Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Storage Management Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Subsurface mafic and ultramafic rock mapping and analysis for carbon mineralization in the United States (SubMAP-CO 2 )

Achieving durable, gigaton-scale carbon dioxide (CO₂) removal will require the development of storage strategies that are both permanent and scalable. Among the available options, carbon mineralization in mafic and ultramafic rocks offers a uniquely robust pathway for long-term CO₂ sequestration, converting CO₂ into thermodynamically stable carbonate minerals. While surface exposures of these lithologies have been extensively studied, particularly in ophiolitic and volcanic settings, the potential for carbon mineralization in the subsurface remains comparatively underexplored at national scale. This gap limits the ability to assess storage capacity, accessibility, and deployment pathways for mineralization-based carbon management in the United States.

08 HYDROGEN

Prairie State Generating Company Static and Dynamic Modeling

A reservoir modeling study was conducted to assess the feasibility of storing 162.5 million tonnes (8.125 million tonnes annually) of industrially sourced carbon dioxide (CO 2 ) in the St. Peter – Everton and Knox storage complexes at the Prairie State Generating Company’s (PSGC) site near Marissa, Washington County, Illinois (PSGC site). Two separate models were constructed for the St. Peter – Everton and the Knox storage complexes. The St. Peter and Everton sandstones are the target storage units for the St. Peter – Everton storage complex. The Knox Group formations are the target storage units for the Knox storage complex. The Maquoketa Shale is the primary confining unit for both storage complexes. The static reservoir models used as input to the dynamic reservoir models of the storage complexes were developed from interpretations of logs (e.g., gamma ray, resistivity, porosity, photoelectric, and sonic), structure surfaces using data from 36 wells, thickness maps, well test data, seismic data, and permeability data in PetrelTM.

01 COAL, LIGNITE, AND PEAT

Prairie State Generating Company Site: Storage Field Development Plan

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, operational plans, and costs associated with the proposed Prairie State Energy Campus - Carbon Capture and Storage (PSEC-CCS) project in Washington County, Illinois, near Marissa. The proposed storage complex, known as the St. Peter-Everton Storage Complex, comprises the St. Peter Sandstone and Everton sandstone reservoirs, with the Maquoketa Shale serving as the primary confining unit and the Knox Group as lower confining unit. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Pennsylvanian section.

01 COAL, LIGNITE, AND PEAT

OES CO 2 Pipeline FEED Project Design Basis Memorandum

The OES CO₂ Pipeline project will move captured carbon dioxide from two ethanol facilities near Gibson City, Illinois, roughly 7.8 miles southeast to three injection wells outside Anchor, where it will be permanently stored underground. The system is designed to handle up to 4.5 million metric tonnes per year of dense-phase CO₂ at pressures up to 2,500 psig, using 16-inch mainline pipe and 10.750-inch laterals made from API 5L X-60 and X-65 steel. Wall thicknesses vary depending on location, with thinner pipe in open country, heavier wall at road crossings, and the heaviest where the pipe passes under highways or railroads via horizontal directional drill. The pipe gets a fusion-bonded epoxy coating, with an added abrasion-resistant layer wherever it's bored or drilled. Major water crossings will use HDD rather than open trenching. The pipeline will be cathodically protected, equipped with SCADA-compatible pressure and temperature instrumentation, and monitored for leaks using a computational pipeline monitoring system per API RP 1130. Hydrostatic testing will be performed at 1.25 times design pressure, and an ILI caliper run will follow to catch any construction defects. Several items, including fracture toughness requirements, specific NDE methods, and ILI tool selection, are left for the detailed design phase. The whole system falls under 49 CFR Part 195 and ASME B31.4, and Gulf Interstate Engineering prepared this document as the FEED-level design basis under the CarbonSAFE Phase III program.

09 BIOMASS FUELS

Microgrid Procurement Checklist Training: Part 1

Learn how to navigate the Microgrid Procurement Checklist, a key resource for federal agencies developing microgrid projects. This first session will provide a step-by-step walkthrough of the checklist, helping participants understand its structure, key tasks, and how to apply it in project planning.

