Engineering PapersSearch

SEARCH · Engineering Papers

Results for “STARTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Portable device for use in starting air-start-units for aircraft and having cable lead testing capability

A portable device for starting aircraft engines and the like is disclosed. The device includes a lead testing and motor starting circuit characterized by: (1) a direct current voltage source, (2) a pair of terminal plugs connected with the circuit (each being characterized by a first, second, and third terminal) (3) a pair of manually operable switches for connecting the first terminal of each plug of the pair to the positive side of the voltage source, (4) a circuit lead connecting to the second terminal of each plug the negative side of said source, (5) a pair of electrical cables adapted to connect said first and second terminals of each plug to an air-start unit, and means for connecting each cable of the pair of cables between the first terminal of one plug and the third terminal of the other plug of the pair, and (6) a second pair of manually operable switches for selectivity connecting the third terminal of each plug of the pair to the negative side of the voltage source.

Rosier, W. R.

Flight evaluation of the DEEC secondary control air-start capability

The air-start capability of a secondary engine control (SEC) was tested for a DEEC-equipped F100 engine and installed in an F-15 airplane. Two air-start schedules were tested. The first was referred to as the group I schedule; the second or revised schedule was the group II start schedule. Using the group I start schedule, an airspeed of 300 knots was required to ensure successful 40- and 25-percent SEC-mode air starts. If N2 were less than 40 percent, a stall would occur when the start bleeds closed 40 sec after initiation of the air start. All JFS-assisted air starts were successful with the group start schedule. For the group II schedule, the time between pressurization and start-bleed closure ranged between 50 and 72 sec depending on altitude. All air starts were successful above 225 knots givin a 75-knot reduction in required airspeed for a successful air start. Spooldown air starts of 40 percent were successful at 200 knots at altitudes up to 10,650 m and at 175 knots at altitudes up to 6100 m. Idle rpm was lower than the desired 65 percent for air starts at higher altitudes and lower airspeeds. All JSF-assisted air starts were successful.

Johnson, J. B.

Variation in Sleep Duration and Circadian Phase by Duty Start Time Among Short-Haul Commercial Airline Pilots

Prior studies have confirmed that commercial airline pilots experience circadian phase shifts and short sleep duration following travel with layovers in different time zones. Few studies have examined the impact of early and late starts on the sleep and circadian phase of airline pilots who return to their domicile after each duty period. We recruited 44 pilots (4 female) from a short-haul commercial airline to participate in a study examining sleep and circadian phase over four duty schedules (baseline, early starts, mid-day starts, late starts). Each duty schedule was five days long, separated by three rest days. Participants completed the rosters in the same order. Sleep outcomes were estimated using wrist-borne actigraphy (Actiware Software, Respironics, Bend, OR) and daily sleep diaries. Thirteen participants volunteered to collect urine samples for the assessment of 6-sulfatoxymelatonin (aMT6s). Urine samples were collected in four hourly bins during the day and eight-hourly bins during sleep episodes, for 24 hours immediately following each experimental duty schedule. The aMT6s results were fit to a cosine in order to obtain the acrophase to estimate circadian phase. Univariate statistics were calculated for acrophase changes, schedule start times and sleep times. All statistical analyses were computed using SAS software (Cary, IN).The mean duty start times varied as expected (baseline 10:17 [ 3:50], early starts 5:24 [ 0:30], mid-day starts 13:52 [ 1:20], late starts 16:33 [ 1:33]). Actigraphy-derived sleep duration varied between schedule types, with the shortest average sleep durations occurring during the early starts and night duty. Mean circadian phase was similar during each schedule type (baseline 26:14 [ 3:22], early starts 25:29 [2:13], mid-day starts 26:20 [ 3:16], late starts 25:49 [ 4:28]), but there were wide inter-individual differences in phase shifting from the beginning to the end of the study, with phase shifts ranging from a 5.98 hour phase advance to an 11.34 hour phase delay. Our preliminary findings suggest that early and late starts are associated with reduced sleep duration. The dispersion in inter-individual differences in circadian phase across shifting duty schedules should be further evaluated to determine how schedule-induced phase shifts may affect operational performance.

