PHEV Cold Start Emissions Management
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
The U.S. Department of Energy (DOE) Office of Integrated Waste Management is planning for the eventual transportation, storage, and disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant and DOE sites. The Stakeholder Tool for Assessing Radioactive Transportation (START) is a web-based, geospatial decision-support tool developed for evaluating routing options and other aspects of transporting SNF and HLW, covering rail, truck, barge, and intermodal infrastructure and operations in the continental United States. The verification and validation (V&V) process is intended to independently assess START to provide confidence in the ability of START to accurately provide intended results. The V&V process checks the START tool using a variety of methods, ranging from independent hand calculations to comparison of START performance and results to those of other codes. The V&V activity was conducted independently from the START development team with opportunities to provide feedback and collaborate throughout the process. The V&V analyzed attributes of transportation routes produced by START, including route distance and both population and population density captured within buffer zones around routes. Population in the buffer zone, population density in the buffer zone, and route distance were all identified as crucial outputs of the START code and were subject to V&V tasks. Some of the improvements identified through the V&V process were standardizing the underlying population data in START, changing the projection of the population raster data, and changes to the methodology used for population density to improve its applicability for expected users. This collaboration also led to suggested improvements to some of the underlying shape file segments within START. A formal series of test routes went through the V&V process from START version 3.2.1 following the implementation of the recommended improvements to START. The V&V of the buffer zone population and distance reported in START were achieved by utilizing a custom workflow developed in QGIS. This platform was chosen because it is fully independent of START. The buffer zone population and route distances in START showed excellent agreement to independent V&V test results. Over 200 route test cases were run; in all cases, the percent difference in the population within the buffer zone was less than +/- 5%, and the majority of cases were below +/- 1%. These cases were also duplicated in ArcMap, which is Environmental Systems Research Institute’s (ESRI) GIS desktop application. The ArcMap results also show good agreement; however, they cannot be considered independent of START because START also uses ESRI software. The V&V tasks are currently addressing population density and estimated radiation dose in START as well as implementing further automation of the V&V process to allow larger suites of test routes to be run more easily and quickly by less experienced GIS users. These improvements to the V&V process will make it a valuable tool for the development team and the stakeholders so that each new iteration of START can easily be checked for quality and consistency. This paper and presentation will describe the V&V process, findings and implications, and ongoing V&V activities.
The air-start capability of a secondary engine control (SEC) was tested for a DEEC-equipped F100 engine and installed in an F-15 airplane. Two air-start schedules were tested. The first was referred to as the group I schedule; the second or revised schedule was the group II start schedule. Using the group I start schedule, an airspeed of 300 knots was required to ensure successful 40- and 25-percent SEC-mode air starts. If N2 were less than 40 percent, a stall would occur when the start bleeds closed 40 sec after initiation of the air start. All JFS-assisted air starts were successful with the group start schedule. For the group II schedule, the time between pressurization and start-bleed closure ranged between 50 and 72 sec depending on altitude. All air starts were successful above 225 knots givin a 75-knot reduction in required airspeed for a successful air start. Spooldown air starts of 40 percent were successful at 200 knots at altitudes up to 10,650 m and at 175 knots at altitudes up to 6100 m. Idle rpm was lower than the desired 65 percent for air starts at higher altitudes and lower airspeeds. All JSF-assisted air starts were successful.
Prior studies have confirmed that commercial airline pilots experience circadian phase shifts and short sleep duration following travel with layovers in different time zones. Few studies have examined the impact of early and late starts on the sleep and circadian phase of airline pilots who return to their domicile after each duty period. We recruited 44 pilots (4 female) from a short-haul commercial airline to participate in a study examining sleep and circadian phase over four duty schedules (baseline, early starts, mid-day starts, late starts). Each duty schedule was five days long, separated by three rest days. Participants completed the rosters in the same order. Sleep outcomes were estimated using wrist-borne actigraphy (Actiware Software, Respironics, Bend, OR) and daily sleep diaries. Thirteen participants volunteered to collect urine samples for the assessment of 6-sulfatoxymelatonin (aMT6s). Urine samples were collected in four hourly bins during the day and eight-hourly bins during sleep episodes, for 24 hours immediately following each experimental duty schedule. The aMT6s results were fit to a cosine in order to obtain the acrophase to estimate circadian phase. Univariate statistics were calculated for acrophase changes, schedule start times and sleep times. All statistical analyses were computed using SAS software (Cary, IN).The mean duty start times varied as expected (baseline 10:17 [ 3:50], early starts 5:24 [ 0:30], mid-day starts 13:52 [ 1:20], late starts 16:33 [ 1:33]). Actigraphy-derived sleep duration varied between schedule types, with the shortest average sleep durations occurring during the early starts and night duty. Mean circadian phase was similar during each schedule type (baseline 26:14 [ 3:22], early starts 25:29 [2:13], mid-day starts 26:20 [ 3:16], late starts 25:49 [ 4:28]), but there were wide inter-individual differences in phase shifting from the beginning to the end of the study, with phase shifts ranging from a 5.98 hour phase advance to an 11.34 hour phase delay. Our preliminary findings suggest that early and late starts are associated with reduced sleep duration. The dispersion in inter-individual differences in circadian phase across shifting duty schedules should be further evaluated to determine how schedule-induced phase shifts may affect operational performance.