25 ENERGY STORAGE

An Architectural Survey of the U12G Tunnel Historic District, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), in conjunction with the National Nuclear Security Administration Nevada Field Office (NNSA/NFO), proposes to demolish six buildings and three storage areas located at the U12g Tunnel portal area in Area 12 of the Nevada National Security Site (NNSS). The buildings are 12-358 (Signal Vault); 12-201800 (Storage Quonset Hut); 12-202555 (Walker Shack); 12-868 (Pipe Assembly); 12-B100933 (Electrical Shop); 12-B100944 (Conference Room); and Storage Area 1; Storage Area 2; and Storage Area 3. The buildings and storage areas were selected for demolition as part of the DOE’s Real Property Efficiency Plan to reduce the footprint of unused and non-operational facilities on the NNSS. They are all vacant and have no proposed uses for current or upcoming NNSS missions. Demolition activities constitute an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. Identification efforts began with resources proposed for demolition in federal Fiscal Year (FY) 23. Four buildings were proposed to be demolished in FY23 (12-358, 12-868, 12-201800, and 12-202555). These buildings and the U12g Tunnel Historic District (SHPO No. D444) were recorded in Identification, Evaluation, and Finding of Adverse Effect for the Proposed Demolition of Five Buildings in Area 12, Nevada National Security Site, Nye County, Nevada (Menocal et al. 2023). Identification efforts indicated three buildings (12-358, 12-201800, and 12-868) supported nuclear testing in the U12g Tunnel. The fourth building post-dated the use of U12g Tunnel for nuclear testing activities. The report recommended that three of the four buildings (12-358, 12-201800, 12-868) and the U12g Tunnel Historic District may be eligible for the National Register of Historic Places (NRHP). The report also found that the undertaking would have an adverse effect on the three buildings and on the historic district. The Nevada State Historic Preservation Office (SHPO) concurred with the report’s findings (Reed 2023). The U12g Tunnel was determined eligible as a historic district under the Secretary of the Interior’s (SOI) Significance Criterion A, at the local level, in the context of the Cold War as an underground testing environment for the development of nuclear weapons and to assess the effects of a nuclear explosion on materials and equipment with a period of significance from 1959 to 1971. It was also determined eligible under Significance Criterion C for embodying the distinctive characters of a horizontal tunnel complex used for nuclear testing and as a significant and distinguishable entity. The three buildings were determined to be contributing elements of the district. The undertaking was expanded with the addition of two buildings and three storage areas proposed to be demolished and located within U12g Tunnel Historic District in FY24. These five resources (12-B100933, 12-B100944, and Storage Areas 1, 2, and 3) were recorded in Supplemental Identification, Evaluation, and Finding of Effect for Additional Proposed Demolition at U12g Tunnel, Area 12, Nevada national Security Site, Nye County, Nevada (Brannan et al. 2024). Identification efforts indicated that the two buildings and Storage Area 1 supported nuclear testing in the U12g Tunnel. Storage Area 1 and Storage Area 2 post-dated the nuclear testing activities at U12g Tunnel and were not recommended as contributing elements to the district. The report also found that the undertaking would have an adverse effect on the newly identified buildings and one storage area and on the historic district. The SHPO concurred that the expanded undertaking would result in adverse effects to historic properties (Reed 2025). To resolve these adverse effects, NNSA/NFO, in consultation with the SHPO, is following standard mitigation as stipulated in the 2024 Programmatic Agreement DE-GM58-22NA25554 Among the U.S. Department of Energy and the Nevada State Historic Preservation Officer and the Advisory Council on Historic Preservation Concerning the Protection of Historic Properties on the Nevada National Security Site, Nye County, Nevada (hereafter referred to as the NNSS PA). The standard mitigation measures are outlined in Appendix D of the NNSS PA. As such, this architectural survey has been prepared in accordance with Appendix D of the NNSS PA and follows the report format outlined in Appendix F. It includes a historic context that describes the district’s origin, history, and support functions, its significance in the context of nuclear testing on the NNSS, and identifies contributing and non-contributing elements within the district. The report is accompanied by Architectural Resource Assessment (ARA) forms for individual resources and a Historic District Resource Assessment (HDRA) for the U12g Tunnel Historic District. In total, this architectural report identified 32 primary resources within the district boundary. Six of the primary resources were previously identified as contributing elements. An additional 17 resources are recommended as contributing elements to the district for a total of 23 contributing elements. The other nine resources identified are recommended as non-contributing elements to the district.

12-201800

The space science data service: A study of its efficiencies and costs

Factors affecting the overall advantages and disadvantages of a centralized facility for both the data base and processing capability for NASA's Office of Space Science programs are examined in an effort to determine the best approach to data management in the light of the increasing number of data bits collected annually. Selected issues considered relate to software and storage savings, security precautions, and the phase-in plan. Information on the current mode of processing and on the potential impact of changes resulting from a conversion to a space science data base service was obtained from five user groups and is presented as an aid in determining the dollar benefits and advantages of a centralized system.

