Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SHAFT EXCAVATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Effective Access Monitoring at Geological Repositories

Access points at a deep, mined geological repository (GR) for the disposal of spent nuclear fuel (SNF) and other nuclear wastes present potential diversion paths for nuclear material. Because C/S measures are not likely to be used underground, access to a GR will require unprecedented reliance on C/S measures to maintain continuity of knowledge (CoK) on SNF buried underground. We develop a model GR based on common features of GR designs from national programs in order to develop and optimize C/S measures for GR access points that maximize confidence that CoK is maintained on SNF underground. Critical access points identified in this study are surface entrances to (1) the GR ramp (2) the excavation shaft, (3) the main elevator shaft, and (4) the ventilation shaft. The first three are considered critical detection points (DPs), whereas the fourth is considered a non-critical DP. The reason for the distinction is due to the different design capabilities of shaft components: the first three (ramp, excavation shaft, main elevator) are all capable of being used to move material from the underground to the surface, whereas the ventilation shaft is not. Such capabilities are verified during periodic design information verification (DIV) inspections.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The subsurface character of Meteor Crater, Arizona, as determined by ground-probing radar

The first results are presented from a ground-probing-radar survey of the subsurface structure of the Meteor Crater (Arizona) and the surrounding ejecta blanket. Five ground-probing radar transects were conducted, including three complete north-south transects of the interior floor of the crater and a partial east-west transect, connecting the three north-south surveys; the fifth transect was exterior to the crater. A number of subsurface dielectric reflectors were identified in both the interior and exterior transects of the Meteor Crater. The depths of most of these reflectors in the interior transects corresponds to lithological boundaries known from previous data from drilling and shaft excavations. However, some of the reflectors, e.g., the horizontal reflectors within the allochthonous breccia lens, were not known from previous work.

Pilon, J. A.↗

IAEA ACTI Presentation

Demonstrate Technologies to Significantly Reduce the Cost and Schedule for Construction of Advanced Reactors. Make these technologies available to reactor developers by the 2030s, to improve the economics of deploying Advanced Reactors. Selected technologies will not require major R& D efforts. Technologies are ready for demonstration for use in the nuclear environment. Cost-shared public-private partnership 70% DOE-NE / 30% GEH & TVA Phase 1: Duration 14 months; Vertical Shaft Excavation Steel Bricks™ - Modular Walling Systems Holdings Limited Advanced Monitoring and Digital Twins Learn By Doing!

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Blind shaft development

The article discusses how Shaft Drillers International (SDI) is breaking new ground in shaft development and ground stabilization. Techniques of blind shaft drilling and raise bore shaft development developed by SDI are briefly explained. An associated company, Coastal Drilling East, deals with all types of ground improvement such as pre-grouting work for shafts, grouting of poor soil and water leaks into the mine. 3 photos.

