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Organic Separation Test Results

Separable organics have been defined as “those organic compounds of very limited solubility in the bulk waste and that can form a separate liquid phase or layer” (Smalley and Nguyen 2013), and result from three main solvent extraction processes: U Plant Uranium Recovery Process, B Plant Waste Fractionation Process, and Plutonium Uranium Extraction (PUREX) Process. The primary organic solvents associated with tank solids are TBP, D2EHPA, and NPH. There is concern that, while this organic material is bound to the sludge particles as it is stored in the tanks, waste feed delivery activities, specifically transfer pump and mixer pump operations, could cause the organics to form a separated layer in the tank farms feed tank. Therefore, Washington River Protection Solutions (WRPS) is experimentally evaluating the potential of organic solvents separating from the tank solids (sludge) during waste feed delivery activities, specifically the waste mixing and transfer processes. Given the Hanford Tank Waste Treatment and Immobilization Plant (WTP) waste acceptance criteria per the Waste Feed Acceptance Criteria document (24590-WTP-RPT-MGT-11-014) that there is to be “no visible layer” of separable organics in the waste feed, this would result in the batch being unacceptable to transfer to WTP. This study is of particular importance to WRPS because of these WTP requirements.

complexants↗

25 years of environmental remediation in the general separations area of the Savannah river site: lessons learned about what worked and what did not work in soil and groundwater cleanup - 15270

The Savannah River Site, which is owned and administered by the US Department of Energy, covers approximately 900 square kilometers. The General Separation Area is located in the center of the site and includes: radioactive material chemical separations facilities, radioactive waste tank farms, radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the General Separation Area from the mid-1950's through the mid-1990's. Operations at the F Canyon began in 1954 and at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility and Low Level Radioactive Waste Disposal Facility received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970's through 1990's led to changes in waste management and environmental cleanup practices. The US Congress passed the Clean Air Act in 1970 and the Clean Water Act in 1972; the Resource Conservation and Recovery Act was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act was enacted by Congress in 1980; and the Federal Facilities Compliance Act was signed into law in 1992. Environmental remediation at the Savannah River Site essentially began with a 1987 Settlement Agreement between the Savannah River Site and the State of South Carolina. The site manages several of the larger groundwater remedial activities under the Resource Conservation and Recovery Act for facilities recognized early on as environmental problems. All subsequent remediation projects are managed under a tri-party agreement (Department of Energy, Environmental Protection Agency, and South Carolina Department of Health and Environmental Control) through the Federal Facilities Agreement. Environmental remediation activities during the past 25 years have stabilized and capped seepage basins as well as consolidated and capped waste units and burial grounds in the General Separation Area. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Concentrations of contaminants in the aquifers beneath the General Separation Area and in surface water streams in the General Separation Area have decreased over the past 25 years. Closure of 65 waste sites and 4 Resource Conservation and Recovery Act facilities has been successfully accomplished. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process of remediating the General Separations Area. Geo-textile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive and enhanced natural processes to address contamination are much more cost effective than pump and treat systems. Forest irrigation can be very effective in water management situations with non-accumulative contaminants such as tritium and volatile organic contaminants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing the perception and reality of arguments against thermal waste treatment plants in terms of property prices

Highlights: • Previous research studies have shown that EfW facilities negatively impact the local house prices. • In this study property prices surrounding 3 operational EfW plants were analysed. • No significant negative effect on property prices due to an incinerator was found. - Abstract: The thermal processing of waste materials, although considered to be an essential part of waste management, is often sharply contested in the UK. Arguments such as health, depletion of resources, cost, noise, odours, traffic movement and house prices are often cited as reasons against the development of such facilities. This study aims to review the arguments and identify any effect on property prices due to the public perception of the plant. A selection of existing energy from waste (EfW) facilities in the UK, operational for at least 7 years, was selected and property sales data, within 5 km of the sites, was acquired and analysed in detail. The locations of the properties were calculated in relation to the plant using GIS software (ArcGIS) and the distances split into 5 zones ranging from 0 to 5 km from the site. The local property sale prices, normalised against the local house price index, were compared in two time periods, before and after the facility became operational, across each of the 5 zones. In all cases analysed no significant negative effect was observed on property prices at any distance within 5 km from a modern operational incinerator. This indicated that the perceived negative effect of the thermal processing of waste on local property values is negligible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Control room consolidation at Hanford tank farms for improved conduct of operation - 15345