Vette, J. I.

Financial Analysis of the High Flow Experiment conducted at the Glen Canyon Dam during Water Year 2023

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specified criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report examines the financial implications of the high flow experiment (HFE) conducted at GCD during the spring of Water Year (WY) 2023 as required by the LTEMP HFE Protocol. This report is part of a series of reports that describe the financial costs of LTEMP experimental releases since the 2016 ROD was adopted in January 2017. Previous reports analyzed the impact of several past HFEs and Bug Flow Experiments. This report focuses on the HFE conducted in April 2023. For this experimental release, financial costs of approximately $1.33 million were incurred because the HFE required sustained water releases exceeding the power plant’s maximum turbine flow rate. In addition, during the experiment, operators were not allowed to shape GCD power production, either to follow Firm Electric Service (FES) customer day-ahead energy deliveries or to respond to market prices. This study identifies the main factors contributing to the HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate Western Area Power Administration (WAPA) financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the operations that actually occurred and (2) a “Without Experiment” case that simulates operations under the assumption that the HFE did not occur. The “With Experiment” case mimics operations during the HFE and the entire month the HFE occurred. It complies with LTEMP hourly and daily operating criteria. The “Without Experiment” case assumes that the HFE did not occur. The monthly water release volume is assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices. In addition to estimating the financial impact of the HFE, the team used the CRiSPPy model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the HFE, and WAPA operating practices.

13 HYDRO ENERGY

Financial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during Water Year 2024

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report presents a financial analysis of the Smallmouth bass (Micropterus dolomieu) (SMB) flows implemented at GCD during Water Year (WY) 2024. These bypass flows were introduced by the U.S. Bureau of Reclamation (USBR) as an emergency response to the growing threat posed by invasive SMB in the Colorado River ecosystem downstream of the dam. SMB are a non-native predatory species that pose a significant threat to native fish populations, including the endangered humpback chub (Gila cypha). The thermal regime below GCD, typically cold due to hypolimnetic releases from Lake Powell, has historically served as a thermal barrier limiting SMB establishment. However, persistently low reservoir levels in recent years have reduced stratification in Lake Powell, allowing warmer water to be released downstream. This has enabled SMB to spawn successfully below the dam, prompting urgent ecological concerns. To mitigate the risk of SMB proliferation, the USBR implemented a series of bypass flows in WY 2024. Drawn from a lower elevation than the penstocks, the bypass structures released cooler water downstream. These short-duration bypass flows aimed to keep temperatures cool enough to prevent SMB from spawning, thereby reducing the ecological threat posed by this invasive species. Although motivated by ecological objectives, these bypass flows came with financial tradeoffs. Releasing water through the bypass structures instead of the turbines at GCD reduced hydropower generation, resulting in a significantly lower financial position for Western Area Power Administration (WAPA), which is responsible for marketing the electricity produced by the GCD Powerplant. This report analyzes the financial impact of the SMB flows implemented from July to November 2024. These experimental releases led to an estimated financial cost of approximately $18.9 million, primarily driven by the substantial volume of water diverted through the bypass structures. This study applies an integrated set of tools to estimate WAPA financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the water operations that actually occurred, including the SMB bypass flows, and (2) a “Without Experiment” case that simulates operations under the assumption that the SMB flows did not occur. Both cases comply with LTEMP hourly and daily operating criteria, and the monthly water release volumes are assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices.

13 HYDRO ENERGY

Battery Energy Storage System (BESS) End-of-Performance and Decommissioning Considerations [Slides]

This presentation provides a comprehensive overview of end-of-performance and decommissioning considerations for large-scale Battery Energy Storage Systems (BESS). It outlines expected system lifespans, midterm assessment needs, and pathways for extending operational life through augmentation or repowering. The presentation details regulatory requirements that govern decommissioning plans, cost estimates, financial assurance mechanisms, and performance obligations across multiple jurisdictions. It further examines end-of-life equipment management, including recycling, waste handling, transportation, and environmental compliance. Designed to support Malawi's electricity-sector institutions, the presentation highlights how planning for decommissioning and environmental stewardship can be integrated early in project development to ensure safe, financially accountable, and environmentally responsible BESS system retirement.

24 POWER TRANSMISSION AND DISTRIBUTION

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION

Financial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during 2025

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases.