Flynn-Evans, Erin

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY

Spin Start Line Effects on the J2X Gas Generator Chamber Acoustics

The J2X Gas Generator engine design has a spin start line connected near to the turbine inlet vanes. This line provides helium during engine startup to begin turbomachinery operation. The spin start line also acts as an acoustic side branch which alters the chamber's acoustic modes. The side branch effectively creates 'split modes' in the chamber longitudinal modes, in particular below the first longitudinal mode and within the frequency range associated with the injection-coupled response of the Gas Generator. Interaction between the spin start-modified chamber acoustics and the injection-driven response can create a higher system response than without the spin start attached to the chamber. This work reviews the acoustic effects of the spin start line as seen throughout the workhorse gas generator test program. A simple impedance model of the spin start line is reviewed. Tests were run with no initial spin start gas existing in the line, as well as being initially filled with nitrogen gas. Tests were also run with varying spin start line lengths from 0" to 40". Acoustic impedance changes due to different spin start gas constituents and line lengths are shown. Collected thermocouple and static pressure data in the spin start line was used to help estimate the fluid properties along the line length. The side branch impedance model was coupled to a chamber impedance model to show the effects on the overall chamber response. Predictions of the spin start acoustic behavior for helium operation are shown and compared against available data.

Kenny, R. Jeremy

A Low-Erosion Starting Technique for High-Performance Arcjets

The NASA arcjet program is currently sponsoring development of high specific impulse thrusters for next generation geosynchronous communications satellites (2 kW-class) and low-power arcjets for power limited spacecraft (approx. 0.5 kW-class). Performance goals in both of these efforts will require up to 1000 starts at propellant mass flow rates significantly below those used in state-of-the-art arcjet thruster systems (i.e., high specific power levels). Reductions in mass flow rate can lead to damaging modes of operation, particularly at thruster ignition. During the starting sequence, the gas dynamic force due to low propellant flow is often insufficient to rapidly push the arc anode attachment to its steady-state position in the diverging section of the nozzle. This paper describes the development and demonstration of a technique which provides for non-damaging starts at low steady-state flow rates. The technique employs a brief propellant pressure pulse at ignition to increase gas dynamic forces during the critical ignition/transition phase of operation. Starting characteristics obtained using both pressure-pulsed and conventional starting techniques were compared across a wide range of propellant flow rates. The pressure-pulsed starting technique provided reliable starts at mass flow rates down to 21 mg/s, typically required for 700 s specific impulse level operation of 2 kW thrusters. Following the comparison, a 600 start test was performed across a wide flow rate range. Post-test inspection showed minimal erosion of critical arcjet anode/nozzle surfaces.

Sankovic, John M.

Start-up Behavior of a Miniature Loop Heat Pipe with Multiple Evaporators and Multiple Condensers

This paper presents the test results on start-up behaviors of a miniature loop heat pipe (MLHP) with two evaporators and two condensers. The MLHP start-up tests were conducted by varying the heat load to one or both evaporators, the condenser sink temperatures, and with or without compensation chamber (CC) temperature control. More than 90 start-up tests have been conducted in horizontal position, and all were successful. Test results showed robust start-ups of the MLHP with heat loads of 1W to 100W. Loop started as soon as the heat load was applied, without a large temperature overshoot. The efficacy and good repeatability of the start-ups with CC active temperature control by using thermoelectric cooler (TEC) was demonstrated. The ability of the loop to start with parasitic heat gain caused by cooling the CC temperature below ambient temperature was also demonstrated.

Nagano, Hosei

Comparison of plasma start-up with high Z and low Z first wall in WEST

The choice of first wall material is of paramount importance for the plasma start-up conditions in ITER and future fusion power plants. In this context, the present work focuses on the correlations between first wall impurity sources and total radiated power during plasma start-up in the tungsten (W) Environment in Steady-state Tokamak (WEST). The objective is to highlight experimental indications for a preferable combination of start-up plasma scenario and first wall materials. Until 2019, WEST featured a full high Z first wall with all limiters exposing only W surfaces to the plasma. To study the impact of a low Z first wall in WEST, boron nitride tiles were installed in the central part of the inner and outer limiters in 2020. Although visible spectroscopy and bolometry measurements show respectively a strong weakening of the WI line intensity on the limiters and a reduction of radiated power after the changeover, a degradation occurs with the accumulation of plasma exposure. In addition, the different plasma facing elements of the main chamber do not influence equally the radiated power during start-up. In both high Z and low Z environments, a clear non-linear dependence is found between the start-up radiated power and the outer limiter W impurity source. Since W seems to be the main cause for core radiation, correlation between outer limiter W sources and other impurity sources are investigated. Finally, analysis of the legacy of B powder drops on a number of start-up plasmas suggests that it is less effective at reducing radiated power when the first wall is covered with W.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Survival and Age at Maturity in Head-Started Wood Turtles ( Glyptemys insculpta ) with Implications for Population Recovery