As the fuel economy regulations increase in stringency, many manufacturers are implementing start-stop operation to enhance vehicle fuel economy. During start-stop operation, the engine shuts off when the vehicle is stationary for more than a few seconds. When the brake is released by the driver, the engine restarts. Depending on traffic conditions, start-stop operation can result in fuel savings from a few percent to close to 10%. Gasoline direct injection (GDI) engines are also increasingly available on light-duty vehicles. While GDI engines offer fuel economy advantages over port fuel injected (PFI) engines, they also tend to have higher PM emissions, particularly during start-up transients. Thus, there is interest in evaluating the effect of start-stop operation on PM emissions. In this study, a 2.5L GDI vehicle was operated over the FTP75 drive cycle. Runs containing cold starts (FTP-75 cycle Phases 1 & 2) and multiple runs containing hot starts (FTP-75 cycle Phases 3 & 4) were performed each day. Note that the FTP-75 Phases 3 & 4 are identical to Phases 1 & 2 except that the engine is warmed up. Three fuels were evaluated: an 87 AKI gasoline (E0), a 21% splash blend of ethanol and the 87 AKI gasoline (E21), and a 12% splash blend of iso-butanol and the 87 AKI gasoline (iBu12). PM mass, transient particle number concentration and size distribution, and soot mass concentration were evaluated for both start-stop operation and no start-stop operation on each fuel. Three Phase 1 & 2 cycles and as many as 27 Phase 3 & 4 cycles were performed for each fuel-mode combination. Composite FTP mass emissions for E0 and iBu12 showed increased total PM emissions with start-stop operation, but E21 showed no difference. Statistical analysis of the effects of start-stop on PM number and soot emissions showed different trends for different fuels. For example, when E0 is used with start-stop operation, the particle number decreased but the soot mass tended to increase. The results of this study have implications for hybrid vehicle operation as well because the internal combustion engine in hybrid vehicles must stop and re-start during normal operation.
This report is an Oregon Institute of Technology thesis project completed in partial fulfillment for the Masters of Science in Renewable Energy Engineering degree. The testing and research done for this report, investigate the phenomena of water start up time in the spiral case of hydro units. Water start up time is defined as the time it takes for water to accelerate from zero to rated velocity. From analysis of the literature there shows no published article of water start up time being measured and compared to theoretically calculated values. However a multiplier is used to create a buffer in the estimations of water start up time to use in the engineering and selection of governors for hydro units. The multiplier has also been widely used in computer model simulations which causes a dependence of this multiplier. In 2013 an article was published which challenges the hypothesis that water start up time has been over hypothesized and that the multiplier would be of a smaller value than what was hypothesized which would mean that the governing ability is more than what was expected. This proposal of a higher governing ability would mean that the hydro facilities that are currently standing has a higher stability rating than what was initially thought. The higher stability would allow for increased penetration of renewables onto the electrical grid. The lack of actual water start up time measurements as well as the infeasibility of testing on an actual hydro unit meant that a model would need to be designed, built, and tested. The model had two testing parameters that were examined. One of the parameters was flow rate that was controlled by the number of wicket gates that was installed into the system and the other was the reference height from the forebay to tail water. There were one hundred results from the test trials. The data from the trials showed a trend for the multiplier which was not constant as previously hypothesized and instead illustrated a parabolic trend that tapers into a linear digression. This result means that the range of testing was insufficient and the height range in which the trials were taking placed was subjected to higher variability. The results showed that the multiplier used in water start up time is not a constant and is variable based on the water level. The previous hypothesis stating that the water start up time is faster is false. In accordance with the results the trend showed that the actual water start up time is slower than what is hypothesized. This means at lower water levels the hypothesized governing ability is actually less than what is calculated to be using the current method of water start up time calculation for spiral cases. The theoretical analysis showed that with increased water level and flow rate showed that the multiplier has less effect on water start up time. The value of the water start up time tapering off from the experimental data shows that the trend for water start up time for both theoretical and experimental share similarities. An increased testing range of the water level in the trials will hypothetically lower the variability of the multiplier and in turn conform to a linear equation. The linear equation is shown to approach zero with increased head in which a static value can be achieved for a specified range.
Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.
The J2X Gas Generator engine design has a spin start line connected near to the turbine inlet vanes. This line provides helium during engine startup to begin turbomachinery operation. The spin start line also acts as an acoustic side branch which alters the chamber's acoustic modes. The side branch effectively creates 'split modes' in the chamber longitudinal modes, in particular below the first longitudinal mode and within the frequency range associated with the injection-coupled response of the Gas Generator. Interaction between the spin start-modified chamber acoustics and the injection-driven response can create a higher system response than without the spin start attached to the chamber. This work reviews the acoustic effects of the spin start line as seen throughout the workhorse gas generator test program. A simple impedance model of the spin start line is reviewed. Tests were run with no initial spin start gas existing in the line, as well as being initially filled with nitrogen gas. Tests were also run with varying spin start line lengths from 0" to 40". Acoustic impedance changes due to different spin start gas constituents and line lengths are shown. Collected thermocouple and static pressure data in the spin start line was used to help estimate the fluid properties along the line length. The side branch impedance model was coupled to a chamber impedance model to show the effects on the overall chamber response. Predictions of the spin start acoustic behavior for helium operation are shown and compared against available data.
Abstract Captive-rearing conservation programs focus primarily on maximizing postrelease survival. Survival increases with size in a variety of taxa, often leading to the use of enhanced size as a means to minimize postrelease losses. Head-starting is a specific captive-rearing approach used to accelerate growth in captivity prior to release in the wild. We explored the effect of size at release, among other potential factors, on postrelease survival in head-started Mojave desert tortoises Gopherus agassizii. Juvenile tortoises were reared for different durations of captivity (2–7 y) and under varying husbandry protocols, resulting in a wide range of juvenile sizes (68–145 mm midline carapace length) at release. We released all animals (n = 78) in the Mojave National Preserve, California, United States, on 25 September 2018. Release size and surface activity were the only significant predictors of fate during the first year postrelease. Larger sized head-starts had higher predicted survival rates when compared with smaller individuals. This trend was also observed in animals of the same age but reared under different protocols, suggesting that accelerating the growth of head-started tortoises may increase efficiency of head-starting programs without decreasing postrelease success. Excluding five missing animals, released head-starts had 82.2% survival in their first year postrelease (September 2018–September 2019), with all mortalities resulting from predation. No animals with >90-mm midline carapace length were predated by ravens. Our findings suggest the utility of head-starting may be substantially improved by incorporating indoor rearing to accelerate growth. Target release size for head-started chelonians will vary among head-start programs based on release site conditions and project-specific constraints.
The Stakeholder Tool for Assessing Radioactive Transportation (START) is a web-based geospatial decision-support tool being developed by the US Department of Energy’s Office of Integrated Waste Management (IWM) to support federal interim storage for spent nuclear fuel (SNF) and associated transportation. START provides many functions for the IWM program including: serving as a communications tool for conveying geospatial data and information, an options analysis tool for exploring potential transport modes and routes for transporting SNF from nuclear power plants to future federal interim storage facilities, an emergency response planning tool for Tribes and States to identify training needs along potential SNF transport corridors, an environmental analysis tool for estimating potential radiation dose exposure from incident-free and incident-case SNF transport conditions, and a systems analysis support tool providing route-related inputs for system throughput analysis. As part of the START development process, a verification and validation (V&V) effort is being undertaken. In the initial V&V phase, several outputs of the START tool were checked such as the total distance, population and population densities within the buffer zone, and incident free dose. The V&V process is fluid as it will be utilized after each version change to ensure that the core functionalities of the tool are maintained and the results are consistent with the previous versions. Efforts have also been put into developing scripts to aid in the process of automating certain sections of the V&V work. As some of the V&V efforts use Environmental Systems Research Institute’s (ESRI) tools upon which the START framework is built, the START data were compared against outputs from tools like Quantum Geographic Information System (QGIS) for buffer zone populations and route lengths to ensure independence of the V&V process. Good agreement was observed between the START results and the independent V&V studies with the majority of the differences falling between 1% and 5% for populations within the buffer zone and route distance. This presentation describes the development and design of the START tool, V&V methods employed for various metrics of interest and their respective results, and future plans.