01 COAL, LIGNITE, AND PEAT↗

Lessons Learned from the Development of the DGR Konrad - 19619

The Federal Republic Germany builds the deep geological repository Konrad. The repository is suitable for low- and intermediate-level radioactive waste (LAW and MAW) and it is the first German repository site, which is not located in a salt geological formation. Konrad is a former iron ore mine in Salzgitter (in southeast Lower Saxony) with an active production time between 1961 and 1976. In 2007, the BGE started with the conversion of the mine infrastructure above and underground to build the repository while using the shafts and some roadways of the former mine. The experiences gained from ten years project progress with its complexities and difficulties can be used for similar repository projects in the future. The Konrad repository is designed for 303,000 m{sup 3} of LAW and MAW, which will be emplaced in chambers. The emplacement chambers are located outside of the existing mine, so an impairment by the old mine workings can be excluded. So far, the first area with emplacement chambers has been excavated. In order to be able to start repository operations in 2027, a wide range of work in building construction, civil engineering, shaft sinking and infrastructure development above and below ground has been necessary and will be completed in the next years. The main activities are focused on the Konrad 1 and 2 sites and the part of the infrastructure located in the future control area, which is used for repository operations. There are still many challenges to overcome in the Konrad repository project, although many processes have been put on the right track in recent years. Looking back on past activities and in the cautious preview, this paper gives some indications from which lessons can be drawn and should be applied to similar projects in the future. - Prefer small dimensions for the infrastructure, such as insets and roadway cross-section, and the appropriate machinery and handling equipment; - Detailed process planning for construction in existing infrastructure in the run-up to implementation; - Intensive communication with contracted partners on the preparation of planning documents for nuclear examination procedures and ensuring an excellent contract management; - Early start of the implementation planning for projects under nuclear law, taking into account the relevant boundary conditions; - Ensuring the support of the project by the local community and other stakeholders. Overall, the use of parts of the existing above and underground infrastructure for the construction of a new repository is more difficult than for a complete new construction. But using the shafts of an existing mine delivers the advantage of very good knowledge about the underground environment. In addition, the areas necessary for the construction and operation of the buildings and facilities are already available and secured and do not compete with other projects.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Clean Energy Technology Applications on US Mine Land: Technical Analysis

As the United States transitions toward a clean energy economy, an opportunity exists for redeveloping the more than 17,000 mine land sites located across the nation with clean energy technologies, which have a combined potential for generating more than 85 GW of clean electricity. This report provides an overview of the potential of demonstrating and deploying clean energy projects on current and former mine land. Clean energy project refers to a project that demonstrates one or more of the following technologies: solar; microgrids; geothermal; direct air capture; fossil-fueled electricity generation with carbon capture, utilization, and sequestration; energy storage, including pumped storage hydropower and compressed air energy storage; and advanced nuclear technologies. The report discusses the following technologies and their potential for creating jobs and generating tax revenue that would result in direct and indirect benefits to the local economy: Solar photovoltaics (PV) is being developed on current and former mine land in various parts of the world, including the United States. This approach is attractive because it requires limited infrastructure investment and would utilize the bare surfaces of mines and tailing ponds. Solar resource availability may be greater in the southern regions, including the Interior and Appalachian Basins and the southwestern United States. However, since some mine land sites include areas of significant change in elevation, the deployment of PV on mine land may require sophisticated planning to account for shading and irradiance, or may require regrading of the areas. PV does not create significant environmental risks and generally does not face public resistance; Geothermal systems are often spatially and genetically associated with ore deposits, and in some cases, they have been discovered while in search for epithermal mineral resources. Numerous diverse geothermal applications have been employed at mine land around the world, including power generation, mineral extraction from geothermal brines, process heating, direct use for other mining operations, and direct use for non-mining operations and subsurface energy storage, including geothermal heat pumps. Case studies highlighting these applications provide key lessons relating to identifying drivers and barriers to geothermal resource deployment and can be used to create screening tools for identifying the types and locations of mine land most amenable to utilizing geothermal resources; Carbon capture, utilization, and sequestration technologies include direct air capture (DAC) and enhanced weathering. DAC technologies include air contactors, regeneration systems, and CO 2 compression systems. Captured CO 2 can be converted to valuable feedstocks or possibly injected into abandoned subsurface mines where it would be absorbed by alkaline rock waste and mine tailings or by the porous minerals along the walls of the mine. DAC systems can be coupled with energy sources such as wind, solar, grid, or geothermal. Many DAC systems require a source of water or steam; however, some are expected to be net producers of water. Local impacts of DAC systems are expected to be low, and are related to land footprint, material disposal, and upstream impacts of energy and material production; Compressed air energy storage is an established energy storage technology in salt caverns. It has the potential for implementation in underground mines by pressurizing and storing a large amount of air using electrical compressors when excess electricity is available. When a need for discharge emerges, the air is used to spin turbines and produce the necessary volume of electricity. Abandoned or unused mine openings, including shafts, adits, access tunnels, and mined workings of any orientation, offer potential for vast amounts of compressed air energy storage if the site characteristics meet operational requirements; Pumped hydropower storage can be implemented in surface and subsurface mines. In surface mine applications, both reservoirs may be located in a mine pit or artificial reservoirs made of excavated materials. In subsurface mines, the lower reservoir may be implemented by waterproofing and flooding mine shafts and tunnels. The water is then pumped from the lower reservoir to the upper reservoir during periods of low load and high production, and it is discharged through the turbines during periods of peak demand. The potential environmental damages associated with acidity of mine water or the presence of toxic chemicals incentivizes the development of closed-loop technologies, in which water circulates inside the pumped hydropower facility without being discharged into the external water basins; Advanced nuclear energy technologies include small modular reactors, which can be deployed locally to produce electricity and heat. Such units require seismic stability and a supply of cooling water, but population constraints may exist in some areas. Therefore, remote mine land could represent an optimal location for siting advanced nuclear energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Underground Architecture and Layout for the Belgian High-Level and Long-Lived Intermediate-Level Radioactive Waste Disposal Facility- 12116

