Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SHAFT EXCAVATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

26 records · Page 2

Engineering for Operation of a Future Belgian Deep Geological Repository for ILW and HLW - 12379

In Belgium, an advanced conceptual design is being elaborated for deep geologic disposal of high level waste (HLW) and for low and intermediate level waste (LILW) not amenable for surface disposal. The concept is based on a shielded steel and concrete container for disposal of HLW, i.e., the Super-container. LILW will be disposed of in separately designed concrete caissons. The reference host rock is the Boom Clay, a poorly indurated clay formation in northeastern Belgium. Investigations into the potential host rock are conducted at the HADES underground research laboratory in Mol, Belgium. In 2009 the Belgian Agency for Management of Radioactive Waste and Enriched Fissile Materials (ONDRAF/NIRAS) initiated a four year research project aimed at confirming the fundamental feasibility of building and operating a repository. The goal of the program is to demonstrate at a detailed conceptual level that the proposed geologic disposal system can be safely constructed, operated, and progressively closed. Part of the broader research efforts being conducted includes evaluations optimization of the waste transportation shaft, subsurface transportation system, ventilation system, and evaluation of backfilling and sealing concepts for the repository design. The potential for implementation of a waste retrieval strategy encompassing the first 100 years after emplacement is also considered. In the framework of a four year research program aimed at confirming the fundamental feasibility of building and operating a repository in poorly indurated clay design studies have been underway to optimize the waste transportation shaft, subsurface transportation system, and ventilation system. Additionally backfilling and sealing concepts proposed for the potential repository have been reviewed in conjunction with impacts related to the potential future inclusion of a retrievability requirement in governing regulations. The main engineering challenges in the Belgian repository concept are size limitations on the underground facilities imposed by the mechanical behavior of the candidate host rock type (i.e., poorly indurated clay) and the resulting ground support requirements. Underground excavations in the Boom Clay require a significant level of ground support to ensure the openings remain stable. A concrete lining system has been developed to address this engineering requirement. As a result strict size limits are imposed on both the diameter of the tunnels and the dimensions of the shaft stations resulting in unique design challenges requiring maximal optimization of the available space. Ongoing studies indicate that a significant (20%) reduction in shaft diameter can be achieved by diagonally orienting the hoist guide rails with respect to the cage, optimizing the counter weight dimensions, and reconfiguring the auxiliary hoisting system as a single rope system. Reliable subsurface transportation of waste packages can be achieved through a hybrid rail/wheel system powered by a battery operated electric locomotive. Key components of the system, including the battery-powered locomotive and a turntable used for transitioning waste shipments from the access gallery into disposal galleries without the need for constructing turnouts, have been successfully demonstrated at the Gorleben exploratory facility and the Konrad repository in Germany, respectively. By optimizing the available space in the disposal galleries and limiting the introduction of hazardous gases by using electric powered systems combined with the relatively small number of workers envisioned in the Belgian repository concept adequate ventilation can be achieved to ensure safe operational conditions. The proposed sealing and backfill systems in the Belgian repository concept should provide adequate safeguards as currently planned. Should a future retrievability requirement be imposed on the design it appears likely that a partial backfilling strategy could be employed. The key component in ensuring retrievability in the design would be the selection of a backfill that combines the safety functions required in the current design concept with a material strength amenable to removal by hydro-jet excavation techniques. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geotechnical Analysis Report for July 2006-June 2007

This Geotechnical Analysis Report (GAR) presents and interprets geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2006, to June 30, 2007. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and borehole observations. Chapter 8 summarizes the results of geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists references.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geotechnical Analysis Report for July 2008-June 2009

This Geotechnical Analysis Report (GAR) presents and interprets geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2008, to June 30, 2009. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and hole observations. Chapter 8 summarizes the results of geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists references.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geotechnical Analysis Report for July 2007-June 2008

This Geotechnical Analysis Report (GAR) presents and interprets geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2007, to June 30, 2008. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and hole observations. Chapter 8 summarizes the results of geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists references.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extraction of Volatiles from Regolith or Soil on Mars, the Moon, and Asteroids

NASA's Advanced Exploration Systems ISRU Technology Project is evaluating concepts to extract water from all resource types Near-term objectives: Produce high-fidelity mass, power, and volume estimates for mining and processing systems Identify critical challenges for development focus Begin demonstration of component and subsystem technologies in relevant environment Several processor types: Closed processors either partially or completely sealed during processing Open air processors operates at Mars ambient conditions In-situ processors Extract product directly without excavation of raw resource Design features Elimination of sweep gas reduces dust particles in water condensate Pressure maintained by height of soil in hopper Model developed to evaluate key design parameters Geometry: conveyor diameter, screw diameter, shaft diameter, flight spacing and pitch Operational: screw speed vs. screw length (residence time) Thermal: Heat flux, heat transfer to soil Testing to demonstrate feasibility and performance Agglomeration, clogging Pressure rise forced flow to condenser.