A small relict population of Glyptemys insculpta (Wood Turtle) was discovered on a protected area in New Jersey in 2006. Marking and radio-tracking of the old founder individuals helped to determine movement patterns and habitat use. Monitoring of nesting females revealed that nesting habitat and nest success was limited due to invasive plants, human landscape alteration, and Procyon lotor (Raccoon) depredation. We initiated habitat restoration including creation of protected nesting areas, mowing in winter, invasive plant removal, and adjacent landowner education. Here, we direct-released hatchlings from protected nests from 2006 to 2015, yet only a few were detected in subsequent years. Between 2011 and 2023, some or all of each hatchling cohort were head-started indoors at a high school for 9 months. We have continuously radio-tracked all head-starts from the 2011 cohort and portions of the 2012–2014 cohorts. Head-started turtles found their own food, established home ranges, and hibernated communally with founder adults. Subsidized Raccoons, mowers, automobiles, and flooding events—all human-instigated—were the causes of mortality. The first males and first females from the 2011 head-start cohort reached maturity in 2017 and 2019, respectively, at ages 6–8, younger than expected by 4–5 years. Successful reproduction by head-starts was confirmed by viable hatchlings produced in 2019, 2020, and 2023. Head-starting can pull a relict population out of the nose-dive to extirpation when used in conjunction with habitat-restoration practices, but it must be conducted with persistence and continuity over at least the number of years it takes for the earliest cohorts to reach maturity and begin producing offspring of their own.

59 BASIC BIOLOGICAL SCIENCES

A parametric study of motor starting for a 2- to 10-kilowatt Brayton power system

A study of the motor starting of a Brayton cycle power system was conducted to provide estimates of system sensitivity to several controllable parameters. These sensitivity estimates were used as a basis for selection of an optimum motor-start scheme to be implemented on the 2- to 10-kilowatt Brayton power system designed and presently under test. The studies were conducted with an analog simulation of the Brayton power system and covered a range of frequencies from 400 Hz (33 percent design) to 1200 Hz (design), voltage-to-frequency ratios of 0.050 (50 percent design) to 0.100 (design), turbine-inlet temperatures of 800 K (1440 R, 70 percent design) to 1140 K (2060 deg R, design), and prestart pressure levels of 14.5 psia to 29.0 psia. These studies have shown the effect of selected system variables on motor starting. The final selection of motor-start variables can therefore be made on the basis of motor-start inverter complexity, battery size and weight, desired steady-state pressure level after startup, and other operational limitations. In general, the study showed the time required for motor starting to be inversely proportional to motor frequency, voltage, turbine-inlet temperature, and pressure level. An increase in any of these parameters decreases startup time.

Cantoni, D. A.

Arcjet starting reliability: A multistart test on hydrogen/nitrogen mixtures

An arcjet starting reliability test was performed to investigate one feasibility issue in the use of arcjets onboard a satellite for north-south stationkeeping. A 1 kW arcjet was run on hydrogen/nitrogen gas mixtures simulating decomposed hydrazine. A pulse width modulated power supply with an integral high voltage starting pulser was used for arc ignition and steady-state operation. The test was performed in four phases in order to determine if starting characteristics changed as a result of long term thruster operation. More than 300 successful starts were accumulated over an operating time of 18 hrs. Overall results indicate that there is a link between starting characteristics and long term thruster operation; however, the large number of starts had no effect on steady-state performance.

Haag, Thomas W.

Arcjet starting reliability - A multistart test on hydrogen/nitrogen mixtures

An arcjet starting reliability test was performed to investigate one feasibility issue in the use of arcjets on board a satellite for north-south stationkeeping. A 1 kW arcjet was run on hydrogen/nitrogen gas mixtures simulating decomposed hydrazine. A pulse width modulated power supply with an integral high voltage starting pulser was used for arc ignition and steady-state operation. The test was performed in four phases in order to determine if starting characteristics changed as a result of long term thruster operation. More than 300 successful starts were accumulated over an operating time of 18 hr. Overall results indicate that there is a link between starting characteristics and long term thruster operation; however, the large number of starts had no effect on steady-state performance.