Washington River Protection Solutions (WRPS) manages the underground waste storage tanks at the Hanford site in Washington State on behalf of the DOE Office of River Protection. There are 177 tanks distributed among 18 tank farms spread across an area of desert scrub covering about 20 square miles. A single evaporator facility supports the tanks to provide waste reduction activities. Farms and associated equipment, including exhausters, have been operated locally since installation. Upgrades over time introduced limited automation, but using inconsistent platforms, and providing isolated control locations around the farms. However, as the Tank Farms move from maintenance operations to production operations, with increased numbers of waste transfers and evaporator campaigns, and also prepare for integration with the adjacent Hanford Waste Treatment Plant, then operational improvements were planned and are being implemented. Infrastructure improvement projects included upgrades of control systems to a common platform, and installation of a fiber optic based local area network to the majority of farms, which together provided a distributed control system supporting tank farms. This new infrastructure provided the basis to propose consolidation of control and monitoring operations to a single location. More than a single location, the new Central Control Room was to increase effectiveness of operations by providing full status of all activities being performed across the Tank Farms and the Evaporator. The recent addition of productivity e-tools also would provide capability for management, supervisors and operators to make informed decisions regarding facility operations, through custom online applications designed to provide real time information derived from operational data. For example, tracking turnover activities between shifts, and maintaining compliance with limited conditions for operations. The Central Control Room would also have a single supervisor able to effectively manage the status of all assets and processes. The expected benefits of this arrangement include increased operator utility, increased situational awareness, improved response time for upset conditions, improvement in operator environment, and reductions in operating costs. The projected ROI for the Central Control Room when fully operational was projected to be about two years based on reduced costs from freeing up operations staff to perform other work plus the time and material savings realized by operations being performed with increased situational awareness. So the Central Control Room would become a hub for monitoring and controlling facility operations while responding to real time information affecting productivity and performance, from a centralized location customized to a fresh working environment. Over a 14-month period, WRPS developed the concept and engineering, procured over 500 items, modified and installed in renovated building, and completed transition and testing of this new Central Control Room, turning over the initial phase to Operations for 24/7 use in April 2014. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Simple Criterion to Estimate Performance of Pulse Jet Mixed Vessels

Pulse jet mixed process vessels comprise a key element of the U.S. Department of Energy’s strategy to process millions of gallons of legacy nuclear waste slurries. Slurry suctioned into a pulse jet mixer (PJM) tube at the end of one pulse is pneumatically driven from the PJM toward the bottom of the vessel at the beginning of the next pulse, forming a jet. The jet front traverses the distance from nozzle outlet to the bottom of the vessel and spreads out radially. Varying numbers of PJMs are typically arranged in a ring configuration within the vessel at a selected radius and operated concurrently. Centrally directed radial flows from neighboring jets collide to create a central upwell that elevates the solids in the center of the vessel when the PJM tubes expel their contents. An essential goal of PJM operation is to elevate solids to the liquid surface to minimize stratification. Solids stratification may adversely affect throughput of the waste processing plant. Unacceptably high slurry densities at the base of the vessel may plug the pipeline through which the slurry exits the vessel. Additionally, chemical reactions required for processing may not achieve complete conversion. To avoid these conditions, a means of predicting the elevation to which the solids rise in the central upwell that can be used during vessel design remains essential. In this paper we present a simple criterion to evaluate the extent of solids elevation achieved by a turbulent upwell jet. The criterion asserts that at any location in the central upwell the local velocity must be in excess of a cutoff velocity to remain turbulent. We find that local velocities in excess of 0.6 m/s are necessary for turbulent jet flow through both Newtonian and yield stress slurries. By coupling this criterion with the free jet velocity equation relating the local velocity to elevation in the central upwell, we estimate the elevation at which turbulence fails, and consequently the elevation at which the upwell fails to further lift the slurry. Comparing this elevation to the vessel fill level predicts whether the jet flow will achieve the full vertical extent of the vessel at the center. This simple local-velocity criterion determines a minimum PJM nozzle velocity at which the full vertical extent of the central upwell in PJM vessels will be turbulent. The criterion determines a minimum because flow in regions peripheral to the central upwelling jet may not be turbulent, even when the center of the vessel in the upwell is turbulent, if the jet pulse duration is too short. The local-velocity criterion ensures only that there is sufficient wherewithal for the turbulent jet flow to drive solids to the surface in the center of the vessel in the central upwell.