Nuclear weapon arms control treaty verification is a key aspect of any agreement between signatories to establish that the terms and conditions spelled out in the treaty are being met. Historically, arms control negotiations have focused more on the rules and protocols for reducing the numbers of warheads and delivery systems - sometimes resorting to complex and arcane procedures for counting forces - in an attempt to address perceived or real imbalances in a nation's strategic posture that could lead to instability. Verification procedures are generally defined in arms control treaties and supporting documents and tend to focus on technical means and measures designed to ensure that a country is following the terms of the treaty and that it is not liable to engage in deception or outright cheating in an attempt to circumvent the spirit and the letter of the agreement. As the Obama Administration implements the articles, terms, and conditions of the recently ratified and entered-into-force New START treaty, there are already efforts within and outside of government to move well below the specified New START levels of 1550 warheads, 700 deployed strategic delivery vehicles, and 800 deployed and nondeployed strategic launchers (Inter-Continental Ballistic Missile (ICBM) silos, Submarine-Launched Ballistic Missile (SLBM) tubes on submarines, and bombers). A number of articles and opinion pieces have appeared that advocate for significantly deeper cuts in the U.S. nuclear stockpile, with some suggesting that unilateral reductions on the part of the U.S. would help coax Russia and others to follow our lead. Papers and studies prepared for the U.S. Department of Defense and at the U.S. Air War College have also been published, suggesting that nuclear forces totaling no more than about 300 warheads would be sufficient to meet U.S. national security and deterrence needs. (Davis 2011, Schaub and Forsyth 2010) Recent articles by James M. Acton and others suggest that the prospects for maintaining U.S. security and minimizing the chances of nuclear war, while deliberately reducing stockpiles to a few hundred weapons, is possible but not without risk. While the question of the appropriate level of cuts to U.S. nuclear forces is being actively debated, a key issue continues to be whether verification procedures are strong enough to ensure that both the U.S. and Russia are fulfilling their obligations under the current New Start treaty and any future arms reduction treaties. A recent opinion piece by Henry Kissinger and Brent Scowcroft (2012) raised a number of issues with respect to governing a policy to enhance strategic stability, including: in deciding on force levels and lower numbers, verification is crucial. Particularly important is a determination of what level of uncertainty threatens the calculation of stability. At present, that level is well within the capabilities of the existing verification systems. We must be certain that projected levels maintain - and when possible, reinforce - that confidence. The strengths and weaknesses of the New START verification regime should inform and give rise to stronger regimes for future arms control agreements. These future arms control agreements will likely need to include other nuclear weapons states and so any verification regime will need to be acceptable to all parties. Currently, China is considered the most challenging party to include in any future arms control agreement and China's willingness to enter into verification regimes such as those implemented in New START may only be possible when it feels it has reached nuclear parity with the U.S. and Russia. Similarly, in keeping with its goals of reaching peer status with the U.S. and Russia, Frieman (2004) suggests that China would be more willing to accept internationally accepted and applied verification regimes rather than bilateral ones. The current verification protocols specified in the New START treaty are considered as the baseline case and are contrasted with possible alternative verification protocols that could be effective in a post-New START era of significant reductions in U.S. and other countries nuclear stockpiles. Of particular concern is the possibility of deception and breakout when declared and observed numbers of weapons are below the level considered to pose an existential threat to the U.S. In a regime of very low stockpile numbers, 'traditional' verification protocols as currently embodied in the New START treaty might prove less than adequate. I introduce and discuss a number of issues that need to be considered in future verification protocols, many of which do not have immediate solutions and so require further study. I also discuss alternatives and enhancements to traditional verification protocols, for example, confidence building measures such as burden sharing against the common threat of weapon of mass destruction (WMD) terrorism, joint research and development.