Haag, Thomas W.

Magnification of starting torques of dc motors by maximum power point trackers in photovoltaic systems

Direct current (dc) motors are used in terrestrial photovoltaic (PV) systems such as in water-pumping systems for irrigation and water supply. Direct current motors may also be used for space applications. Simple and low weight systems including dc motors may be of special interest in space where the motors are directly coupled to the solar cell array (with no storage). The system will operate only during times when sufficient insolation is available. An important performance characteristic of electric motors is the starting to rated torque ratio. Different types of dc motors have different starting torque ratios. These ratios are dictated by the size of solar cell array, and the developed motor torque may not be sufficient to overcome the load starting torque. By including a maximum power point tracker (MPPT) in the PV system, the starting to rated torque ratio will increase, the amount of which depends on the motor type. The starting torque ratio is calculated for the permanent magnet, series and shunt excited dc motors when powered by solar cell arrays for two cases: with and without MPPT's. Defining a motor torque magnification by the ratio of the motor torque with an MPPT to the motor torque without an MPPT, a magnification of 3 was obtained for the permanent magnet motor and a magnification of 7 for both the series and shunt motors. The effect of the variation of solar insolation on the motor starting torque was covered. All motor types are less sensitive to insolation variation in systems including MPPT's as compared to systems with MPPT's. The analysis of this paper will assist the PV system designed to determine whether or not to include an MPPT in the system for a specific motor type.

Appelbaum, Joseph

Start-On-The-Part Transient Model for In-Situ Automated Tape Placement of Thermoplastic Composites

Fabrication of a complex part by automated tape placement (ATP) can require starting up a new tape-end in the part interior, termed start-on-the-part. Careful thermal management of the starting transient is needed to achieve uniform crystallinity and inter-laminar weld strength - which is the objective of this modeling effort. The transient is modeled by a Fourier-Laplace transform solution of the time-dependent thermal transport equation in two spatial dimensions. The solution is subject to a quasi-steady approximation for the speed and length of the consolidation head. Sample calculations are done for the Langley ATP robot applying PEEK/carbon fiber composite and for two upgrades in robot performance. The head starts out almost at rest which meets an engineering requirement for accurate placement of the new tape-end. The head then rapidly accelerates until it reaches its steady state speed. This rapid acceleration, however, violates the quasi-steady approximation, so uniform weld strength and crystallinity during the starting transient are not actually achieved. The solution does give the elapsed time and distance from start-up to validity of the quasi-steady approximation - which quantifies the length of the non-uniform region. The elapsed time was always less than 0.1 s and the elapsed distance less than 1 cm. This quantification would allow the non-uniform region to be either trimmed away or compensated for in the design of a part. Such compensation would require experiments to measure the degree of non-uniformity, because the solution does not provide this information. The rapid acceleration suggests that the consolidation roller or belt be actively synchronized to avoid abrading the tape.

Costen, Robert c.

Effects of Gravity on Start-up of a Miniature Loop Heat Pipe with Multiple Evaporators and Multiple Condensers

This paper describes an experimental study on the effect of gravity on the start-up of a miniature loop heat pipe (MLHP) with two evaporators and two condensers. Each evaporator has an outer diameter of 9 mm and has its own integral compensation chamber (CC). The MLHP was placed under five configurations where the relative elevation and tilt among the loop components were varied. The four well-known initial conditions between the evaporator and CC prior to the LHP start-up were created in this experimental study through combinations of: 1) the test configuration; 2) the method of preconditioning the loop prior to start-up, and 3) the heat load distribution among the evaporators. A total of 165 start-ups were conducted under the five test configurations. All of these start-ups were successful. However, the effect of gravity on start-up transients was clearly seen under otherwise the same heat load distribution and sink temperatures. An analytical model was used to simulate the MLHP transient behaviors, and the model predictions agreed very well with the experimental results.