mixing↗

Addressing an aging facility: improving reliability of the defense waste processing facility at the Savannah River Site - 15539

The High Level Waste program at the Savannah River Site significantly reduces environmental risks associated with the storage of radioactive waste from legacy efforts to separate fissionable nuclear material from irradiated targets and fuels. The Defense Waste Processing Facility treats and immobilizes High Level Waste into a durable borosilicate glass for safe, permanent storage. Construction of the facility began in 1983 and radioactive operations commenced in 1996. In an effort to support the disposition of radioactive waste and accelerate tank closure for the balance of the Savannah River Site mission, the Defense Waste Processing Facility recently underwent an extensive reliability review in 2013 to understand future needs as well as to address aging infrastructure. As a product of this review, a Performance Improvement Plan was developed to systematically address three major focus areas including, a) asset preservation, b) facility housekeeping, and 3) process improvements. Since issuance of the plan, significant progress has been made in each of these areas to improve the reliability and predictability of the Defense Waste Processing Facility. Providing consistent, constructive, and concise communications is vital in the face of a changing budgetary environment. The Savannah River Site case study provides an example of the U.S. Department of Energy - Savannah River (DOE-SR) and SRR partnering to inform stakeholders about cleanup progress at the site. DOE-SR and SRR periodically and consistently provide both annual written progress reports under the Federal Facility Agreement and quarterly written progress reports under the landfill permit to the government regulators. Through the Liquid Waste System Plans, DOE-SR and SRR constructively and concisely summarize both the significant progress made and explain how a changed budget can impact the goals moving forward. Furthermore, DOE-SR and SRR informs the community and general public about the Site's progress and future during Citizens Advisory Board meetings. In addition, through the new proposed model for complex-wide communications, stakeholders can better understand how budget constraints will affect them. The set-aside program would also encourage stakeholder participation and involvement in helping each state and site obtain extra funding through performance evaluations. Waste management organizations can benefit in a number of ways from an effective partnership approach to communicate with stakeholders about available funding. Keeping an open and honest dialogue with regulatory agencies can help preserve confidence, thus mitigating or completely avoiding costly and distracting fines and penalties. Informing the public not only promotes trust, but also spurs the public to exercise its right to demand more information and voice any concerns to elected or DOE officials. With this approach, DOE can receive better understanding and cooperation from stakeholders in a changing budgetary landscape. Furthermore, a set-aside competitive program would encourage efficiency and innovation that could lead to further cost savings for the government while providing extra funding for cleanup efforts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 70: Nuclear Power Plant Waste Management, LLRW Processing Issues

This panel focused on senior utility managers discussing issues with commercial LLW processors. LLW processors had an opportunity to update utilities/NPPs on new or different services or technologies being offered to assist in their radioactive waste management goals, changes to their facility license, revisions to their acceptance guidelines, and emerging compliance issues. Panelists with presentations: UniTech - 'Expanding to Reduce Costs' LLW Processor Update (Gregg Johnstone); Veolia Nuclear Solutions Federal Services - Alaron Nuclear Services (Dave Garber); EnergySolutions Tennessee Processing Facilities (Fred Schulz); Complex Waste Management Issues Services and Treatment Facilities (George M. Taylor)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of cement solidification process for sodium borate waste generated from PWR plants