The NASA arcjet program is currently sponsoring development of high specific impulse thrusters for next generation geosynchronous communications satellites (2 kW-class) and low-power arcjets for power limited spacecraft (approx. 0.5 kW-class). Performance goals in both of these efforts will require up to 1000 starts at propellant mass flow rates significantly below those used in state-of-the-art arcjet thruster systems (i.e., high specific power levels). Reductions in mass flow rate can lead to damaging modes of operation, particularly at thruster ignition. During the starting sequence, the gas dynamic force due to low propellant flow is often insufficient to rapidly push the arc anode attachment to its steady-state position in the diverging section of the nozzle. This paper describes the development and demonstration of a technique which provides for non-damaging starts at low steady-state flow rates. The technique employs a brief propellant pressure pulse at ignition to increase gas dynamic forces during the critical ignition/transition phase of operation. Starting characteristics obtained using both pressure-pulsed and conventional starting techniques were compared across a wide range of propellant flow rates. The pressure-pulsed starting technique provided reliable starts at mass flow rates down to 21 mg/s, typically required for 700 s specific impulse level operation of 2 kW thrusters. Following the comparison, a 600 start test was performed across a wide flow rate range. Post-test inspection showed minimal erosion of critical arcjet anode/nozzle surfaces.
A major challenge in the recovery of long-lived at-risk taxa like turtles is low juvenile recruitment. Head-starting—the raising of juveniles to larger sizes to improve survival—is one tool that can be used in circumstances where juvenile recruitment is limited. Due to declining populations and difficulty detecting juveniles, however, lack of knowledge of the ecology of juveniles can hinder efforts to develop and evaluate head-starting programs for many turtle species. We sought to inform recovery efforts of Mojave desert tortoises by quantifying multi-year space use and survival of head-started juveniles after release. We radio-tracked tortoises head-started under three different husbandry treatments that varied in rearing duration (from two to over six years) and whether head-starting included an indoor rearing component the first year. We compared postrelease space use and survival as a function of treatment, release size, and time since release. We found that space use, including home range size and site fidelity, varied by husbandry treatment, with smaller and younger tortoises having smaller home ranges and higher site fidelity. Additionally, home range size decreased and site fidelity increased with time since release across treatments. Tortoises with an indoor-rearing component experiencing increased risk of mortality as movement increased compared to tortoises reared solely outdoors. Nevertheless, survival did not differ among treatments or with tortoise age or size. Regardless of husbandry treatment, head-started tortoises exhibited similar space-use and survival overall. Our study provides insight into juvenile tortoise behavior and head-starting as a tool for tortoise conservation.
As the modern power systems are experiencing exceptional changes with increasing penetration of inverter-based resources (IBRs), system restoration using IBRs has received attention. Using local grid-forming (GFM) assets near consumers, engineered to establish grid voltages in the absence of a stiff grid, i.e., bottom-up restoration, a distribution system would obtain high system resilience, by not relying on the bulk power system restoration requiring significant human intervention and procedure to restore. This paper studies the technical feasibility of the novel approach with detailed electromagnetic transient (EMT) simulations. To thoroughly evaluate the potential of GFM inverters and technical challenges in IBR-driven black start, a detailed three-phase inverter model is developed, including negative-sequence control for voltage balance and a phase-by-phase current limiter to sustain momentary overloading during the black start. To examine dynamic aspects of the black start process, the EMT simulation also models transformer and motor dynamics to emulate their inrush and start-up behaviors as well as network dynamics. In addition, active involvement of grid-following distributed energy resources (DER) is also studied to facilitate the black start process. It is shown that, by allowing multiple GFM inverters to collectively black start without master-slave coordination, a system can achieve high resilience even with a fraction of assets lost. Two test cases of inverter-driven black start using two and one GFM inverters, respectively, for a heavily unbalanced 2-MVA distribution feeder are demonstrated. Takeaways for further study and field deployment are provided.