The underground architecture and layout of the proposed Belgian high-level (HLW) and long-lived, intermediate-level radioactive wastes (ILW-LL) disposal system (repository) is mainly based on lessons learned during the development and 30-year-long operation of an underground research laboratory (URL) ('HADES') located adjacent to the city of Mol at a depth of 225 m in a 100-m-thick, Tertiary clay formation; the Boom clay. The following main operational and safety challenges are addressed in the proposed architecture and layout: 1. Following excavation, the underground openings needed to be promptly supported to minimize the extent of the excavation damaged zone (EDZ). 2. The size and unsupported stand-up time at tunnel crossings/intersections also needed to be minimized to minimize the extent of the related EDZ. 3. Steel components had to be minimized to limit the related long-term (post-closure) corrosion and hydrogen production. 4. The shafts and all equipment had to go down through a 180-m-thick aquifer and handle up to 65-Ton payloads. 5. The shaft seals had to be placed in the underlying clay layer. The currently proposed layout minimizes the excavated volume based on strict long-term-safety criteria and optimizes operational safety. Operational safety is further enhanced by a remote-controlled waste-package-handling system transporting the waste packages from their respective surface location down to their respective disposal location with no intermediate operation. The related on-site preparation and thenceforth use of cement-based, waste package- transportation containers are integral operational-safety components. In addition to strengthening the waste packages and providing radiation protection, these containers also provide long-term corrosion protection of the internal 'primary' steel packages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 7)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 8)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations for High-Wattage Waste (Rev. 11)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations for High-Wattage Waste (Rev. 12)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concepts and Tests for the Remote-Controlled Dismantling of the Biological Shield and Form work of the KNK Reactor - 13425

The compact sodium-cooled nuclear reactor facility Karlsruhe (KNK), a prototype Fast Breeder, is currently in an advanced stage of dismantling. Complete dismantling is based on 10 partial licensing steps. In the frame of the 9. decommissioning permit, which is currently ongoing, the dismantling of the biological shield is foreseen. The biological shield consists of heavy reinforced concrete with built-in steel fitments, such as form-work of the reactor tank, pipe sleeves, ventilation channels, and measuring devices. Due to the activation of the inner part of the biological shield, dismantling has to be done remote-controlled. During a comprehensive basic design phase a practical dismantling strategy was developed. Necessary equipment and tools were defined. Preliminary tests revealed that hot wire plasma cutting is the most favorable cutting technology due to the geometrical boundary conditions, the varying distance between cutter and material, and the heavy concrete behind the steel form-work. The cutting devices will be operated remotely via a carrier system with an industrial manipulator. The carrier system has expandable claws to adjust to the varying diameter of the reactor shaft during dismantling progress. For design approval of this prototype development, interaction between manipulator and hot wire plasma cutting was tested in a real configuration. For the demolition of the concrete structure, an excavator with appropriate tools, such as a hydraulic hammer, was selected. Other mechanical cutting devices, such as a grinder or rope saw, were eliminated because of concrete containing steel spheres added to increase the shielding factor of the heavy concrete. Dismantling of the biological shield will be done in a ring-wise manner due to static reasons. During the demolition process, the excavator is positioned on its tripod in three concrete recesses made prior to the dismantling of the separate concrete rings. The excavator and the manipulator carrier system will be operated alternately. Main boundary condition for all the newly designed equipment is the decommissioning housing of limited space within the reactor building containment. To allow for a continuous removal of the concrete rubble, an additional opening on the lowest level of the reactor shaft will be made. All equipment and the interaction of the tools have to be tested before use in the controlled area. Therefore a full-scale model of the biological shield will be provided in a mock-up. The tests will be performed in early 2014. The dismantling of the biological shield is scheduled for 2015. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Salt Repository Concept for CSNF in 21-PWR Size Canisters