A cement solidification process for treating sodium borate waste produced in pressurized water reactor (PWR) plants was studied. To obtain high volume reduction and high mechanical strength of the waste, simulated concentrated borate liquid waste with a sodium / boron (Na/B) mole ratio of 0.27 was dehydrated and powdered by using a wiped film evaporator. To investigate the effect of the Na/B mole ratio on the solidification process, a sodium tetraborate decahydrate reagent with a Na/B mole ratio of 0.5 was also used. Ordinary portland cement (OPC) and some additives were used for the solidification. Solidified cement prepared from powdered waste with a Na/B mole ratio 0.24 and having a high silica sand content (silica sand/cement>2) showed to improved uniaxial compressive strength. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Analysis for the Disposal of the Idaho National Laboratory Idaho Chemical Processing Plant Low-Level Waste Stream at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This special analysis (SA) evaluates whether the Idaho National Laboratory (INL) Idaho Chemical Processing Plant (ICPP) Low-Level waste stream is suitable for disposal by shallow land burial at the Area 5 Radioactive Waste Management Site on the Nevada National Security Site (NNSS). The INL ICPP Low-Level waste stream consists of debris and solidified liquids. The INL ICPP Low-Level waste stream requires an SA to resolve two unreviewed disposal questions (UDQs). The first UDQ addresses whether it is acceptable to dispose of radium-226 (226Ra) at an activity concentration that exceeds the NNSS Waste Acceptance Criteria (WAC) Action Level. The second UDQ evaluates the acceptability of disposing of five long-lived radionuclides without WAC action levels. Long-lived radionuclides without action levels are radionuclides not evaluated in the performance assessment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatment of Activated Carbon, PVC, and Other Wastes using the THOR process - Pilot Plant Test Summary - 17399

This presentation will provide an overview of the first pilot plant study to be conducted for the Japanese Nuclear Market by Kobelco Studsvik Company (A new Joint Venture Company between Studsvik AB and Kobe Steel Ltd.). The test program was scheduled for October 2016, and it was designed to evaluate the treatment of activated carbon, PVC, and other waste types using Studsvik's THOR Process. This new study is being conducted to identify key design parameters required for application of the THOR process in the Japanese Waste Market and to confirm the effectiveness of the THOR technology in meeting the requirements for final waste acceptance. The findings of this pilot plant test will assist in the development of a revised THOR process in Japan that will treat not only spent ion exchange resins but other organic materials generated by Nuclear Power Plants (NPP) during normal operations and D and D activities. The information shared by this new pilot plant study will provide the audience with an understanding of the adaptability of the THOR process for treatment of various radioactive waste types and the results necessary to successful treat different types of carbon, plastic materials, and other waste types. In addition, it will share the lessons learned regarding how a pilot plant study should be planned and optimized to meet the specific requirements of the Japanese Nuclear waste market. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementing a Low-Activity Waste Direct Feed Capability in the Waste Treatment and Immobilization Plant Project - 15594

The current design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility. The U.S. Department of Energy (DOE) has developed a strategic, phased approach to completing the WTP Project, beginning with feeding some liquid waste from the tank farms to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. To accomplish this, the DOE Office of River Protection (ORP) will construct a new capability outside WTP to remove cesium and solids from the liquid portion of the tank waste before transferring that waste to the LAW Facility. This new capability, referred to as the Low-Activity Waste Pretreatment System, is outside WTP and not included in the project's scope. The primary driver for the Direct-Feed LAW (DFLAW) approach is to enable commissioning of the LAW Facility for low-activity waste processing before the PT and High-Level Waste Facilities are complete and operational. As such, the functions intended to be provided to the LAW Facility by the PT Facility and the common functionality with the High-Level Waste Facility must be refined and modified. The DFLAW approach will provide necessary systems and facilities to replace these enabling PT Facility functions until the PT Facility is completed and commissioned. In February 2014, ORP requested the WTP contractor to develop separate contract modification proposals for completing: (1) the LAW Facility, Balance of Facilities, and Analytical Laboratory work scope in the current contract through hot commissioning in a manner to accommodate a phased start of the WTP mission; and (2) initial planning and design for incorporating a permanent capability to accommodate DFLAW in the WTP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Processing liquid organic wastes at the NNL Preston laboratory