De novo synthesis of the sphingolipid sphingomyelin requires non-vesicular transport of ceramide from the endoplasmic reticulum to the Golgi by the multidomain protein ceramide transfer protein (CERT). CERT's N-terminal pleckstrin homology (PH) domain targets it to the Golgi by binding to phosphatidylinositol 4-phosphate (PtdIns(4)P) in the Golgi membrane, whereas its C-terminal StAR-related lipid transfer domain (START) carries out ceramide transfer. Hyperphosphorylation of a serine-rich motif immediately after the PH domain decreases both PtdIns(4)P binding and ceramide transfer by CERT. This down-regulation requires both the PH and START domains, suggesting a possible inhibitory interaction between the two domains. In this study we show that isolated PH and START domains interact with each other. The crystal structure of a PH–START complex revealed that the START domain binds to the PH domain at the same site for PtdIns(4)P-binding, suggesting that the START domain competes with PtdIns(4)P for association with the PH domain. We further report that mutations disrupting the PH–START interaction increase both PtdIns(4)P-binding affinity and ceramide transfer activity of a CERT-serine–rich phosphorylation mimic. We also found that these mutations increase the Golgi localization of CERT inside the cell, consistent with enhanced PtdIns(4)P binding of the mutant. Collectively, our structural, biochemical, and cellular investigations provide important structural insight into the regulation of CERT function and localization.
Many drivers of personal and commercial vehicles believe that turning the vehicle off and on frequently instead of idling will cause premature wear of the starter system (starter motor and starter battery). As a result, they are concerned that the replacement cost of the starter motor and/or battery due to increased manual engine cycling would be more than the cumulative cost of the fuel saved by not idling unnecessarily. A number of variables play a role in addressing this complex concern, including the number of starting cycles per day, the time between starting cycles, the intended design life of the starting system, the amount of fuel used to restart an engine, and the cumulative cost of the saved fuel. Qualitative and quantitative information from a variety of sources was used to develop a life-cycle economic model to evaluate the cost and quantify the realistic factors that are related to the permissible frequency of starter motor cycles for the average vehicle to economically minimize engine idle time. Annual cost savings can be calculated depending on shutdown duration and the number of shutdown cycles per day. Analysis shows that cost savings are realized by eliminating idling exceeding one minute by shutting down the engine and restarting it. For a typical motorist, the damage to starting system components resulting from additional daily start cycles will be negligible. Overall, it was found that starter life is mostly dependent on the total number of start cycles, while battery life is more dependent on ensuring a full charge between start events.
The U.S. Department of Energy’s Co-Optimization of Fuels and Engines initiative (Co-Optima) aims to simultaneously transform both transportation fuels and engines to maximize performance and energy efficiency. Researchers from across the DOE national laboratories are working within Co-Optima to develop merit functions for evaluating the impact of fuel formulations on the performance of advanced engines. The merit functions relate overall engine efficiency to specific measurable fuel properties and will serve as key tools in the fuel/engine co-optimization process. This work focused on developing a term for the Co-Optima light-duty boosted spark ignition (SI) engine merit function that captures the effects of fuel composition on emissions control system performance. For stoichiometric light-duty SI engines, the majority of NOx, NMOG, and CO emissions occur during cold start, before the three-way catalyst (TWC) has reached its “light-off” temperature. This light-off temperature depends on the exhaust composition, which changes with fuel formulation. Thus, the time to achieve light-off, and therefore the cold start emissions, depends on fuel composition. Since the time to reach light-off must be minimized to meet emissions regulations, modern vehicles employ cold start strategies that intentionally release fuel energy into the engine exhaust to heat the TWC above the light-off temperature as quickly as possible. The fuel penalty associated with catalyst heating during cold start provides a link between fuel properties, emissions performance, and engine efficiency. This paper describes the derivation of the Co-Optima SI engine merit function term for emissions control, which is based on the cold start fuel penalty for catalyst heating and the catalytic light-off temperature for a particular fuel composition. It also discusses the process used for extracting cold start fuel penalties from chassis dynamometer data sets previously collected at ORNL. The form of the merit function term is simple, but it is only intended as a starting point for comparing the potential impacts of changes in fuel formulation on emissions control system performance.
This paper presents the test results on start-up behaviors of a miniature loop heat pipe (MLHP) with two evaporators and two condensers. The MLHP start-up tests were conducted by varying the heat load to one or both evaporators, the condenser sink temperatures, and with or without compensation chamber (CC) temperature control. More than 90 start-up tests have been conducted in horizontal position, and all were successful. Test results showed robust start-ups of the MLHP with heat loads of 1W to 100W. Loop started as soon as the heat load was applied, without a large temperature overshoot. The efficacy and good repeatability of the start-ups with CC active temperature control by using thermoelectric cooler (TEC) was demonstrated. The ability of the loop to start with parasitic heat gain caused by cooling the CC temperature below ambient temperature was also demonstrated.