The most straightforward concept for disposal of large, heavy packages containing commercial spent nuclear fuel (CSNF) in a repository in bedded salt, would be to emplace them directly on the floor in emplacement tunnels. In-tunnel axially aligned horizontal emplacement would minimize excavated volume and avoid drilling of large-diameter emplacement boreholes. A similar concept was proposed in Germany for direct disposal of POLLUX ® canisters. The repository would be constructed at a depth of 500 to 1,000 m for isolation from the surface, and for sufficient overburden stress to ensure creep reconsolidation of repository openings. It could entail modular panels of emplacement tunnels arranged on headings oriented in cardinal directions from a central core, to accommodate the estimated 140,000 MTU total U.S. CSNF inventory. To do so, the overall area of the repository layout would be approximately 20 km 2 . Many layouts are possible, but the approach should be modular, excavation should be deferred for as long as possible to avoid maintenance, and the emplacement areas should share support facilities and shafts. Vertical shafts would be used in accordance with mining practice in sedimentary basins. Large diameter shafts would be needed for ventilation exhaust and waste transport, with smaller shafts for waste salt removal, men & materials, and ventilation intake. The spacing between disposal tunnels as estimated from thermal modeling, seeks to limit the maximum average areal thermal load in the panels to 11 W/m 2 to control long-term heat buildup in the host rock. Peak salt temperature would occur within a few years and would be dominated by each waste package locally, simplifying thermal management. There would be some flexibility to decrease the package spacing or increase the emplacement thermal power limit Backfilling emplaced waste packages immediately with mine-run crushed salt would provide shielding and expedite reconsolidation. This arrangement would isolate adjacent waste packages from one another by the intervening backfill, especially after it reconsolidates and its properties approach those of intact salt. After the repository is fully loaded and the performance confirmation program is complete, activities to permanently close the repository would be initiated. During closure operations all openings in the host salt would be backfilled, then shafts would be sealed, and boreholes plugged. Plans for the Waste Isolation Pilot Plant (WIPP) show how sealing and plugging could be done. A monitoring program could continue for 50 years or longer after repository closure. With an emplacement thermal power limit of 10 kW per waste package, nearly all the CSNF that is projected to be produced by the current fleet of reactors in the U.S. could be emplaced over a period of approximately 50 years starting in calendar 2048. No barriers to implementation in a reasonable timeframe have been identified from this generic analysis. Engineering challenges include: 1) shaft construction; 2) a very-large capacity shaft hoist; 3) overpack design; 4) a transport-emplacement-vehicle (TEV) for transporting waste packages once they are underground and emplacing them remotely; and 5) remotely operated equipment for emplacing backfill. The method of shaft construction would depend on site-specific conditions, and could involve freezing the subsurface. A shaft hoist with payload capacity of 175 MT seems technically and economically feasible based on development work in Germany, and it would be the largest hoist of its kind. The function of disposal overpacks would be to provide reliable containment during repository operations, which could be accomplished using a corrosion allowance material such as a low-carbon steel. Development effort would be needed to determine overpack thickness (e.g., 7 to 20 cm) that can resist corrosion and loading from salt creep, to rovide containment throughout the repository operational period. The transport-emplacement vehicle (TEV) would be similar to previous concepts, particularly one option proposed for a Yucca Mountain repository. It would move over a rough salt floor on independently driven and steered wheels, and carry heavy shielding in addition to a waste package. By analogy to the safety case for the WIPP in New Mexico, human intrusion is likely to be the dominant mode of radionuclide release from the repository. Treatment of human intrusion for a CSNF repository in salt could depend on promulgation of site-specific changes in the regulations. Radionuclide release and migration would be quite limited for undisturbed conditions. There may be opportunities for improved understanding of salt performance with waste heating, based on future in situ testing in an underground salt research laboratory. This report also discusses a developing area of salt rock mechanics that involves low-stress, low strain-rate creep that might cause large, heavy waste packages to slowly sink. Site-specific sampling, testing, and modeling would be used to determine if the mechanism is important enough to merit consideration in design, or inclusion in performance assessment. Part of engineering design and postclosure safety assessment for a CSNF repository in salt would be to implement a methodology to show that the probability of a criticality event in the repository, when waste packages eventually breach and are flooded, is less than the probability screening threshold for performance assessment. In the methodology, a criticality analysis would be performed for waste packages in the repository, incorporating measures that could be introduced as needed to limit reactivity, for example using fuel selection and loading rules, and crediting the absorption of thermal neutrons by natural chlorine in the environment. A similar analysis has been underway for CSNF stored in dual-purpose canisters. Ideally the strategy would be developed prior to actually loading SNF assemblies into canisters used in waste packages for disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Flexible Mechanical Conveyors for Regolith Extraction and Transport