Ploussard, Quentin [Argonne National Laboratory (A

Makah Tribe Strategic Energy Plan

The U.S. Department of Energy’s (DOE) Energy Transitions Initiative Partnership Project (ETIPP) connects remote and island communities, regional partners, and the DOE national laboratories to support communities as they seek to build resilience in their energy systems. The Makah Tribe faces several energy challenges, including frequent power outages and the potential for an extended outage due to an earthquake or tsunami. The Tribe joined ETIPP in 2022 to address those challenges, seeking to build energy resilience and sovereignty in the community. The Makah Tribe, Spark Northwest, the Pacific Northwest National Laboratory (PNNL), and the National Renewable Energy Laboratory (NREL) collaborated to develop a strategic energy plan as part of the second cohort of ETIPP communities. The long-term energy vision of the Makah Tribe includes increasing energy efficiency in the community, improving energy management capacity, and developing the renewable energy generation and storage sufficient to independently power the Reservation for one year. Additionally, the ETIPP team worked with Makah leadership, staff, and community members to identify a set of community priorities, values, and goals to guide energy development as the Tribe takes the incremental steps toward their vision for energy sovereignty. Those energy values include ecosystem-based management, energy sovereignty and project ownership, workforce development and capacity, economic opportunity, community wellbeing and priorities, and emergency disaster resilience. To understand what would be needed for a year for energy independence, the PNNL team conducted an assessment to determine the current energy usage of the Tribe and also modeled several scenarios for future energy use. Using the energy usage values, the team estimated how two types of renewable energy technology, specifically locally deployed solar and small-scale wind, could contribute towards the energy independence goal. The energy baseline and resource assessment produced the following key findings:

29 ENERGY PLANNING, POLICY, AND ECONOMY

The NASA space power technology program

The objective and planning of the NASA space power research and technology program are reviewed. The areas of research covered include photovoltaic energy conversion, chemical energy conversion and storage, thermal to electric conversion, environmental interactions and power systems management of distribution.

Mullin, J. P.

Public water supply infrastructure extensification and diversification in surface waters is insufficient to meet future demands in Texas

The data were developed to evaluate the capacity of existing and potential new surface water supply infrastructure to meet projected public water demands across districts in Texas under multiple future socioeconomic and climate scenarios. The database integrates hydrologic, water quality, infrastructure, energy, cost, demographic, and demand-projection information for candidate surface water supply locations. Candidate sites include stream reaches, waterbodies, reservoir surplus locations, and potential new reservoir sites. Water availability is characterized using historical and projected flow conditions, while site suitability is evaluated using five indicators: Water Availability Index (WAI), Water Quality Index (WQI), Energy Requirement Index (ERI), Water Treatment Cost (WTC), and Water Infrastructure Cost (WIC). The datasets include statewide candidate-site information, district-level demand projections under Shared Socioeconomic Pathways (SSPs), runoff-based allocation constraints, climate-stress metrics, and optimization outputs evaluating alternative infrastructure planning strategies. Optimization results compare Business-as-Usual (BAU) and All Surface Water (AllSW) demand-management approaches under both scaled and fixed cost-cap strategies. Associated validation datasets provide district-level feasibility assessments, infrastructure selection outcomes, cost-cap utilization, demand satisfaction metrics, and constraint diagnostics. Additional datasets quantify projected changes in storage and flow conditions as well as water availability stress for both existing and newly selected intake locations under the SSP5 scenario for mid-century and late-century climate conditions. Together, these datasets support assessment of the extent to which surface-water infrastructure expansion and diversification strategies can satisfy future public water demands while accounting for hydrologic, economic, and planning constraints across Texas. Dataset(s) Description Dataset_preoptimization.xlsx Comprehensive pre-optimization dataset containing candidate water-supply sites and associated hydrologic, water-quality, infrastructure, climate, demographic, runoff, and demand-projection variables used as inputs to the optimization analyses. Includes variable descriptions and the full statewide candidate-site database. District_level_site_selection.zip - Compressed archive containing all SSP-specific district-level optimization result files MESIO_ssp1_results.xlsx District-level site selection results for SSP1 (MESIO). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. MESID_ssp2_results.xlsx District-level site selection results for SSP2 (MESID). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. LCMRD_ssp3_results.xlsx District-level site selection results for SSP3 (LCMRD). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-Low_ssp4l_results.xlsx District-level site selection results for SSP4-Low (IRDev-Low). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-High_ssp4h_results.xlsx District-level site selection results for SSP4-High (IRDev-High). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. RSIM_ssp5_results.xlsx District-level site selection results for SSP5 (RSIM). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. tx_hydrological_stress.xlsx Hydrological stress dataset for existing and newly selected intake locations. Includes projected mid-century and late-century changes, gain/loss classifications, planning strategy information, and accompanying variable descriptions. Also includes water-stress metrics derived from historical and projected low-flow conditions.