Organic compounds of various kinds have been used in the nuclear industry for numerous duties in uranium chemical, metal and ceramic processing plants. In the course of the various operations undertaken, these organic compounds have become contaminated with uranic material, either accidentally or as an inevitable part of the process. Typically, the chemical/physical form and/or concentration of the uranic content of the organics has prevented disposal. In order to address the issue of contaminated liquid organic wastes, the National Nuclear Laboratory (NNL) has developed a suite of treatments designed to recover uranium and to render the waste suitable for disposal. The developed processes are operated at industrial scale via the NNL Preston Laboratory Residue Processing Plant. The Oil Waste Leaching (OWL) Process is a fully industrialised process used for the treatment of contaminated oils with approximately 200 tonnes of uranium contaminated oil being treated to date. The process was originally developed for the treatment of contaminated tributyl phosphate and odourless kerosene which had been adsorbed onto sawdust. However, over the years, the OWL process has been refined for a range of oils including 'water emulsifiable' cutting oils, lubricating oils, hydraulic oils/fluids and 'Fomblin' (fully fluorinated) oils. Chemically, the OWL process has proved capable of treating solvents as well as oils but the highly volatile/flammable nature of many solvents has required additional precautions compared with those required for oil treatment. These additional precautions led to the development of the Solvent Treatment Advanced Rig (STAR), an installation operated under an inert atmosphere. STAR is a small 'module' (100 dm{sup 3} volume) which allows the treatment of both water miscible and immiscible solvents. This paper discusses the challenges associated with the treatment of liquid organic wastes and the process developments which have allowed a wide range of materials to be successfully treated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Retrieval, Disruption and Processing of Legacy Nuclear Waste - 16179

The UK National Nuclear Laboratory (NNL) is currently undertaking, in conjunction with Sellafield Ltd, a series of high profile trials of robotic equipment on a full scale test facility at their Workington Laboratory in England. These trials are designed to underpin and substantiate the processes proposed for the remote retrieval, disruption and processing of legacy Miscellaneous Beta Gamma Waste (MBGW) from a number of different donor plants on the Sellafield site, including some of the older fuel storage ponds and storage silos. These processes will be conducted inside the new Box Encapsulation Plant (BEP) which is due to be commissioned at Sellafield by 2020. These processes will subsequently enable Sellafield Ltd to safely recover legacy Intermediate Level Waste (ILW) from the older storage facilities on site and process it into a safer form which is more suitable for long term storage and then ultimately final disposal in a Geological Disposal Facility. As part of this legacy waste processing within the BEP plant, MBGW waste items will have to be remotely removed from a variety of different types of import skips. This waste will then be transferred, using robots, into the export container, which is a 3 m{sup 3} box liner, where the processed waste will be flood grouted to produce an encapsulated waste package. As part of this processing, any MBGW items consisting of sealed containers will have to be remotely disrupted before being grout encapsulated. This disruption is in order to (a) release any trapped liquors or gases from the containers and (b) ensure full grout infiltration of the container contents, thus minimising the amount of free liquors and voids within the final waste product. The NNL are conducting this technical work to confirm the viability of the proposed concept, processes and equipment. The developed solution consists of a linear layout of processing equipment with a pair of heavy duty, standard industrial, 'commercially off the shelf' (COTS) robots positioned around a Waste Handling Table. These robots have a 500 kg payload capacity and are operated remotely to handle all of the various types of MBGW waste, including the heavy and bulky items. The robots can be operated in manual tele-operation mode as well as pre-programmed automatic mode and have a range of primary and secondary tooling in order to perform the waste processing and disruption tasks as well as undertake general house-keeping and cleaning duties within the cell. The main tools include two types of hydraulic grab for the main waste recovery and handling tasks and a hydraulic shear for the waste disruption activities, but a number of other tools have also been designed and built for ancillary activities, such as a set of general purpose gripper jaws, drilling tool, bolt removal tool, pump tool, spray tool and a number of different housekeeping tools etc. The robot trials were started in November 2014, and have attracted a significant degree of high level stakeholder interest, including the UK Nuclear Decommissioning Authority (NDA), Office for Nuclear Regulation (ONR), Environment Agency (EA) and Radioactive Waste Management Limited (RWML) witnessing a number of the critical demonstration trials. Robots of the type selected are readily available, robust, reliable and easy to use. The trials have been very successful in proving the retrieval, processing and disruption operations, reducing the burden in the legacy waste facilities. Utilising robots to perform these tasks will lower the probability of producing non-compliant waste packages. In addition the robots can increase the consolidation of incoming waste skips into outgoing 3 m{sup 3} box liners, significantly increasing packing efficiencies and reducing the overall number of export containers produced thus lowering the decommissioning and waste storage/disposal costs. The trials have also enabled an assessment of the optimum way to operate the robots, as well as their reliability and maintainability issues. Engineering work associated with recovering failed robots and removing them from a typical Sellafield plant environment and then subsequently replacing them with functioning robots has also been undertaken and further work is now planned. The success of the trials, completed safely to a very challenging timescale, has enabled the use of robots in BEP to be endorsed as a viable option by the key stakeholders. Following a robust decision making process, this was a clear cut decision. The technical development and testing of the robot technology is currently continuing in order to investigate areas such as robot reliability, failure recoveries, human factors, ease of waste identification, optimisation of throughput rates, nuclearisation modifications etc. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Treatment Technology Process Development Plan For Hanford Waste Treatment Plant Low Activity Waste Recycle