Extration↗

EGS Collab Experiment 2: Continuous Broadband Seismic Waveform Data

Two broadband seismometers were installed on the 4100 level and recorded for the duration of EGS Collab Experiment #2. Inspired by published data from similar instruments installed in the Aspo Hard Rock Lab, these long-period instruments aimed to measure the tilting of the drift in response to the injection of fluid into the testbed. One instrument was installed underneath the wellheads in Site A (aka the "battery" alcove) and the other was installed along the east wall of the drift, south of Site B. Due to the feet of gravel (ballast) laid along the floor of the drift, we were unable to anchor the sensors directly to the rock. As a result, the coupling of the sensors to the experiment rock volume is likely poor. In addition, there are a number of noise sources that complicate the interpretation of the data. For example, sensor BBB is installed adjacent (within 3 ft) to the rail line that runs towards the Ross shaft. Trains (motors) run along this line almost daily and produce a large signal in these data. Careful extraction of periods of interest, as well as filtering for specific signals, is necessary. The sensors are Nanometrics Trillium Compact Posthole seismometers, sensitive down to 120 seconds period. They were installed as close to the drift wall and as deep as we could manually excavate (only about 1 ft or so). The holes were leveled with sand and the sensors were placed on a paver before backfilling with sand. The hole was then covered by a bucket filled with insulation to improve the sensor's isolation from daily temperature variations, which are minor but present due to drift ventilation from the surface. Data were recorded on Nanometrics Centaur digitizers at 100 Hz. The full response information is available in the StationXML file provided here, or by querying the sensors through the IRIS DMC (see links below). These instruments were provided free of charge through the IRIS PASSCAL instrument center. The network code is XP and the station codes are BBA and BBB. The waveform data can be queried through the IRIS FDSN server using any method the user likes. One convenient option is to use the Obspy python package: https://docs.obspy.org/packages/obspy.clients.fdsn.html

15 GEOTHERMAL ENERGY↗

Linear and Nonlinear Solvers for Simulating Multiphase Flow within Large-Scale Engineered Subsurface Systems

Simulation of multiphase flow in the subsurface is well-known to be computationally challenging. While there have been many studies that have explored approaches to overcoming these challenges, they often utilize relatively simple case studies. In this paper, we focus on the unique numerical challenges posed by modeling large-scale engineered subsurface systems, characterized by discrete features embedded in a heterogeneous natural subsurface setting. The man-made features such as shafts, tunnels, and barriers often cause multiple challenges in modeling the domain for multiphase porous media flow. This flow scenario can have a wide range of applications such as nuclear waste repositories, enhanced recovery of a petroleum reservoir, geothermal engineering, and carbon sequestration. An example of these severe numerical challenges is the case of performance assessment (PA) for Waste Isolation Pilot Plant (WIPP), the only operating deep geological repository in the US, which simulates extreme material properties of bedded salt rock formation and extreme contrast due to open excavation next to the formation. The models have extremes not only of permeability and porosity but also of the constitutive models needed for multiphase flow; additionally, they have process models like salt creep closure reducing porosity over time, fracturing in clay and anhydrite interbeds of the bedded salt, gas generation from the waste materials, and unintentional human borehole intrusions in some scenarios. Numerical simulations require the solution of coupled systems of nonlinear PDEs; in our work, we use the open-source simulator PFLOTRAN which is based on Finite Volume discretization. The solution of the nonlinear equations requires use of the Newton-Raphson iteration at each time step, which entails the solution of the linearized Jacobian system at each iteration. The effects of all the processes (i.e., large number of unknowns, highly nonlinear constitutive relations, large contrasts in material properties in short distances) lead to an ill-conditioned Jacobian matrix that severely challenges traditional linear solver, i.e., stabilized biconjugate gradient with block Jacobi incomplete LU preconditioner (BCGS-ILU) leading to non-convergence for traditional Newton-Raphson nonlinear solver causing unacceptably long computation time for each model. This paper presents linear solvers such as constrained pressure residual (CPR) two-stage preconditioner with alternate-block-factorization (ABF) and quasi- implicit pressure and explicit saturation (QIMPES) decouplers and flexible generalized residual solver (FGMRES). The new general-purpose nonlinear solver, Newton trust-region dogleg Cauchy (NTRDC), is also introduced to resolve extreme nonlinearities in the models. We demonstrate the effectiveness of each method relative to the default BCGS-Newton solver. The two best cases had nearly 50 times speed-up and achieved completion of a simulation in 14 hours that never completed due to non-convergence with the default solver. We also investigate the strong scalability of each method and discuss some of the deficiencies found for Block Jacobi preconditioner using parallel domain decomposition, and node packing effects of modern processor architecture.

Preconditioner, Nonlinear, Porous media, Multiphas↗

Canada's Underground Research Laboratory (1980-2014) - 16274

In 1980, Canada initiated a long-term, comprehensive research and development program of geologic characterization and large-scale in situ geotechnical experiments in a subsurface facility, the Underground Research Laboratory (URL). The URL was excavated specifically to evaluate the concept of permanent disposal of used CANDU{sup R} nuclear reactor fuel in a deep geological repository (DGR) constructed in Canadian Shield granite. Key phases of the URL included siting, detailed site characterization and monitoring, construction, operation, decommissioning, and closure. Much collaborative research with international organizations was undertaken at the URL and continues, even after the closure of the facility, through the ongoing Enhanced Sealing Project (ESP). The ESP monitors the engineered performance of a full-scale composite shaft seal that was emplaced during URL closure to permanently seal the main URL access shaft across a sub-horizontal hydraulically active fracture zone. Currently the ESP is jointly funded by Canadian Nuclear Laboratories (CNL) (Canada), Posiva (Finland), and Andra (France), and monitoring is planned to continue until the end of 2016. Decades of programmatic experience at the URL have shown that knowledge continuity is integral to supporting the development of a safe geological disposal facility for high level nuclear waste. This paper outlines the history of the URL and describes some technical lessons learned from its 30-plus years of construction, operation, and closure activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