Okoye, Perpetua I. (ORCID:0000000215545033)

Hydrogen Leak Modeling for Development of Smart Distributed Monitoring Under Unintended Releases

Hydrogen is a versatile and clean energy carrier that can be produced from various renewable sources such as wind, solar, and hydropower. Hydrogen has the potential to play a crucial role in decarbonizing industrial processes that are currently reliant on fossil fuels and provide long-duration and/or seasonal energy storage to enable electricity decarbonization. Hydrogen can also be used as a fuel for fuel cell vehicles, providing a zero-emission alternative to traditional internal combustion engines. DOE launched the Hydrogen Energy Earthshot (Hydrogen Shot) in June 2021 to reduce the cost of clean hydrogen by 80% to $1 per 1 kilogram in 1 decade ("1 1 1"). While promising, Hydrogen is highly-flammable, and in the presence of oxygen, it can form explosive mixtures. . Therefore, understanding leak scenarios is essential to evaluate and mitigate the safety risks associated with potential hydrogen leaks. An increased understanding of leak behavior, and having tools to model leaks, can help assess how hydrogen would disperse in different environments, influencing emergency response plans and safety measures, and identify potential issues with materials and design systems that can withstand the challenges posed by hydrogen. Recently, researchers have attempted to study hydrogen leaks for development of risk management strategies. However, the focus has been on closed or semi-closed spaces like storage rooms, vehicles, garages, and fueling stations - all promising locations for future hydrogen infrastructure. In this presentation, the modeling environment extends the span of research further by modeling hydrogen leak in an outdoor, open space. We will present the key challenges with modeling hydrogen leaks in an uncontrollable environment, how they were handled, and how modeling results informed sensor selection and placement. A Hydrogen research facility at the National Renewable Energy Laboratory (NREL) was used as a case study to model hydrogen leaks. In the future, Hydrogen wide area detection methodologies will be developed and tested at this site to monitor for unintended and operational hydrogen releases. The data generated from modeling will be used to develop a predictive model to detect hydrogen leak location based on concentration measured by sensors in this open space. Furthermore, the facility was also chosen because controlled hydrogen releases can be performed. A computational fluid dynamics (CFD) based modeling approach was taken to model hydrogen leak. The full-scale hydrogen facility was modeled with a large ambient domain. The electrolyzer at the facility can produce a controlled release rate of 27 kg-H2/hr. Site-specific atmospheric and weather condition data such as wind direction, wind speed at various altitudes, and temperature were used as inputs to the model. To capture the variability of weather conditions, a subset of the weather conditions experienced during daytime hours without precipitation over the course of three months was generated; using established data clustering techniques, a total of 100 condition sets were chosen. The results show statistical distributions and ranges of hydrogen concentrations at locations throughout the domain. These distributions are compared to experimental data from a constant mass flow, controlled hydrogen release at the facility. The stochastic wind conditions of the release make direct validation difficult, therefore, statistical comparison approaches were used. Wind conditions are found to significantly impact the release behavior, including direction and concentration. Sensor selection and placement is proposed for the facility and is now based on release behavior predicted for the facility given its weather patterns; this is much more informed than without the modeling results. The methodology and analysis procedure can be translated to other facilities using modified geometries and site-specific weather conditions. Hydrogen holds great promise as a renewable energy fuel, but ensuring safety in its production, storage, and use is paramount. Studying potential leak scenarios in an open space will help develop sensors to detect hydrogen on a large spectrum of concentration and eventually build a smart distributed monitoring system.

CFD

Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report

Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

Source record

Safer Liquid Natural Gas

After the disaster of Staten Island in 1973 where 40 people were killed repairing a liquid natural gas storage tank, the New York Fire Commissioner requested NASA's help in drawing up a comprehensive plan to cover the design, construction, and operation of liquid natural gas facilities. Two programs are underway. The first transfers comprehensive risk management techniques and procedures which take the form of an instruction document that includes determining liquid-gas risks through engineering analysis and tests, controlling these risks by setting up redundant fail safe techniques, and establishing criteria calling for decisions that eliminate or accept certain risks. The second program prepares a liquid gas safety manual (the first of its kind).

Source record