The purpose of this Process Development Plan is to summarize the objectives and plans for the technology development activities for an alternative path for disposition of the recycle stream that will be generated in the Hanford Waste Treatment Plant Low Activity Waste (LAW) vitrification facility (LAW Recycle). This plan covers the first phase of the development activities. The baseline plan for disposition of this stream is to recycle it to the WTP Pretreatment Facility, where it will be concentrated by evaporation and returned to the LAW vitrification facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving PCM Waste Management Through New Approaches to Screening for LLW Treatment and Disposal - 20145

A major step forward in the management of Plutonium Contaminated Material (PCM) Waste has been taken at the Sellafield site with the introduction of new capabilities to enable wastes previously conservatively designated as PCM Intermediate Level Waste (ILW) to be re-classified for treatment as Low Level Waste (LLW). The Sellafield site, located in the North West of England, within the United Kingdom (UK), has operated plutonium processing plants and waste facilities for almost 70 years. During this time management of the raw PCM waste produced has presented a variety of challenges. The waste is currently processed by high force waste compaction in the Waste Treatment Complex (WTC). The WTC converts 200 litre drums of raw PCM waste into a compacted, grout encapsulated monolith form within stainless steel containment, ready for emplacement within the UK's Geological Disposal Facility (GDF) when it becomes available. To help progress some of the wastes waiting for treatment, recent improvements have been made with the introduction of new waste assay instrumentation which enables the identification of a 'candidate' waste potentially suitable for disposal via the LLW treatment route. Opening a new LLW route for previously designated PCM has been a major advance in PCM waste management policy. It has required a range of technical assessment arrangements to be developed, tested and commissioned and involved the engagement of a wide range of stakeholders. In particular, very detailed technical analysis methods have been developed to ensure that there is a robust and conservative approach to the final sentencing of waste. Following completion of commissioning tests, the first 86 m{sup 3} of previously designated PCM waste was successfully treated through the LLW route and consigned to LLW disposal in June 2019. The direct benefit of sentencing waste to the correct waste route (LLW) is the significant cost savings across the complete range of waste management activities. This work is also strategically important for demonstrating to a range of stakeholders including workforce and regulators, that waste previously designated as PCM can be re-classified in a systematic and justifiable way without increasing risk to personnel or the wider environment. By ensuring that waste is being managed appropriately it will be possible to carry out more remediation work safely, in less time, and at a lower cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The completion of the construction and commissioning of the liquid radwaste treatment plant at ChNPP - 15685

Since a beginning of ChNPP operation, and after a tragedy in 1986, a few thousands m{sup 3} of LRW have been collected in a storage tanks. In 2004 ChNPP started the new project on creation of LRW treatment plant (LRWTP) financed from EBRD fund. But it was stopped in 2008 because of financial and contract problems. In 2010, FSUE RADON jointly with Ukrainian partners has won a tender on completion of LRWTP, in particular I and C system. The purpose of LRTP is to process liquid rad-wastes from SSE 'Chernobyl NPP' site and those liquids stored in the LRWS and SLRWS tanks as well as the would-be wastes after ChNPP Power Units 1, 2 and 3 decommissioning. The LRTP design lifetime - 20 years. (authors)