A report describes flexible mechanical conveying systems for transporting fine cohesive regolith under microgravity and vacuum conditions. They are totally enclosed, virtually dust-free, and can include enough flexibility in the conveying path to enable an expanded range of extraction and transport scenarios, including nonlinear drill-holes and excavation of enlarged subsurface openings without large entry holes. The design of the conveyors is a modification of conventional screw conveyors such that the central screw-shaft and the outer housing or conveyingtube have a degree of bending flexibility, allowing the conveyors to become nonlinear conveying systems that can convey around gentle bends. The central flexible shaft is similar to those used in common tools like a weed whacker, consisting of multiple layers of tightly wound wires around a central wire core. Utilization of compliant components (screw blade or outer wall) increases the robustness of the conveying, allowing an occasional oversized particle to pass hough the conveyor without causing a jam or stoppage

Walton, Otis R.↗

Overview of Observed and Measured Physical and Geophysical Effects of Historic Underground Nuclear Tests at the Nevada National Security Site

As detailed in a variety of sources (e.g., Allen et al. [1997]; Grasso [2001]), underground explosions can leave visible evidence of their occurrence in the geologic medium. The appearance and extent of the effects visible at the surface depend on a variety of factors, including scaled depth of burial (SDOB; actual depth of burial divided by the cube root of the yield of the explosion) and geologic medium characteristics. Surface effects were routinely documented for most of the underground nuclear explosions (UNEs) conducted at the former Nevada Test Site (now Nevada National Nuclear Site) and spatial data for them are available to the public (Grasso, 2001). Other effects, including collapse chimneys, glass-lined surfaces indicative of the initial explosion cavity, and shock damage to the medium, have also been characterized in various ways. These studies were done for a variety of purposes such as determining how closely UNEs could safely be positioned to conserve testing “real estate,” as input for containment design, to obtain survivability data for various types of equipment and instrumentation, and to understand device performance. Here we present examples of various mapped and measured explosion effects for the two main types of historical UNEs conducted at the NNSS, those in vertical shafts and those in horizontal tunnels. We do not include here cratering tests, which were shots conducted at shallow SDOBs for the purpose of creating a surface excavation.