Ku, Jentung

Evaluation of Start Transient Oscillations with the J-2X Engine Gas Generator Assembly

During development of the gas generator for the liquid oxygen/liquid hydrogen propellant J-2X rocket engine, distinctive and oftentimes high-amplitude pressure oscillations and hardware vibrations occurred during the start transient of nearly every workhorse gas generator assembly test, as well as during many tests of engine system hardware. These oscillations appeared whether the steady-state conditions exhibited stable behavior or not. They occurred similarly with three different injector types, and with every combustion chamber configuration tested, including chamber lengths ranging over a 5:1 range, several different nozzle types, and with or without a side branch line simulating a turbine spin start gas supply line. Generally, two sets of oscillations occurred, one earlier in the start transient and at higher frequencies, and the other almost immediately following and at lower frequencies. Multiple dynamic pressure measurements in the workhorse combustion chambers indicated that the oscillations were associated with longitudinal acoustic modes of the combustion chambers, with the earlier and higher frequency oscillation usually related to the second longitudinal acoustic mode and the later and lower frequency oscillation usually related to the first longitudinal acoustic mode. Given that several early development gas generator assemblies exhibited unstable behavior at frequencies near the first longitudinal acoustic modes of longer combustion chambers, the start transient oscillations are presumed to provide additional insight into the nature of the combustion instability mechanisms. Aspects of the steadystate oscillations and combustion instabilities from development and engine system test programs have been reported extensively in the three previous JANNAF Liquid Propulsion Subcommittee meetings (see references below). This paper describes the hardware configurations, start transient sequence operations, and transient and dynamic test data during the start transient. The implications of these results on previous analyses and understanding of the combustion instability observed during steady-state conditions, especially the effects of injector influences, is discussed.

Hulka, J. R.

Black-Starting Microgrids Using Inverter-Based Distributed Energy Resources

Recent trends in power systems show increasing deployment of inverter-based distributed energy resources (DERs) at the distribution level. Efforts have also been made to use inverter-based DERs for system restoration of critical sections of distribution feeders. In the past few years, there has been active consideration of using local grid-forming (GFM) DERs, which can form their own voltage and frequency, to black-start microgrids instead of waiting for the bulk system for supply restoration. However, using current-limited inverter-based DERs for black-start operations with high inrush currents can pose some technical challenges. This paper presents detailed electromagnetic transient studies on a digital real-time simulator to assess the operational feasibility of using local inverter-based GFM DERs for microgrid black-start operations as a bottom-up approach instead of a top-down approach where the substation is used to restore critical sections of the feeder. The paper presents key modeling details for distribution system components for studying GFM DER-based microgrid black-start operations. The paper presents simulation results comparing different black-start approaches using GFM DERs for two test systems: i) a simple test microgrid and ii) a real-world utility microgrid currently being designed and deployed by Holy Cross Energy in Colorado.

black start

Implementation and validation of optimal start control strategy for air conditioners and heat pumps

Commercial buildings are responsible for approximately 20 % of the total energy consumption and greenhouse gas emissions in the United States. Over 85 % of these buildings lack building automation systems, and many are small (<50,000 square feet), underserved, and use rooftop units (RTUs) for heating, ventilation, and air-conditioning needs. Because these buildings lack proper energy management systems, several operational deficiencies lead to excess energy consumption. Studies have shown that managing the RTUs’ heating and cooling set points, schedules, setbacks, and optimal start can result in a 20 % to 25 % reduction in electricity consumption in small commercial buildings. These buildings typically use fixed schedules to start the RTUs 60 to 120 min before occupancy begins, which results in excess energy consumption. This paper presents research that demonstrates and evaluates the performance of four optimal start methods, which utilize data-based modeling as a key element in facilitating adaptive control in response to time-varying inputs while requiring minimal sensor inputs. The evaluation found energy savings in two commercial buildings equipped with RTUs by periodically alternating four different optimal start models during the cooling and heating season. The resulting energy savings are positive for all models and range from 2 to 5 kWh/day/unit. The units on the east side of the building showed higher savings, while interior units showed greater variability in savings due to the differences in capacities and room sizes. Savings were considerably greater during the heating season compared to the cooling season. The performance of all four models on Mondays was poor; models suggested a shorter optimal start time, which resulted in relatively larger errors. Finally, the future work will look at using a different model for the days after weekends and holidays.

42 ENGINEERING