explosion effects, Nevada National Security Site↗

Engineering for Operation of a Future Belgian Deep Geological Repository for ILW and HLW - 12379

In Belgium, an advanced conceptual design is being elaborated for deep geologic disposal of high level waste (HLW) and for low and intermediate level waste (LILW) not amenable for surface disposal. The concept is based on a shielded steel and concrete container for disposal of HLW, i.e., the Super-container. LILW will be disposed of in separately designed concrete caissons. The reference host rock is the Boom Clay, a poorly indurated clay formation in northeastern Belgium. Investigations into the potential host rock are conducted at the HADES underground research laboratory in Mol, Belgium. In 2009 the Belgian Agency for Management of Radioactive Waste and Enriched Fissile Materials (ONDRAF/NIRAS) initiated a four year research project aimed at confirming the fundamental feasibility of building and operating a repository. The goal of the program is to demonstrate at a detailed conceptual level that the proposed geologic disposal system can be safely constructed, operated, and progressively closed. Part of the broader research efforts being conducted includes evaluations optimization of the waste transportation shaft, subsurface transportation system, ventilation system, and evaluation of backfilling and sealing concepts for the repository design. The potential for implementation of a waste retrieval strategy encompassing the first 100 years after emplacement is also considered. In the framework of a four year research program aimed at confirming the fundamental feasibility of building and operating a repository in poorly indurated clay design studies have been underway to optimize the waste transportation shaft, subsurface transportation system, and ventilation system. Additionally backfilling and sealing concepts proposed for the potential repository have been reviewed in conjunction with impacts related to the potential future inclusion of a retrievability requirement in governing regulations. The main engineering challenges in the Belgian repository concept are size limitations on the underground facilities imposed by the mechanical behavior of the candidate host rock type (i.e., poorly indurated clay) and the resulting ground support requirements. Underground excavations in the Boom Clay require a significant level of ground support to ensure the openings remain stable. A concrete lining system has been developed to address this engineering requirement. As a result strict size limits are imposed on both the diameter of the tunnels and the dimensions of the shaft stations resulting in unique design challenges requiring maximal optimization of the available space. Ongoing studies indicate that a significant (20%) reduction in shaft diameter can be achieved by diagonally orienting the hoist guide rails with respect to the cage, optimizing the counter weight dimensions, and reconfiguring the auxiliary hoisting system as a single rope system. Reliable subsurface transportation of waste packages can be achieved through a hybrid rail/wheel system powered by a battery operated electric locomotive. Key components of the system, including the battery-powered locomotive and a turntable used for transitioning waste shipments from the access gallery into disposal galleries without the need for constructing turnouts, have been successfully demonstrated at the Gorleben exploratory facility and the Konrad repository in Germany, respectively. By optimizing the available space in the disposal galleries and limiting the introduction of hazardous gases by using electric powered systems combined with the relatively small number of workers envisioned in the Belgian repository concept adequate ventilation can be achieved to ensure safe operational conditions. The proposed sealing and backfill systems in the Belgian repository concept should provide adequate safeguards as currently planned. Should a future retrievability requirement be imposed on the design it appears likely that a partial backfilling strategy could be employed. The key component in ensuring retrievability in the design would be the selection of a backfill that combines the safety functions required in the current design concept with a material strength amenable to removal by hydro-jet excavation techniques. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geotechnical Analysis Report for July 2008-June 2009

This Geotechnical Analysis Report (GAR) presents and interprets geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2008, to June 30, 2009. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and hole observations. Chapter 8 summarizes the results of geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists references.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geotechnical Analysis Report for July 2007-June 2008

This Geotechnical Analysis Report (GAR) presents and interprets geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2007, to June 30, 2008. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and hole observations. Chapter 8 summarizes the results of geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists references.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